W912QR21Q0033-0001 Amendment.pdf
PDF 374 KB Posted
- Solicitation number
- W912QR21Q0033
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR21Q0033-0002 Amendment.pdf | ||
| W912QR21Q0033 Modular Relocatable Building at Fort Campbell.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL/OPS/ENVIRONMENTAL BR
ATTN: RENEE BOOTH
600 DR M L KING JR PL RM 821
LOUISVILLE KY 40202-2236
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This solicitation for a contract to provide and install a 60x24 Modular Relocatable Building at Fort Campbell, KY is hereby modified as follows:
a. This modification incorporates the document titled Questions and Answers to address multiple questions that were received after the initial publishing of the solicitation.
b. Acknowledgment of receipt of this amendment and quotes are due by date of 5 Apr 2021 by 10:00 am ET.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR21Q0033
X 9B. DATED (SEE ITEM 11)
05-Mar-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Mar-2021
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912QR
FACILITY CODECODE
EMAIL:TEL:
W912QR21Q0033
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS & ANSWERS
*Answers to the questions are indicated in RED*
House Cabling
1. Are all office Drops to be located as a high drop 18” below ceiling? All drops will be 18” below the ceiling minus the 4 x drops in the ceiling distributed evenly in the conference area.
2. Will there be any low drops in the offices (14” AFF)? Negative.
3. What are the Total Drops in the Building? We calculate Twelve (12) to factor in Two (2) per Office (x4) and Four (4) in Conference Area? Correct.
4. How many Single Cat6 Cables are needed for Wireless Access Points? One per Access Point, (total of 4).
Outside Plant Cabling (OSP)
1. What type of 6-Strand Fiber is requested, Single-Mode or Multi-Mode? Single mode.
2. What is the Linear Distance from the Modular Building to the Building 7277 Room 134? N/A See #4 answer.
3. What is in the Path of the Fiber run? Conduit Only direct between buildings or Manhole/Hand-Holes? Path:
N/A See #4 answer. Conduit only.
4. If Conduit what is the total length from Start to Finish? The BLDG 7277 Rm 134 fiber terminates in a manhole approx 108’ from the future relocatable site. It has exposed wires contractors can use as a pull for the new fibers. RNEC requires an additional 30’ of maintenance loops in the manhole and the comms room.
5. If Manholes or Handholes are in the path how many are there? N/A.
6. Will you require an additional 3-Cell Mesh with Tracer included with Fiber run? Negative.
Other
1. Is there any electrical, plumbing, or communications manifolding needed or will this be handled by the Base? Electrical: unit handled.
Plumbing: unit handled.
Communications: unit and RNEC (Regional Network Enterprise Center) handled.
2. Are restroom facilities needed in the building? If there is, is 1 restroom acceptable? Yes, two required at the expense of conference room space.
3. Is there a need for Security alarm, fire alarm, fire sprinkler, or access control? Security alarm: no. Fire alarm: smoke detectors required. Fire sprinkler: no. Access control: No.
4. Are we required to provide a Deck, Step and ADA Ramp as well? Yes to all.
(End of Summary of Changes)