This document provides details for a federal solicitation seeking offers for sediment dam raise and armor work in Littcarr, KY. The solicitation seeks a firm-fixed-price contract to re-establish an existing gravel access road, move several large boulders upstream to re-establish downstream slope protection, place new channel lining along the crest and downstream slope of the dam to provide armoring and raise the overall height approximately 30 inches. The scope also includes establishing a 12-foot wide access road along the entire dam crest using number 4 stone. Upon completion, all access roads will remain in place for future project use. The solicitation includes options to place new riprap over the crest and downstream slope of the dam. The solicitation was issued by the U.S. Army Corps of Engineers Louisville District and offers are due by May 25, 2023 at 1:00 PM Eastern Time.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Invitation for Bid W912QR23B0012, Sediment Dam Raise and Armor at Carr Creek Lake in Littcarr, KY is hereby amended as follow s:

SEE SUMMARY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR23B0012

X 9B. DATED (SEE ITEM 11)

25-Apr-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-May-2023

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR23B0012_Specs-0001

W912QR23B0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

a. The due date for bids has been extended until 25 MAY 2023 at 1:00 PM Eastern Time.

b. SPECIFICATION CHANGES:

31 00 00.00 06 Earthwork section added.

c. PLAN SHEET CHANGES:

GI001: Sheet Reference No. and Sheet Description changed.

GR106: Photo GR401-H11 location moved.

Photo GR407-A1 location added.

Photo GR407-A11 location added.

General Notes revised.

GR401: Photo H11 replaced photograph.

GR407: New sheet added.

CS105: Approximate location of scour added.

Approximate location of borrow added.

Sheet keynotes revised.

CS501: Approximate area of scour added.

d. All other terms and conditions remain unchanged.

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 24-May-2023 01:00 PM to 25-May-2023 01:00 PM.

(End of Summary of Changes)

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 80 00.00 06 SPECIAL PROVISIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 32 01.00 06 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 04.10 06 CONTRACTOR QUALITY CONTROL

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

DIVISION 31 - EARTHWORK

31 11 00 CLEARING AND GRUBBING

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 42 37.00 06 STONE PROTECTION

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

128611 Littcarr Sediment Dam Raise and Armoring Littcar, KY

CERTIFIED FINAL

EARTHWORK31 00 00.00 06

AMENDMENT 0001************************

************************AMENDMENT 0001

SECTION 31 00 00.00 06

EARTHWORK

07/18

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO T 180 (2017) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop

AASHTO T 224 (2010) Standard Method of Test for Correction for Coarse Particles in the Soil Compaction Test

ASTM INTERNATIONAL (ASTM)

ASTM C136/C136M (2014) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates

ASTM D1140 (2017) Standard Test Methods for Determining the Amount of Material Finer than 75-µm (No. 200) Sieve in Soils by Washing

ASTM D1557 (2012; E 2015) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)

ASTM D2487 (2011) Soils for Engineering Purposes (Unified Soil Classification System)

ASTM D422 (1963; R 2007; E 2014; E 2014)

Particle-Size Analysis of Soils

ASTM D4318 (2017) Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils

1.2 MEASUREMENT

1.2.1 Excavation

The unit of measurement for excavation and borrow will be the cubic yard, computed by the average end area method from cross sections taken before and after the excavation and borrow operations, including the excavation

SECTION 31 00 00.00 06 Page 1

AMENDMENT 0001************************************************************************

AMENDMENT 0001

CERTIFIED FINAL

128611 Littcarr Sediment Dam Raise and Armoring Littcar, KY W912QR23B0012_Specs-0001 for ditches, gutters, and channel changes, when the material is acceptably utilized or disposed of as herein specified. The measurements will include authorized excavation of rock (except for piping trenches that is covered below), authorized excavation of unsatisfactory subgrade soil, and the volume of loose, scattered rocks and boulders collected within the limits of the work; allowance will be made on the same basis for selected backfill ordered as replacement. The measurement will not include the volume of subgrade material or other material that is scarified or plowed and reused in-place, and will not include the volume excavated without authorization or the volume of any material used for purposes other than directed. The volume of overburden stripped from borrow pits and the volume of excavation for ditches to drain borrow pits, unless used as borrow material, will not be measured for payment. The measurement will not include the volume of any excavation performed prior to the taking of elevations and measurements of the undisturbed grade.

1.2.2 [Enter Appropriate Subpart Title Here]Not Used

1.2.3 [Enter Appropriate Subpart Title Here]Not Used

1.2.4 [Enter Appropriate Subpart Title Here]Not Used

1.2.5 Select Granular Material

Select granular material shall be measured in place as the actual cubic yards replacing wet or unstable material in trench bottoms within the limits shown. The unit price shall include furnishing and placing the granular material, excavation and disposal of unsatisfactory material, and additional requirements for sheeting and bracing, pumping, bailing, cleaning, and other incidentals necessary to complete the work.

1.3 [Enter Appropriate Subpart Title Here]Not Used

1.4 DEFINITIONS

1.4.1 Satisfactory Materials

Satisfactory materials shall comprise any materials classified by ASTM D2487 as GW, GP, GM, GP-GM, GW-GM, GC, GP-GC, GM-GC, SW, SP, SM, SW-SM, SC, SW-SC, SP-SM, SP-SC, CL, ML, CL-ML. Satisfactory materials for grading shall be comprised of stones less than 3 inches.

1.4.2 Unsatisfactory Materials

Materials which do not comply with the requirements for satisfactory materials are unsatisfactory. Unsatisfactory materials also include man-made fills; trash; refuse; backfills from previous construction; and material classified as satisfactory which contains root and other organic matter or frozen material. The Contracting Officer shall be notified of any contaminated materials.

1.4.3 Cohesionless and Cohesive Materials

Cohesionless materials include materials classified in ASTM D2487 as GW, SECTION 31 00 00.00 06 Page 2

AMENDMENT 0001

CERTIFIED FINAL

GP, SW, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH. Materials classified as GM and SM will be identified as cohesionless only when the fines are nonplastic. Testing required for classifying materials shall be in accordance with ASTM D4318, ASTM C136/C136M, ASTM D422, and ASTM D1140.

1.4.4 Degree of Compaction

Degree of compaction required, except as noted in the second sentence, is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D1557 abbreviated as a percent of laboratory maximum density. Since ASTM D1557 applies only to soils that have 30 percent or less by weight of their particles retained on the 3/4 inch sieve, the degree of compaction for material having more than 30 percent by weight of their particles retained on the 3/4 inch sieve shall be expressed as a percentage of the maximum density in accordance with AASHTO T 180 Method D and corrected with AASHTO T 224. To maintain the same percentage of coarse material, the "remove and replace" procedure as described in the NOTE 8 in Paragraph 7.2 of AASHTO T 180 shall be used.

1.4.5 Initial Backfill Material

Initial backfill shall consist of select granular material or satisfactory materials free from rocks 3 inches or larger in any dimension.

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with LRL Section 01 33 00.00 06 SUBMITTAL

PROCEDURES:

SD-03 Product Data

Utilization of Excavated Materials; G, DO

Procedure and location for disposal of unused satisfactory material. Proposed source of borrow material.

SD-06 Test Reports

Testing Borrow Site Testing

Within 24 hours of conclusion of physical tests, 2 copies of test results, including calibration curves and results of calibration tests. Results of testing at the borrow site.

SD-07 Certificates

Testing Qualifications of the Contractor's validated testing facilities.

1.6 [Enter Appropriate Subpart Title Here]Not Used

SECTION 31 00 00.00 06 Page 3

AMENDMENT 0001

CERTIFIED FINAL

1.7 CLASSIFICATION OF EXCAVATION

No consideration will be given to the nature of the materials, and all excavation will be designated as unclassified excavation.

1.8 CRITERIA FOR BIDDING

Base bids on the following criteria:

a. Surface elevations are as indicated.

b. Pipes or other artificial obstructions, except those indicated, will not be encountered.

1.9 [Enter Appropriate Subpart Title Here]Not Used

PART 2 PRODUCTS

2.1 REQUIREMENTS FOR BORROW AND EXCESS SOIL

Borrow soils shall meet the requirement of LRL Section 01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS; paragraphs BORROW SOILS and

MANAGEMENT OF BORROW MATERIAL AND EXCESS SOIL.

2.2 [Enter Appropriate Subpart Title Here]Not Used

2.3 [Enter Appropriate Subpart Title Here]Not Used

2.4 MATERIAL FOR RIP-RAP

Provide Bedding material conforming to (KYTC)Standard Specifications for Road and Bridge Construction (Edition of 2019).

2.4.1 Bedding Material

Consisting of sand, gravel, or crushed rock, well graded, with a maximum particle size of 2.5 inches. Material shall be composed of tough, durable particles. Fines passing the No. 200 standard sieve shall have a plasticity index less than six.

Bedding material shall also be placed within the area of the scour. Bedding shall be placed after the scour is filled with earthen material and prior to replaceing the oversized sandstone.

2.5 Not Used

2.6 Not Used

PART 3 EXECUTION

3.1 GENERAL EXCAVATION

The Contractor shall remove all exposed foreign matter from within the limits of the scour area to be backfilled. Grading shall be in conformity with the typical sections shown and the tolerances specified in paragraph

SECTION 31 00 00.00 06 Page 4

AMENDMENT 0001

CERTIFIED FINAL

FINISHING. Satisfactory excavated materials shall be placed back into the embankment within the limits of the work. Unsatisfactory materials encountered within the limits of the work shall be replaced with satisfactory materials as directed. Such excavated material and the satisfactory material ordered as replacement shall be included in excavation. Unsatisfactory excavated material shall be disposed of in designated waste or spoil areas. During construction, excavation and fill shall be performed in a manner and sequence that will provide proper drainage at all times. Material required for fill or embankment in excess of that produced by excavation within the grading limits shall be excavated from the borrow areas indicated or from other approved areas selected by the Contractor as specified.

3.2 SELECTION OF BORROW MATERIAL

Borrow material shall be selected to meet the requirements and conditions of the particular fill or embankment for which it is to be used. Borrow material shall be obtained from the areas shown on drawings or from approved private sources. Unless otherwise provided in the contract, the Contractor shall obtain from the owners the right to procure material, pay royalties and other charges involved, and bear the expense of developing the sources, including rights-of-way for hauling. Borrow material from approved sources on Government-controlled land may be obtained without payment of royalties. Unless specifically provided, no borrow shall be obtained within the limits of the project site without prior written approval. Necessary clearing, grubbing, and satisfactory drainage of borrow pits and the disposal of debris thereon shall be considered related operations to the borrow excavation.

3.3 [Enter Appropriate Subpart Title Here]Not Used

3.4 [Enter Appropriate Subpart Title Here]Not Used

3.5 GROUND SURFACE PREPARATION

3.5.1 General Requirements

Unsatisfactory material in surfaces to receive fill or in excavated areas shall be removed and replaced with satisfactory materials as directed by the Contracting Officer.

3.5.2 Frozen Material

Material shall not be placed on surfaces that are muddy, frozen, or contain frost. Compaction shall be accomplished by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, or other approved equipment well suited to the soil being compacted. Material shall be moistened or aerated as necessary to plus or minus 2 percent of optimum moisture.

Minimum subgrade density shall be as specified in paragraph TESTING.

3.6 UTILIZATION OF EXCAVATED MATERIALS

Unsatisfactory materials removed from excavations shall be disposed of in designated waste disposal or spoil areas. Satisfactory material removed from excavations shall be used, insofar as practicable, in the construction of fills. No satisfactory excavated material shall be wasted without specific written authorization. Satisfactory material authorized to be wasted shall be disposed of in designated areas approved for surplus material storage. Coarse rock from excavations shall be used for slope

SECTION 31 00 00.00 06 Page 5

AMENDMENT 0001

CERTIFIED FINAL

protection on the downstream slope. No excavated material shall be disposed of to obstruct the flow of any stream, endanger a partly finished structure, impair the efficiency or appearance of any structure, or be detrimental to the completed work in any way.

3.7 [Enter Appropriate Subpart Title Here]Not Used

3.8 BACKFILLING AND COMPACTION

Backfill adjacent to any and all types of structures shall be placed and compacted between 85 and 90 percent laboratory maximum density for cohesionless materials. Ground surface on which backfill is to be placed shall be prepared as specified in paragraph PREPARATION OF GROUND SURFACE FOR EMBANKMENTS. Compaction requirements for backfill materials shall also conform to the applicable portions of paragraphs PREPARATION OF GROUND SURFACE FOR EMBANKMENTS, EMBANKMENTS, and SUBGRADE PREPARATION, and UFGS Section 33 40 00 STORM DRAINAGE UTILITIES; and LRL Section 31 00 00.00 06 EARTHWORK. Compaction shall be accomplished by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, vibratory compactors, or other approved equipment.

3.9 SPECIAL REQUIREMENTS

Special requirements for both excavation and backfill relating to the specific utilities are as follows:

3.9.1 Sandstone Replacement

When replaceing the oversized sandstone, sandstone shall be placed on bedding material in the area of the scour. Trim and dress indicated areas to conform to cross sections, lines and grades shown within a tolerance of

0.1 foot.

3.9.1.1 Bedding Placement

Spread bedding material uniformly to a thickness of at least 4 inches on prepared subgrade as indicated.

3.9.1.2 Sandstone Placement

Place sandstone on prepared bedding material to produce a well graded mass with the minimum practicable percentage of voids in conformance with lines and grades indicated. Rearrange individual pieces by mechanical equipment or by hand as necessary.

3.10 EMBANKMENTS AND STRUCTURAL FILL

3.10.1 Earth Embankments

Earth embankments shall be constructed from satisfactory materials free of organic or frozen material and rocks with any dimension greater than 3 inches. The material shall be placed in successive horizontal layers of loose material not more than 8 inches in depth. Each layer shall be spread uniformly on a soil surface and compacted. Compaction shall be accomplished by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, vibratory compactors, or other approved equipment.

3.11 [Enter Appropriate Subpart Title Here]Not Used

SECTION 31 00 00.00 06 Page 6

AMENDMENT 0001

CERTIFIED FINAL

3.12 [Enter Appropriate Subpart Title Here]Not Used

3.13 FINISHING

The surface of excavations, embankments, and subgrades shall be finished to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. The degree of finish for graded areas shall be within 0.1 foot of the grades and elevations indicated except that the degree of finish for subgrades shall be specified in paragraph SUBGRADE PREPARATION. Gutters and ditches shall be finished in a manner that will result in effective drainage. The surface of areas to be turfed shall be finished to a smoothness suitable for the application of turfing materials. Settlement or washing that occurs in graded, topsoiled, or backfilled areas prior to acceptance of the work, shall be repaired and grades re-established to the required elevations and slopes.

3.13.1 Subgrade and Embankments

During construction, embankments and excavations shall be kept shaped and drained. Ditches and drains along subgrade shall be maintained to drain effectively at all times. The finished subgrade shall not be disturbed by traffic or other operation and shall be protected and maintained by the Contractor in a satisfactory condition. The storage or stockpiling of materials on the finished subgrade will not be permitted.

3.14 TESTING

The Contractor's laboratory shall be validated by the Materials Testing Center (MTC) and approved by the Contracting Officer or designated representatives on-site prior to starting any work which requires quality control (QC) testing. The Contractor can use an independent commercial laboratory that has been validated by the Corps of Engineers MTC, for the required test methods. Existing commercial labs that are presently validated by the Corps can be found at the website:

http://www.erdc.usace.army.mil/Portals/55/docs/CEERD-GV/CEERD-GM-C/160426_CEERD-GMC_Valid

If the Contractor intends to use a laboratory that is not presently validated by the Corps, the Contractor shall provide to the MTC no later than seven (7) days after issuance of Notice to Proceed: 1) a copy of the proposed laboratory's AASHTO accreditation certificate and applicable AMRL/CCRL inspection reports, and 2) a copy of the desk audit validation request, available from http://acwc.sdp.sirsi.net/client/en_US/search/asset/1045309 , for independent validation and desk audit by MTC. The cost for validation by the MTC shall be the responsibility of the Contractor. Copies of the desk audit validation request shall be provided for acceptance by the Contracting Officer or designated representatives on-site. The above information shall be submitted for Government Approval as part of the Contractor's Quality Control Plan.

3.15 DISPOSITION OF SURPLUS MATERIAL

Surplus material or other soil material not required or suitable for filling or backfilling, and brush, refuse, stumps, roots, and timber shall be removed from Government property as directed by the Contracting Officer.

-- End of Section --

SECTION 31 00 00.00 06 Page 7

AMENDMENT 0001

CERTIFIED FINAL

************************************************************AMENDMENT 0001

SF30
SUMMARY OF CHANGES
PROJECT TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
31 00 00.00 06 - EARTHWORK

File details come from the government source that posted it. Updated .