Running_RFI_Log_dated_12_Jul.pdf
PDF 113 KB Posted
- Attached to
- Energy Reduction Measures Federal contract opportunity
- Solicitation number
- W912SV-19-B-5001
About this file
Running RFI Log dated 12 Jul
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B01 OF1419 Abstract 19B5001 (signed).pdf | ||
| Abstract__Energy_Reduction_Measures_(Rev01).pdf | ||
| Abstract__Energy_Reduction_Measures.pdf | ||
| W912SV19B5001_Amendment_0003.pdf | ||
| Running_RFI_Log_dated_15_Jul.pdf | ||
| Sign_in_Sheet_Pre_Bid_conference_Amendment_01.pdf | ||
| RFIs_as_of_20_Jun_19.pdf | ||
| A07_Pre-Bid_Slide_Amendment_01.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AXQD112847 Energy Reduction Measures Solicitation W912SV-19-B-5001 12 July 2019
Running Request for Information
1. Generated while in building 54- What is the anticipated start date of work?
a. Fall of 2019, depending on award date and NTP.
2. Generated while in building 54- Are they completing work in phases or in all buildings at once?
a. Scheduling of work will be done during pre-construction. We will need to deconflict office work while lights, etc., are being completed. There is no official phasing and the Government’s intent is not to impede the Contractor from resourcing the work.
3. Generated while in building 54- Will there be days they will be not allowed access to the base to work/work schedule?
a. Reference specifications for work restrictions – specification section 011000.
4. Generated while in building 54- Will the class sign in sheet be available for everyone to see?
a. It is provided as part of Amendment 01
5. Generated while in building 54- Are the half darkened light fixtures supposed to be egress?
a. The general notes indicate “WHERE SHOWN, REMOVE EMERGENCY LIGHTING CIRCUIT
FROM TROFFER AND INSTALL WALL MOUNTED EMERGENCY LIGHT. EXISTING
EMERGENCY LUMINAIRE LOCATIONS SHOWN FOR REFERENCE BUT DO NOT INSTALL
FIXTURE MOUNTED BATTERIES.” The location of the new wall-mounted egress lights are shown on the drawing with fixture type “EL.” The base has found that maintaining integrated batteries to be expensive and had decided to eliminate the fixture-integrated batteries and install separate dedicated egress lights as part of this project.
6. Generated while in building 54- In reference to drawing E0, detail E1- is this new work or existing? Where does it apply in which building?
a. See Amendment No. 01. This detail applies to the boiler wiring and applies to buildings getting new boilers. The intent of the detail is to indicate that there is electrical work associated with boiler trim wiring and that it should be accomplished according to the manufacturer’s wiring instructions.
7. Generated while in building 40- Room 100 “Boyer Way”-comments referring to design not matching drawings because of lighting?
a. See Amendment No. 01
8. B55- Shop Area - Does REM really mean remove the light? Won’t they be dark?
a. Yes the note “REM” means to remove the light and pendant back to the junction box and seal up the junction box with a proper cover and any necessary knock-out seals.
The adjacent luminaires were selected to account for these lights being removed and with the addition of the infrared heaters and the skylights, there is no room to hang a light fixture in this area.
9. E8- key note 3-It says replace 12 lights, but there are 14 fixtures.
a. See Amendment No. 01.
10. Is the work going to be inspected by the City of Westfield?
a. The Base Civil Engineer is the authority having jurisdiction, AHJ, for inspection of the work, per the FAR and UFC 1-200-01.
11. Does exit light sign in building 65 need to be rotated?
a. The new exit signs to be installed in accordance with state codes.
12. Is Asbestos and Mold report available for this project to be shared with the bidders?
a. There is no known asbestos in the facilities associated with this project.
13. The Government generally is not required to pay sales/use tax on materials or equipment permanently installed in its facilities. Thus, contractors should not be charged this tax if it would be passed on to the Government. The Solicitation references FAR Clause 52.229-3 “Federal, State and Local Taxes,” but this does not provide any guidance on the Government’s or contractor’s exemption. The Massachusetts Department of Revenue (MA DOR) does allow this exemption (with strict limitations), but the proper use of the process requires that the Contracting Officer (or other designated official) provide the contractor with a copy of the Government's or Base's exemption certificate (MA DOR form ST-2) and the Contracting Officer/designated official fill out and sign Part A of the contractor's exemption certificate (form ST-5C). Please confirm that the Contracting Officer can provide this support of the process.
a. The Contracting Office can provide the above documents.
14. Part 1.2 of Specifications section 013000 Administrative Requirements requires “at least one qualified supervisor…on the job site during working hours.” Is one supervisor adequate to oversee work ongoing at multiple buildings at the same time? This part also indicates that “if a Quality Control (QC) representative is required on the contract…” We find no requirement in the Specifications that a separate QC representative is required. Please confirm this is the correct interpretation.
a. Per paragraph 1.2 Section 013000 “one qualified supervisor capable of reading, writing, and conversing fluently in the English language on the job site during working hours” Reference paragraph 1.4.2.1 Section 014500 “Designate a Quality Program Manager within the on-site organization whose sole responsibility is the day-to-day on-site management and direction of the Quality Program.”
15. Keyed Note 2 on Drawing A-64 indicates to infill wall openings left behind after removal of louvers “matching existing construction.” These walls appear to consist of brick at the exterior and concrete masonry units on the interior, but other information is required to properly address these openings: Is there a wall cavity? Insulation? Dampproofing? As this is a munitions handling/storage facility with noted hardened building elements, are there any specific structural requirements for performing these infills?
a. As Built drawing A3 for Bldg 64 and a picture of wall section of Bldg. 64 from plans provided for informational purposes only.
16. Can the Government provide roof types for the following buildings: 1, 27, 40, 54, 55, 64, and 65? Basic information such as membrane, built-up, tar and gravel, etc. (each with or without insulation) should be sufficient for bidding purposes. Also, can the Government provide any information on existing roof warranties that exist for any of the facilities on the Base, if available?
a.
Roof Information Building # Roof Type Year
Installed Roof
Access Insulation Warranty
001 White EPDM 2007 Yes Yes No 027 Hangars A & B White PVC 2009 No Yes No
027 Hangar Roof Extensions
Arch. Standing Seam Metal 2009 No Yes No
027 Admin Area White EPDM 2009 Yes Yes No
040 White EPDM 2012 Yes Yes No
040 Fire Bays Arch. Standing Seam Metal 2012 Yes No No
054 White PVC 2000 Yes Yes No 055 White PVC 1994 No Yes No
055 Admin Area Arch. Standing Seam Metal 1994 No Yes No
055 Paint/Fuels Bay White PVC 1994 No Yes No
064 Black EPDM 1994 Yes Yes No
065 Black EPDM 1994 Yes Yes No
17. Drawing M-3 directs bidders to “Replace or repair broken chiller compressor” in Building 3. Can the Government provide definitive direction relative to this activity, either to replace the equipment or perform specific repairs that the Government expects will restore the equipment to proper operation?
a. See Amendment No. 02.
18. Drawing E-40 includes new light fixtures tagged TR24 and TR24B, but these fixtures are not included on the Luminaire Schedule on Drawing E-0. Please provide the description, basis of design, and other relevant characteristics of these fixtures.
a. See Amendment No. 02.
19. There is no electrical symbol legend provided in the drawings. Please confirm that light fixture symbols shown with a diagonal slash and half the fixture darkened are intended to represent emergency fixtures (e.g., ‘HBS’ in Apparatus Room (136) on Drawing E-40).
20. Keyed Note 3 on Drawing E-8 indicates 12 lamps to be replaced in Meeting Room, but 14 fixtures are shown. Please confirm only 12 lamps are to be replaced in this room.
21. General Comments- please provide door dimensions or Bar scales on the drawings to allow for scale calibration. This will provide accurate Electronic Quantification of materials.
a. The drawings are to scale when printed on the designed size of 18x24 and the scales noted in the title block. The page size is self-contained in the PDF file.
22. Drawing E-0 includes a Lighting Fixture schedule. Please provide the Lamp schedule that goes with each Fixture.
a. E-0 contains a Luminaire schedule, not a “lighting fixture” schedule. These are not light fixtures. These are LED luminaires and they do not use bulbs and as such, there is no bulb information.
23. Drawing E-0. Light Fixture “XP- Explosion Proof- 52” is on the lighting list. Where are these fixtures to be installed?
a. Reference Drawing sheet E-52.
24. Drawing E-0, Detail Note 5. Remove all Fireamatic Controls from Mechanical Rooms. Please provide “As Built drawings” that shows the Fireamatic Control System.
a. This note only applies to the buildings getting new boilers. The existing Fireamatic Thermal Fuses are to be removed. B1 has 4, B8 has 2, B27 has 4, B40 has 2, B54 has 1 and B55 has 2 thermal fuses.
25. Drawing E-1F, Note 5. Note indicates modification is from single switch of all light fixtures to be reconfigured to BI-Level switching.
a. Is the switching by putting every other fixture on a different light switch or A. Nearly every office already has two switches and the existing fixtures are already high-low. The 24BL and 24BH, basis of design, luminaires take 2 hot leads to accomplish the high/low operation. Reference Keyed Note #1, “Modify wall switch and wiring to provide Hi/Low operation of new Luminaires.
b. Is the switching by opening the light fixtures and changing the light ballasts within the fixture to be powered by two different switch legs?
A. Reference Notes 2, and 3 on sheet E-1F : The project calls for the existing light fixtures, bulbs, and ballasts to be completely removed and disposed of and completely new LED luminaires provided. The new ballasts will accept two hot legs for high/low operation
c. Please provide Architectural “As built drawings” to show existing switching method (Surface mount vs. Recessed). This will also show the wall type for the needed demolition and restoration.
A. Building 1 as-built for lighting is being provided for reference only.
d. Does this change to Bi-Level switching apply to office areas, hallways and Common areas?
A. Bi-Level operation is for the lights that are specified to be bi-level. Hall-way lights are not bi-level. There is a bi-level column on the luminaire schedule that indicates which areas are to get bi-level lights.
26. Drawing E-1F, Keyed Notes 1-5. Can lights are to be relamped with “4p” lamps. Please provide the current light fixture type and current lamp make, voltage, type and lumens rating.
a. Reference Notes 3. “Disconnect, remove, and dispose of existing light fixtures where shown. Maintain existing branch circuiting.” Light fixture housing and ballast shall not be reused.
27. Drawing E-1S, Note 3. Replace 4 incandescent bulbs with LED in Waiting Rm 212. Please provide existing Fixture type, make, voltage and required new Lamp Type.
a. New Lamp type to be type “LB” as shown on the drawing E-1S. Reference the luminaire schedule for the bulb information. Per notes 5 - once the project is awarded, verify existing voltages before applying power.
28. Drawing E-1S, Keyed Note 1. Motion Sensor to be added in Room 202. The note is in office 202 with a Sensor symbol. Is the intent to also have a motion detection sensor in the Corridor (Rm 200)?
A. See Amendment No. 02
29. Drawing E-1S, Keyed Note 3. Reference of note is to “Perimeter Light Fixtures”. Please provide “As-built drawings” for this building to confirm what and where the Perimeter Light fixtures are located.
a. This is a “Keyed Note” and applies to room 202. The symbol is shown in this room
30. Drawing E-8, Keyed Note 3. Reference is to “dimmable Lamps”. Please confirm the light fixtures can be dimmed with no fixture modification.
a. No fixture modification is required.
31. Drawing E-17, General Notes #5. Scope requires modification of existing wiring to accommodate New IR Heaters. Please provide “As Built Drawings” for the electrical in this building.
a. Building 17 as-built for electrical are being provided for informational purposes only
32. Drawing E-17, Keyed Note 2. Reference is to “provide power to new IR Heaters”. Does this scope allow reuse of the existing cable, conduit, breakers in existing panels for connection to the new IR Heaters?
a. The design intention is to re-use the circuit (wiring and conduit) that was feeding the unit heaters to feed the new infrared heaters. It is assumed the existing breaker and wiring is sized adequately that it doesn’t need to be replaced.
33. Drawing E-27L, Note 2. Replace High Bay lights with fixtures shown. Please provide “as built Lighting drawings”.
a. Existing lights are typical single-pendent hanging metal halide lights and are being completely removed.
34. Drawing E-27L, Note 3. Note requires contractor to provide correct Motion Sensor Lens. What is the operational intent on what areas are to remain lite and for how long, based on the Motion Sensors?
a. The motion sensors shall be set to timeout after 20 minutes. A separate motion sensor is to be provided on each luminaire as indicated in the E-0 luminaire schedule (5th column marked “Sensor”). The reason for this note is some sensor lenses are universal and other sensors require different lenses for different mounting heights.
35. Drawing E-27L, Note 6. Fuel Cell Hanger is indicating the explosion proof environment (Class 1, Div. 1).
a. What is the height above the finish floor, that the Class 1, Div. 1 environment ends?
A. The drawing says Class 1 Div 2, not Div 1. The Class 1, Div 2 is throughout the hangar aircraft repair up to 18” and within 5’ of the aircraft. Reference NEC NFPA 70 Article 5-13.
b. What rooms associated with this building are included in the Class, 1, Div. 1 environment?
A. Reference NEC NFPA 70 Article 5-13.
c. Please confirm all Mechanical Controls and DDC components in this building do not require Explosion proofing to meet the Class 1, Div. 1 Protection.
A. Reference NEC NFPA 70 Article 5-13
36. Drawing E-27PR, Keyed Note 1. Note refers to exiting power connections. Please provide “As-built” power drawings for this building.
a. As-builts provided for informational purpose only.
37. Drawing E-31, Keyed Note 1. Scope of this note requires separation of Light circuits and 3-way switches.
a. Please provide “As Built Electrical drawings” for this building
A. As-builts provided for informational purpose only
b. Please clarify what circuits are to be separated and clarify if 3-way circuits are being added to removed
A. The room used to be one room but is now two separate rooms and 3-way switches need to be disabled so that there is one switch for each room and it does not activate the lights in the other room.
c. Please indicate which 3-way circuits are in this Scope of Work.
A. The two rooms shown with keyed note #1.
38. Drawing E-40, Note 6. Note refers to Final Fixture location taking precedence over existing fixture location. Please provide “As built Lighting drawings” for this building.
a. As-builts provided for informational purpose only
39. Drawing DDC-0, Scope refers to Lon Works System. What is the name of the Lon Works
Contractor that handles this DDC Work?
a. Per the sole source justification, posted with the solicitation, the base controls must be handled by a licensed Schneider Electric (Invensys) authorized dealer.
40. Drawing DDC-17, General Note requires hooking up this building to Head End in Building 40.
a. What is the design, hardware, cable, conduit and software requirements needed to add
Building 17 to the existing Head End in Building 40.
A. Applies to buildings 17, 52, and 77. The notes refer to extending the existing “facilities only” base-wide fiber network to include the new buildings noted. It is assumed there are spare underground fiber strands that can be utilized to each building being added. The contractor is to provide an unmanaged fiber-to-copper switch that has two spare ports for a technician laptop. The basis of design for this is the Moxa EDS-208-M-ST. The contractor shall also provide a Jace Ax controller appropriately sized for each building with version 3.X that will integrate seamlessly into the existing system without upgrades or license changes.
b. Will Building 40 Master Graphics and software handle this building addition, or will an upgrade be needed?
A. No upgrade is needed.
c. Please provide “As built” drawings for Building 40 DDC System.
A. The DDC work for building 40 is minimal and only in the mechanical room as shown on the drawings.
41. Drawing DDC-23, Key Note1. Reference is to “Existing Controllers”. Please provide “As-built DDC Drawings and Power controls” that will allow understanding on how the IR Heaters are controlled by the opening of the doors.
a. Presently the door is interlocked with the line-voltage thermostat through a relay. The system shall be converted to low voltage DDC controlled. The panels shall be mounted where shown and existing wiring can be re-used and modified as needed.
42. Drawing DDC-27, Key Notes (general comment). Please provide “As Built drawings” for whole building to allow discernment of existing equipment not under DDC Controls. This will allow adding scope and cost to include the requirements to put “additional items” under DDC Control.
a. Please see points list D1 on top right of drawing DDC-27
43. Drawing DDC-27, General Note 4. “Enclosure shall be rated for the location in which it is installed. There are many controls shown for the Fuel Cell Area.
a. Please provide the various Explosionproof classifications that are within this building.
b. Please clarify the classifications into type of electrical conduit and enclosures expected and the elevation of the various enclosures above the finished floor.
A. Rating is Class 1 Div. 2 in the fuel hangar and corrosion hangar. Office
Spaces are General Occupancy.
Electrical components shall be 18” AFF. Enclosures are NEMA 7.
44. Drawing DDC-52, Keyed Note 3. Provide new Jace Controller.
a. Does DDC Control already exist between this building and the head end?
b. Will any new upgrades be required at the Head End due to this new Jace Controller?
A. No. Applies to buildings 17, 52, and 77. The building 52 notes refer to extending the existing “facilities only” base-wide fiber network to include the new buildings noted. It is assumed there are spare underground fiber strands that can be utilized to each building being added. The contractor is to provide an unmanaged fiber-to-copper switch that has two spare ports for a technician laptop. The basis of design for this is the Moxa EDS-208-M-ST. The contractor shall also provide a Jace Ax controller appropriately sized for each building with version 3.X that will integrate seamlessly into the existing system without upgrades or license changes. No upgrades will be required due to new Jace Controller.
45. Drawing DDC-54, Keyed Note 3. Comment refers to “Connect Ethernet jack of new pumps to DDC Front End” Does this building contain the DDC capacity to handle the added communication of the new pumps or will new DDC infrastructure attached to the Head End be required?
a. The pump interface is html and there is no traffic or load associated with adding a hyperlink to the graphics. The pump hosts its own web site in the pump electronics.
46. Drawing DDC-55, Keyed notes and general comments about Mech. Rm (115) notes. Please provide “as built DDC and Control drawings” for the Mechanical Room and Panel P1 (Keyed Note 8).
a. Panel P-1 is a new panel provided by the contractor, not an existing panel. DDC-0 shows the points required for this panel.
47. Drawing DDC-77, General Note 1. Provide DDC for this building.
a. What is the design, hardware, cable, conduit and software requirements needed to add Building 77 to the existing Head End in Building 40.
A. This response also applies to building 17 and 52. The building 77 notes refer to extending the existing “facilities only” base-wide fiber network to include the new buildings noted. It is assumed there are spare underground fiber strands that can be utilized to each building being added. The contractor is to provide an unmanaged fiber-to-copper switch that has two spare ports for a technician laptop. The basis of design for this is the Moxa EDS-208-M-ST. The contractor shall also provide a Jace Ax controller appropriately sized for each building with version 3.X that will integrate seamlessly into the existing system without upgrades or license changes.
b. Will Building 40 Master Graphics and software handle this building addition, or will an upgrade be needed?
A. Yes, the buildings being added are minimal and the existing server will be able to handle the expansion.
48. Drawing A-27. Keyed Note 6 refers to patch area with existing materials. Please provide “as built Arch. Drawing” showing current outside building materials of construction.
a. As-builts provided for informational purpose only
49. Drawing M-3, Building 3 Renovation. Note 5 indicates Replace or Repair Broken Chiller.
a. What is preference, Replace or Repair?
b. Please provide existing unit Make, Model, Manufacture and Serial Number.
50. Drawing M-27R, Building 27 Keynote 9. Reference is to similar unit in Main Fuels Hanger.
a. Please provide Make, Model, Manufacture of unit desired.
A. Provide a Car-mon or equivalent exhaust system capable of exhausting vapors from a 600 gallon fuel tank in the fuel tank maintenance room
b. Please provide Grounding connectivity sketch to allow meeting comment of “add grounding Mechanism”.
A. A typical grounding bar detail has been provided
51. Drawing M-27R note 9 BLDG 27
a. Is this for jet exhaust only?
A. No, it is for the fuel tank maintenance.
b. Is this for fueling operation?
A. No, it is for the fuel tank maintenance and repair
c. Is it a jet fuel purging operating system?
A. Yes, this is a fuel tank maintenance room for 600 gallon external fuel tanks.
d. Are they loading ordinance?
e. Does the exhaust cone touch jet or is it a hovering system?
f. Do they want manual powered back-up to remove from jet?
52. Drawing M-55D, Keynote 1 refers to old vent system and associated Ductwork removal. Please provide “as built drawings” for this system.
a. As-built drawings are being provided.
53. Drawing M-55R, Keynote 5 Symbol. What does this Symbol indicate (no note in the Key Notes box)?
54. Sheet A-55 Keyed Note 1 states “Replace windows where shown with same size window. See
Specifications”. Please provide the window size and a the basis of design manufacturer as this information was not provided in the specifications.
A. All eight (8) windows (with Keyed Note 1) on Sheet A-55 are 4’-0” x 4’-0” M.O (masonry opening)
55. Is it possible to schedule a second site visit to accommodate a representative from CAR-MON?
This is specifically related to the requirements for a new system installation in B27.
A. Due to security, only one site visit was held, will be held.