USACE Visitor Center - RI Analytical Lead and Asbestos Report.pdf

PDF 3 MB Posted

Attached to
HVAC System Replacement, Door Replacements, and Insulation, Cape Cod Canal, Sandwich, MA
Solicitation number
W912WJ23Q0096
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15 Lark Industrial Dr., Smithfield, RI 02828 41 Illinois Ave., Warwick, RI 02888 131 Coolidge St., Suite 105, Hudson, MA 01749 P: 401.737.8500 - www.rianalytical.com

April 26, 2023

Mr. Travis Germano O: 978.318.8550; C: 508.431.8878 CIV USARMY CENAE (USA) E: Travis.J.Germano@usace.army.mil US Army Corps of Engineers Cape Cod Canal Field Office 40 Academy Drive Buzzards Bay, MA 02532

RE: Report – Limited Pre-Renovation Inspection – Suspect Asbestos and Lead Site: Visitor Center, 60 Ed Moffit Drive, Sandwich, MA 02563

RI Analytical Laboratories, Inc. Project #2023045

Dear Mr. Germano:

RI Analytical Laboratories, Inc. (RI Analytical), Exposure Assessment, and Management (EAM) Division would like to thank you for the opportunity to provide US Army Corps of Engineers (the "Client") with environmental consulting services.

1 BACKGROUND

RI Analytical conducted a limited pre-renovation inspection for and sampling of visible, accessible materials suspected of containing asbestos (“Suspect Materials”) and inspection for and sampling of paints suspected of containing Lead at the above-referenced Site on March 30, 2023.

The purpose of this limited asbestos inspection was to identify, sample, and analyze Suspect Materials at the Site which would be impacted by renovation activities in areas designated by Client. The inspection and sampling was completed by a MADLS1-certified and EPA2-accredited Asbestos Inspector, Danny Mullen

(#AI900798).

1 MADLS = Commonwealth of Massachusetts Department of Labor Standards.

2 EPA = United State Environmental Protection Agency.

http://www.rianalytical.com/ about:blank

Report - Pre-Renovation Inspection – Suspect Asbestos and Lead RI Analytical #2023045 Site: Visitor Center, 60 Ed Moffit Dr., Sandwich, MA 02563 April 26, 2023 - Page 2

15 Lark Industrial Dr., Smithfield, RI 02828 41 Illinois Ave., Warwick, RI 02888 131 Coolidge St., Suite 105, Hudson, MA 01749

The purpose of this limited Lead in paint inspection was to identify whether representative paints on building components at the Site that may be impacted during renovation/demolition activities contain Lead.

The sampling was performed in accordance with generally-accepted industry standards for non-residential (i.e., not child-occupied) buildings.

Client indicated that very little paint will be disturbed and declined the sample collection of likely building renovation/demolition waste that includes painted materials and analysis for TCLP3 Lead for building demolition waste transportation and disposal characterization.

2 ASBESTOS INSPECTION

A property owner must ensure that a comprehensive asbestos inspection is performed prior to the possible disturbance of materials suspected of containing asbestos due to renovation or demolition activities. This is a requirement of the asbestos regulations of EPA NESHAP4, OSHA5, MassDEP6 and MADLS. RI Analytical did not conduct sub-slab or subsurface (underground) investigations to identify concealed suspect materials throughout the subject property.

2.1 Methodology

Suspect Materials identified were classified into Homogeneous Material (HM) groups7 to be sampled and analyzed for asbestos content by PLM8. In addition, NOB9 materials were analyzed using PLM with gravimetric preparation. Samples were analyzed by RI Analytical, a MADLS-certified Asbestos Analytical Laboratory (#AA000028).

2.2 Observations

The 1.5-story building was built in approx. 1937. There were additions (east room and theater) added in approx. 1990’s. The interior materials of the building include gypsum board walls with joint compound, suspended acoustical tile ceiling and carpet flooring. The exterior materials include wood shingle siding and asphalt shingle gable style roof.

