Highbay drawings - Sheet - 104 - Hydraulic System Set-up.pdf
PDF 144 KB Posted
- Attached to
- Hydraulic System Upgrade
- Solicitation number
- W9132T20Q0034
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Highbay drawings - Sheet - 103 - Lab Layout and HPU Location.pdf | ||
| Questions and Answers (1-4).docx | DOCX document | |
| RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HPU POSSIBLE LOCATION 1
HOSES
SERVICE MANIFOLD
CURRENT
CONTROLLER
CURRENT
ACTUATORS
24" REINFORCED CONCRETE LOAD FLOOR16' TALL REACTION
WALL
2 3/4" ANCHOR HOLES
SPACED 3' - 0" O. C.
3' - 8"
HPU POSSIBLE LOCATION 2
2'
8"
Scale
Project number Date Drawn by Checked by http://www.erdc.usace.army.mil/Locations/CERL/
US ARMY CORPSE OF ENGINEERS
ENGINEER RESEARCH AND DEVELOPMENT CENTER
CONSTRUCTION ENGINEERING RESEARCH
LABORATORY
3/16" = 1'-0"
4/
/2
3:
:2
PM
Hydraulic System Set-up
Construction Engineering Research Laboratory Hydraulic System Upgrade
04/17/2020
CERL
CERL
No. Description Date
3/16" = 1'-0"1 Hydraulic System Set-up HYDRAULIC SYSTEM COMPONENTS NOT TO SCALE
| Sheets |
| 103 - Lab Layout & HPU Location |
| 104 - Hydraulic System Set-up |