Highbay drawings - Sheet - 104 - Hydraulic System Set-up.pdf

PDF 144 KB Posted

Attached to
Hydraulic System Upgrade
Solicitation number
W9132T20Q0034
Issued by

View the file

Other files

File Type Posted
Highbay drawings - Sheet - 103 - Lab Layout and HPU Location.pdf PDF
Questions and Answers (1-4).docx DOCX document
RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HPU POSSIBLE LOCATION 1

HOSES

SERVICE MANIFOLD

CURRENT

CONTROLLER

CURRENT

ACTUATORS

24" REINFORCED CONCRETE LOAD FLOOR16' TALL REACTION

WALL

2 3/4" ANCHOR HOLES

SPACED 3' - 0" O. C.

3' - 8"

HPU POSSIBLE LOCATION 2

2'

8"

Scale

Project number Date Drawn by Checked by http://www.erdc.usace.army.mil/Locations/CERL/

US ARMY CORPSE OF ENGINEERS

ENGINEER RESEARCH AND DEVELOPMENT CENTER

CONSTRUCTION ENGINEERING RESEARCH

LABORATORY

3/16" = 1'-0"

4/

/2

3:

:2

PM

Hydraulic System Set-up

Construction Engineering Research Laboratory Hydraulic System Upgrade

04/17/2020

CERL

CERL

No. Description Date

3/16" = 1'-0"1 Hydraulic System Set-up HYDRAULIC SYSTEM COMPONENTS NOT TO SCALE

Sheets
103 - Lab Layout & HPU Location
104 - Hydraulic System Set-up

File details come from the government source that posted it. Updated .