W912QG-20-B-0002-0001.pdf
PDF 462 KB Posted
- Attached to
- Install Secondary Barrier North & South
- Solicitation number
- W912QG-20-B-0002
About this file
This modification amends a solicitation for a firm fixed price construction contract to install secondary barriers on the north and south ends of a runway at Joint Base McEntire in Eastover, South Carolina. The modification changes the time of the site visit to August 17, 2020 at 0800 hours. It also attaches drawings and specifications to the solicitation posting on SAM.gov. The work involves constructing footings and modifying pavement to support new textile aircraft arresting systems, along with associated site and lighting work. The period of performance is 60 days for CLIN 0001 and 120 days each for CLINs 0002 and 0003. The pre-bid conference and site visit will be held on the base and require advance registration by attendees. Questions are due by the fifth business day before the bid opening, which will occur on the date specified in the SF1442 at the contracting office. The wage determination is SC20200035 and subcontracting goals include 72% for small business and 9% for SDVOSBs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QG-20-B-0002 Site Visit (1).pdf | ||
| OF 1419 - Abstract of Offers Construction.pdf | ||
| Specifications.pdf | ||
| Final Design Submittal Drawing.pdf | ||
| W912QG-20-B-0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PSTE132001/132011
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to change the time of the Site Visit to 0800 on 17 August 2020.
Original Site Visit reads as follow s: 17 August 2020 at 0900 AM, is now changed to read as: 17 August 2020 at 0800 AM.
In addition, draw ings and specifications are attached to the FBO posting. No other changes have been made.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QG20B0002
X 9B. DATED (SEE ITEM 11)
07-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Aug-2020
CODE
USPFO SC PURCHASING & CONTRACTING
9 NATIONAL GUARD ROAD
COLUMBIA SC 29201-4763
W912QG 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QG20B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
DELIVERIES AND PERFORMANCE
The following Delivery Schedule for CLIN 0001 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
60 dys. ANP N/A
FOB: Destination
The following Delivery Schedule for CLIN 0002 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
120 dys. ANP N/A
The following Delivery Schedule for CLIN 0003 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
120 dys. ANP 0 N/A
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
INSTRUCTION TO OFFERORS
SECTION 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. Description of the Project: Construct footings on the south and north end overrun in support of new textile secondary aircraft arresting system (AAS). Infrastructure to include modifying existing pavements and constructing new textile AAS foundations, access pavements, and associated site work. Certain above ground approach and threshold lights will require alterations to flush mounted fixtures. Selectively demolish pavements and lighting.
2. Instructions to Bidders:
2.1. You are invited to submit a bid in response to our Invitation for Bids (IFB) entitled W912QG-20-B-0002 entitled Secondary Barrier North & South, Project Numbers PSTE 132001 and PSTE 132011, at McEntire Joint National Guard Base, Eastover, SC 29044.
2.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.
2.3. This solicitation is Full and Open Competititon.
3. EVALUATION FOR AWARD. Reference DFARS 252.236-7007.
4. NOTICE OF PRE-BID CONFERENCE AND SITE VISIT:
4.1. A pre-bid conference will be conducted on 17 August 2020 at 08:00 AM for the purposes of briefing on the bid requirements and answering questions regarding this solicitation. This conference will be held at Joint Base McEntire, 169th FW, CE Conference Room, 1325 South Carolina Road, STE 8, Eastover, SC 29044. Interested Contractors are highly encouraged to attend the pre-bid conference. The site visit will be held following the conference.
4.2. Due to security conditions, all offerors must register to attend this conference and site visit. Email the following information for all attendees to Ms. Fontane Mathis at the following addresses:
fontane.l.mathis.mil@mail.mil AND LTC James Robinson at james.o.robinson10.mil@mail.mil.
Firm Name and Telephone Number Visitor’s Name and Social Security No.
Drivers License Citizenship
4.3. This information must be provided in advance, 5 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
4.4. Visitors must pick up their passes at the Installation’s Main Entry Gate prior to arrival. You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Drivers License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
4.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
4.6. A record of the conference shall be made and furnished to all prospective bidders via posting at https://beta.sam.gov/. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
5. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:
5.1. Submit all questions in the format shown below by email to the contracting office at the addresses show below. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer. All questions must be submitted to the Contracting Office.
Subject Line: Reference No. SOLICITATION W912QG-20-B-0002
Email: fontane.l.mathis.mil.mil@mail.mil AND james.o.robinson10.mil@mail.mil.
PRE-BID INQUIRY FORMAT
Date of Bid Inquiry: _______________ From: ______________________________ Company Name: ________________________________ Address:_____________________________________________________________________________ Phone Number: _____________________________ Fax Number:______________________________ Email address:________________________________________________________________________ Bid Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.)
5.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid.
5.3. All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day prior to bid opening. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS
EARLY IN THIS PROCESS.
5.4. Any changes to the drawings, specifications, etc. will be issued in the form of an amendment.
However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on FBO at https://beta.sam.gov/
5.5. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids.
5.6. RESERVED.
5.6.1. Amendments, if/when issued will be posted to https://beta.sam.gov/ for electronic downloading.
This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons.
6. BID REPOSITORY AND BID OPENING:
6.1. A bid repository is provided for hand carried bids and is located at 1 National Guard Road, Columbia, SC 29201. Hand carried bids must be deposited in the repository prior to the time established for opening of bids.
Bidders are cautioned that they will be required to sign-in and obtain a visitor’s pass to enter the facility and should allow time to accomplish this. See instructions for obtain access to the base in the Site Visit instruction. Follow the same instruction for obtaining entry to hand carry bid. Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304.
6.2. The bid opening will occur at the time and date specified in Block 13 of the SF1442 1 National Guard Road, Columbia, SC 29201. All interested offerors and their major subcontractors are encouraged to attend the bid opening.
7. WAGE DETERMINATION:
7.1. Construction Wage Rates are applicable to this project are SC20200035, 01/03/2020 SC35 for Richland County, SC as shown in Section 00800.
8. BID PREPARATION EXPENSES AND PRE-CONTRACT COSTS: This IFB does not commit the
Government to pay costs incurred in preparation and submission of bids or for other costs incurred prior to award of a formal contract.
9. CLAUSES:
9.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
10. DISPOSITION OF UNSUCCESSFUL BIDS:
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful bids including the bid bond.
11. OFFERORS QUALIFICATIONS:
To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.
12. SUBCONTRACTING PLAN
In accordance with FAR 52.219-9 Alt I, the apparent low bidder, upon request by the Contracting Officer, where applicable, shall submit a subcontracting plan that separately addresses subcontracting with small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns. The plan shall be included in and made a part of the resultant contract. The subcontracting plan shall be submitted within the time specified by the Contracting Officer. Failure to submit the subcontracting plan shall make the bidder ineligible for the award of a contract. The plan will be evaluated by the Government in accordance with AFARS Appendix DD.
The following small business subcontracting goals are applicable for this acquisition;
DoD Goals for FY’20:
72% Small Business 7% HUBZone
9% SDVOSB
20% SDB
15.5% WOSB
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
17 August 2020 at 08:00am
(b) Site visits may be arranged during normal duty hours by contacting:
Joint Base McEntire
169th FW CE Conference Room 1325 South Carolina Roadt, Suite 8 Eastover, SC 29044
(End of provision)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .