W912WJ-16-B-0010_Amendment_0001.pdf

PDF 63 KB Posted

Attached to
Franklin Falls Dam Service Bridge repairs
Solicitation number
W912WJ-16-B-0010
Issued by

About this file

solicitation amendment 0001

View the file

Other files

File Type Posted
BidAbstract.pdf PDF
Site_Visit_sign_in_sheet_.pdf PDF
W912WJ-16-B-0010_solicitation_.pdf PDF
PLANS_.pdf PDF
SPECS_.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to answ er contractor questions from the Franklin Falls Dam site visit 06/15/2016. All other aspects of this solicitation remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Jun-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912WJ-16-B-0010

X 9B. DATED (SEE ITEM 11)

02-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Jun-2016

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ-16-B-0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by full text:

AMENDMENT 1

Questions from the Site Visit, Franklin Falls Concrete Repairs, 15 June 2016.

1. Will Contractors be allowed to inject epoxy into cracks that become visible once the surface spalled concrete is removed?

Answer: Spalled area shall be repaired using the typical procedures on Sheet S‐502. There is not a technical or contract requirement to inject epoxy into cracks in these areas. Reference Note 4 on Sheet G‐002 for cracks requiring epoxy sealer.

2. Is the broken off piece of concrete, located at the back side of the bearing point on the western‐ most support on the pier under the start of the service road, included in the amounts shown on the bid schedule?

Answer: This area is not included in the amounts shown on the bid schedule. The area in question is a bearing plate grout pad, and the concrete in this area is a high‐strength material.

This repair is not part of this project. Therefore, please bid this project as shown and do not include this repair.

3. Can Contractors combine the Contractor Quality Control Manager (CQC) and Site Safety and

Health Officer (SSHO) person so that there are only two people (the Site Super and the combined CQC/SSHO) on site?

Answer: As per Spec Section 01 35 26, GOVERNMENTAL SAFETY REQUIREMENTS, Paragraph

1.5.1.2 Contractor Quality Control (QC) Manager, the Contractor Quality Control Manager can be the SSHO on this project but neither may serve as Project Superintendent.

Additionally, in Spec Section 01 45 00 QUALITY CONTROL, Paragraph 3.4.2 CQC System

Manager, it is stated: The CQC System Manager must be assigned as System Manager but may have duties as Site Safety and Health Officer (SSHO) in addition to quality control. The CQC

Manager may not serve as Project Superintendent.

Therefore, the Superintendent and the SSHO have to be separate individuals, but it is okay if the

SSHO is the CQC Manager.

W912WJ-16-B-0010

4. How is the concrete rubble/debris to be disposed of? Can we just leave it on the riprap?

Answer: As per Spec Section 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT, Paragraph 1.6 COLLECTION, waste products are to be collected and separated for reuse or recycling. Therefore, please bid this project in keeping with the specification requirements. If the Contractor would like to submit a Value Engineering proposal for an alternative method of disposal that would save the government the cost of disposing of this concrete waste, this can be submitted after award.

5. How is access into the areas fenced off with the black chain link fence that surrounds the central pier to be provided?

Answer: Franklin Falls personnel will remove a section of this fence to allow access to the Contractor.

6. Is the Contractor required to provide a separate trailer for the USACE personnel? Or can they use the Project Office?

Answer: As per Spec Section 01 50 00, TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS, Paragraph 3.9 GOVERNMENT FIELD OFFICE, a Government field office is not required for this project.

7. Is water and/or electricity available at the work site?

Answer: As per Spec Section 01 50 00, TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS, Paragraph 3.2 AVAILABILITY AND USE OF UTILITY SERVICES, water and electricity required in the prosecution of the work shall be furnished by the Contractor at his own expense. The Government will not supply water and electricity.

(End of Summary of Changes)