W912QR24Q0045.pdf
PDF 3 MB Posted
- Attached to
- Smithland Gudgeon Pins and Shims
- Solicitation number
- W912QR24Q0045
About this file
This document is a solicitation for the Smithland Ohio River Locks Miter Gate Anchorage Gudgeon Pins and Shim Pack. The U.S. Army Corps of Engineers, Louisville District is seeking contractors to provide all labor, equipment and materials to furnish the required parts, including casting, forging, milling, machining, quality control, painting, and packaging. This 100% small business set-aside procurement, with NAICS code 332999 and a 750-employee size standard, will be awarded to the lowest total price offer. Quotes are due by 12:00 PM Eastern Time on April 10, 2024. The contract will utilize electronic funds transfer (EFT) payment. Contractors must be registered in the System for Award Management (SAM) prior to submitting a proposal. The solicitation includes detailed technical specifications, drawings, quality control requirements, and packaging/shipping instructions.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912QR24Q0045 27-Mar-2024
b. TELEPHONE NUMBER
502.315.6213
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 10 Apr 2024
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912QR9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MARCIE BILLOTTO
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: 502.315.7494 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
332999
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF42
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912QR24Q0045
Section SF 30 - BLOCK 14 CONTINUATION PAGE
SPECIAL INSTRUCTIONS
The Smithland Ohio River Locks Miter Gate Anchorage Gudgeon Pins and Shim Pack.
LOCATIONS:
Louisville Repair Station (LRS) 2605 Shippingport Drive Louisville, KY 40212-1010
This procurement is 100% set-aside for Small Business, NAICS 332999, Size Standard 750 Employees. The contract award will be based on lowest total price to the Government.
Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.
Note: In addition to the completed price breakout schedule/price quote, the Offeror must complete their Representation and Certifications located in the solicitation.
Quotes are due 10 April 2022, 12:00PM Eastern Time. Fax submittals will not be accepted. Electronic submittals may be emailed to Marcie Billotto at marcie.billotto@usace.army.mil.
All contractors must be registered in the System for Award Management (www.SAM.gov) prior to submission of proposal. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov. Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg.
Please begin the registration process immediately in order to avoid delay of the contract award should your firm be selected.
ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration.
Effective 29 June 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM.
Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (formerly known as DUNS). The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards.
Remember, there is no cost to use SAM.
To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).
20240315
Ohio River Locks Miter Gate Anchorage Gudgeon Pins and Shim Packs
1. GENERAL:
1.1 Scope of Work: The Contractor shall provide all labor, equipment and materials and perform all operations necessary to furnish the Gate Anchorage Gudgeon Pins and Accessories for various locks along the Ohio River that are operated by the Louisville District, Corps of Engineers. All work is to be completed in accordance with these SPECIFICATIONS, referenced drawings, Industry Standards and all applicable codes, regulations and ordinances. This includes but not limited to the casting and forging the various parts, milling and machining of the specified parts, Quality Control Testing and Acceptance, painting, part identification and packaging. The Contractor shall package all items as indicated in these Specifications and deliver all the completed parts and assemblies to the Louisville Repair Station (LRS), Louisville, KY.
LINE
ITEM Bid Item
QTY Unit Cost
Cost
01 Gudgeon Pin (M-1) 6 $ $ 02 1/4" Adjusting Ring (230.1/10-19) 36 $ $ 03 1/8" Adjusting Ring (230.1/10-20) 24 $ $ 04 1/16" Adjusting Ring (230.1/10-21) 36 $ $ 05 1/4" Shim (230.1/10-16) 16 $ $ 06 1/8" Shim (230.1/10-17) 16 $ $ 07 1/16" Shim (230.1/10-18) 32 $ $ 08 1” Support Block (230.1/10-22) 64 $ $ 09 1/2” Support Block (230.1/10-23) 48 $ $ 10 1/4” Support Block (230.1/10-24) 68 $ $ 11 3-3/4" Diameter Round Bar A193 Grade B6-3 ft Length 4 $ $ Option 001 Gudgeon Pin (M-1) 2 $ $ Option 002 1/4" Adjusting Ring (230.1/10-19) 12 $ $ Option 003 1/8" Adjusting Ring (230.1/10-20) 8 $ $ Option 004 1/16" Adjusting Ring (230.1/10-21) 12 $ $
Options can be exercised up to 4 times each.
1.2 Start/Completion Dates: The Contractor shall begin work within 10 days of the Date of Award
(DOA). Only complete assemblies with parts detailed in paragraph 1.1, delivered together as one unit will be accepted. No partial assemblies will be accepted. All complete assemblies for the BASE Bid shall be delivered to the Louisville Repair Station (LRS) by 5 AUG 2024. Options 001-002-003-004 can be optioned up to 4 times. Options shall be exercised within 30 days of DOA and allowed additional 15 days per Option awarded to complete from DOA.
1.3 Corps of Engineers Inspection: Corps of Engineers personnel shall be allowed to inspect the progress of any portion of this project at the Contractor’s work site. All parts or assemblies shall not be shipped until the units have been inspected and approved by the Contractor
Quality Control Representative (CQCR). The CQCR shall provide reports to the Technical Representative prior to the shipment of any part or assembly certifying that the part or assembly meets or exceeds the Contract requirements.
1.4 Technical Representatives: All questions regarding this contract shall be directed to Brandon
Keller at (502) 315-6459, email: brandon.p.keller@usace.army.mil.
1.5 Safety: The Contractor shall complete all work in accordance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, and all applicable Federal, State and local laws, codes and regulations.
1.6 Delivery: The contractor shall deliver all items to the Louisville Repair Station (LRS). The contractor shall contact Will Chapman at Louisville Repair Station or Warehouseman at (502)- 778-3530 of the LRS Warehouse 48 hours prior to delivery to schedule unloading of the crated items. Address of the LRS Warehouse is 2605 Shippingport Drive, Louisville, KY, 40212-1010.
Hours of operation are Monday through Friday from 7:00am to 2:30pm EST. Delivery shall not be made until inspection is performed of all items by the Contracting Officer or Technical representative.
2. REFERENCES:
The publications listed below form a part of this specification to the extent referenced herein and on the contract drawings.
ASTM A 27/A 27M-17 Standard Specification for Steel Castings, Carbon for General Application.
ASTM A 29/A 29M-16 Standard Specification for Steel Bars, Carbon and Alloy, Hot-Wrought, General Requirements for
ASTM A 36/A 36M-14 Standard Specification for Carbon Structural Steel
ASTM A 53/A 53M-18 Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless.
ASTM A240/A240M-22a Specification for Stainless Steel Plates, Sheets and Strips used as parent material for manufacturing Flat Washers
ASTM A 307-14 E17 Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength
ASTM A388/A388M-16a Standard Practice for Ultrasonic Examination of Heavy Steel Forgings
ASTM A 449-14 Standard Specification for Quenched and Tempered Steel Bolts and Studs.
ASTM A 489-18 E18 Standard Specification for Carbon Steel Lifting Eyes
ASTM A 514/A 514M-14 Standard Specification for High-Yield-Strength, Quenched and Tempered
Alloy Steel Plate, Suitable for Welding
ASTM A 563-15 Standard Specification for Carbons and Alloy Steel Nuts
ASTM A 572/A 572M-18 Standard Specification for High-Strength Low-Alloy Columbium-Vanadium
Structural Steel
ASTM A609/A609-12 R18 Standard Practice for Castings, Carbon, Low-Alloy, and Martensitic Stainless
Steel, Ultrasonic Examination Thereof
ASTM A 668/A 668M-17 Standard Specification for Steel Forgings, Carbon and Alloy for General
Industrial Use.
ASTM B 177-11 R17 Standard Guide for Engineering Chromium Electroplating
ASTM B148-14 Standard Specification for Aluminum-Bronze Sand Castings
ASTM B 505/B 505M-18 Standard Specification for Copper Alloy Continuous Castings
ASTM B 733-15 Standard Specification for Autocatalytic (Electroless) Nickel-Phosphorus Coatings on Metal
ASTM D 561-82 R14 Standard Specification for Carbon Black Pigment for Paint
ASTM D 841-17 Standard Specification for Nitration Grade Toluene
ASTM D 1045-14 Standard Test Methods for Sampling and Testing Plasticizers Used in
Plastics
ASTM D 1153-12 Standard Specification for Methyl Isobutyl Ketone
ASTM D 1200-10 R14 Standard Test Method for Viscosity by Ford Viscosity Cup ASTM D 1210-05 R14 Standard Test Method for Fineness of Dispersion of Pigment-Vehicle
Systems by Hegman-Type Gage
ASTM D 7091-13 Standard Practice for Nondestructive Measurement of Dry Film Thickness of
Nonmagnetic Coatings Applied to Ferrous Metals and Nonmagnetic, Nonconductive Coatings Applied to Non- Ferrous Metals
ASTM E 1347-06 R15 Standard Test Method for Color and Color-Difference Measurement by
Tristimulus Colorimetry
ASTM F436/F436M-18 Standard Specification for Hardened Steel Washers
ASME B1.1-2003 R08 R18 Unified Screw Threads
ASME B1.5-1997 R04 R09 R14 Acme Screw Threads
ASME B4.1-1967 R94 R04 R09 Preferred Limits and Fits for Cylindrical Parts
ASME B46.1-2009 Surface Texture (Surface Roughness, Waviness, and Lay)
ASME Y14.5-09 Dimensioning and Tolerancing
Fed Std No. 595C Notice 1 Colors Used In Government Procurement
MSS SP-55-2006 Quality Standard for Steel Castings for Valves, Flanges, Fittings and Other Piping Components - Visual Method for Evaluation of Surface Irregularities
SSPC-SP-1 1982 E04 Solvent Cleaning
SSPC-SP-5 2007 White Metal Blast Cleaning
3. DRAWINGS:
3.1 Contract Drawings: The completed work shall conform to these drawings and the following specifications. The following drawings are included in this contract.
