Specifications.pdf
PDF 14 MB Posted
- Attached to
- ANNISQUAM RIVER MAINTENANCE DREDGING
- Solicitation number
- W912WJ19B0014
About this file
SPECS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Plans.pdf | ||
| W912WJ19B0014_Annisquam_Maintenance_Dredging_FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912WJ-19-B-0014
MAINTENANCE DREDGING
8-FOOT DEEP ANNISQUAM RIVER
CHANNEL AND LOBSTER COVE
ANCHORAGE
Gloucester Harbor & Annisquam River, Massachusetts
Construction Solicitation and Specifications
MAY 2019
Annisquam Maintenance Dredging
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 32 00 GEOTECHNICAL DATA
00 41 00 BIDDING SCHEDULE
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 22 00 MEASUREMENT AND PAYMENT
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 CONTRACTOR QUALITY CONTROL
01 45 01 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 54 50 DREDGING PLANT AND EQUIPMENT
01 57 20 ENVIRONMENTAL PROTECTION
01 58 00 PROJECT IDENTIFICATION
01 71 23 FIELD ENGINEERING FOR DREDGING
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 23 MECHANICAL DREDGING
35 20 24 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM: SCOW -
MONITORING PROFILE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 32 00
GEOTECHNICAL DATA
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 EXAMINATION OF SAMPLES
1.4 ANALYSIS OF SAMPLES
1.5 INTERPRETATION
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
DOCUMENT 00 32 00 Page 1
SECTION 00 32 00
GEOTECHNICAL DATA
PART 1 GENERAL
1.1 SUMMARY
The surface conditions indicated in the attachment at the end of specifications are the result of cores taken by U.S. Army Corps of Engineers, New England District in 2011, with grain size analysis subsequently performed by New England District Environmental Laboratory.
The samples were analyzed using ASTM D422.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referenced to in the text by basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D422 (1963; R 2007; E 2014; E 2014)
Particle-Size Analysis of Soils]
1.3 EXAMINATION OF SAMPLES
Pertinent subsurface information is shown in the attachment at the end of the specifications. Sample materials obtained from the subsurface explorations are not available for examination.
1.4 ANALYSIS OF SAMPLES
Analysis of samples included grain size analysis in accordance with
ASTM D422.
1.5 INTERPRETATION
Subsurface investigation data are provided only for information purposes and for the convenience of the Contractor. The data shown in the attachment at the end of the specifications is for the specific locations indicated only and no assurance is given that these conditions are representative of conditions between sampling locations or areas adjacent thereto. The responsibility lies with the Contractor to interpret subsurface conditions that may affect his work.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
DOCUMENT 00 32 00 Page 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 41 00
BIDDING SCHEDULE
PART 1 GENERAL
1.1 LINE ITEMS
1.2 BID NOTES
DOCUMENT 00 41 00 Page 1
Document 00 41 00 Page 1
SECTION 00 41 00
BIDDING SCHEDULE
PART 1 GENERAL
Refer to Section 01 22 00 MEASUREMENT AND PAYMENT
1.1 LINE ITEMS
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount __
BASE BID ITEMS
0001 Mobilization and Demobilization for Dredging and Disposal in Season 1 (2019/2020) 1 Job Job $________
0002 Mobilization and
Dredging and Disposal in Season 2 (2020/2021) 1 Job Job $________
0003 Maintenance Dredging and Disposal to Ipswich Near- Shore Placement Site; 8-Foot Channel(Station 72+53 to Station 259+09)
0003AA First 59,400 CD 59,400 CD $______ $________
0003AB Over 59,400 CD 35,300 CD $______ $________
0004 Maintenance Dredging and Disposal to Gloucester Historic Disposal Site (GHDS) 8-Foot Channel (Station 0+00 to Station 44+00)
0004AA First 3,750 CD 3,750 CD $______ $________
0004AB Over 3,750 CD 6,700 CD $______ $________
0005 Maintenance Dredging and Disposal to Ipswich Near- Shore Placement Site; 8-Foot Anchorage (area within Lobster Cove)
0005AA First 34,350 CD 34,350 CD $______ $________
Document 00 41 00 Page 2
0005AB Over 34,350 CD 5,900 CD $______ $________
TOTAL ESTIMATED AMOUNT, BASE BID ITEMS $___________
OPTIONAL BID ITEM
0006 Mobilization and
Silt Dredging and Disposal in Season 2 (2020/2021) 1 Job Job $________
0007 Maintenance Dredging and Disposal to Massachusetts Bay Disposal Site (MBDS); 8-Foot Channel (Station 44+00 to Station 72+53)
0007AA First 9,800 CD 9,800 CD $______ $________
0007AB Over 9,800 CD 9,250 CD $______ $________
0008 Maintenance Dredging and Disposal to MBDS; 8-Foot Anchorage (Area within Lobster Cove)
0008AA First 15,500 CD 15,500 CD $______ $________
0008AB Over 15,500 CD 15,200 CD $______ $________
TOTAL ESTIMATED AMOUNT, OPTIONAL BID ITEM $___________
TOTAL ESTIMATED AMOUNT, BASE AND OPTIONAL BID ITEMS $___________
1.2 BID NOTES
Note 1: "CD" = Cubic Yards.
Note 2: Bidders must bid all items. The work will be awarded as a whole to one bidder. Offers will be evaluated and the low bidder determined by the Total Estimated Amount for Line Items 0001 through 0008, which includes the Base Bid Items and Optional Bid Item. The minimum work awarded will be the Base Bid work.
Note 3: If bidders intend to complete all of the base bid work in the first season, the bidder may bid $0 for item 0002, and include all mobilization and demobilization in items 0007 and 0008 for the silt dredging in option item number 0006.
Note 3: Item Numbers 0004, 0005,0007 and 0008 are subdivided into two estimated quantities and are to be separately priced. The Government will evaluate this item on the basis of the total price of their sub-items. See CONTRACT REQUIREMENTS, Clause "VARIATIONS IN ESTIMATED QUANTITIES -
SUBDIVIDED ITEMS (UAI 12.212-5001)".
Document 00 41 00 Page 3
Note 4: All work shall be completed within the time period specified in the SPECIAL CONTRACT REQUIREMENTS, Subpart "COMMENCEMENT, PROSECUTION AND
COMPLETION OF WORK (APR 1984) FAR 52.211-10."
Note 5: Item Numbers 0007, 0007, and 0008 above are an Optional Line Items that may, at the option of the Government, be exercised within 365 of calendar days of Notice to Proceed. If Optional Items 0007 or 0008 are exercised, optional item 0006 will also be exercised. If option items 0006, 0007, and/or 0008 are awarded, no additional days will be added to the contract duration.
Note 6: Identify a point of contact e-mail for all correspondence related to this bid: ______________________@______________.
- End of Bidding Schedule -
-- End of Document --
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 PROJECT LOCATION AND DESCRIPTION
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.3 REFERENCES
1.4 SUBMITTALS
1.5 PROJECT SITE CONDITIONS
1.5.1 Physical Data
1.6 WORK SITE
1.7 WORK SEQUENCING AND SCHEDULING
1.7.1 Hours of Operations
1.7.2 Work Restrictions
1.7.3 Work Commencement and Completion Requirements
1.7.4 Work Sequence
1.7.4.1 General
1.7.4.2 Initial Project Schedule
1.7.4.3 Periodic Schedule Updates
1.7.5 Scheduling
1.7.6 Rate of Progress
1.8 SUPERINTENDENCE BY THE CONTRACTOR
1.9 PRECONSTRUCTION CONFERENCE
1.10 COORDINATION AND DIRECTION DURING CONSTRUCTION
1.11 CONTRACTOR'S USE OF UPLAND FACILITIES AND HAULING ROUTES
1.12 CONTRACTOR USE OF PREMISES
1.12.1 General
1.12.2 Access to the Site
1.12.3 Temporary Facilities and Utilities, and Storage Areas
1.12.4 Work Limits
1.12.5 Protection and Security
1.12.6 Emergency Contacts
1.12.7 Damaged Property
1.12.8 Contractor's Receipt of Supplies
1.12.9 Daily Clean Up
1.12.10 Littering
1.12.11 Government Sanitary Facilities
1.13 QUALITY ASSURANCE
1.14 COORDINATION
1.14.1 Public Notice
1.14.2 Notice to Mariners
1.14.3 Aids to Navigation
1.14.4 Points of Contact
1.15 PRE-DREDGING PHOTOGRAPHIC SURVEY
1.16 GENERAL SAFETY REQUIREMENTS
1.16.1 General
1.16.2 Contractor's Project Superintendent
1.17 ENVIRONMENTAL PROTECTION
PART 2 PRODUCTS
SECTION 01 11 00 Page 1
PART 3 EXECUTION
SECTION 01 11 00 Page 2
Anni squam Mai nt enance Dr edgi ng
SECTI ON 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1. 1 PROJECT LOCATI ON AND DESCRI PTI ON
The Anni squam Ri ver i s a t i dal est uar y l ocat ed on t he east er n hal f of Cape Ann i n t he Ci t y of Gl oucest er i n Essex Count y, Massachuset t s. The r i ver r uns sout h f or 3 mi l es f r om I pswi ch Bay t o t he Massachuset t s Bay Tr anspor t at i on Aut hor i t y ( MBTA) Gl oucest er Dr awbr i dge wher e i t connect s t o West er n Har bor i n out er Gl oucest er Har bor v i a t he 1. 5 mi l e l ong Bl ynman Canal . I t compr i ses t he nor t her nmost por t i on of t he I nt r acoast al Wat er way Syst em, and i s used ext ensi vel y by commer ci al vessel s, bar ges, and r ecr eat i onal cr af t t hr oughout t he year . I n f act , t he Bl ynman Canal Br i dge at t he West er n Har bor i nl et i s r ai sed appr oxi mat el y 20, 000 t i mes per year .
Dur i ng t he busi est t i me of year , May 1 t o November 1, t he br i dge i s r ai sed on aver age t hr ee t i me per hour i l l ust r at i ng t hi s v i t al wat er ways i mpor t ance t o boat er s. Hi st or i cal l y , t he Anni squam Ri ver has been used by commer ci al f i shi ng vessel s, some dr awi ng up t o 12 f eet of wat er , as wel l as r ecr eat i onal vessel s wi t h dr af t s of 5 t o 6 f eet . The r i ver pr ovi des vessel s wi t h saf e passage bet ween Gl oucest er Har bor and I pswi ch Bay wi t hout havi ng t o t r avel ar ound t he nor t her n t i p of Cape Ann, a l ess pr ot ect ed r out e. The U. S. Coast Guar d depends upon t he channel i n t he Anni squam Ri ver t o t r ansi t i t s vessel s bet ween Gl oucest er Har bor and I pswi ch Bay and adj acent wat er s t o per f or m sear ch and r escue and homel and secur i t y mi ssi ons.
The Anni squam Ri ver por t i on of t he FNP consi st s of an 8 f oot deep MLLW channel , 60 f eet wi de f r om West er n Har bor t o t he B&M Rai l r oad Br i dge, t hen 100 f eet wi de t o t he Ri ver ' s mout h and 200 f eet wi de acr oss t he bar i n I pswi ch Bay. The FNP wi t hi n Anni squam Ri ver was aut hor i zed by t he Ri ver and Har bor Act of 30 August 1935. The pr oj ect was amended by t he Ri ver and Har bor Act of 2 Mar ch 1945 t o i nc l ude an 8- f oot MLLW deep 17. 3- acr e anchor age i n Lobst er Cove, near t he head of navi gat i on i n I pswi ch Bay.
The pur pose and need f or t he pr oposed pr oj ect i s t o ensur e saf e vessel passage f or commer ci al , r ecr eat i onal and U. S. Coast Guar d ( USCG) vessel s t hr ough t he Anni squam Ri ver . The USCG has a st at i on i n Gl oucest er Har bor wher e t hey per f or m mi ssi ons v i t al t o homel and secur i t y and f r om whi ch USCG Sear ch and Rescue ( USCG- SAR) vessel s oper at e. Shoal i ng wi t hi n t he Anni squam Ri ver has r educed t he cont r ol l i ng dept hs t o - 1 f eet MLLW and di mi ni shes saf e vessel passage t hr ough t he r i ver . As a r esul t , deeper dr af t vessel s such as USCG, f i shi ng, and r ecr eat i onal boat s must now t r ansi t ar ound t he ocean si de of Cape Ann when t r avel i ng i n t he ar ea. The r out e ar ound Cape Ann i s mor e exposed t o wi nds and swel l s maki ng i t mor e danger ous t han t r ansi t i ng t hr ough t he Anni squam Ri ver . Use of t he r i ver al so shor t ens t r ansi t t i mes f or vessel s navi gat i ng t o poi nt s nor t h and sout h of Cape Ann.
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
a. The Cont r act or shal l per f or m t he wor k i n st r i c t accor dance wi t h t he cont r act dr awi ngs and speci f i cat i ons and pr ovi de al l super vi s i on, pl ant , l abor , mat er i al s, equi pment , saf et y, and qual i t y cont r ol necessar y t o per f or m al l oper at i ons as necessar y t o accompl i sh t he
SECTI ON 01 11 00 Page 3 wor k, compl et e. The Cont r act or i s r esponsi bl e f or pr ovi di ng and ut i l i z i ng appr opr i at e pl ant and equi pment t o r emove and di spose of t he dr edged mat er i al .
b. The gener al descr i pt i on of t he wor k descr i bed bel ow i s gener al i n nat ur e and i s onl y gi ven t o i ndi cat e t he appr oxi mat e scope of wor k under t hi s cont r act . I t does not l i mi t t he wor k r equi r ed under t he pr oj ect cont r act dr awi ngs and speci f i cat i ons.
c. Gener al Descr i pt i on of t he Wor k:
( 1) Mobi l i zat i on and demobi l i zat i on as necessar y t o compl et e al l wor k i n accor dance wi t h t he cont r act document s.
( 2) Mai nt enance dr edgi ng t o t he speci f i ed dept hs pl us over dept h at t he f ol l owi ng l ocat i ons wi t hi n t he Anni squam Ri ver Feder al navi gat i on pr oj ect : The 8- Foot deep channel t o i t s mai nt ai ned dept h of - 8 f eet Mean Lower Low Wat er ( MLLW) pl us one f oot al l owabl e over dept h t o - 9 f eet MLLW; and t he 8- Foot deep anchor age i n Lobst er Cove t o i t s aut hor i zed dept h of - 8 f eet MLLW wi t h a one f oot al l owabl e over dept h t o
- 9 f eet MLLW.
( 3) Mat er i al t o be dr edged shal l be r emoved by mechani cal means, l oaded ont o scows, and t r anspor t ed t o and di sposed of at t he desi gnat ed near shor e di sposal s i t e and of f shor e open ocean di sposal s i t es; f or descr i pt i on and l ocat i on of di sposal s i t es r ef er t o subpar agr aph " Di sposal at Desi gnat ed Si t es" under Sect i on 35 20 23 MECHANI CAL DREDGI NG. Dr edgi ng of s i l t mat er i al wi l l r equi r e t he use of an envi r onment al bucket .
d. Due t o envi r onment al r est r i c t i ons and t he r el at i vel y shor t const r uct i on wi ndow, t he Gover nment has ant i c i pat ed t hat t he pr oj ect wi l l r equi r e t wo dr edge seasons t o compl et e al l dr edgi ng and di sposal wor k. The 1st Dr edge Season wi l l be f r om 1 Oct ober 2019 t o 31 Januar y 2020 and t he 2nd Dr edge Season wi l l be f r om 1 Oct ober 2020 t o 31 Januar y 2021. No wor k shal l occur bet ween 01 Feb and 30 Sept ember , i ncl usi ve of any year . Ref er bel ow t o subpar agr aph " Wor k Commencement and Compl et i on Requi r ement s" . Addi t i onal l y, t he Gl oucest er Hi st or i c Di sposal s i t e wi l l onl y be open f or di sposal act i v i t i es f r om 01 December t o 31 Januar y, i ncl usi ve of any year .
e. The pr oj ect descr i pt i on i s f ur t her def i ned i n t he cont r act dr awi ngs and speci f i cat i ons. Pr oj ect phot os ar e at t ached at t he end of t he specifications.
1. 3 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual
1. 4 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
SECTI ON 01 11 00 Page 4 submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
I ni t i al Pr oj ect Schedul e; G, RO
I n accor dance wi t h t he cont r act c l auses, t he Cont r act or shal l , wi t hi n 5 days af t er r ecei pt of Not i ce t o Pr oceed ( NTP) or as ot her wi se det er mi ned by t he Cont r act i ng Of f i cer , submi t f or appr oval a pr act i cabl e pr oj ect schedul e. When changes ar e aut hor i zed t hat r esul t i n cont r act t i me ext ensi ons, t he Cont r act or shal l submi t a r evi sed pr oj ect schedul e f or appr oval by t he Cont r act i ng Of f i cer .
Publ i c Not i ce; G, RO
Submi t a copy of t he pr oposed wor di ng of t he Publ i c Not i ce t o t he Cont r act i ng Of f i cer f or appr oval .
Not i ce t o Mar i ner s
Submi t a copy of Not i ce t o Mar i ner s t o t he Cont r act i ng Of f i cer .
Ai ds t o Navi gat i on
Submi t pr oof of coor di nat i on wi t h t he USCG f or any necessar y r el ocat i on or movement of ai ds t o navi gat i on.
Saf e Har bor Pl an; G, RO
The Cont r act or shal l submi t a Saf e Har bor Pl an t o t he Cont r act i ng Of f i cer f or appr oval pr i or t o t he st ar t of on- si t e wor k. The Saf e Har bor Pl an shal l i ncl ude a wr i t t en descr i pt i on of t he Cont r act or ' s pl an t o pr ovi de f or t he saf et y and secur i t y of f l oat i ng pl ant , equi pment , and per sonnel i n t he event of a st or m or ot her s i t e emer gency. The l ocat i on f or t he docki ng of f l oat i ng pl ant and t he of f - l oadi ng of equi pment and cr ews shal l be c l ear l y indicated.
Ut i l i t y Locat i on Conf i r mat i on; G, DO
Pr i or t o begi nni ng dr edgi ng oper at i ons wi t hi n one hundr ed f eet of any ut i l i t i es wi t hi n t he f eder al navi gat i on channel , t he Cont r act or shal l submi t al l r ecor d i nf or mat i on col l ect ed f r om ut i l i t i es and any addi t i onal dat a wi t h r egar ds t o hor i zont al and ver t i cal posi t i oni ng.
Pr e- Dr edgi ng Phot ogr aphi c Sur vey; G, RO
The Cont r act or shal l submi t a pr e- dr edgi ng phot ogr aphi c sur vey as descr i bed i n t hi s sect i on.
SD- 07 Cer t i f i cat es
Per i odi c Schedul e Updat es; G, RO
SECTI ON 01 11 00 Page 5
1. 5 PROJECT SI TE CONDI TI ONS
1. 5. 1 Physi cal Dat a
Dat a and i nf or mat i on f ur ni shed or r ef er r ed t o bel ow i s f or t he Cont r act or ' s i nf or mat i on. The Gover nment shal l not be r esponsi bl e f or any i nt er pr et at i on of or concl usi on dr awn f r om t he dat a or i nf or mat i on by t he Contractor.
a. Si t e Condi t i ons: The i ndi cat i ons of physi cal condi t i ons on t he dr awi ngs and i n t he speci f i cat i ons ar e t he r esul t of s i t e i nvest i gat i ons and sur veys. The condi t i ons r epr esent ed pr evai l ed at t he t i me t he i nvest i gat i ons and sur veys wer e made. A pr e- dr edge sur vey may be per f or med by t he Gover nment pr i or t o t he st ar t of Cont r act or dr edgi ng oper at i ons at t he s i t e. Bef or e commenci ng wor k at t he s i t e, t he Cont r act or shal l ver i f y t he exi st i ng condi t i ons i ndi cat ed on t he dr awi ngs and i n t he speci f i cat i ons. See CONTRACT CLAUSE ent i t l ed " SI TE
I NVESTI GATI ON AND CONDI TI ONS AFFECTI NG THE WORK" .
b. Weat her Condi t i ons: Weat her condi t i ons f or t he s i t e may be obt ai ned by t he Cont r act or f r om t he Nat i onal Oceani c and At mospher i c Admi ni st r at i on' s Nat i onal Weat her Ser vi ce; www. NOAA. gov.
c. Ti de Condi t i ons: The mean t i dal r ange i n t he pr oj ect ar ea i s 8. 8 f eet .
Pr edi ct ed t i mes and hei ght s of t i des f or each day of t he year can be obt ai ned f r om t he Nat i onal Oceani c and At mospher i c Admi ni st r at i on, Nat i onal Ocean Ser vi ce, " Ti dal Cur r ent Tabl es, At l ant i c Coast of Nor t h America."
d. Tr anspor t at i on f aci l i t i es: The Cont r act or shal l make i t s own i nvest i gat i ons on t he use of t own, St at e and Feder al hi ghways, r oads, st r eet s, and br i dges.
e. Condi t i ons of Channel : The Feder al Navi gat i on Channel was l ast mai nt ai ned i n 1976 wher e appr oxi mat el y 2, 700 cubi c yar ds of f i ne mat er i al and s i l t wer e r emoved f r om t he channel over i n t he I pswi ch Bay Bar . Pr i or t o t hat , 65, 000 cy of mat er i al was dr edged f r om t he 8 f oot deep channel i n 1972. Soundi ngs shown on t he cont r act dr awi ngs ar e t he r esul t s of sur veys conduct ed dur i ng Febr uar y 2016 and December 2018.
f . Channel Tr af f i c :
( 1) The r i ver cont ai ns t he Anni squam Yacht Cl ub, l ocat ed i n Lobst er Cove, Cape Ann Mar i na, and t he Gl oucest er Mar i na. The t own has 150 act i ve moor i ngs, and wi l l be r esponsi bl e f or r el ocat i on pr i or t o t he Cont r act or execut i ng t he cont r act wor k. Ref er t o Sect i on 35 20 23 f or mor e i nf or mat i on r egar di ng act i ve moor i ngs.
( 2) The Gover nment wi l l not under t ake t o keep t he channel f r ee f r om vessel s or ot her obst r uct i ons, except t o t he ext ent of appl i cabl e r egul at i ons. The Cont r act or shal l conduct t he wor k i n such a manner as t o obst r uct navi gat i on as l i t t l e as possi bl e, and i n t he event t he Cont r act or ' s pl ant so obst r uct s t he channel as t o make di f f i cul t or endanger t he passage of any vessel s, t he pl ant shal l be pr ompt l y moved on t he appr oach of any vessel t o such an ext ent as may be necessar y t o af f or d a pr act i cabl e passage.
( 3) The Masschuset t s Bay Tr anspor t at i on Aut hor i t y ( MBTA) Bascul e Rai l r oad Br i dge wi l l under go s i gnf i cant const r uct i on r epai r s t hr oughout
SECTI ON 01 11 00 Page 6 t he dur at i on of t he cont r act . I t i s ant i c i pat ed t hat r i ver t r af f i c under t he br i dge wi l l be shut down f or 14 cal endar days i n t he f i r st dr edge season ( 2019/ 2020) and wi l l be shut down f or al l of t he second dr edge season ( 2020/ 2021) .
h. Ut i l i t i es: Ther e ar e mul t i pl e ut i l i t i es cr ossi ng t he Anni squam Ri ver .
Ut i l i t i es shown on t he pl ans i ncl ude: sani t ar y sewer l i ne, wat er mai n, gas mai n, gas pi pel i ne, s i gnal cabl e, power cabl es, and communi cat i on l i nes. The cont r act or shal l make i t s own i nvest i gat i ons concer ni ng ut i l i t y l i nes and ensur e t hat l i nes ar e not damaged dur i ng dr edgi ng, di sposal , and pl acement oper at i ons. No spud zones ar e r equi r ed ar ound al l ut i l i t i es. The Cont r act or shal l mar k t he l i mi t s of t he no spud zone.
1. 6 WORK SI TE
Al l r ul es, r egul at i ons, and r equi r ement s cover i ng such i t ems as, but not l i mi t ed t o, gener al saf et y, secur i t y, sani t ar y r equi r ement s, envi r onment al pr ot ect i on, pol l ut i on cont r ol , and t r af f i c r egul at i ons shal l be obser ved by t he Cont r act or .
1. 7 WORK SEQUENCI NG AND SCHEDULI NG
1. 7. 1 Hour s of Oper at i ons
Oper at i onal Hour s: The Cont r act or wi l l be al l owed t o per f or m dr edgi ng and di sposal wor k 24 hour s a day, 7 days a week, i ncl udi ng hol i days, f or t he ent i r e per f or mance per i od of t hi s cont r act .
1. 7. 2 Wor k Rest r i ct i ons
Al l dr edgi ng and di sposal wor k shal l be compl et ed wi t hi n t he desi gnat ed dr edge const r uct i on wi ndow as speci f i ed under par agr aph " Speci al Envi r onment al Requi r ement s" , subpar agr aph " Envi r onment al Dr edge Wi ndow" i n Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON.
1. 7. 3 Wor k Commencement and Compl et i on Requi r ement s
The Cont r act or shal l :
( 1) Commence on pr el i mi nar y dr edgi ng oper at i on wor k wi t hi n 10 cal endar days af t er Not i ce To Pr oceed by pr ompt l y pl aci ng al l or der s, awar di ng subcont r act s, pr ocessi ng r equi r ed submi t t al s and det ai l s t o ensur e i mmedi at e r eadi ness t o commence wi t h dr edgi ng and di sposal oper at i ons under t hi s cont r act wi t hi n 30 cal endar days af t er t he dat e t he Cont r act or r ecei ves t he Not i ce t o Pr oceed ( NTP) , pr ovi ded t hat t hi s dat e f al l s wi t hi n t he desi gnat ed const r uct i on dr edge wi ndow.
( 2) Compl et e dr edgi ng i n t he f eder al navi gat i on channel bet ween St at i on 72+53 and St at i on 205+00 wi t hi n t he f i r st dr edge season, t o i ncl ude f i nal accept ance of t he ar ea by t he Gover nment . Cont r act or shal l assume t hat t he opt i on i t ems, i f exer ci sed, shal l be compl et ed i n t he second season of dr edgi ng.
( 3) Compl et e t he ent i r e wor k r eady f or use by Jan 31, 2021. The t i me( s) st at ed f or compl et i on shal l i ncl ude t he Gover nment ' s af t er dr edge sur veys and f i nal c l eanup of t he pr emi ses. No wor k shal l occur 01 Feb t hr ough 30 Sept ember , i ncl usi ve of any year . Ref er above t o subpar agr aph d under par agr aph " Wor k Cover ed by Cont r act Document s" .
SECTI ON 01 11 00 Page 7
1. 7. 4 Wor k Sequence
1. 7. 4. 1 General
Ther e ar e cer t ai n essent i al cr i t er i a r el at i ve t o t he pr epar at i on of a wor k sequence and t i me schedul e whi ch t he Cont r act or wi l l be r equi r ed t o i mpl ement and f ol l ow dur i ng t he pr osecut i on of t he wor k. Mi nor var i at i ons i n t he sequence of t he i t ems of wor k as appr oved may be made by t he Cont r act or , pr ovi ded such var i at i ons do not conf l i c t wi t h cr i t i cal el ement s of t he schedul e. Pr oposed mi nor var i at i ons shal l be not ed on t he pr ogr ess char t s submi t t al r equi r ed by CONTRACT CLAUSE, ent i t l ed " SCHEDULES FOR CONSTRUCTI ON CONTRACTS. " Var i at i ons shal l be appr oved by t he Cont r act i ng Of f i cer pr i or t o i mpl ement at i on.
1. 7. 4. 2 I ni t i al Pr oj ect Schedul e
The i ni t i al pr oj ect schedul e shal l be i n t he f or m of a char t gr aphi cal l y i ndi cat i ng t he sequence pr oposed t o accompl i sh each wor k f eat ur e or oper at i on. The char t shal l be pr epar ed t o show t he st ar t i ng and compl et i on dat es of al l wor k f eat ur es on a l i near hor i zont al t i me scal e begi nni ng wi t h dat e of Not i ce t o Pr oceed and i ndi cat i ng cal endar days t o compl et i on.
Cont r act or shal l i ndi cat e on t he char t t he i mpor t ant wor k f eat ur es or oper at i ons t hat ar e cr i t i cal t o t he t i mel y over al l compl et i on of t he pr oj ect . Key dat es f or such i mpor t ant wor k f eat ur es and por t i ons of wor k f eat ur es ar e mi l est one dat es and shal l be so i ndi cat ed on t he char t . Thi s schedul e, wi t h t he number of ant i c i pat ed weat her del ay days annot at ed on t he schedul e, wi l l be t he medi um t hr ough whi ch t he t i mel i ness of t he Cont r act or ' s const r uct i on ef f or t i s appr ai sed. Ant i c i pat ed adver se weat her del ay days shal l be i ncl uded i n t he schedul e.
1. 7. 4. 3 Per i odi c Schedul e Updat es
An updat ed schedul e showi ng act ual pr ogr ess shal l be submi t t ed mont hl y or wi t h each pay r equest . Changes t o t he base- l i ne schedul e shal l be out l i ned i n a nar r at i ve descr i bi ng t he r eason f or t he change.
1. 7. 5 Scheduling
a. Al l wor k shal l be car ef ul l y schedul ed t o pr event del ays and any excessi ve i nt er r upt i ons wi t h channel t r af f i c .
1. 7. 6 Rat e of Pr ogr ess
a. Empl oy ampl e per sonnel and suf f i c i ent equi pment t o accompl i sh t he wor k of t hi s cont r act i n t he l east amount of t i me, wi t hi n t he pr osecut i on per i od speci f i ed i n t he Speci al Cont r act Requi r ement s.
b. Pr osecut e t he wor k di l i gent l y , and mai nt ai n a dr edge pr oduct i on r at e, based on wor ki ng 24 hour s a day, 7 days a week, of not l ess t han 30, 000 cubi c yar ds f or each 30 cal endar day per i od of act ual dr edgi ng wor k at t he s i t e.
c. Shoul d t he Cont r act or f ai l t o mai nt ai n t he r equi r ed r at e of pr ogr ess, t he Cont r act i ng Of f i cer may r equi r e t hat addi t i onal per sonnel and equi pment be pl aced on t he wor k and weekend and over t i me wor k be per f or med, i n or der t hat t he wor k be br ought up t o schedul e and mai nt ai ned. I f , af t er a r easonabl e amount of t i me det er mi ned by t he Cont r act i ng Of f i cer , pr ogr ess has ei t her not been i ni t i at ed, or has f ai l ed t o suf f i c i ent l y br i ng t he wor k back on schedul e t o be compl et ed
SECTI ON 01 11 00 Page 8 by t he schedul ed cont r act per i od, t he cont r act may be t er mi nat ed.
1. 8 SUPERI NTENDENCE BY THE CONTRACTOR
a. At al l t i mes dur i ng t he per f or mance of t he cont r act and unt i l t he wor k i s compl et ed and accept ed, t he Cont r act or shal l di r ect l y super i nt end t he wor k or assi gn and have on t he wor ksi t e a compet ent pr oj ect super i nt endent who i s sat i sf act or y t o t he Cont r act i ng Of f i cer and has t he aut hor i t y t o act f or t he Cont r act or .
b. The pr oj ect super i nt endent shal l mai nt ai n a physi cal pr esence at t he s i t e at al l t i mes and be r esponsi bl e f or al l const r uct i on and r el at ed act i v i t i es at t he s i t e, except as ot her wi se accept abl e t o t he Cont r act i ng Of f i cer .
c. Fai l ur e t o compl y wi t h t hese r equi r ement s shal l be deemed as cause f or a non- compensat or y st oppage and suspensi on of wor k unt i l t he def i c i ency i s r emedi ed.
d. The pr oj ect super i nt endent may not ser ve as t he Si t e Saf et y and Heal t h Of f i cer ( SSHO) or t he Const r uct i on Qual i t y Cont r ol Manager ( CQCM) .
1. 9 PRECONSTRUCTI ON CONFERENCE
The Cont r act i ng Of f i cer wi l l conduct a pr econst r uct i on conf er ence wi t h key Cont r act or per sonnel . The pur pose of t he conf er ence i s t o r evi ew cont r act r equi r ement s and t o est abl i sh a wor ki ng r el at i onshi p bet ween t he Cont r act or ' s St af f and t he U. S. Ar my Cor ps of Engi neer s ( USACE) per sonnel who wi l l be c l osel y associ at ed wi t h t he pr oj ect . Dur i ng t he conf er ence, t he Cont r act i ng Of f i cer wi l l i nf or m t he Cont r act or concer ni ng t opi cs such as, but not l i mi t ed t o, j ob saf et y, qual i t y cont r ol , t empor ar y f aci l i t i es and st or age ar eas, l abor r el at i ons, and envi r onment al pr ot ect i on.
Suggest ed at t endees i ncl ude, but not l i mi t ed t o t he Cont r act or ' s Pr oj ect Super i nt endent , Qual i t y Cont r ol Repr esent at i ve, and Si t e Saf et y and Heal t h Of f i cer ( SSHO) shal l at t end t hi s conf er ence.
1. 10 COORDI NATI ON AND DI RECTI ON DURI NG CONSTRUCTI ON
a. The Cont r act or shal l not t ake or accept any di r ect i on or i nst r uct i ons i ssued by any per son, empl oyed by t he Gover nment or ot her wi se, ot her t han t he Cont r act i ng Of f i cer t hat changes t he t er ms and condi t i ons of cont r act act i ons, t he scope, or any change t hat i mpact s t he cost , pr i ce, or schedul e. Changes aut hor i zed by t he Cont r act i ng Of f i cer wi l l be i n t he f or m of a wr i t t en, of f i c i al , s i gned modi f i cat i on t o t he cont r act act i on r ecei ved by t he Cont r act or bef or e t he Cont r act or wi l l act upon t hose changes. Any di r ect i on gi ven by any Gover nment empl oyee or any ot her per son out s i de t hei r aut hor i t y must be r epor t ed t o t he Cont r act i ng Of f i cer .
b. The Cont r act i ng Of f i cer Repr esent at i ve ( COR) i s l i mi t ed t o t he aut hor i t i es st at ed i n t he COR appoi nt ment l et t er . I f a COR i s appoi nt ed under t hi s cont r act , t hey wi l l be appoi nt ed by wr i t t en l et t er f r om t he Cont r act i ng Of f i cer t o t he Cont r act or and COR speci f i c t o t hi s cont r act onl y. COR appoi nt ment l et t er s f r om pr evi ous cont r act s ar e not val i d f or t hi s cont r act . See t he Cont r act i ng Of f i cer ’ s Repr esent at i ve c l ause of t hi s cont r act .
SECTI ON 01 11 00 Page 9
1. 11 CONTRACTOR' S USE OF UPLAND FACI LI TI ES AND HAULI NG ROUTES
a. Unl ess obt ai ned by t he Gover nment or speci f i ed ot her wi se i n t he cont r act document s, t he Cont r act or shal l be r esponsi bl e f or t he following:
( 1) Locat i ng, coor di nat i ng, and obt ai ni ng per mi ssi on t o use any l and- based wat er access ( docks, pi er s, r amps, et c. ) t hat t he Cont r act or deems necessar y t o compl et e t he wor k.
( 2) Det er mi ni ng, i f necessar y, t he t r ucki ng and haul i ng r out es and associ at ed r est r i c t i ons t o and f r om t he wor k, t o i ncl ude t he coor di nat i on f or t he use of such r out es wi t h l ocal , st at e, and f eder al authorities.
( 3) Compl yi ng wi t h al l l ocal , st at e, and f eder al r egul at i ons and r est r i c t i ons when usi ng any upl and f aci l i t i es or haul i ng r out es.
b. The Gover nment and i t s r epr esent at i ves wi l l be al l owed t he use of t he same l and- based wat er access obt ai ned by t he Cont r act or .
1. 12 CONTRACTOR USE OF PREMI SES
1. 12. 1 General
Pr i or t o t he st ar t of const r uct i on, t he Cont r act or shal l ar r ange wi t h t he Cont r act i ng Of f i cer a sequence of pr ocedur es, means of access t o wor k ar eas, space ut i l i zat i on f or st agi ng and st or age of mat er i al s and equi pment , and t he use of appr oaches t o t he wor k ar eas.
1. 12. 2 Access t o t he Si t e
a. The Cont r act or i s r esponsi bl e f or mai nt ai ni ng access necessar y f or i t s equi pment , mat er i al , and pl ant t o and f r om t he wor k ar ea.
1. 12. 3 Tempor ar y Faci l i t i es and Ut i l i t i es, and St or age Ar eas
See Sect i on 01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS, subpar t " Cont r act or ' s Tempor ar y Faci l i t i es. "
1. 12. 4 Wor k Li mi t s
The l i mi t s of wor k wi t hi n t he Feder al navi gat i on pr oj ect ar e t he 8- f oot channel and t he 8- f oot anchor age. Speci f i c dr edgi ng ar eas and si de s l ope ar eas wi t hi n t hese l i mi t s shal l be dr edged t o obt ai n t he r equi r ed dept hs and si de s l opes as shown on t he cont r act dr awi ngs.
1. 12. 5 Pr ot ect i on and Secur i t y
a. Pr ot ect i on t o Cont r act or per sonnel or t hei r equi pment cannot be pr ovi ded at t he wor ksi t e by t he Gover nment .
b. The Cont r act or shal l pr ot ect al l i t s per sonnel , Gover nment per sonnel , and t he gener al publ i c f r om i nj ur y.
c. The Cont r act or shal l conduct al l i t s wor k so as t o pr event i nj ur y or unsaf e condi t i ons dur i ng const r uct i on.
a. The Cont r act or shal l r epor t any vandal i sm, suspi c i ous act i v i t i es, or
SECTI ON 01 11 00 Page 10 devi ces t o t he Cont r act i ng Of f i cer and l ocal pol i ce as soon as possi bl e.
1. 12. 6 Emer gency Cont act s
The Cont r act or shal l pr ovi de a l i s t of emer gency cont act s i n t he event of an emer gency. The l i s t shal l i nc l ude t he cont act names, addr esses, and t el ephone number s. As changes occur and addi t i onal i nf or mat i on becomes avai l abl e, cor r ect and change t he i nf or mat i on cont ai ned i n pr evi ous l i s t s.
1. 12. 7 Damaged Pr oper t y
Wor k shal l pr oceed i n a manner whi ch wi l l mi ni mi ze di st ur bance or r i sk of damage t o boat s, st r uct ur es, and sur r oundi ng l ands. The Cont r act or shal l r epai r such i t ems damaged i n t he cour se of car r y i ng out t he wor k at no addi t i onal cost t o t he Gover nment . Al l r epai r s shal l mat ch s i mi l ar exi st i ng i t ems i n al l aspect s. Al l r epl acement s shal l be i n k i nd.
1. 12. 8 Cont r act or ' s Recei pt of Suppl i es
The Cont r act or shal l be r esponsi bl e f or al l ar r angement s f or t he r ecei pt of mat er i al s and suppl i es at t he j ob s i t e. Gover nment per sonnel ar e not per mi t t ed t o r ecei ve or s i gn f or i t ems del i ver ed t o t he s i t e.
1. 12. 9 Dai l y Cl ean Up
The Cont r act or shal l at al l t i mes keep r ubbi sh f r om ent er i ng sur r oundi ng l ands and wat er . Rubbi sh accumul at ed at t he t empor ar y f aci l i t i es shal l be r emoved f r om t he pr emi ses dai l y.
1. 12. 10 Littering
The Cont r act or may be subj ect ed t o f i nes by st at e or l ocal aut hor i t i es f or l i t t er i ng or di scar di ng of t obacco mat er i al s ot her t han i nt o r ecept acl es.
1. 12. 11 Gover nment Sani t ar y Faci l i t i es
Toi l et f aci l i t i es ar e not avai l abl e on s i t e f or Cont r act or ' s use. The Cont r act or shal l pr ovi de por t abl e t oi l et s f or i t s per sonnel and subcont r act or s as speci f i ed i n EM 385- 1- 1 under Sect i on 2, Sani t at i on.
1. 13 QUALI TY ASSURANCE
a. Al l i t ems of wor k not addr essed i n t he cont r act document s shal l be compl et ed i n st r i c t accor dance wi t h t he manuf act ur er s’ speci f i cat i ons.
b. The Gover nment i s not obl i gat ed t o i nspect t he Cont r act or ’ s wor k, or t o pr ot ect t he Cont r act or f r om t he consequences of i t s wor k. Gover nment i nspect i ons ar e a gener al exami nat i on of t he Cont r act or ’ s conduct and wor kmanshi p and ar e sol el y f or t he pur pose of t he Gover nment .
Gover nment - desi gnat ed Qual i t y Assur ance Repr esent at i ves ( QARs) do not have t he aut hor i t y t o accept wor k, nor i s a Gover nment i nspect i on t o be const r ued as concl usi ve.
c. Gover nment agent s i ncl udi ng QARs and pr oj ect engi neer s ar e not aut hor i zed t o change t he cont r act wi t hout t he wr i t t en appr oval of t he Cont r act i ng Of f i cer ; t hi s l ack of aut hor i t y ext ends t o al l s i t uat i ons i n whi ch t he act i on of t hese agent s coul d be const r ued as const i t ut i ng a change.
SECTI ON 01 11 00 Page 11
d. The qual i t y of wor kmanshi p i s subj ect t o audi t by Gover nment or Gover nment - desi gnat ed QARs at any t i me dur i ng t he cont r act . The Cont r act or shal l cooper at e f ul l y and pr ovi de al l i nf or mat i on necessar y f or t hi s audi t .
e. The Cont r act or shal l submi t al l r equest s f or changes i n wr i t i ng t o t he Cont r act i ng Of f i cer . Do not pr oceed wi t h changes wi t hout possessi on of wr i t t en aut hor i zat i on of t he Cont r act i ng Of f i cer .
f . The Cont r act or shal l not conceal any wor k unl ess t he Cont r act i ng Of f i cer has appr oved al l i t ems of wor k whi ch ar e t o be conceal ed. The Cont r act or shal l not i f y t he Cont r act i ng Of f i cer of i t s i nt ent i on t o conceal wor k at l east 24 hour s i n advance of conceal ment .
1. 14 COORDINATION
1. 14. 1 Publ i c Not i ce
The publ i c shal l be not i f i ed of t hi s dr edgi ng pr oj ect appr oxi mat el y t wo weeks bef or e commencement of dr edgi ng oper at i ons at t he s i t e, each year t hat dr edgi ng i s per f or med. A br i ef descr i pt i on of t he wor k t o be per f or med and t he i nt ended schedul e of dr edgi ng and di sposal oper at i ons shal l be publ i shed i n a newspaper of gener al c i r cul at i on i n t he ar ea adj acent t o t he dr edgi ng. The not i ce shal l i ncl ude t he l ocat i ons wher e t he wor k i s t o be per f or med, t he t i me sequence of event s, a map of t he haul r out e t o be f ol l owed bet ween t he dr edgi ng ar eas and t he di sposal s i t e wi t h r ef er ence t o t he wi dt h of t he haul l ane, t he l ocat i on and l i mi t s of t he di sposal s i t e, and t he pr ocedur e t he Cont r act or wi l l use t o r espond t o c l ai ms f or l oss of pr oper t y dur i ng t he haul i ng wor k. The not i ce shal l i ncl ude t he Cont r act or ' s poi nt of cont act and t el ephone number .
1. 14. 2 Not i ce t o Mar i ner s
Pr i or t o t he st ar t of dr edgi ng oper at i ons each year , t he Cont r act or shal l coor di nat e wi t h t he U. S. Coast Guar d ( USCG) t o i ssue a " Not i ce t o Mar i ner s" r egar di ng t he wor k t o be per f or med and t he Cont r act or ' s pr oposed oper at i ons.
The Cor ps of Engi neer s and t he USCG have agr eed t o phr aseol ogy when i ssui ng navi gat i onal bul l et i ns and not i ces. The i nf or mat i on f ur ni shed shal l be consi st ent wi t h USCG Br oadcast Not i ce t o Mar i ner s and Local Not i ce t o Mar i ner s. When r equest i ng l ocal USCG of f i ces t o i ssue navi gat i onal i nf or mat i on f or Cor ps of Engi neer s wor k i nvol v i ng mar i ne const r uct i on, t he f ol l owi ng t er mi nol ogy shal l be used, as appl i cabl e:
For caut i onar y ar eas: " Mar i ner s ar e ur ged t o use ext r eme caut i on i n t he ar ea. "
For dr edgi ng and wor k oper at i ons: " Mar i ner s ar e ur ged t o t r ansi t at t hei r s l owest saf e speed t o mi ni mi ze wake and pr oceed wi t h caut i on af t er passi ng ar r angement s have been made. "
1. 14. 3 Ai ds t o Navi gat i on
Ai ds t o navi gat i on ( beacons, buoys, mar ker s, et c. ) have been pl aced by t he USCG i n t he v i c i ni t y of t he pr oj ect ar ea. The Cont r act or shal l not i nt er f er e wi t h t hese ai ds t o navi gat i on. I f t he wor k of t hi s pr oj ect r equi r es t he t empor ar y movement or r el ocat i on of any ai d t o navi gat i on, t he Cont r act or shal l not i f y t he USCG and t he Cont r act i ng Of f i cer of t he r equi r ement 30 days i n advance. USCG per sonnel wi l l t hen move or r el ocat e
SECTI ON 01 11 00 Page 12 t he ai d t o navi gat i on as appr opr i at e f or t he pr ogr ess of t he wor k. Under no c i r cumst ances shal l t he Cont r act or move or r el ocat e an ai d t o navi gat i on under hi s own aut hor i t y wi t h hi s own per sonnel . The Cont r act or shal l al so cont act t he USCG at t he compl et i on of al l wor k and t he r emoval of al l mar i ne pl ant .
1. 14. 4 Poi nt s of Cont act
a. Coast Guar d:
( 1) Ai ds t o Navi gat i on:
Mr . John Maur o Of f i ce Tel ephone: 617- 223- 8355 emai l : j ohn. j . maur o@uscg. mi l
Mr . Mat t hew St uck Of f i ce Tel ephone: 617- 223- 8365 emai l : mat t hew. b. st uck@uscg. mi l
( 2) Not i ce t o Mar i ner s:
Ms. Mar y F. Swanson Of f i ce Tel ephone: 617- 223- 8356 emai l : mar y. f . swanson@uscg. mi l
b. Town of Gl oucest er Massachuset t s
( 1) Har bor mast er 19 Har bor Loop, Gl oucest er , MA 01930
( a) Thomas P. Ci ar amet ar o, Jr .
Har bor Mast er Of f i ce Tel ephone: 978- 282- 3012 emai l : t c i ar amet ar o@gl oucest er - ma. gov websi t e: ht t p: / / gl oucest er - ma. gov/ har bor mast er
( b) Mr . Chad Johnson Deput y Har bor Mast er Of f i ce Tel ephone: 978- 325- 5750 emai l : c j ohnson@gl oucest er - ma. gov
The Har bor mast er ' s Of f i ce i s st af f ed Monday t hr ough Thur sday 8: 30a. m. - 3: 30p. m. Fr i days 8: 30 a. m - 12: 30 p. m. The Har bor mast er can be r eached on VHF Channel 16, VHF Channel 14, Ci t y Launch VHF Channel 72
( 2) Br i dget ender s
( a) Bl yman Canal VHF Channel 13 Tel ephone: 978- 283- 0243
( b) MBTA Rai l Road Br i dge VHF Channel 13 Tel ephone: 978- 281- 6228
( 3) Emer gency Ser vi ce
( a) Town of Gl oucest er Pol i ce Depar t ment 197 Mai n St # 1, Gl oucest er , MA 01930 Mai n Tel ephone: 978- 283- 1212
SECTI ON 01 11 00 Page 13
( b) Town of Gl oucest er Fi r e Depar t ment 8 School St , Gl oucest er , MA 01930 Mai n Tel ephone: 978- 281- 9760
( c) Emer gency Number : 911
1. 15 PRE- DREDGI NG PHOTOGRAPHI C SURVEY
The Cont r act or shal l per f or m a pr e- dr edgi ng phot ogr aphi c sur vey at t he pr oj ect s i t e wi t h t he Cont r act i ng Of f i cer . Thi s pr e- dr edgi ng phot ogr aphi c sur vey shal l i nc l ude st i l l phot ogr aphs and vi deos i n suf f i c i ent quant i t y t o f ul l y document t he exi st i ng condi t i on of al l bul kheads, pi er s, pi l es, f ender s, and ot her shor ef r ont f eat ur es wi t hi n and adj acent t o ar eas t o be dr edged as par t of t hi s cont r act . A wr i t t en nar r at i ve shal l be pr epar ed by t he Cont r act or whi ch or gani zes and summar i zes t he f i ndi ngs of t he pr e- dr edgi ng sur vey phot ogr aphs and vi deos. The nar r at i ve shal l separ at el y or gani ze al l i t ems by i ndi v i dual owner s. The condi t i on of each i t em shal l al so be document ed i n wr i t i ng. The wr i t t en nar r at i ve, t oget her wi t h t he phot ogr aphs and vi deos, shal l const i t ut e a " Pr e- Dr edgi ng Phot ogr aphi c Sur vey Repor t " , whi ch shal l be submi t t ed t o t he Cont r act i ng Of f i cer f or appr oval . No on- si t e dr edgi ng wor k shal l be per f or med unt i l t hi s " Pr e- Dr edgi ng Phot ogr aphi c Sur vey Repor t " has been appr oved. Damage t o f eat ur es caused by t he Cont r act or ' s oper at i ons shal l be r epai r ed by t he Cont r act or at no addi t i onal expense t o t he Gover nment .
1. 16 GENERAL SAFETY REQUI REMENTS
1. 16. 1 General
a. The Cont r act or shal l t ake al l necessar y pr ecaut i ons i n obser vi ng saf et y r egul at i ons i n accor dance wi t h Sect i on 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS, and shal l assume t he r esponsi bi l i t y t o guar d agai nst causi ng of f i r es and/ or expl osi ons and t o pr ot ect Gover nment pr oper t y.
The Cont r act or shal l per f or m t he wor k i n a manner consi st ent wi t h secur i t y and wi t h f i r e saf et y r egul at i ons especi al l y wi t h r egar ds t o i ngr ess and egr ess. Tempor ar y c l osur es shal l not compr omi se l i f e saf et y, secur i t y or f i r e saf et y.
1. 16. 2 Cont r act or ' s Pr oj ect Super i nt endent
The Cont r act or ' s pr oj ect super i nt endent shal l t ake an act i ve r ol e i n enf or ci ng t he saf et y r equi r ement s by par t i c i pat i on i n saf et y conf er ences, hazar d anal ysi s, t ool box meet i ngs, wal k- t hr ough i nspect i ons, cor r ect i on of v i ol at i ons, et c. , and i ncl udi ng t hat of any subcont r act or ' s wor k.
1. 17 ENVI RONMENTAL PROTECTI ON
To pr ovi de f or cont r ol of al l envi r onment al pol l ut i on ar i s i ng f r om const r uct i on act i v i t i es, t he Cont r act or and i t s subcont r act or s, i n t he per f or mance of t hi s cont r act , shal l compl y wi t h Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON, and al l appl i cabl e f eder al , st at e, and l ocal l aws and r egul at i ons concer ni ng envi r onment al pr ot ect i on pol l ut i on cont r ol and abatement.
PART 2 PRODUCTS
Not Used
SECTI ON 01 11 00 Page 14
PART 3 EXECUTI ON
Not Used
SECTI ON 01 11 00 Page 15
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 SUBMITTALS
1.2 JOB PAYMENT ITEMS
1.3 UNIT PRICE PAYMENT ITEMS
1.4 BIDDING SCHEDULE - PAYMENT ITEMS
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 22 00 Page 1
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-05 Design Data
Quantity Surveys
Submit originals of all field notes and all other records relating to the quantity surveys.
1.2 JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the BIDDING SCHEDULE and described below. The job price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.3 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items. Submit originals of all field notes and all other records relating to Quantity Surveys.
1.4 BIDDING SCHEDULE - PAYMENT ITEMS
Payment items for the work of this contract on which the contract progress payments will be based are listed in the BIDDING SCHEDULE and are described below. All costs for items of work, which are not specifically mentioned to be included in a particular Bidding Schedule job or unit price payment item, shall be included in the listed job or unit price item most closely associated with the work involved.
BASE BID ITEMS:
a. Item No. 0001, "Mobilization and Demobilization for
SECTION 01 22 00 Page 2
Dredging and Disposal in Season 1 (2019/2020)."
Payment Item Number 0001 will be made for costs associated with mobilization and demobilization required for dredging and disposal operations necessary to complete all work over dredge season one as required by the contract documents. Refer to Section 01 11 00 SUMMARY OF WORK under paragraph "Work Covered by Contract Documents", subparagraph d.
Mobilization and demobilization shall be as defined in Special Contract Requirements clause "PAYMENT FOR MOBILIZATION AND DEMOBILIZATION".
Unit of measure: Job.
b. Item No. 0002, "Mobilization and Demobilization for Dredging and Disposal in Season 2 (2020/2021)."
Payment Item Number 0002 will be made for costs associated with mobilization and demobilization required for dredging and disposal operations necessary to complete all work over dredge season two as required by the contract documents. Refer to Section 01 11 00 SUMMARY OF WORK under paragraph "Work Covered by Contract Documents", subparagraph d.
Mobilization and demobilization shall be as defined in Special Contract Requirements clause "PAYMENT FOR MOBILIZATION AND DEMOBILIZATION".
Unit of measure: Job.
b. Item No. 0003, "Maintenance Dredging and Disposal to Ipswich Bay Near-shore Placement Site ; 8-Foot Channel (Station 72+53 to Station 259+09"
c. Item No. 0004, "Maintenance Dredging and Disposal to Gloucester Bay Disposal Site; 8-Foot Channel (Station 0+00 to Station 44+00)"
d. Item No. 0005, "Maintenance Dredging and Disposal to Ipswich Near- Shore Placemnt Site; 8-Foot Anchorage"
The contract price per cubic yard for Payment Item Numbers 0002, 0003, and 0004 shall include all costs for removal of shoaled materials encountered from dredging the Federal Navigation Project (FNP) to the specified depths, and the transportation to and disposal of the dredged material at the designated disposal site as specified under Section
35 20 23 MECHANICAL DREDGING.
The total amount of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.