Solicitation_W912WJ-17-Q-0101.pdf

PDF 761 KB Posted

Attached to
Thames River Basin Minor Construction BPA
Solicitation number
W912WJ-17-Q-0101
Issued by

About this file

Solicitation W912WJ-17-Q-0101

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

W912WJ-17-Q-0101 04-May-2017 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

SEE SCHEDULE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ] FOB

DESTINATION

[ ] OTHER X

(See Schedule)

15-May-2017(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

978-318-8195ERIN E BRADLEY

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

W912WJ-17-Q-0101

Section B - Supplies or Services and Prices

BID SCHEDULE

BLANKET PURCHASE AGREEMENT

U.S. ARMY CORPS OF ENGINEERS

MINOR BUILDING CONSTRUCTION SERVICES

Thames River Basin

Massachusetts, Rhode Island, Connecticut February 2017

Unit Price Schedule

DESCRIPTION UNIT

Base Year

PRICE 4

Option Year 1 PRICE

Option Year 2

PRICE 4

1. Administrative – Office Work

HR 1

2. Master Carpenter 5

3. Master Plumber 5

4. Master Electrician 5

5. Roofer 5 HR 1

6. Painter 5

7. General Laborer 5

8. Building Construction Demolition Debris Disposal 2

9. Construction Materials & Supplies 3

Not to Exceed $3,000/BPA Call

NOTES:

1. The Unit Price (HR) includes the Combined Hourly Rate for the equipment, crew and the supplies/materials/fuel required to support the specified crew or trade.

2. The Percent (%) Mark-Up is for Contractor’s actual disposal cost. The building construction demolition debris will not contain any hazardous materials. The contractor shall provide the Technical Point of Contact with actual disposal waybill as part of the applicable invoice.

3. The Percent (%) Mark-Up is for Contractor Furnish Construction Materials and Supplies Only.

4. A separate Bid Schedule may be provided for each Project Location or County to accommodate potential differences in pricing.

5. The Contractor may utilize separate subcontractors to satisfy the specific trade requirements.

ADDITIONAL INFORMATION

PLEASE DIRECT QUESTIONS TO ERIN E. BRADLEY AT (978) 318‐8195 OR

erin.e.bradley@usace.army.mil. THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE

GOVERNING DOCUMENT IN ALL CASES.

QUOTES CAN BE FAXED OR E‐MAILED TO ERIN E. BRADLEY AT (978) 318‐8207 or erin.e.bradley@usace.army.mil. E‐MAIL IS THE PREFERRED METHOD OF SUBMISSION.

Offerors are notified that the basis for award is price alone.

Contractors must be registered in the System for Awards Management at www.SAM.gov (formerly the Central Contractor Registration (CCR) database and the On‐Line Representations and Certifications (ORCA) (see DFARS clause 252.204‐7004 Alt A). Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla FireFox, Safari, and Internet Explorer are supported browsers.

SAM.gov registration takes approximately 3 weeks (DUNS registration 1‐2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7‐10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow‐up with required tasks. SAM.gov registration does not have to be “active” to be able to submit a quote. However, contractors must have an active record before a contract award can be made. If SAM.gov registration is not completed in a timely fashion in accordance with the SAM.gov timelines, the Government reserves the right to disqualify the quote in accordance with FAR 52.204‐7(d).

Provide DUNS number: ___________________________ (telephone 866‐705‐5711 for DUNS) Provide CAGE code: ____________________________ Provide TAX ID: __________________________ Per FAR Clause 52.212‐3 Alt I, the Contractor is required to complete the On‐line Representations and Certifications Application (www.SAM.gov) and paragraph (b) if applicable, OR to complete paragraphs (c) thru (m) of this clause and return with quote.

Section C - Descriptions and Specifications

SCOPE OF WORK

BLANKET PURCHASE AGREEMENT

U.S. ARMY CORPS OF ENGINEERS

MINOR BUILDING CONSTRUCTION SERVICES

Thames River Basin

March 2017

I. General

1. Scope of Work

The purpose of this Blanket Purchase Agreement (BPA) is to provide an indefinite quantity of Minor Building Construction Services. The Contractor shall furnish all labor, equipment and materials necessary to execute the Construction Equipment Services for each BPA Call under this agreement. No single BPA Call may exceed $25,000 in total cost. The BPA Master Dollar Limit is $250,000. The intent of this blanket BPA is to provide the government with a cost-effective rapid response way to maintain the U.S. Army Corps of Engineers facilities.

In accordance with FAR 13.303-3(a)(2), the Government is obligated only to the extent of authorized purchases actually made under the BPA.

2. Project Locations The Project Offices are located in Massachusetts, Rhode Island, and Connecticut and include the following locations:

a. Buffumville Lake Project Office 48 Old Oxford Road, Charlton, MA 01507 (Worcester County)

b. Charles River Natural Valley Storage Area Project Office

518 E. Hartford Ave., Uxbridge, MA 01569

c. Conant Brook Dam Project Office

98 Conant Brook Road, Monson, MA 01057 (Hampden County)

d. East Brimfield Lake Project Office

24 Riverview Ave., Fiskdale, MA 01518 (Worcester County)

e. Hodges Village Dam Project Office

30 Howarth Road, Oxford, MA 01540 (Worcester County)

f. Mansfield Hollow Lake Project Office

147 Mansfield Hollow Road, Mansfield Center, CT 06250 (Windham County)

g. Thames River Basin Office (Co-Located with Hodges Village Dam)

30 Howarth Road, Oxford, MA 01540 (Worcester County)

h. West Hill Dam Project Office

518 Hartford Ave., Uxbridge, MA 01569 (Worcester County)

i. Westville Lake Project Office

99 Marjorie Lane, Southbridge, MA 01550 (Worcester County)

j. West Thompson Park Project Office 449 Reardon Road, N. Grosvenordale, CT 06255 (Windham County)

k. Woonsocket Flood Control Project Area Includes the following:

i. Woonsocket Falls Dam, 121 South Main Street, Woonsocket, RI 02895 (Providence County)

ii. Social District Pumping Station, 593 Clinton Street, Woonsocket, RI 02895 (Providence County)

iii. Hamlet District Pumping Station, 195 Davidson Avenue, Woonsocket, RI 02895 (Providence County)

iv. Singleton Street Pumping Station, 100 Singleton Street, Woonsocket, RI 02895 (Providence County)

3. Site Visit Contact the Technical Point of Contact for each location to arrange a site visit. The Technical Point of Contact for each location is as follows:

a. Buffumville Lake Hodges Village Dam Project Manager, Timothy Russell Phone: 978.318.8426 Email: Timothy.G.Russell@usace.army.mil

b. Charles River Natural Valley Storage West Hill Dam Woonsocket Flood Control Project Project Manager, Joe Zanca Phone: 978.318.8419 Email: Joseph.l.zanca@usace.army.mil

c. Conant Brook Dam East Brimfield Lake Westville Lake Project Manager, Keith Beecher Phone: 978.318.8405 Email: Keith.W.Beecher@usace.army.mil

d. Mansfield Hollow Lake West Thompson Park Project Manager, Ed Greenough Phone: 978.318.8554 Email: Edward.P.Greenough@usace.army.mil

4. Schedule

a. The BPA Base Year shall have a 12-month period of performance from the date of award. In addition, the Government may exercise two (2) optional years with the same scope of services. Each option year shall have a 12- month period of performance.

b. The Contractor shall provide a quote for each BPA Call request within 14 days of the initial contact by the Technical Point of Contact. The Contractor may receive additional time to provide the quote if it is pre-approved by the Technical Point of Contact.

c. Upon receipt of an executed BPA Call from the Government, the Contractor shall coordinate the start of the work no later than 14 calendar days after notification.

5. Workday Project areas will be open to the contractor Monday through Friday 7:00 AM to 3:30 PM and all work must be completed during those hours unless additional hours are approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays unless approved by the Technical Point of Contact.

6. Safety The Contractor shall comply with all pertinent provisions of the latest edition of the U.S.

Army Corps of Engineers Safety and Health Requirements, COE EM 385-1-1. A copy of COE EM 385-1-1 is available for reference at the project office or may be viewed at the following link:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385- 1-1.pdf.

The Contractor shall also comply with all OSHA work safety standards. The project staff can and will order the cessation of work at any time should the safety of employees and visitors become jeopardized.

7. Preconstruction Conference

Prior to the start of any work, the Technical Point of Contact will schedule and conduct a “Preconstruction Conference.” The Contractor’s Project Manager and Quality Control Personnel shall attend this meeting. This conference will be held at the time and location agreeable to the Government and Contractor. No work shall be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Preconstruction Conference the Contractor shall provide the name of the project manager with a telephone number for project coordination.

The following is a general list of items for discussion during this Preconstruction Conference:

i. Authority of the Technical Point of Contact and Quality Assurance Inspectors

ii. Contractor’s Safety Program (including sub-contractors)

iii. Abbreviated Accident Prevention Plan (Submitted & Accepted Annually)

iv. Activity Hazard Analysis (Submitted & Accepted prior to start of each BPA Call)

v. Safety Meetings for each BPA Call (Documented on NED Form 251)

vi. Accident Reporting (ENG Form 3394)

vii. Safety Data Sheet (SDS) requirements

viii. Correspondence, Communication and Administrative Procedures

ix. Invoice and payment NOTE: Work cannot begin until all safety paperwork is submitted and accepted by the Government

8. Permits The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

9. Security

The Contractor shall comply with all established security policies at each Project Office identified. If applicable, Contractor shall comply with Projects Key Control Management Program. Due to periods of heightened security, which may affect access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor’s ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least a 24-hour notice of any such closure.

10. Contractor Conduct

Alcohol and firearms are prohibited on project grounds. Contractor and employees shall comply with CFR 36 Rules and Regulations.

11. Payment

Payment will be made on a per job basis. After final inspection and acceptance by the Government, the Contractor shall submit an invoice to the Technical Point of Contact. The invoice shall include the following: Invoice Date; Contract Number; Dates of Service;

Description of Work; Quantities; Material/Supply Back-Up, and total amount due per line item. For jobs greater than 30 days the Contractor may request progress payment. The invoices for each project will be sent (via mail, email or fax) to the appropriate Technical Point of Contact:

Point of Contact:

a. Buffumville Lake Hodges Village Dam

i. Mail: 48 Old Oxford Road Charlton, MA 01507 Attn: Timothy Russell Phone: 978.318.8426

ii. Email: Timothy.G.Russell@usace.army.mil

iii. FAX: 508.248.1862

b. Charles River Natural Valley Storage West Hill Dam Woonsocket Flood Control Project

i. Mail: 518 E. Hartford Ave Uxbridge, MA 01569 Attn: Joe Zanca Phone: 978.318.8419

ii. Email: joseph.l.zanca@usace.army.mil

iii. FAX: 508.278.4234

c. Conant Brook Dam East Brimfield Lake

i. Mail: 24 Riverview Ave Fiskdale, MA 01518 Attn: Keith Beecher Phone: 978.318.8405

ii. Email: Keith.W.Beecher@usace.army.mil

iii. FAX: 508.347.8732

d. Mansfield Hollow Lake West Thompson Park

i. Mail: 449 Reardon Road, N. Grosvenordale, CT 06255 Attn: Ed Greenough Phone: 978.318.8554

ii. Email: Edward.P.Greenough@usace.army.mil

iii. FAX: 860.923.1126

II. Technical Requirements:

Part 1 General:

1.1. Requests for Information:

Requests concerning the work each individual BPA Call should be directed to the Technical Point of Contact for the specific Project Location.

1.2. References:

1.2.1. National Fire Protection Association (NFPA)

1.2.1.1. NFPA 101 Life Safety Code 2015 Edition

1.2.2. International Code Council

1.2.2.1. International Building Code (IBC) 2015 Edition

1.3. Submittals:

Although the Government technically reviews submissions required by this Scope of Work, it is emphasized that the Contractor’s work must be prosecuted using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted for review and accepted by the Government prior to the commencement of any field activities.

1.3.1. Abbreviated Accident Prevention Plan (AAPP) for the Base Year and annual for each Option Year.

1.3.2. Activity Hazard Analysis (AHA) for each BPA Call

1.3.3. Material List for each BPA Call: Detail material/parts list identifying the material, parts or supplies to be installed, as part of the BPA Call. In addition, the Contractor shall identify recycled material content based upon EPA’s Comprehensive Procurement Guidelines (Reference FAR 52.223-17 and FAR 52.223-4).

1.4. Clean Up:

The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials. Upon completing work in an area, the Contractor shall remove any tools, equipment, and materials that are not the property of the Government.

Upon completion of work, the Contractor shall clean up the job site to the satisfaction of the Government.

All recyclable construction and demolition materials shall be recycled according to state and local laws.

1.5. Government Resources:

The Contractor is responsible for providing all materials to complete the project. Unless specified in the contract, the Government will not provide any equipment, water, electricity, telephone services or other resources.

1.6. Omissions:

This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable and functional product.

1.7. Quality Assurance:

The Contractor is responsible for the quality control of the contract work. The Government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.

1.8. Other Contracts:

The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other contractors and Government employees. The Contractor shall not commit or permit any act, which will interfere with the performance of work by another contractor or by Government employees.

1.9. Receiving and Storing Materials:

The Contractor is responsible for protecting any stored materials until they are placed in service. The Contractor is responsible for receiving and unloading delivered goods.

Government employees will not receive materials or supplies for the Contractor and will not be responsible for damage to Contractor equipment or materials.

Part 2 Products:

Sustainability:

All products provided by the contractor must meet the recycled content requirements set forth by the EPA. Products that fall under these requirements are things such as cement, concrete, non-pressure pipes, etc. The list of approved products is periodically updated, please check the EPA website for the most current list: https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products.

Furthermore, the contractor should also meet the BioPreferred Program requirements set in place by the USDA. These will include products such as wood and concrete sealers, erosion controlled materials, sorbents, etc. For the most current list of products, please visit:

https://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml

2.1. Construction Materials

2.1.1. The intent of this material section is not to specify every product to be used in the execution of the work. Rather, to define the expected standards to be followed and the quality of the product to be used.

2.1.2. All construction material shall be new, un-used and be first quality material or products. In addition, construction material shall and be produced domestically or manufactured domestically in accordance with the Buy American Act.

2.1.3. All construction material shall be in conformance to the applicable sections of the International Building Code (2015).