Sheet Title
M-1 Gudgeon Pin
OS-230.1/10.1 Miter Gates Anchorage Details
4. MATERIALS
. See attached drawings for materials unless detailed below General:
4.1 Pins: Gudgeon Pins shall be ASTM A 29, Grade 4340 hardened to 230 Brinnell Hardness. The finished pins shall have the surface finishes specified on the drawings and adhere to the tolerances shown.
4.2 Shims: New and unused ASTM A240 Type 304 Stainless Steel.
5. SECURITY:
5.1 All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
5.2 The contractor and all associated sub-contractors shall receive a brief/training (provided by the
RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
5.3 The Contractor must pre-screen Candidates using the E-verify Program
(http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
6. SUBMITTALS:
6.1 General. Contractor submittals shall be furnished in accordance with the specifications below.
All listed items shall be submitted for Government approval by the Contracting Officer.
Associated work items shall not be performed until receiving approval from the Contracting Officer. Contracting Officer shall provide a response to the shop drawings within one week of receipt.
6.2 Shop Drawings. Use of the attached drawings for shop drawings shall be at the Contractor’s option and risk. If the Contractor’s shop practice requires details in the additions to, or different from, those shown on the contract drawings, he shall prepare shop drawings and furnish three sets for approval. If approved by the Contracting Officer, each copy of the drawings will be identified as having received such approval by being so stamped and dated, and one set will be returned to the Contractor. The Contractor shall make any corrections required by the Contract Officer. The approval of the drawings by the Contracting Officer shall not be construed as a complete check but will indicate only that the general method of construction and detailing is satisfactory. Approval of shop drawings by the Contracting Officer shall not relieve the Contractor of the responsibility for complete conformity with the specifications.
6.3 List of Materials. The Contractor shall submit evidence, satisfactory to the Contracting Officer, stating that all materials conform to the requirements of these specifications. The Contractor shall also furnish a shipping bill or memorandum of each shipment of finished pieces or members, giving the designation mark and weight of each piece, the number of pieces and the total weight.
7. QUALITY CONTROL
7.1 Quality Control Program. The Contractor shall submit a Quality Control Plan prior to the start of any work. The Plan shall include a detail process of how the Contractor’s Quality Control Program shall function throughout this entire Contract so that all materials delivered to the Government meet the Contract requirements in every aspect. The Plan shall indicate Contractor Quality Control (CQC) Organization, letters of authority to the CQC staff, testing laboratories to be used, inspection procedures, documentation process to control delivered materials, sample of the proposed CQC daily report, test report forms and other reports necessary to complete this contract. The Contractor shall establish and maintain an effective Quality Control Program to assure compliance with the contract requirements and shall submit records of all quality control operations for the items covered by these specifications. These records shall document material and workmanship compliance. They shall document all inspections and testing completed by the Contractor’s Quality Control staff to ensure compliance to this contract.
7.2 Test of Materials. The Contractor shall, at his expense, perform analyses tests to demonstrate that all materials are in conformity with the specifications and drawings. Should the Contractor desire to use stock materials not manufactured specifically for the work covered by these specifications, he shall submit evidence, satisfactory to the Contracting Officer, stating that such material conforms to the requirement specifications. Detailed tests of these materials will then not be required, if so, approved by the Contracting Officer. Tests, except where modified shall be made as indicated in the respective detailed specifications or on the drawing and, unless otherwise authorized, in the presence of the Contracting Officer. The Contractor shall furnish the Contracting Officer certified reports in duplicate of all required analyses and tests.
7.3 Nondestructive Testing. When doubt exists as to the soundness of any material part, such part may be subjected to any form of nondestructive testing permitted by the Contracting Officer.
This may include ultrasonic, magnaflux, dye penetrant, x-ray, gamma ray or any other test that will thoroughly investigate the part in question. The cost of such investigation will be borne by the Government. Any defects will be cause for rejection and rejected parts shall be replaced and retested at the Contractor’s expense.
8. WORKMANSHIP:
8.1 General: Workmanship shall be of the highest grade in accordance with the best modern practices to conform to the specifications and drawings for the items being furnished.
8.2 Quality Control: The Contractor shall establish and maintain a quality control system to assure compliance with the contract requirement. The Contractor’s Quality Control staff will ensure that workmanship is of the highest quality and provide documentation that supports this quality for all work performed by the Contractor, any Sub-Contractor, Fabricator or Supplier.
9. NOT USED:
10. METAL WORK FABRICATION:
10.1 General. Material before being laid off or worked must be straight. If straightening is necessary, it shall be done by methods that will not injure the metal. Sharp kinks or bends shall be cause for rejections of the material. Material with welds will not be accepted, except where otherwise approved. Where heating is required, precautions shall be taken to avoid overheating the metal and it shall be allowed to cool in such a manner as not to destroy the original properties of the metal. Finished members shall be free from twists, bends and open joints.