Client indicated that the future project renovation scope of work will likely include:

1. Replace (3) HVAC10 Units

2. Install (2) Split Units (East Room/West Room Theater)

3. Replace (4) Exterior Doors

4. Replace (3) Garage Doors

3 TCLP = Toxicity Characteristic Leaching Procedure.

4 NESHAP = National Emission Standards for Hazardous Air Pollutants - 40CFR61, Subpart M.

5 OSHA = United States Department of Labor, Occupational Safety and Health Administration - 29 CFR 1926.1101 Asbestos Construction Industry Standard.

6 MassDEP = Commonwealth of Massachusetts Department of Environmental Protection - 310 CMR 7.00: Air Pollution Control; 7.15 Asbestos 7 Homogeneous Material groups = groups of materials similar in color, texture, and typically application 8 PLM = Polarized Light Microscopy, EPA/600/R-93/116 (1993) "Method for the Determination of Asbestos in Bulk Building Materials."

9 NOB = Non-Friable, Organically-Bound Materials 10 HVAC = Heating, Ventilation, and Air Conditioning

Site: Visitor Center, 60 Ed Moffit Dr., Sandwich, MA 02563 April 26, 2023 - Page 3

15 Lark Industrial Dr., Smithfield, RI 02828 41 Illinois Ave., Warwick, RI 02888 131 Coolidge St., Suite 105, Hudson, MA 01749

5. Remove (3) Roof Vents

6. Install Roof Insulation (East Room/West Room Theater)

The building was occupied at the time of inspection.

2.3 Results

The EPA, OSHA, and the MADLS, define a material that contains greater than one percent (> 1%) asbestos as an ACM11. MassDEP further defines ACM as materials containing greater than or equal to (≥) 1% asbestos.

MassDEP also defines a category of materials, ACWM12, as:

• ACM removed during renovation or demolition activities;

• Materials contaminated by an ACM during renovation or demolition activities; or

• ACM on and/or in facility components that are inoperable or have been taken out of service.

The MassDEP further defines waste material containing any amount of asbestos as an ACWM, which must be managed and disposed in accordance with the requirements for packaging [310 CMR 7.15 (15)], transport [310 CMR 7.15 (16)], storage and disposal [310 CMR 7.15 (17)], and waste shipment records and reports [310 CMR 7.15 (18)]. Materials that are identified as “Not Detected” are specified as not containing asbestos.

The Suspect Materials HM groups sampled with laboratory analytical results are summarized in Table 1 below. Materials determined to be ACM are highlighted in yellow. Materials determined to be ACWM are highlighted in green. The laboratory analytical report and chain-of-custody form are attached.

Table 1 - Work Order # 2304-05246 Suspect Materials - Laboratory Analytical Data Summary

Line # HM # Sample # Material Location Asbestos Result

1 1A Caulk (white) on metal and wood Theater – NW emergency exit door frame Not Detected 2 1B Caulk (white) on metal and wood Theater – NW emergency exit door frame Not Detected 3 2A Caulk (white) on metal and wood Renier room – NW emergency door exit frame Not Detected 4 2B Caulk (white) on metal and wood Renier room – NW emergency door exit frame Not Detected 5 3A Gypsum board (GB) (white) u/#4A on wood East room – wall east above door Not Detected 6 3B GB (white) u/#4B on wood East room – wall east above window Not Detected 7 4A Joint compound (JC) (white) on GB East room – wall east above door Not Detected 8 4B JC (white) on GB East room – wall east above window Not Detected 9 4C JC (white) on GB East room – wall north above window Not Detected

10 5A Mastic (red) on round metal exhaust duct Attic – west HVAC unit Not Detected 11 5B Mastic (red) on round metal exhaust duct Attic – west HVAC unit Not Detected 12 5C Mastic (red) on round metal exhaust duct Attic – west HVAC unit Not Detected 13 6A Tar paper (black) on wood Attic floor at west HVAC unit Not Detected 14 6B Tar paper (black) on wood Attic floor at west HVAC unit Not Detected 15 7A Asphalt shingle (red) East flat roof at edge Not Detected

11 ACM = Asbestos-Containing Materials 12 ACWM = Asbestos-Containing Waste Material

Site: Visitor Center, 60 Ed Moffit Dr., Sandwich, MA 02563 April 26, 2023 - Page 4

15 Lark Industrial Dr., Smithfield, RI 02828 41 Illinois Ave., Warwick, RI 02888 131 Coolidge St., Suite 105, Hudson, MA 01749

Table 1 - Work Order # 2304-05246 Suspect Materials - Laboratory Analytical Data Summary

Line # HM # Sample # Material Location Asbestos Result

16 7B Asphalt shingle (red) East flat roof at edge Not Detected 17 8A Asphalt shingle (black) u/#7A East flat roof at edge Not Detected 18 8B Asphalt shingle (black) u/#7B East flat roof at edge Not Detected 19 9A Tar paper (black) u/#8A on wood East flat roof at edge Not Detected 20 9B Tar paper (black) u/#8B on wood East flat roof at edge Not Detected

The following representative photographs depict Site conditions on the day of the inspection.

Garage doors and framing being replaced with new doors.

Total Lead in Paint Sample #2P = Black & Gray paint scrapings on wood interior trim board at North side of garage doors.

Exterior doors and framing being replaced.

Site: Visitor Center, 60 Ed Moffit Dr., Sandwich, MA 02563 April 26, 2023 - Page 5

15 Lark Industrial Dr., Smithfield, RI 02828 41 Illinois Ave., Warwick, RI 02888 131 Coolidge St., Suite 105, Hudson, MA 01749

Total Lead in Paint Sample #3P = White & Blue paint scrapings on wood of exterior trim board at East entrance door Mastic (red) on round metal exhaust duct of HVAC in Attic

Larger mini-split air conditioners being installed. Mini-split air conditioners being installed in theater.

Site: Visitor Center, 60 Ed Moffit Dr., Sandwich, MA 02563 April 26, 2023 - Page 6

15 Lark Industrial Dr., Smithfield, RI 02828 41 Illinois Ave., Warwick, RI 02888 131 Coolidge St., Suite 105, Hudson, MA 01749

3 LEAD IN PAINT SAMPLING

Painted building components at the Site that may be disturbed during renovation/demolition activities were sampled to determine Total Lead content. The sampling was performed in accordance with generally-accepted industry standards for non-residential (i.e., not child-occupied) buildings.

3.1 Methodology

Paint chip samples were collected from representative paints using the following procedures to check Lead content of painted materials:

a. Paint chips were carefully loosened and removed using disposable hand tools to prevent contamination.

b. A section of paint including all layers down to the substrate was removed and containerized.

c. Each sample was individually containerized, labeled, and identified with a unique sample number to designate the location of the sample.

d. The samples were submitted under chain of custody to RI Analytical Laboratories for analysis of Total

Lead by ICP13.

3.2 Results

The laboratory sample analytical results are summarized in Table 2 below. Surface coatings determined to contain Lead in paint above Detection Limit of the analytical method are highlighted in orange. The laboratory analytical report and chain-of-custody form are attached.

Table 2 – Work Order #2303-05141 Total Lead in Paint Analytical Summary

Sample # Description Location

Lead Content

Analytical Method

Detection Limit

1P Yellow paint scrapings on gypsum board

Office area east wall interior 0.0017 0.0016

2P Black & Gray paint scrapings on wood

Interior trim board at North side garage doors

3.3 0.030

3P White & Blue paint scrapings on wood

Exterior trim board at East entrance door

0.0048 0.0015

13 ICP = Inductively Coupled Plasma with Digestion, EPA Method SW-846-3050B/6010C

Site: Visitor Center, 60 Ed Moffit Dr., Sandwich, MA 02563 April 26, 2023 - Page 7

15 Lark Industrial Dr., Smithfield, RI 02828 41 Illinois Ave., Warwick, RI 02888 131 Coolidge St., Suite 105, Hudson, MA 01749

4 CONCLUSIONS AND RECOMMENDATIONS

4.1 Asbestos

None of the sampled suspect ACM that were identified in the areas designated by Client as likely to be impacted by the scope of work was found to contain asbestos (i.e., no ACM or ACWM were identified within the scope of work established by Client) utilizing the EPA, OSHA, MADLS and MassDEP protocols and criteria.

If Suspect Materials should be encountered during renovation/demolition activities that are not identified in this report as being non-ACM, they should be assumed to be ACM until sample collection and laboratory analysis indicate otherwise.

