File Type Posted
B01 OF1419 Abstract 19B5001 (signed).pdf PDF
Abstract__Energy_Reduction_Measures_(Rev01).pdf PDF
Abstract__Energy_Reduction_Measures.pdf PDF
Running_RFI_Log_dated_15_Jul.pdf PDF
Running_RFI_Log_dated_12_Jul.pdf PDF
Sign_in_Sheet_Pre_Bid_conference_Amendment_01.pdf PDF
A07_Pre-Bid_Slide_Amendment_01.pdf PDF
RFIs_as_of_20_Jun_19.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AXQD112847

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Issue updated w age determination - MA20190003 revision 4, dated 07-05-2019.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 15

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Jul-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912SV19B5001

X 9B. DATED (SEE ITEM 11)

31-May-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Jul-2019

CODE

W912SV - 104 FW//MSC

175 FALCON DR

WESTFIELD MA 01085-1482

W912SV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912SV19B5001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

CONSTRUCTION WAGE RATES

"General Decision Number: MA20190003 07/05/2019

Superseded General Decision Number: MA20180003 State: Massachusetts Construction Type: Building Counties: Berkshire, Franklin, Hampden and Hampshire Counties in Massachusetts.

BUILDING CONSTRUCTION PROJECTS Does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/04/2019 1 02/01/2019 2 02/22/2019 3 05/17/2019 4 07/05/2019

ASBE0006-011 09/01/2017

Rates Fringes

Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems).....$ 36.87 27.50

BOIL0029-001 01/01/2017

Rates Fringes

BOILERMAKER......................$ 42.42 24.92

BRMA0001-001 02/01/2019

SPRINGFIELD/PITTSFIELD CHAPTER FRANKLIN, HAMPDEN, and

HAMPSHIRE COUNTIES

BRICKLAYER

BRICKLAYERS; CEMENT

MASONS; PLASTERERS; STONE

MASONS; MARBLE, TILE &

TERRAZZO WORKERS............$ 41.96 29.80

BRMA0001-003 02/01/2019

SPRINGFIELD/PITTSFIELD

BERKSHIRE

Rates Fringes

BRICKLAYER

BRICKLAYERS; CEMENT

MASONS; PLASTERERS; STONE

MASONS; MARBLE, TILE &

TERRAZZO WORKERS............$ 41.96 29.80

* CARP0056-014 08/01/2018

Rates Fringes

PILEDRIVERMAN....................$ 46.07 32.25

CARP0107-009 09/01/2017

Franklin County (Erving, Orange, North Orange and Warwick)

CARPENTER........................$ 39.28 27.90

CARP0108-005 09/04/2017

HAMPDEN; HAMPSHIRE AND FRANKLIN (Remainder)

Rates Fringes

Carpenter/Lather/Drywall Applicator.......................$ 35.56 23.76

CARP0108-011 09/04/2017

BERKSHIRE COUNTY

Rates Fringes

CARPENTER........................$ 35.56 23.76

CARP1121-001 10/01/2017

Rates Fringes

MILLWRIGHT.......................$ 39.52 30.85

* CARP2168-003 03/01/2019

Rates Fringes

FLOOR LAYER: Carpet.............$ 37.09 24.73

ELEC0007-002 12/30/2018

HAMPDEN (Except Chester & Holyoke); HAMPSHIRE (Belchertown, Ware)

ELECTRICIAN......................$ 41.91 23.16

ELEC0007-003 12/30/2018

BERKSHIRE; FRANKLIN; HAMPDEN (Chester, Holyoke); HAMPSHIRE (Except Belchertown, Ware)

ELECTRICIAN......................$ 41.91 23.16

ELEC0007-006 12/30/2018

Teledata System Installer........$ 41.91 23.16

ELEC0042-003 09/03/2017

Rates Fringes

Line Construction:

Heavy Equipment Operator....$ 42.26 6.5%+19.81 Lineman, Cable Splicer and Dynamite Man................$ 46.96 6.5%+22.00 Material Man, Tractor Trailer Driver, Equipment Operator....................$ 39.92 6.5%+19.21

ELEV0041-001 01/01/2019

Rates Fringes

ELEVATOR MECHANIC................$ 53.11 34.125+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0098-001 12/01/2016

Rates Fringes

Power equipment operators:

(BUILDING & RESIDENTIAL)

Group 1...................$ 33.68 23.96+A Group 2...................$ 33.37 23.96+A Group 3...................$ 33.15 23.96+A Group 4...................$ 32.54 23.96+A Group 5...................$ 29.92 23.96+A Group 6...................$ 28.80 23.96+A Group 7...................$ 26.86 23.96+A Group 8...................$ 305.95 23.962+A Group 9...................$ 230.69 23.96+A Group 10...................$ 35.17 23.96+A Group 11...................$ 38.18 23.96+A Group 12...................$ 39.68 23.96+A Group 13...................$ 40.68 23.96+A Group 14...................$ 41.68 23.96+A Group 15...................$ 43.18 23.96+A

HAZARDOUS WASTE PREMIUM $2.00

FOOTNOTE FOR POWER EQUIPMENT OPERATORS:

Group 8 and Group 9 are per day wages.

A. Paid Holidays: New year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

Group 1: Shovels; crawlers and truck cranes including all tower; self-propelled hydraulic cranes 10 tons and over;

draglines; clam shells; cableways; shaft hoists; mucking machines derricks; backhoes; bulldozers; gradalls;

elevating graders; pile drivers; concrete pavers; trenching machines; front end loaders- 5 1/2 cu yds and over; dual drum paver; automatic grader-excavator(C.M.I. or equal);

scrapers towing pan or wagon; tandem dozers or push cats(2 units in tandem); shotcrete machine; tunnel boring machine;

combination backhoe/loader 3/4 cu yd hoe or over; jet engine dryer; tree shredder; post hole digger; post hole hammer; post extractor; truck mounted concrete pump with boom; roto-mill; Grader; Horizontal Drilling Machine; John Henry Rock Drill and similar equipment.

Group 2: Rotary drill with mounted compressor; compressor house (3 to 6 compressors); rock and earth boring machines (excluding McCarthy and similar drills); front end loaders 4 cu yds to 5 1/2 cu yds); forklifts-7 ft lift and over 3 ton capacity; scraper 21 yds and over (struck load); sonic hammer console; reclaimers road planer/milling machine; cal tracks; ballast regulators; rail anchor machines; switch tampers, asphalt pavers; mechanic; welder and transfer machine.

Group 3: Combination backhoe/loader up to 3/4 cu yd;

scrapers up to 21 cu yd (struck load, self propelled or tractor drawn); tireman; front end loaders up to 4 yds;

well drillers; engineer or fireman on high pressure boiler;

self-loading batch plant; well point operators electric pumps used in well point system; pumps, 16 inches and over (total discharge); compressor, one or two 900 cu ft and over; powered grease truck; tunnel locomotives and dingys;

grout pumps; hydraulic jacks; boom truck; hydraulic cranes-up to 10 ton.

Group 4: Asphalt rollers; self-powered rollers and compactors; tractor without blade drawing sheepsfoot roller; rubber tire roller; vibratory roller or other type of compactors including machines for pulverizing and aerating soil; york rake.

Group 5: Hoists; conveyors; power pavement breakers;

self-powered concrete pavement finishing machines; two bag mixers with skip; McCarthy and similar drills; batch plants (not self loading); bulk cement plants; self-propelled material spreaders; three or more 10 KW light plants; 30 KW or more generators; power broom.

Group 6: Compressor (one or two) 315 cu ft to 900 cu ft;

pumps 4 inches to 16 inches (total discharge).

Group 7: Compressors up to 315 cu ft; small mixers with skip; pumps up to 4 inches; power heaters; oiler; A-frame trucks; forklifts-up to 7 ft. lift and up to 3 ton capacity; hydro broom; stud welder.

Group 8: Truck crane crews Group 9: Oiler Group 10: Master Mechanic Group 11: Boom lengths over 150 feet including jib Group 12: Boom lengths over 200 feet including jib Group 13: Boom lengths over 250 feet including jib Group 14: Boom lengths over 300 feet including jib Group 15: Boom lengths over 350 feet including jib

IRON0007-014 09/16/2017

BERKSHIRE (Becket, East Otis, Hinsdale, Monterey, New Marlboro, North Otis, Otis, Peru, Sandisfield, Savoy, Sheffield, Washington, Windsor); FRANKLIN; HAMPDEN; HAMPSHIRE

IRONWORKER.......................$ 32.49 28.67

IRON0012-003 07/01/2018

BERKSHIRE (Lee)

Rates Fringes

IRONWORKER.......................$ 31.00 24.43

IRON0012-004 07/01/2018

BERKSHIRE (Remainder of County)

Rates Fringes

Ironworkers:

Sheeter.....................$ 31.25 24.43 Structural, Ornamental, Reinforcing, Fence Erector, Machinery Mover, Rigger, Rodman, Stone Derrickman..................$ 31.00 24.43

LABO0014-004 12/01/2017

BERKSHIRE COUNTY

FRANKLIN COUNTY (the towns of Ashfield, Buckland, Charlemont, Hawley, Heath, and Rowe only) HAMPSHIRE COUNTY (the towns of Chesterfield, Cummington, Goshen, Middlefield, Plainfield, and Worthington only)

Plasterer tender.................$ 26.10 20.90

LABO0014-005 12/01/2017

HAMPDEN COUNTY

HAMPSHIRE COUNTY (with the exception of Chesterfield, Cummington, Goshen, Middlefield, Plainfield, and Worthington) FRANKLIN COUNTY (with the exception of Ashfield, Buckland, Charlemont, Hauley, Heath, Orange, Rowe, and Warwick)

Plasterer tender.................$ 30.60 21.91

LABO0022-002 06/01/2018

FRANKLIN (Orange, Warwick)

Rates Fringes

Laborers:

GROUP 1.....................$ 33.25 22.92

GROUP 2.....................$ 33.50 22.92

GROUP 3.....................$ 34.00 22.92

GROUP 4.....................$ 34.25 22.92

GROUP 5.....................$ 34.00 22.92

GROUP 6.....................$ 34.25 22.92

LABORERS CLASSIFICATIONS

GROUP 1: Laborers; carpenter tenders; cement finisher tenders, plasterer tenders

GROUP 2: Asphalt raker; fence and guard rail erector; laser beam operator; mason tenmder; pipelayer; pneumatic drill operator; pneumatic tool operator; wagon drill operatorm jackhammer operator, pavement breaker, carbide core drilling machine, chain saw operator, barco type jumping tampers, concrete pump, motorized mortar miner, ride-on motorized buggy

GROUP 3: Air track operator; block paver; rammer; curb setter, hydraulic and similar self-powered drills

GROUP 4: Blaster; powderman

GROUP 5: Precast floor and roof, plank erector

GROUP 6: Asbestos Abatement, Toxic and Hazardous waste laborers

LABO0473-001 06/01/2018

BERKSHIRE COUNTY, FRANKLIN COUNTY, (THE TOWNS OF ASHFIELD,

BUCKLAND, CHARLEMONT, HAWLEY, HEATH, AND ROWE ONLY) HAMPSHIRE

COUNTY (THE TOWNS OF CHESTERFIELD, CUMMINGTON, GOSHEN,

MIDDLEFIELD, PLAINFIELD, AND WORTHINGTON ONLY)

Laborers:........................$ 26.40 20.75

LABO0596-001 06/04/2018

HAMPDEN COUNTY, HAMPSHIRE COUNTY (WITH THE EXCEPTION OF

CHESTERFIELD, CUMMINNGTON, GOSHEN, MIDDLEFIELD, PLAINFIELD, AND

WORTHINGTON) FRANKLIN COUNTY (WITH THE EXCEPTION OF ASHFIELD,

BUCKLAND, CHARLEMONT, HAULY, HEATH, ORANGE,ROWE AND WARWICK)

Laborers:

GROUP 1.....................$ 31.00 22.19

GROUP 2.....................$ 31.25 22.19

GROUP 3.....................$ 31.75 22.19

GROUP 4.....................$ 31.75 22.19

GROUP 5.....................$ 32.00 22.19

LABORERS CLASSIFICATIONS

GROUP 1: Laborers, carpenter tenders, wrecking laborers

GROUP 2: Asphalt rakers, carbide core driller operators, chain saw operators, pipelayers, jackhammer and paving breaker operators, Barco type jumping tampers, laser beam operators, concrete pump operators, mason tenders, motorized mortar mixers, ride-on motorized buggy operators, wagon drill operators

GROUP 3: precast floor and roof plank erectors, sign erectors, asbestos removal laborers, haz-mat laborers

GROUP 4: Air track operators, block pavers, rammers and curb setters, hydraulic and similar self-powered drills

GROUP 5: Powderman and blaster

MARB0097-001 03/01/2012

Rates Fringes

MARBLE FINISHER..................$ 28.43 25.85

* PAIN0011-008 06/01/2019

GLAZIER..........................$ 38.18 21.80

FOOTNOTE:

A. PAID HOLIDAY: LABOR DAY (provided employee has worked any part of the week prior to Labor Day and any part of the week after Labor Day

PAIN0035-007 01/01/2019

Rates Fringes

PAINTER

NEW CONSTRUCTION:

Brush, Taper...............$ 32.33 26.35 Spray, Sandblast...........$ 33.73 26.35

REPAINT:

Brush, Taper...............$ 29.65 26.35 Spray, Sandblast...........$ 31.05 26.35

PLUM0004-003 03/01/2019

FRANKLIN (Orange)

Rates Fringes

Plumber and Steamfitter..........$ 44.81 26.36

PLUM0104-004 03/17/2019

BERKSHIRE (Becket, Otis, Sandisfield); FRANKLIN (Except Monroe, Rowe, and the Western part of Charlemont); HAMPDEN; HAMPSHIRE

Plumbers and Pipefitters.........$ 40.21 25.90

FOOTNOTE:

A. Two paid holidays, Independence Day and Labor Day, provided the employee has been employed seven days prior to the holiday by the same employer

PLUM0104-009 03/17/2019

BERKSHIRE (Except Otis, Becket, Sandisfield); FRANKLIN (Monroe, Rowe and the Western part of Charlemont)

Plumber and Steamfitter..........$ 40.21 25.90

FOOTNOTE FOR PLUMBERS & STEAMFITTERS:

A. Paid holidays: Independence Day and Labor Day, provided the employee has been employed seven days prior to the holiday by the same employer.

ROOF0248-001 07/16/2017

All tear-off and/or removal (of any types of roofing), and all spudding, sweeping, vacuuming and/or cleanup of any and all areas of any type where a roof is to be relaid.

Roofers:

Composition Roofers & Damp Waterproofers...............$ 31.75 23.66 Pitch,Slate, Tile and Precast Concrete............$ 32.25 24.16

SFMA0550-003 01/01/2019

Rates Fringes

SPRINKLER FITTER.................$ 52.18 29.38

a. PAID HOLIDAYS: Memorial Day, July 4th, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has been in the employment of a contractor 20 working days prior to any such paid holidays.

SHEE0063-001 01/01/2016

Rates Fringes

Sheet metal worker...............$ 31.57 28.12

TEAM0379-001 06/01/2018

Rates Fringes

Truck drivers:

Group 1.....................$ 33.08 24.6125+A+B Group 2.....................$ 33.25 24.6125+A+B Group 3.....................$ 33.32 24.6125+A+B Group 4.....................$ 33.44 24.6125+A+B Group 5.....................$ 33.54 24.6125+A+B Group 6.....................$ 33.83 24.6125+A+B Group 7.....................$ 34.12 24.6125+A+B

POWER TRUCKS $.25 DIFFERENTIAL BY AXLE

TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE

HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM

TRUCK DRIVERS CLASSIFICATIONS

Group 1: Station wagons; panel trucks; and pickup trucks

Group 2: Two axle equipment; & forklift operator

Group 3: Three axle equipment and tireman

Group 4: Four and Five Axle equipment

Group 5: Specialized earth moving equipment under 35 tons other than conventional type trucks; low bed; vachual;

mechanics, paving restoration equipment

Group 6: Specialized earth moving equipment over 35 tons

Group 7: Trailers for earth moving equipment (double hookup)

FOOTNOTES:

A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day

B. PAID VACATION: Employees with 4 months to 1 year of service receive 1/2 day's pay per month; 1 week vacation for 1 - 5 years of service; 2 weeks vacation for 5 - 10 years of service; and 3 weeks vacation for more than 10 years of service

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"