10.2 Structural Steel Fabrication. Shearing shall be accurately done and all portions of the work neatly finished. Structural steel may be cut by mechanically guided or hand guided torches provided an accurate profile with a smooth surface free from cracks and notches is secured. Cuts shall be chopped, ground or machined smooth so that the finished piece meets the dimensions given on the drawings.
10.2.1 Dimensional Tolerances of Structural Steel Items. Dimensions shall be measured by means of an approved calibrated steel tape of the same temperature as the item or part at the time of the measurement.
10.2.1.1 The overall dimensions of the assembled structural unit shall be within the tolerances indicated on the drawings or as required for proper assembly.
10.2.1.2 Except as required to meet the requirements above, an allowable variation of 1/32 inch is permissible in the overall length of individual component members with both ends milled and individual component members without milled ends shall not deviate from the dimensions shown on the drawings by more than 1/16 inch.
10.3 Dimensional Tolerances of Machined Items
10.3.1 Dimensioning and Tolerancing – Dimensioning and Tolerancing of machined elements shall be in accordance with ASME Y14.5M.
10.3.2 Finished Surfaces – Where surface finishes are indicated on the drawings or specified herein, the symbols used or finishes specified shall be in accordance with ANSI B46.1.
Finished surfaces shall be 125 micro inches unless otherwise shown.
10.3.3 Test Assembly – All items shall be test fit before delivery to determine proper fit and function.
10.4 Not Used
10.5 Not Used
10.6 Shop Assembly: All assemblies shall be assembled in the shop to determine the correctness of the work and matching of the component parts. The tolerances shall not exceed those shown on the drawings and each unit assembled shall be closely checked to ensure that all necessary clearances have been provided and that the binding does not occur in any moving part. Assembly in the shop shall be in the same position as final installation in the field. Final assembly and disassembly work shall be performed in the presence of a Government inspector, unless waived in writing by the Contracting Officer, and the Contractor shall immediately remedy any errors or defects disclosed, without cost to the Government. Before disassembly of any assemblies for shipment the components of the assembly shall be match-marked to facilitate erection in the field. Circling with a ring of white paint shall indicate the location of the match-marks.
11 PAINTING OF FINISHED WORK:
11.1 Not Used.
11.2 SAFETY. The Contractor shall follow all applicable Federal, State, and Local laws.
11.2.1 STEEL PAINTING
11.2.2 SAMPLING AND TESTING. The Contracting Officer shall have the option to require sampling and testing of the vinyl paint and its ingredients. Testing of paint for compliance with the specifications will be performed in a Government-designated laboratory at no expense to the Contractor except that the cost of testing any sample representing material that replaces previously rejected material will be deducted from payments to the Contractor. Paint over one year old will require testing.
11.2.3 PACKAGING, LABELING, DELIVERY, AND STORAGE OF PAINTS.
Paints shall be so processed and packaged as to ensure that within a period of one year from date of manufacture, they will not gel, liver, or thicken deleteriously, or form gas in the closed container. Paints, unless otherwise specified or permitted, shall be packaged in standard containers not larger than five gallons in size, with removable friction or lug-type covers.
Containers for vinyl-type paints shall be lined with a coating resistant to the solvents in the formulations and capable of effectively isolating the paint from contact with the metal container.
Each container of paint or separately packaged component thereof shall be clearly and durably labeled to indicate the purchaser's order number, date of manufacture, manufacturer's batch number, quantity, color, component identification, and the designated name, formula, or specification number of the paint together with special labeling instructions, when specified.
Paint shall be delivered to the job in unbroken containers. Paints that can be harmed by exposure to cold weather shall be stored in ventilated, heated shelters. All paints shall be stored under cover from the elements and in locations free from sparks and flames.
11.3 PAINT FORMULATION SPECIFICATIONS
11.3.1 General. Special paints shall have the composition as indicated in the formulas listed herein.
11.3.2 Colors and Tints. Colors shall conform to the listed chip of Fed. Std. 595, "Colors."
11.3.3 Vinyl-Type White (or Gray) Paint.
Formula V-766e:
Ingredients Percent by Weight
Vinyl Resin, Type 3 5.6 Vinyl Resin, Type 4 11.6 Titanium Dioxide and (for Gray) Carbon Black 13.0 Diisodecyl Phthalate 2.9 Methyl Isobutyl Ketone 32.0 Toluene 34.7 Ortho-Phosphoric Acid .2
11.3.4 Processing. The dispersion of pigment in this paint shall be accomplished by means of pebble mills or other approved methods to produce a fineness of grind (ASTM D 1210) of not less than 7 on the Hegman scale. Grinding of this formulation in steel-lined or steel-ball mills will not be permitted. No grinding aids, antisettling agents, or any other materials except those shown in the formula will be permitted. The paint shall show the proper proportions of specified materials when analyzed by chromatographic and/or spectrophotometric methods. The ortho-phosphoric acid shall be measured with great care and diluted with at least four parts of ketone to one part of acid. It shall be slowly incorporated into the finished paint with constant and thorough agitation.
11.3.5 Viscosity. The viscosity of this paint shall be between 60 and 90 seconds using a No. 4 Ford cup
(ASTM D 1200).
11.3.6 Adhesion Test. This paint is subject to the adhesion test for vinyl paint.
11.3.7 Colors. The white and gray paints shall be furnished in the volume ratio designated by the purchaser. The gray paint shall contain no pigments other than those specified. Enough carbon black shall be included to result in the dry paint film having a reflectance of 20-24 (ASTM E 1347). The resulting gray color shall approximate but not necessarily match color 26231 of Fed.
Std. 595.
11.4 INGREDIENT MATERIALS AND THINNERS FOR SPECIAL PAINT FORMULATIONS.
11.4.1 Pigments and Suspending Agents
Carbon Black. Carbon black shall conform to ASTM D 561, Type I or II.
Titanium Dioxide. The titanium dioxide in vinyl paint Formula V-766e shall be one of the following:
Titanox 2160 or 2101, NL Chemicals; Ti-Pure 960, E. I. DuPont DeNemours and Co., Inc.; Unitane OR-650, Kermira Inc.
11.4.2 Resins, Plasticizer and Catalyst
11.4.2.1 Diisodecyl Phthalate shall have a purity of not less than 99.0 percent, shall contain not more than 0.1 percent water and shall have an acid number (ASTM D 1045) of not more than 0.10.
11.4.2.2 Vinyl Resin, Type 3. Vinyl resin, Type 3, shall be vinyl chloride-acetate copolymer of medium average molecular weight produced by a solution polymerization process and shall contain 85 to 88 percent vinyl chloride and 12 to 15 percent vinyl acetate by weight. The resin shall have film-forming properties and shall, in the specified formulations, produce results equal to "Vinylite" resin VYHH, as manufactured by the Union Carbide Corporation.
11.4.2.3 Vinyl Resin, Type 4. Vinyl resin, Type 4, shall be a copolymer of the vinyl chloride-acetate type produced by a solution polymerization process, shall contain (by weight) one percent interpolymerized dibasic acid, 84 to 87 percent vinyl chloride, and 12 to 15 percent vinyl acetate. The resin shall have film-forming properties and shall, in the specified formulations, produce results equal to "Vinylite" resin VMCH, as manufactured by the Union Carbide Corporation.
11.4.2.4 Ortho-phosphoric Acid shall be a chemically pure 85 percent grade.
11.4.3 Solvents and Thinners
Methyl Isobutyl Ketone (MIBK) shall conform to ASTM D 1153.
Toluene shall conform to ASTM D 841.
11.5 CLEANING AND PREPARATION OF SURFACES TO BE PAINTED
11.5.1 General. Surfaces to be painted shall be clean before applying paint or surface treatments.
Deposits of grease or oil shall be removed in accordance with SSPC-SP1, "Solvent Cleaning" prior to mechanical cleaning. Solvent cleaning shall be accomplished with mineral spirits or other low-toxicity solvents having a flashpoint above 100 deg. F. Clean cloths and clean fluids shall be used to avoid leaving a thin film of greasy residue on the surfaces being cleaned. Items not to be prepared or coated shall be protected from damage by the surface preparation methods.
Cleaning and painting shall be so programmed that dust or other contaminants from the cleaning process do not fall on wet, newly painted surfaces, and surfaces not intended to be painted shall be suitably protected from the effects of cleaning and painting operations. All surfaces shall be dry blast cleaned to a grade approaching White Metal grade which shall be in accordance with SSPC-SP 5, except that a limited relaxation from the uniform White Metal grade of surface cleanliness will be permitted, as described below. The metal shall be cleaned to such a degree that if a large surface were divided approximately into six-inch squares, at least 75 percent of the subdivisions would meet the White Metal grade of cleanliness and the remaining subdivisions would be randomly distributed. Within these small, randomly distributed areas, a minor relaxation from White Metal cleanliness will be permitted, consisting only of very slight shadows, stains, and discolorations stemming from very thin, adherent, sparsely scattered residues of mill scale and corrosion products. No relaxation from the White Metal grade will be permitted on surface irregularities such as edges, interior angles, welds, lines, and junctions of joining members. The overall blasting effort expended shall be not less two-thirds (2/3) of that which would be required to accomplish the White Metal grade of cleanliness on the specific surfaces involved, but this limitation shall not be construed as a waiver of any of the requirements above. Weld spatter not dislodged by blasting shall be removed with impact or grinding tools and the areas reblasted prior to painting. Surfaces shall be dry at the time of blasting. Within eight hours after cleaning, prior to the deposition of any detectable moisture, contaminants, or corrosion, all ferrous surfaces blast cleaned to a grade approaching White Metal shall be cleaned of dust and abrasive particles by brushing, vacuum cleaning, and/or blowdown with clean, dry compressed air, and given the first coat of paint.
11.6 PAINT APPLICATION
11.6.1 General. The finished coating shall be free from holidays, pinholes, bubbles, runs, drops, ridges, waves, laps, excessive or unsightly brush marks, and variations in color, texture, and gloss.