All work related to asbestos abatement (i.e. removal, repair, encapsulation, and enclosure) must be completed by a MADLS-licensed Asbestos Contractor in accordance with federal, state, and local rules and regulations, including those of OSHA, as required. Storage, transportation, and disposal of ACM must also comply with EPA, OSHA, and MassDEP regulations.

4.2 Lead Paint Sampling

All three (3) paint samples collected were found to contain Lead above the Detection Limit of the analytical method.

All paints should be treated as if they contain Lead and all work that may impact paints must be completed in accordance with the requirements of OSHA Lead in Construction Standard 29CFR1926.62.

There may be other painted components present in the building which contain Lead but were not included in the scope of work for sampling at the time of this inspection. Surface coatings not tested should be assumed to contain Lead and be treated accordingly, or until sample collection and laboratory analysis indicate otherwise.

The OSHA Lead in Construction Standard 29 CFR 1926.62 does not specify a level of Lead in surface coatings (including paints) below which it is safe to impact them without appropriate work practices, engineering controls, personal medical monitoring, and personal protective equipment and respiratory protection.

Work on any Lead-containing materials (i.e., such as drilling, grinding, sanding, scraping, burning, wheel cutting, torch-cutting and welding) must comply with the OSHA regulations. The contractor must prove, through air sampling analytical data, that removal of painted materials containing Lead will not expose employees to levels of Lead prohibited by the regulations. Compliance with this standard will also ensure that employees will not be exposed to inhalation of elevated airborne levels of Lead, as well as skin contact with and ingestion of Lead while this work is conducted.

Site: Visitor Center, 60 Ed Moffit Dr., Sandwich, MA 02563 April 26, 2023 - Page 8

15 Lark Industrial Dr., Smithfield, RI 02828 41 Illinois Ave., Warwick, RI 02888 131 Coolidge St., Suite 105, Hudson, MA 01749

Lead paint waste and debris must be packaged, transported and disposed of appropriately. All building materials coated with Lead-containing paint must be properly removed and containerized. Prior to disposal, a TCLP analysis must be conducted on each waste load to ensure that the leachable Lead is below five milligrams per liter (<5.0 mg/L) for proper transportation and disposal in accordance with 40CFR261.24. If the TCLP result of the waste load is below 5.0 mg/L, then the waste load may be considered general construction debris (assuming no other hazards exist). If the TCLP result is above 5.0 mg/L, the waste load must be treated as hazardous and packaged, transported disposed of accordingly.

Site: Visitor Center, 60 Ed Moffit Dr., Sandwich, MA 02563 April 26, 2023 - Page 9

15 Lark Industrial Dr., Smithfield, RI 02828 41 Illinois Ave., Warwick, RI 02888 131 Coolidge St., Suite 105, Hudson, MA 01749

5 LIMITATIONS

RI Analytical conducted a limited pre-renovation asbestos inspection in the Site building. Limited destructive investigations in representative locations were conducted to identify and sample building materials suspected of containing asbestos. However, some hidden Suspect Materials may only be discovered during renovation/demolition activities and discovered materials must be sampled for laboratory analysis for asbestos prior to being impacted in any way or assumed to be ACM and treated accordingly. In addition, RI Analytical conducted sampling and analysis of paints for Total Lead. Likely building demolition waste sampling and analysis for analysis of Leachable Lead was not conducted per Client. No sampling or inspection for other hazardous materials was included. No sub-slab or subsurface (underground) investigations to identify concealed hazardous materials throughout the subject property was included in the scope of work.

All observations documented in this report were made under the conditions existing at the time of this investigation. Should hidden conditions be found or changes from existing conditions occur in the future, warranting further inspection, sampling and laboratory analysis, they should be brought to the attention of RI Analytical.

This report was prepared at the request of Client. We further confirm that Client, its affiliates and subsidiaries, and their successors, assigns and grantees may rely on the report within the limitations and recommendations contained therein, as if it were prepared for the benefit of and addressed to them.

This report should not be represented, reproduced, or disseminated without the written approval of RI Analytical or Client. No warranties other than those expressed in the contract for this project are expressed or implied.

Please do not hesitate to contact our EAM Division at 401-737-8500 if you have any questions concerning this report or if we may be of further assistance.

Sincerely, RI Analytical Laboratories, Inc.

Exposure Assessment and Management Division

Danny Mullen Kenneth Davis Environmental Science Consultant Senior Environmental Scientist EAM Division Manager, EAM Division

MADLS# AI900798 MADLS #AI060869

Doc: rpt_visitorctr-60edmoffitdr.,sandwich,ma02563-usacoe-2023045-drm-jj

Attachments: Laboratory Analytical Reports and Chain-of-Custody Forms

Site: Visitor Center, 60 Ed Moffit Dr., Sandwich, MA 02563 April 26, 2023

15 Lark Industrial Dr., Smithfield, RI 02828 41 Illinois Ave., Warwick, RI 02888 131 Coolidge St., Suite 105, Hudson, MA 01749

Laboratory Analytical Reports and Chain-of-Custody Forms

LABORATORY REPORT

Date Received:

Date Reported:

Work Order #:

Approved by:

R.I. Analytical Laboratories

E.A.M. Division 15 Lark Industrial Parkway Smithfield, RI 02828

3/30/2023 4/4/2023 2304-05246

Attn:

Enclosed please find your sample(s) analysis results for asbestos content. The six asbestos types include amosite, chrysotile, crocidolite, anthophyllite, tremolite, and actinolite.

Analysis by Polarized Light Microscopy (PLM) was performed in accordance with EPA 40 CFR Appendix E to Subpart E of Part

763 and/or EPA 600/R-93/116.

R.I. Analytical Laboratories, Inc. maintains bulk asbestos fiber NVLAP accreditation under Lab Code 101440-0. This report does not serve as a product certification, approval, and/or endorsement by NVLAP, NIST, or any federal agency.

The sample(s) submitted for analysis were accepted by R.I. Analytical unless otherwise noted in the report. If a sample is found to be inhomogeneous, individual components will be analyzed separately. If individual components cannot be separated, the sample will be homogenized and a single result will be provided. These results only pertain to the samples submitted for this Work Order # and this report shall not be reproduced except in its entirety.

In accordance with EPA guidelines, vermiculite materials should be assumed to contain asbestos even if PLM analysis reports asbestos not detected. All NOB (Non-Friable Organically Bound) materials such as vinyl floor tile, vinyl sheet flooring, glues, and mastics, that test as <1% asbestos, trace asbestos and no asbestos detected, should be further analyzed by TEM (Transmission

Electron Microscopy).

Samples submitted for analysis will be retained for three months for future reference.

We certify that the following results are true and accurate to the best of our knowledge. If you have questionsor need further assistance, please contact our Customer Service Department.

Site Location:US Army Corp Engineers EAM # 2023045

Asbestos Signatory

R.I. Analytical Laboratories, Inc.

LABORATORY REPORT

Date Received:

Work Order #:

R.I. Analytical Laboratories 3/30/2023 2304-05246

Site Location:US Army Corp Engineers EAM # 2023045

SAMPLE

RESULTS / UNITS

METHOD: EPA 600/R-93/116

DATE

ANALYZED ANALYSTPARAMETER

SAMPLE SAMPLE

DESCRIPTIONNO.

PLM Fiber Analysis001 1A Caulk (white) on metal and wood

Asbestos KMG4/3/2023Not Detected

Non-fibrous KMG4/3/2023%100

Sample Color KMG4/3/2023White

PLM Fiber Analysis002 1B Caulk (white) on metal and wood

Asbestos KMG4/3/2023Not Detected

Non-fibrous KMG4/3/2023%100

Sample Color KMG4/3/2023White

PLM Fiber Analysis003 2A Caulk (white) on metal and wood

Asbestos KMG4/3/2023Not Detected

Non-fibrous KMG4/3/2023%100

Sample Color KMG4/3/2023White

PLM Fiber Analysis004 2B Caulk (white) on metal and wood

Asbestos KMG4/3/2023Not Detected

Non-fibrous KMG4/3/2023%100

Sample Color KMG4/3/2023White

PLM Fiber Analysis005 3A Gypsum board (GB) (white) u/4A on wood

Asbestos KMG4/3/2023Not Detected

Non-fibrous KMG4/3/2023%100

Sample Color KMG4/3/2023White

PLM Fiber Analysis006 3B Gypsum board (GB) (white) u/4A on wood

Asbestos KMG4/3/2023Not Detected

Non-fibrous KMG4/3/2023%100

Sample Color KMG4/3/2023White

LABORATORY REPORT

Date Received:

Work Order #:

R.I. Analytical Laboratories 3/30/2023 2304-05246

Site Location:US Army Corp Engineers EAM # 2023045

SAMPLE

RESULTS / UNITS

METHOD: EPA 600/R-93/116

DATE

ANALYZED ANALYSTPARAMETER

SAMPLE SAMPLE

DESCRIPTIONNO.

PLM Fiber Analysis007 4A Joint compound (white) on GB

Asbestos KMG4/3/2023Not Detected

Non-fibrous KMG4/3/2023%100

Sample Color KMG4/3/2023White

PLM Fiber Analysis008 4B Joint compound (white) on GB

Asbestos KMG4/3/2023Not Detected

Non-fibrous KMG4/3/2023%100

Sample Color KMG4/3/2023White

PLM Fiber Analysis009 4C Joint compound (white) on GB

Asbestos KMG4/3/2023Not Detected

Non-fibrous KMG4/3/2023%100

Sample Color KMG4/3/2023White

PLM Fiber Analysis010 5A Mastic (red) on round metal exhaust duct

Asbestos KMG4/3/2023Not Detected

Non-fibrous KMG4/3/2023%100

Sample Color KMG4/3/2023Red

PLM Fiber Analysis011 5B Mastic (red) on round metal exhaust duct

Asbestos KMG4/3/2023Not Detected

Non-fibrous KMG4/3/2023%100

Sample Color KMG4/3/2023Red

PLM Fiber Analysis012 5C Mastic (red) on round metal exhaust duct

Asbestos KMG4/3/2023Not Detected

Sample Color KMG4/3/2023Red

LABORATORY REPORT

Date Received:

Work Order #:

R.I. Analytical Laboratories 3/30/2023 2304-05246

Site Location:US Army Corp Engineers EAM # 2023045

SAMPLE

RESULTS / UNITS

METHOD: EPA 600/R-93/116

DATE

ANALYZED ANALYSTPARAMETER

SAMPLE SAMPLE

DESCRIPTIONNO.

PLM Fiber Analysis013 6A Tar paper (black) on wood

Asbestos KMG4/3/2023Not Detected

Non-fibrous KMG4/3/2023%100

Sample Color KMG4/3/2023Black

PLM Fiber Analysis014 6B Tar paper (black) on wood

Asbestos KMG4/3/2023Not Detected

Non-fibrous KMG4/3/2023%100

Sample Color KMG4/3/2023Black

PLM Fiber Analysis015 7A Asphalt shingle (red)

Asbestos KMG4/3/2023Not Detected

Glass Fiber KMG4/3/2023%5-15

Non-fibrous KMG4/3/2023%85-95

Sample Color KMG4/3/2023Red

PLM Fiber Analysis016 7B Asphalt shingle (red)

Asbestos KMG4/3/2023Not Detected

Glass Fiber KMG4/3/2023%5-15

Non-fibrous KMG4/3/2023%85-95

Sample Color KMG4/3/2023Red

PLM Fiber Analysis017 8A Asphalt shingle (black) u/ 7A

Asbestos KMG4/3/2023Not Detected

Glass Fiber KMG4/3/2023%5-15

Non-fibrous KMG4/3/2023%85-95

Sample Color KMG4/3/2023Black

LABORATORY REPORT

Date Received:

Work Order #:

R.I. Analytical Laboratories 3/30/2023 2304-05246

Site Location:US Army Corp Engineers EAM # 2023045

SAMPLE

RESULTS / UNITS

METHOD: EPA 600/R-93/116

DATE

ANALYZED ANALYSTPARAMETER

SAMPLE SAMPLE

DESCRIPTIONNO.

PLM Fiber Analysis018 8B Asphalt shingle (black) u/ 7B

Asbestos KMG4/3/2023Not Detected

Glass Fiber KMG4/3/2023%5-15

Non-fibrous KMG4/3/2023%85-95

Sample Color KMG4/3/2023Black

PLM Fiber Analysis019 9A Tar paper (black) u/8A on wood

Asbestos KMG4/3/2023Not Detected

Non-fibrous KMG4/3/2023%100

Sample Color KMG4/3/2023Black

PLM Fiber Analysis020 9A Tar paper (black) u/8B on wood

Asbestos KMG4/3/2023Not Detected

Sample Color KMG4/3/2023Black

Date Received:

Date Reported:

P.O. Number

Work Order #:

Project Name:

Enclosed are the analytical results and Chain of Custody for your project referenced above. The sample(s) were analyzed by our Warwick, RI laboratory unless noted otherwise. When applicable subcontracted results are noted and subcontracted reports are enclosed in their entirety.

All samples were analyzed within the established guidelines of US EPA approved methods with all requirements met, unless otherwise noted at the end of a given sample's analytical results or in a case narrative.

The Detection Limit is defined as the lowest level that can be reliably achieved during routine laboratory conditions.

These results only pertain to the samples submitted for this Work Order # and this report shall not be reproduced except in its entirety.

We certify that the following results are true and accurate to the best of our knowledge. If you have questions or need further assistance, please contact our Customer Service Department.

Approved by:

R.I. Analytical Laboratories Danny Mullen

E.A.M. Division 15 Lark Industrial Parkway Smithfield, RI 02828

3/31/2023 4/12/2023

2303-05141

PROJECT #2023045 US ARMY CORP OF ENGINEERS - VISITOR CENTER

Attn:

Laboratory Certification Numbers (as applicable to sample's origin state):

Warwick RI * RI LAI00033, MA M-RI015, CT PH-0508

LABORATORY REPORT

Kristin Phelan

Data Reporting Manager

Laboratory Report

Work Order #:

R.I. Analytical Laboratories

2303-05141

PROJECT #2023045 US ARMY CORP OF ENGINEERS - VISITOR CENTERProject Name:

PARAMETER RESULTS

SAMPLE

LIMIT

DET.

UNITS METHOD ANALYZED

DATE/TIME

ANALYST

Sample Type :

3/30/2023

GRAB

1P YELLOW PAINT SCRAPINGS OFFICE AREA EAST WALL INTERIOR

Sample Date / Time :

Sample Description:

Sample Number:

Total Metals Analyzed by ICP

Lead KK4/6/2023SW-846 6010C%0.00160.0017 16:37

ICP Digestion KK4/4/2023SW-846 3050B 10:08

PARAMETER RESULTS

SAMPLE

LIMIT

DET.

UNITS METHOD ANALYZED

DATE/TIME

ANALYST

Sample Type :

3/30/2023

GRAB

2P BLK/GRAY PAINT SCRAPINGS-INT TRIM BOARD @ N. SIDE GARAGE

Sample Date / Time :

Sample Description:

Sample Number:

Total Metals Analyzed by ICP

Lead KK4/6/2023SW-846 6010C%0.0303.3 17:45

ICP Digestion KK4/4/2023SW-846 3050B 10:08

PARAMETER RESULTS

SAMPLE

LIMIT

DET.

UNITS METHOD ANALYZED

DATE/TIME

ANALYST

Sample Type :

3/30/2023

GRAB

3P WHT/BLUE PAINT SCRAPINGS-EXT. TRIM BOARD @ EAST ENT. DOOR

Sample Date / Time :

Sample Description:

Sample Number:

Total Metals Analyzed by ICP

Lead KK4/6/2023SW-846 6010C%0.00150.0048 16:40

ICP Digestion KK4/4/2023SW-846 3050B 10:08

1 Background
2 ASBESTOS INSPECTION
2.1 Methodology
2.2 Observations
3 LEAD IN PAINT sampling
3.1 Methodology
3.2 Results
4 Conclusions and recommendations
2
3
4
4.1 Asbestos
4.2 Lead Paint Sampling
5 Limitations
2304-05246 PLM 3.30.23.pdf
05246
SKM_458e23040316480
2303-05141 Total Lead-Paint 3.30.23.pdf
05141
05141c