2.1.4. All construction material shall be in conformance to the applicable sections of the National Fire Protection Association (NFPA) Fire and Life Safety Codes [in place of the International Fire Code (IFC)].

2.1.5. All construction material shall conform to the EPA’s Comprehensive Procurement Guidelines to the greatest extend practical. The guidelines can be located at:

http://www3.epa.gov/epawaste/conserve/tools/cpg/products/construction.htm (Reference FAR 52.223-17, Affirmative Procurement of EPA-designated Items in Service and Construction Contracts).

Part 3 Execution:

3.1. Scope of Work:

The Technical Point of Contact will provide a Scope of Work (SOW) to the Contractor to review and determine the level of effort required to complete the project. The Technical Point of Contact and the Contractor will negotiate the final SOW. The Contractor shall furnish the Technical Point of Contact a quote and detailed Parts/Materials list required to complete the final SOW. The work may likely include the following requirements:

3.1.1. Roof repair (including framing, decking, shingles and membrane)

3.1.2. Siding and trim repair & replacement

3.1.3. Sheetrock and drywall repair & replacement

3.1.4. Finish carpentry

3.1.5. Flooring repair or replacement (including wood, tile, vinyl & carpet)

3.1.6. Interior, exterior & garage door replacement and repair

3.1.7. Plumbing repairs and upgrades

3.1.8. Electrical repairs and upgrades

3.1.9. Interior & exterior painting

3.1.10. Timber or wooden fence repair or replacement.

3.1.11. The above task may be required at the following location:

3.1.11.1. Project Office

3.1.11.2. Gatehouse

3.1.11.3. Pumping Stations

3.1.11.4. Recreation Areas

3.1.11.5. Garages & accessory buildings

3.2. Qualifications:

3.2.1. Experience: The Contractor shall have a minimum of five years of experience with general building construction, including each applicable trade identified in the BPA. The Contractor shall have sufficient personnel to adequately service up to three (3) BPA Calls concurrently with fully-qualified personnel to satisfy the requirements of each BPA Call with no degradation in quality or supervision. The contractor may rely in part on the experience and qualification of subcontractors to satisfy the above requirements.

3.2.2. License and/or Certification:

ALL work shall be performed by Qualified Personnel with verifiable credentials who are familiar with applicable code requirements. Verifiable credentials consist of State, National and/or Local Certifications or Licenses that a Master or Journeyman may hold, depending on work being performed under this BPA.

3.2.3. Equipment:

3.2.3.1. ALL equipment shall be in good operating and mechanical condition and comply with EM 385-1-1 Army Corps of Engineers Safety and Health

Requirements. ALL equipment shall be operated in accordance with manufacturers recommendations and include

3.2.3.2. The Technical Point of Contact may inspect required equipment at any time when in use on Government property. Any equipment found deficient shall be removed from service immediately until faulty conditions have been corrected. No such removal will reduce the Contractor’s obligation to perform all work required within the time scheduled under this contract.

3.3. Building Construction Trades and Personnel Descriptions:

ALL equipment provided shall include the appropriate qualified operator, personal protection equipment (PPE), and fuel. All labor shall be performed in accordance with all federal, state and local laws.

3.3.1. Administrative – Office Work:

The Administrative or Office Work shall be completed by an individual knowledgeable about the specific trades involved and the contract requirements.

The personnel are not required to be licensed in the specific trades. The tasks may likely include, Project Coordination, Submittal Coordination and other related tasks.

3.3.2. Master Carpenter:

The Master Carpenter shall be capable of independent work, with knowledge and experience related to residential and commercial carpentry work. The Master Carpenter shall have a comprehensive knowledge of the applicable building codes.

3.3.3. Master Plumber:

The Master Plumber shall be licensed and capable of independent work, with knowledge and experience related to residential and commercial plumbing work.

The Master Plumber shall have a comprehensive knowledge of the applicable building codes.

3.3.4. Master Electrician:

The Master Electrician shall be licensed and capable of independent work, with knowledge and experience related to residential and commercial electrical work.

3.3.5. Roofer:

The Roofer shall be capable of independent work, with knowledge and experience related to residential and commercial construction. The Roofer shall have a comprehensive knowledge of the applicable building codes.

3.3.6. Painter:

The Painter shall be capable of independent work, with knowledge and experience related to residential and commercial construction. The Painter shall have a comprehensive knowledge of the applicable building codes.

3.3.7. General Laborer:

The General Laborer shall have knowledge and experience related to residential and commercial building construction. The General Laborer shall have knowledge of the applicable building codes.

3.3.8. Travel Time:

The Contractor may include travel time for each crew member for each day that the personnel are on site executing the BPA Call requirements. The travel time charge may not exceed two (2) hours per day and may not exceed the travel time from the Contractor’s Office/base of operation to the Project Location (Route Trip) included in the BPA Call.

3.4. Material and Supply Descriptions:

3.4.1. Contractor Furnished Materials and Supplies:

As part of the Quote, the Contractor shall furnish a detailed material/supply list required to complete the SOW. The parts list shall include the unit price and the extended price. The parts list shall be detailed enough to allow the Technical Point of Contact to confirm compliance with the applicable requirements and price reasonableness. The Contractor-Furnished Materials and Supplies shall not exceed $3,000 for each individual BPA Call. The Contractor will be required to provide the detailed list as part of the invoice backup.

3.4.2. Government Furnished Materials and Supplies:

At times it may be advantageous for the Government to provide the materials and supplies (in whole or part) to the Contractor for installation. The Government will utilize the detailed material/supply list provided by the Contractor to purchase the materials and supplies outside of the BPA Call. Under this circumstance, the Government-Furnished Materials and Supplies will not be included in the BPA Call total.

BLANKET PURCHASE AGREEMENT

U.S. ARMY CORPS OF ENGINEERS

MINOR BUILDING CONSTRUCTION SERVICES

Thames River Basin

February 2017

Map of Project Locations

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

Section H - Special Contract Requirements

WAGE RATES

General Decision Number: MA170018 04/14/2017 MA18

Superseded General Decision Number: MA20160018

State: Massachusetts

Construction Type: Building

County: Worcester County in Massachusetts.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 1 02/03/2017 2 03/03/2017 3 03/10/2017 4 03/17/2017 5 04/07/2017 6 04/14/2017

ASBE0006-013 09/01/2016

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR (Duct, Pipe, & Mechanical System Insulation)....$ 40.58 26.35

* BRMA0003-004 03/01/2017

Rates Fringes

TILE FINISHER....................$ 38.78 28.54

TILE SETTER......................$ 50.80 30.29

* BRMA0003-005 03/01/2017

Rates Fringes

BRICKLAYER (Includes

Pointing, Caulking, Cleaning, and Waterproofing)...............$ 48.66 29.47

CARP0107-001 09/01/2016

Rates Fringes

CARPENTER (Includes Acoustical Ceiling installation, Batt Insulation, Drywall Hanging, Form Work, Metal Building-Metal Siding/Wall Panels, Metal Stud Installation, Scaffold Building, Fireproofer, Window and Curtain Wall Installation)...$ 37.80 27.40

ELEC0096-003 02/01/2017

Rates Fringes

ELECTRICIAN

Includes HVAC/Temperature Controls Installation.......$ 39.37 22.59 Low Voltage Wiring..........$ 26.16 22.49

ELEV0041-005 01/01/2017

Rates Fringes

ELEVATOR MECHANIC................$ 49.90 31.585+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0004-012 12/01/2016

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1:

Backhoe/Excavator/Trackhoe, Loader......................$ 45.38 26.15+A GROUP 2: Bulldozer..........$ 44.94 26.15+A

FOOTNOTE:

A. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Patriot's Day, Columbus Day, Labor Day, Vetersns Day; Thanksgiving Day and Christmas Day.

IRON0007-018 03/16/2016

IRONWORKER (Ornamental, Reinforcing, and Structural).....$ 42.89 29.89

LABR0721-002 12/01/2016

Rates Fringes

LABORER (Mason Tender-Brick).....$ 31.90 21.30

PAIN0035-018 01/01/2015

Rates Fringes

PAINTER (Brush/Roller, Including Drywall Finisher/Taper)..................$ 36.26 25.95

PLUM0004-004 03/01/2017

Rates Fringes

PLUMBER/PIPEFITTER (Includes HVAC Pipe and Unit Installation)....................$ 42.81 25.51

ROOF0033-005 02/01/2017

Rates Fringes

ROOFER...........................$ 41.36 25.17

SHEE0063-006 01/01/2016

Rates Fringes

SHEET METAL WORKER (Includes HVAC Duct and Unit Installation)....................$ 31.57 28.12

SUMA2014-002 04/04/2016

Rates Fringes

LABORER: Common or General......$ 39.84 12.04

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division

U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: MA170003 04/14/2017 MA3

Superseded General Decision Number: MA20160003

State: Massachusetts

Construction Type: Building

Counties: Berkshire, Franklin, Hampden and Hampshire Counties in Massachusetts.

BUILDING CONSTRUCTION PROJECTS Does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional

1 01/13/2017 2 02/03/2017 3 03/03/2017 4 03/10/2017 5 03/17/2017 6 04/14/2017

ASBE0006-011 09/01/2016

Rates Fringes

Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems).....$ 36.07 26.35

* BOIL0029-001 01/01/2017

Rates Fringes

BOILERMAKER......................$ 42.42 24.92

* BRMA0001-001 02/27/2017

SPRINGFIELD/PITTSFIELD CHAPTER FRANKLIN, HAMPDEN, and

HAMPSHIRE COUNTIES

BRICKLAYER

BRICKLAYERS; CEMENT

MASONS; PLASTERERS; STONE

MASONS; MARBLE, TILE &

TERRAZZO WORKERS............$ 39.26 28.23

* BRMA0001-003 02/27/2017

SPRINGFIELD/PITTSFIELD

BERKSHIRE

Rates Fringes

BRICKLAYER

BRICKLAYERS; CEMENT

MASONS; PLASTERERS; STONE

MASONS; MARBLE, TILE &

TERRAZZO WORKERS............$ 39.26 28.23

CARP0056-014 08/01/2015

Rates Fringes

PILEDRIVERMAN....................$ 42.04 29.73

CARP0107-009 09/01/2016

Franklin County (Erving, Orange, North Orange and Warwick)

Rates Fringes

CARPENTER........................$ 37.80 27.40

CARP0108-005 09/05/2016

HAMPDEN; HAMPSHIRE AND FRANKLIN (Remainder)

Rates Fringes

Carpenter/Lather/Drywall Applicator.......................$ 33.56 23.76

CARP0108-011 09/05/2016

BERKSHIRE COUNTY

Rates Fringes

CARPENTER........................$ 33.56 23.76

CARP1121-001 10/01/2016

Rates Fringes

MILLWRIGHT.......................$ 37.97 29.25

CARP2168-003 09/01/2016

Rates Fringes

FLOOR LAYER: Carpet.............$ 33.56 23.78

ELEC0007-002 07/03/2016

HAMPDEN (Except Chester & Holyoke); HAMPSHIRE (Belchertown, Ware)

ELECTRICIAN......................$ 39.11 20.27

ELEC0007-003 07/03/2016

BERKSHIRE; FRANKLIN; HAMPDEN (Chester, Holyoke); HAMPSHIRE (Except Belchertown, Ware)

ELECTRICIAN......................$ 39.11 20.27

ELEC0007-006 07/03/2016

Rates Fringes

Teledata System Installer........$ 39.11 20.27

ELEC0042-003 08/30/2015

Rates Fringes

Line Construction:

Heavy Equipment Operator....$ 39.87 6.25%+18.56 Lineman, Cable Splicer and Dynamite Man................$ 44.30 6.25%+20.70 Material Man, Tractor Trailer Driver, Equipment Operator....................$ 37.66 6.25%+17.99

ELEV0041-001 01/01/2017

Rates Fringes

ELEVATOR MECHANIC................$ 49.90 31.585+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0098-001 12/01/2016

Rates Fringes

Power equipment operators:

(BUILDING & RESIDENTIAL)

Group 1...................$ 33.68 23.96+A Group 2...................$ 33.37 23.96+A Group 3...................$ 33.15 23.96+A Group 4...................$ 32.54 23.96+A Group 5...................$ 29.92 23.96+A Group 6...................$ 28.80 23.96+A Group 7...................$ 26.86 23.96+A Group 8...................$ 305.95 23.962+A Group 9...................$ 230.69 23.96+A Group 10...................$ 35.17 23.96+A Group 11...................$ 38.18 23.96+A Group 12...................$ 39.68 23.96+A Group 13...................$ 40.68 23.96+A Group 14...................$ 41.68 23.96+A Group 15...................$ 43.18 23.96+A

HAZARDOUS WASTE PREMIUM $2.00

FOOTNOTE FOR POWER EQUIPMENT OPERATORS:

Group 8 and Group 9 are per day wages.

A. Paid Holidays: New year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

Group 1: Shovels; crawlers and truck cranes including all tower; self-propelled hydraulic cranes 10 tons and over;

draglines; clam shells; cableways; shaft hoists; mucking machines derricks; backhoes; bulldozers; gradalls;

elevating graders; pile drivers; concrete pavers; trenching machines; front end loaders- 5 1/2 cu yds and over; dual drum paver; automatic grader-excavator(C.M.I. or equal);

scrapers towing pan or wagon; tandem dozers or push cats(2 units in tandem); shotcrete machine; tunnel boring machine;

combination backhoe/loader 3/4 cu yd hoe or over; jet engine dryer; tree shredder; post hole digger; post hole hammer; post extractor; truck mounted concrete pump with boom; roto-mill; Grader; Horizontal Drilling Machine; John Henry Rock Drill and similar equipment.

Group 2: Rotary drill with mounted compressor; compressor house (3 to 6 compressors); rock and earth boring machines (excluding McCarthy and similar drills); front end loaders 4 cu yds to 5 1/2 cu yds); forklifts-7 ft lift and over 3 ton capacity; scraper 21 yds and over (struck load); sonic hammer console; reclaimers road planer/milling machine; cal tracks; ballast regulators; rail anchor machines; switch tampers, asphalt pavers; mechanic; welder and transfer machine.

Group 3: Combination backhoe/loader up to 3/4 cu yd;

scrapers up to 21 cu yd (struck load, self propelled or tractor drawn); tireman; front end loaders up to 4 yds;

well drillers; engineer or fireman on high pressure boiler;

self-loading batch plant; well point operators electric pumps used in well point system; pumps, 16 inches and over (total discharge); compressor, one or two 900 cu ft and over; powered grease truck; tunnel locomotives and dingys;

grout pumps; hydraulic jacks; boom truck; hydraulic cranes-up to 10 ton.

Group 4: Asphalt rollers; self-powered rollers and compactors; tractor without blade drawing sheepsfoot roller; rubber tire roller; vibratory roller or other type of compactors including machines for pulverizing and aerating soil; york rake.

Group 5: Hoists; conveyors; power pavement breakers;

self-powered concrete pavement finishing machines; two bag mixers with skip; McCarthy and similar drills; batch plants (not self loading); bulk cement plants; self-propelled material spreaders; three or more 10 KW light plants; 30 KW or more generators; power broom.

Group 6: Compressor (one or two) 315 cu ft to 900 cu ft;

pumps 4 inches to 16 inches (total discharge).

Group 7: Compressors up to 315 cu ft; small mixers with skip; pumps up to 4 inches; power heaters; oiler; A-frame trucks; forklifts-up to 7 ft. lift and up to 3 ton capacity; hydro broom; stud welder.

Group 8: Truck crane crews Group 9: Oiler Group 10: Master Mechanic Group 11: Boom lengths over 150 feet including jib Group 12: Boom lengths over 200 feet including jib Group 13: Boom lengths over 250 feet including jib Group 14: Boom lengths over 300 feet including jib Group 15: Boom lengths over 350 feet including jib

IRON0007-014 03/16/2016

BERKSHIRE (Becket, East Otis, Hinsdale, Monterey, New Marlboro, North Otis, Otis, Peru, Sandisfield, Savoy, Sheffield, Washington, Windsor); FRANKLIN; HAMPDEN; HAMPSHIRE

IRONWORKER.......................$ 30.93 28.15

IRON0012-003 05/01/2016

BERKSHIRE (Lee)

Rates Fringes

IRONWORKER.......................$ 30.05 23.14

IRON0012-004 05/01/2016

BERKSHIRE (Remainder of County)

Rates Fringes

Ironworkers:

Sheeter.....................$ 30.30 23.14 Structural, Ornamental, Reinforcing, Fence Erector, Machinery Mover, Rigger, Rodman, Stone Derrickman..................$ 30.05 23.14

LABO0014-004 06/01/2015

BERKSHIRE COUNTY

FRANKLIN COUNTY (the towns of Ashfield, Buckland, Charlemont, Hawley, Heath, and Rowe only) HAMPSHIRE COUNTY (the towns of Chesterfield, Cummington, Goshen, Middlefield, Plainfield, and Worthington only)

Plasterer tender.................$ 28.75 19.58

LABO0014-005 06/01/2016

HAMPDEN COUNTY

HAMPSHIRE COUNTY (with the exception of Chesterfield, Cummington, Goshen, Middlefield, Plainfield, and Worthington) FRANKLIN COUNTY (with the exception of Ashfield, Buckland, Charlemont, Hauley, Heath, Orange, Rowe, and Warwick)

Plasterer tender.................$ 31.65 21.30

LABO0022-002 06/01/2016

FRANKLIN (Orange, Warwick)

Rates Fringes

Laborers:

GROUP 1.....................$ 31.65 21.30

GROUP 2.....................$ 31.90 21.30

GROUP 3.....................$ 32.40 21.30

GROUP 4.....................$ 32.65 21.30

GROUP 5.....................$ 32.40 21.30

GROUP 6.....................$ 33.65 21.30

LABORERS CLASSIFICATIONS

GROUP 1: Laborers; carpenter tenders; cement finisher tenders, plasterer tenders

GROUP 2: Asphalt raker; fence and guard rail erector; laser beam operator; mason tenmder; pipelayer; pneumatic drill operator; pneumatic tool operator; wagon drill operatorm jackhammer operator, pavement breaker, carbide core drilling machine, chain saw operator, barco type jumping tampers, concrete pump, motorized mortar miner, ride-on motorized buggy

GROUP 3: Air track operator; block paver; rammer; curb setter, hydraulic and similar self-powered drills

GROUP 4: Blaster; powderman

GROUP 5: Precast floor and roof, plank erector

GROUP 6: Asbestos Abatement, Toxic and Hazardous waste laborers

LABO0473-001 06/01/2016

BERKSHIRE COUNTY, FRANKLIN COUNTY, (THE TOWNS OF ASHFIELD,

BUCKLAND, CHARLEMONT, HAWLEY, HEATH, AND ROWE ONLY) HAMPSHIRE

COUNTY (THE TOWNS OF CHESTERFIELD, CUMMINGTON, GOSHEN,

MIDDLEFIELD, PLAINFIELD, AND WORTHINGTON ONLY)