Application of initial or subsequent coatings shall not commence until a Government representative has verified that atmospheric conditions and the surfaces to be coated are satisfactory or has waived specific verification. All paint coats shall be applied in such manner as to produce an even, continuous film of uniform thickness. Edges, corners, crevices, seams, joints, welds, and other surface irregularities shall receive special attention to ensure that they receive an adequate thickness of paint. Spray equipment shall be equipped with traps and separators and where appropriate, mechanical agitators, pressure gages, pressure regulators, and screens or filters. Air aps, nozzles, and needles shall be as recommended by the spray equipment manufacturer for the material being applied. Airless type equipment shall not be used for the application of vinyl paints.
11.6.2 Mixing and thinning. Paints shall be thoroughly mixed, strained where necessary, and kept at a uniform composition and consistency during application. Paste or dry powder pigments specified to be added at the time of use shall, with the aid of powered stirrers, be incorporated into the vehicle or base paint in such a manner as to produce a smooth, homogeneous mixture, free of lumps and dry particles. Where necessary, in the opinion of the inspector, to suit conditions of surface, temperature, weather, and method of application, the packaged paint may be thinned immediately prior to use by the addition of not more than one pint per gallon of the proper thinner, provided that this general limitation shall not apply when more specific thinning instructions are provided. Paint that has been stored at low temperature, shall be brought up to at least 70 deg. F before being mixed and thinned, and its temperature in the spray tank or other working container shall not fall below 60 deg. F during the application. Paint that has deteriorated in any manner to such degree that it cannot be restored to essentially its original condition by customary field-mixing methods shall not be used and shall be removed from the project site. Paint and thinner that is more than one year old shall be sampled and submitted for testing to determine its suitability for application.
11.6.3 Atmospheric and Surface Conditions. Paints shall be applied only to surfaces that are above the dew point temperature and that are completely free of moisture as determined by sight and touch.
In no case shall any paint be applied to surfaces upon which there is detectable frost or ice.
Except as otherwise specified, the temperature of the surfaces to be painted and of air in contact therewith shall be not less than 45 deg. F during paint application nor shall paint be applied if the surfaces can be expected to drop to 32 deg. F or lower before the film has dried to a reasonably firm condition. During periods of inclement weather, painting may be continued by enclosing the surfaces and applying artificial heat, provided the minimum temperatures and surface dryness requirements prescribed above are maintained. Paint shall not be applied to surfaces heated by direct sunlight or other sources to temperatures that will cause detrimental blistering, pin holing, or porosity of the film.
11.6.4 Time Between Surface Preparation and Painting. Surfaces that have been cleaned and/or otherwise prepared for painting shall be primed within eight hours as previously stated.
11.6.5 Coverage and Film Thickness. The paint shall be applied at a rate normal for the type of material being used. In any event, the combined coats of a specified paint system shall completely hide the base surface and the finish coats shall completely hide undercoats of a dissimilar color. Dry film thickness measurements shall be made with one of the thickness gages listed below. They shall be calibrated and used in accordance with ASTM D7091. They shall be calibrated using plastic shims with metal practically identical in composition and surface preparation to that being coated, and of substantially the same thickness (except that for measurements on metal thicker than 1/4-inch, the instrument may be calibrated on metal with a minimum thickness of 1/4-inch).
The instruments shall be calibrated in the thickness range expected to be encountered and the range of accuracy determined. If thickness readings are encountered outside of the calibrated range, the instrument shall be recalibrated, and measurements retaken. The instruments shall be calibrated, or calibration verified prior to, during and after each use. Authorized thickness gages:
Mikrotest, Elektro-Physik, Inc.
Inspector Gage, Elcometer Instruments, Ltd.
Positest, Defelsko Corporation General Electric, Type B, General Electric Company Minitector, Elcometer Instruments, Ltd.
Positector 2000, Defelsko Corporation
11.6.6 Progress of Painting Work. Where field painting on any type of surface has commenced, the complete painting operation, including priming and finishing coats, on that portion of the work, shall be completed as soon as practicable, without prolonged delays. Sufficient time shall elapse between successive coats to permit them to dry properly for recoating, and this period shall be modified as necessary to suit adverse weather conditions. Paint shall be considered dry for recoating when it feels firm, does not deform or feel sticky under moderate pressure of the finger, and the application of another coat of paint does not cause film irregularities such as lifting or loss of adhesion of the undercoat. All coats of all painted surfaces shall be unscarred and completely integral at the time of application of succeeding coats. At the time of application of each successive coat, undercoats shall be cleaned of dust, grease, overspray, or foreign matter by means of airblast, solvent cleaning, or other suitable means.
11.6.7 Protection of Painted Surfaces. Where shelter and/or heat are provided for painted surfaces during inclement weather, such protective measures shall be maintained until the paint film has dried and discontinuance of the measures is authorized. Items that have been painted shall not be handled, worked on, or otherwise disturbed until the paint coat is fully dry and hard. All metalwork coated in the shop or field prior to final erection shall be stored out of contact with the ground in such manner and location as will minimize the formation of water-holding pockets, soiling, contamination, and deterioration of the paint film, and damaged areas of paint on such metalwork shall be cleaned and touched-up without delay.
11.6.8 Special Directions for Mixing and Applying Vinyl Paints.
13.7.8.1 General. Vinyl paints, such as Formula V-766e, shall be spray applied, except that areas inaccessible to spraying shall be brushed. All of the vinyl paints require thinning for spray application. (See following subparagraphs for more specific thinning instructions).
Selection of thinners for all vinyl paints shall be in accordance with the following table:
Table 1: Paint Thinner.
Approximate Ambient Air Temperature (Degrees F).
Below 50 50 – 70 Above 70
MEK MIBK MIAK
The amount of thinner shall be varied to suit the specific paint and prevailing temperature and wind conditions and shall at all times be sufficient to provide a wet spray and avoid deposition of particles that are semi-dry when they strike surface. Vinyl paints shall not be applied when the temperature of the ambient air receiving surfaces is less than 35 deg. F nor when the receiving surfaces are higher than 125 deg. F. Each spray coat of Formula V-766e vinyl paint shall consist of a preliminary, extra spray pass on edges, corners, interior angles, seams, crevices, junctions of joining members, weld lines and similar surface irregularities followed by an overall double spray coat. A double spray coat of vinyl type paint shall consist of applying paint to a working area of not less than several hundred square feet in a single, half-lapped pass, followed drying to at least a near tack-free condition by another spray pass applied at the same coverage rate and where practicable at right angles to the first. Surface projections shall receive sprayed paint from every direction to ensure complete coverage of all faces. Pits, cracks, and crevices shall be filled with paint insofar as practicable, but in any event, all pit surfaces shall be thoroughly covered, and all cracks and crevices shall be sealed off against the entrance of moisture. Nut threads shall be protected from blasting and painting, or the threads shall be chased with a tap after painting.
Fluid and atomization pressures shall be kept as low as practicable consistent with good spraying results. Not more than 2.0 mils, average dry film thickness of vinyl paint shall be applied per double spray coat. Except where otherwise indicated, an undercoat of the vinyl type paint may receive the next coat any time after the undercoat is tack-free and firm to the touch provided that no speedup or delay in the recoating schedule shall cause film defects such as sags, runs, air bubbles, air craters or poor intercoat adhesion. Neither the prime coat nor any other coat shall be walked upon or be subjected to any other abrading action until it has hardened sufficiently to resist mechanical damage. Vinyl Paint (Formula V-766e) is a ready-mixed paint designed to be spray applied over a wide range of ambient temperatures by field thinning with the proper type and amount of thinner. For spray application, it shall be thinned as necessary up to approximately 25 percent (one quart per gallon of base paint) with the appropriate thinner shown in Table I above; when ambient and steel temperatures are above normal, up to 40 percent thinning may be necessary for satisfactory application.
11.7 PAINT SYSTEM TO BE APPLIED--NUMBER OF COATS AND FORMULAS
11.7.1 General. The required paint systems and the surfaces to which they shall be applied are shown in on the drawings. Supplementary information follows:
11.7.1.1 Colors and Tints. Colors and tints shall match the respective color specimens designated by, or shall otherwise be subject to the approval of, the Contracting Officer. Tinting of vinyl-type paints shall be done by the manufacturer.
11.7.1.2 Surface Preparation. The method of surface preparation and pretreatment shown in the tabulation of paint systems is for identification purposes only. Cleaning and pretreatment of surfaces prior to painting shall be accomplished in accordance with detailed requirements hereinbefore described.
11.7.2 Paint Systems and Painting Schedule. See para 11.7.3 below for supplementary application instructions pertaining to the following paint systems:
SYSTEM NO. 5-F
Surface Preparation: Approaching White metal blast cleaning.
Paint Formulas to be applied:
1st Coat 2nd Coat 3rd Coat 4th Coat 5th Coat Gray Vinyl White Vinyl Gray Vinyl White Vinyl Gray Vinyl V-766e V-766e V-766e V-766e V-766e (double (double (double (double (double spray coat) spray coat) spray coat) spray coat) spray coat)
11.7.3 System No. 5-F Application Instructions. This vinyl system shall be spray applied to an average dry film thickness of at least 7.5 mils for the completed system and the thickness at any point shall not be less than 6.0 mils. Specified film thicknesses shall be applied at no additional cost to the Government.
12. IDENTIFICATION AND PROTECTION:
The Contractor shall crate each assembly in its own crate. All the parts of the assembly shall be properly packaged in the crate so that no damage to any part can occur. All machined faces shall have a protective coating, such as Cosmolene or other approved material, applied to prevent any corrosion on the face prior to the face receiving a protective covering or wrapping. All threaded parts shall have the treads protected in a similar manner. All machined faces or surfaces shall also have a protective covering to prevent any damage to face or surface prior to installation of the part. Loading within the crates shall be balanced to the greatest extent possible and all items within the crate shall be restrained by acceptable methods. All crates that have unbalanced loads shall be identified by approved methods. Crates shall be designed so that they are the same size as much as possible for each group of assemblies or similar items and they can be stacked to a height of 6 crates. Crates shall also be designed so that lids are fastened with screws or other type fasteners that allows easy removal of the lid for inspections by the Government at time of delivery.
The crates shall contain all the parts for any one assembly unless otherwise indicated in these Specifications. There shall be no mixing of parts from one assembly to another in any crate, unless approved by the Government.
The crates shall be labeled to identify the Contract Number, assembly name, bid item number and all the parts packaged within that crate, name and mark number and resource code. See the following sample crate identification. Also, include the crate total weight and any special handling instructions (such as off center weight).
13. PACKING AND SHIPPING:
13.1 The Contractor shall package all items as indicated in these Specifications and accompanying drawings and deliver all the completed parts and assemblies to the Louisville Repair Station (LRS), Louisville, KY.
13.2 Individual assemblies identified in paragraph 1.1 shall be crated in substantial wooded containers capable of withstanding handling for the weight of the contents. Individual item shall protected within the containers to protect them from damage. One assembly shall allowed per container.
13.3 Containers shall be labeled similar to the following example
Sample Crate Identification
Miter Gate Anchorage Gudgeon Pins and Shim Packs Contract Number __________ Miter Gate Anchorage Gudgeon Pins and Shim Packs, Ohio River Locks Resource Code 9999310014 Contents Item Quantity Name Mark #
1. 6 Gudgeon Pin M-1
2. 36 1/4" Adjusting Ring 230.1/10-19
TOTAL WT.__________ CRATE #________OF_________
DETAIL A
GREASE SLOT TO INTERSECT GREASE HOLE
3/16" DEEP
2 PLCS
G
2 3 4 5 6 7 8 9
F
E
D
C
B
A
09/01/2021 1:50:25 PM
O:\OP\Private\OP-T\OP-TM\Navigation\918.5R - Smithland - SMI\Projects\2024 Smithland Land Chamber Miter Gate Rehab\2_Requisitions and Contracts\Contracts\Gudgeon Pins and Shim Packs\Gudgon Pin.dwg
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
D R
AW
IN
G C
O D
E:
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SHEET ID
US Army Corps of Engineers ®
Lo w er O hi o
R iv er M ac hi ne ry
Sm al l A nc ho r A rm
W ed ge P in s
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
, J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
AN
SI
D
M M
M M
M M
M M
M Y
YY
Y
XX
XX
XX
-X
X- X-
XX
XX
XX
XX
XX
-X
X- X-
XX
XX
M-1
A
/2 in
8.
0"
0.
R5.500"
9.9940.001"
1/2" X 45° CHAMFER
3/4-14 NPT 1.00"
3.00"
3/ in 3/ in
Ø1/2" THRU
GUDGEON PIN
SCALE: NTS
MAKE: 4
MATERIAL: 4340 HT
1. ALL MACHINED SURFACES SHALL BE 125 FINISH
2. BREAK SHARP CORNERS / REMOVE ALL BURRS
3. LATHE CENTERS ACCEPTABLE UNLESS
OTHERWISE NOTED
TOLERANCES UNLESS OTHERWISE NOTED:
X/XX: 1/64"
X.XX: .01
X.XXX: .002
Ø1/2" 10.5" h2optbpk Image h2optbpk Architect h2optbpk Cloud+ 1.00" h2optbpk Architect h2optbpk Cloud+ 11.0" h2optbpk Rectangle h2optbpk Rectangle h2optbpk Line h2optbpk Line h2optbpk Architect
SEE REVISION ON SHEET M-1
h2optbpk Rectangle
REPS AND CERTS
REPRESENTATIONS AND CERTIFICATIONS
COMPANY NAME AND ADDRESS: _________________________________________
PHONE NUMBER: _________________________________________
EMAIL ADDRESS: _________________________________________
BUSINESS SIZE (select one or more as applicable):
Large Business ____ Small Business ____ HUBZone ____ 8(a) ____ Women-Owned Small Business ____ Economically Disadvantaged Women-Owned Small Business ____ Service-Disabled Veteran-Owned ____
CURRENTLY REGISTERED WITH SYSTEM FOR AWARD MANAGEMENT (SAM): YES ____ NO ____
(Note: See FAR 52.204-7)
TAX IDENTIFICATION NUMBER (TIN): ____________
UNIQUE ENTITY IDENTIFIER: ____________
(Note: See FAR 52.204-7. The Unique Entity Identifier is a 12 character alphanumeric code.)
CAGE CODE: ________
(Note: See FAR 52.204-7)
Section SF 1449 - CONTINUATION SHEET
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-13 System for Award Management Maintenance OCT 2018
CLAUSES INCORPORATED BY FULL TEXT
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 30 calender days. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of clause)
CLAUSES INCORPORATED BY REFERENCE
52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.204-26 Covered…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .