This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a tree removal project issued by W25D Endist New England Contracting Division of the U.S. Army Corps of Engineers. The amendment extends the solicitation closing date from November 4, 2025, to November 5, 2025, at 2:00 PM Eastern, and includes responses to six industry questions about the project. Key details include clarifications about tree removal quantities, measurement methods, equipment staging, dust control, water sources, site coordination, and insurance requirements. The project involves removing blue-marked trees in a designated work area, with the contractor responsible for determining appropriate equipment and work methods. The Technical Point of Contact will inspect tree removal to ensure compliance with the Performance Work Statement, and there are no other concurrent government contracts at the work site.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachments 26QA005.pdf | ||
| Solicitation W912WJ26QA005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation/Contract Form Continuation
The following changes have been made:
INFORMATION FROM TO
Response Due Date 04 Nov 2025 05 Nov 2025
Miscellaneous text in this section has been added to:
REQUEST FOR INFORMATION:
QUESTION 1: Quantity & measurement: Please confirm the Government's current measured volume (e.
g., ~216k CY with an upper bound of 250k CY) and the acceptance/measurement method (surveyed quantities, area depth, or daily ticketing). Who signs the daily quantities for COR acceptance?
RESPONSE 1: The Government is not providing a measured volume of trees to be removed. An estimated quantity of blue marked trees to be removed is provided in Part 4, Section 1.b. Site Information of the Performance Work Statement. The acceptance/measurement method is a visual inspection by the Government of whether all blue marked trees in the designated work area have been successfully removed in accordance with the Performance Work Statement. Responsibility of signing daily quantities for the Contractor can be determined by the Contractor. For the Government, the Technical Point of Contact will be responsible for inspecting the number of trees removed to determine compliance with the requirements in the Performance Work Statement.
QUESTION 2: Chip specification: Any screen or piece-size limits beyond "mechanical reduction"?
RESPONSE 2: Please refer to Part 3, Section 3.b. for information regarding wood chips.Wood Chipping
QUESTION 3: Staging & haul distances: Where can we stage the grinder and fuel? Expected push/haul distances inside the VSS; any need for ADTs versus dozer/CTL pushing?
RESPONSE 3: The Contractor is permitted to store their equipment on Chairfactory Road as long as it is off the roadway. As stated in the Performance Work Statement, "The Contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive materials or supplies for the Contractor and will not be responsible for damage to the Contractor's equipment or materials." The Contractor is responsible for determining push/haul distances inside the work area, and for determining how work should be performed, including what equipment is most appropriate to be used in the work area.
QUESTION 4: Water & dust control: Approved water source and any dust/noise restrictions?
RESPONSE 4: There are no noise restrictions for operation during the schedule timeframe outlined in the Performance Work Statement. For water and dust control, as stated in the Performance Work Statement environmental protection section, "Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the Contractor at the site, and the site will be inspected/ cleaned daily when working onsite.
Water, air, and land resources shall not be adversely impacted during the course of the work. The Contractor will take necessary steps to ensure all Federal, State, and local environmental regulatory requirements are met at no additional cost to the Government. Assurance of compliance with this section by subcontractors shall be the responsibility of the Contractor." Additionally, regarding an approved
W912WJ26QA0050001
water source, there is no access to potable water or restroom facilities at the contract site. The Contractor is responsible for providing this resource or have an acceptable alternative plan for this resource.
QUESTION 5: Site coordination: Any other USACE contractors working concurrently we need to coordinate with?
RESPONSE 5: There are no other Government contracts currently scheduled in the work site highlighted in the Performance Work Statement. A timber sale is scheduled south of the work site along Chairfactory Road but does not fall inside the work area for this contract.
QUESTION 6: What is the Insurance/bonding requirements for subs, and whether there are safety/QC templates you'd like us to use?
RESPONSE 6: The insurance and bonding requirements are those listed in the Performance Work Statement and both the Prime and subcontractor must meet all requirements of the Performance Work Statement. As stated in the Performance Work Statement, there is a mandatory ENG Form 6293 required for the Accident Prevention Plan. Other non-mandatory fillable templates are available for Contractor use and can be provided upon request if awarded the contract.
W912WJ26QA0050001
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0001 |
| EffDate: 04 NOV 2025 |
| ReqNo: |
| ProjNo: |
| IssCode: W912WJ |
| AdmCode: |
| IssuedBy: W2SD ENDIST NEW ENGLAND |
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD
CONCORD, MA 01742-2751
UNITED STATES
ALICIA LACROSSE, EMAIL: ALICIA.N.LACROSSE@USACE.ARMY.MIL TELEPHONE: 978-318-8902
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912WJ26QA005 |
| SolDate: 23 OCT 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: SEE CONTINUATION |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: Amendment is necessary to provide responses to questions from industry. |
The solicitation closing has been extended until November 5, 2025 at 2:00 PM Eastern.
All other terms and conditions remain unchanged.
| ContNameTitle: |
| CoNameTitle: JENNIFER SAMELA |
| ContDate: |
| CODate: 04 NOV 2025 |
File details come from the government source that posted it. Updated .