Laborers:........................$ 25.25 18.90

LABO0596-001 06/06/2016

HAMPDEN COUNTY, HAMPSHIRE COUNTY (WITH THE EXCEPTION OF

CHESTERFIELD, CUMMINNGTON, GOSHEN, MIDDLEFIELD, PLAINFIELD, AND

WORTHINGTON) FRANKLIN COUNTY (WITH THE EXCEPTION OF ASHFIELD,

BUCKLAND, CHARLEMONT, HAULY, HEATH, ORANGE,ROWE AND WARWICK)

Laborers:

GROUP 1.....................$ 29.15 20.55

GROUP 2.....................$ 29.40 20.55

GROUP 3.....................$ 29.90 20.55

GROUP 4.....................$ 29.90 20.55

GROUP 5.....................$ 30.15 20.55

LABORERS CLASSIFICATIONS

GROUP 1: Laborers, carpenter tenders, wrecking laborers

GROUP 2: Asphalt rakers, carbide core driller operators, chain saw operators, pipelayers, jackhammer and paving breaker operators, Barco type jumping tampers, laser beam operators, concrete pump operators, mason tenders, motorized mortar mixers, ride-on motorized buggy operators, wagon drill operators

GROUP 3: precast floor and roof plank erectors, sign erectors, asbestos removal laborers, haz-mat laborers

GROUP 4: Air track operators, block pavers, rammers and curb setters, hydraulic and similar self-powered drills

GROUP 5: Powderman and blaster

MARB0097-001 03/01/2012

Rates Fringes

MARBLE FINISHER..................$ 28.43 25.85

PAIN0011-008 06/01/2016

Rates Fringes

GLAZIER..........................$ 35.58 20.15+A

FOOTNOTE:

A. PAID HOLIDAY: LABOR DAY (provided employee has worked any part of the week prior to Labor Day and any part of the week after Labor Day

PAIN0035-007 01/01/2015

Painters:

NEW CONSTRUCTION:

Brush, Taper...............$ 29.03 22.05 Spray, Sandblast...........$ 30.43 22.05

REPAINT:

Brush, Taper...............$ 26.35 22.05 Spray, Sandblast...........$ 27.75 22.05

PLUM0004-003 03/01/2017

FRANKLIN (Orange)

Rates Fringes

Plumber and Steamfitter..........$ 42.81 25.51

PLUM0104-004 03/17/2017

BERKSHIRE (Becket, Otis, Sandisfield); FRANKLIN (Except Monroe, Rowe, and the Western part of Charlemont); HAMPDEN; HAMPSHIRE

Plumbers and Pipefitters.........$ 39.26 24.60+a

FOOTNOTE:

A. Two paid holidays, Independence Day and Labor Day, provided the employee has been employed seven days prior to the holiday by the same employer

PLUM0104-009 03/17/2017

BERKSHIRE (Except Otis, Becket, Sandisfield); FRANKLIN (Monroe, Rowe and the Western part of Charlemont)

Plumber and Steamfitter..........$ 37.73 24.60+a

FOOTNOTE FOR PLUMBERS & STEAMFITTERS:

A. Paid holidays: Independence Day and Labor Day, provided the employee has been employed seven days prior to the holiday by the same employer.

ROOF0248-001 07/16/2015

All tear-off and/or removal (of any types of roofing), and all spudding, sweeping, vacuuming and/or cleanup of any and all areas of any type where a roof is to be relaid.

Roofers:

Composition Roofers & Damp Waterproofers...............$ 29.25 22.00 Pitch,Slate, Tile and Precast Concrete............$ 29.75 22.50

SFMA0550-003 10/01/2016

Rates Fringes

SPRINKLER FITTER.................$ 49.93 26.38+a

a. PAID HOLIDAYS: Memorial Day, July 4th, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has been in the employment of a contractor 20 working days prior to any such paid holidays.

SHEE0063-001 01/01/2016

Rates Fringes

Sheet metal worker...............$ 31.57 28.12

TEAM0379-001 08/01/2016

Rates Fringes

Truck drivers:

Group 1.....................$ 31.98 21.96+A+B Group 2.....................$ 32.15 21.96+A+B Group 3.....................$ 32.22 21.96+A+B Group 4.....................$ 32.34 21.96+A+B Group 5.....................$ 32.44 21.96+A+B Group 6.....................$ 32.73 21.96+A+B Group 7.....................$ 33.02 21.96+A+B

POWER TRUCKS $.25 DIFFERENTIAL BY AXLE

TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE

HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM

TRUCK DRIVERS CLASSIFICATIONS

Group 1: Station wagons; panel trucks; and pickup trucks

Group 2: Two axle equipment; & forklift operator

Group 3: Three axle equipment and tireman

Group 4: Four and Five Axle equipment

Group 5: Specialized earth moving equipment under 35 tons other than conventional type trucks; low bed; vachual;

mechanics, paving restoration equipment

Group 6: Specialized earth moving equipment over…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .