Redacted_J A.pdf

PDF 37 KB Posted

Attached to
PostgreSQL
Solicitation number
W912PX-16-Q-0011
Issued by

About this file

The government will award a Firm Fixed Price contract with a base and two option periods.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

410th CSB Control No.

BRAND NAME JUSTIFICATION

(Simplified Acquisition Procedures under FAR Part 13 Not Exceeding $150K)

1. Agency/Contracting Activity: Joint Interagency Task Force South (JIATFS) Truman Annex

Key West, Florida 33040

2. Description of Action:

Nature: New Requirement Follow-On Requirement Mod to Existing Purchase Order/Contract Number

Pricing: Firm-Fixed Price Time and Materials

Funds: OMA Other Funds:_________

3. Description of Supplies/Services:

The total estimated dollar value of the proposed action is

The purpose of this action is to provide annual recurring specialized software technical telephone and onsite support, if required for PostgreSQL DBMS.

CLIN DESCRIPTION QTY

0001 PostgresSQL Plus Enterprise Edition to include:

Support for two (2) physical sockets and two (2) vCPUs for Production Database Support for two (2) physical sockets and two (2) vCPUs for Failover Database Support for two (2) physical sockets and two (2) vCPUs for COOP Database Support for two (2) physical sockets and two (2) vCPUs for Test Database Support for six (6) vCPUs for Development and Test Database Onsite Resource Visit (Technicians with Secret Clearance/NTE 4 days)

Job

The period of performance includes a base period of 12 months with two options.

4. Authority:

Action using Simplified Acquisition Procedures

FAR 13.106-1(b)(1): For purchases not exceeding the simplified acquisition threshold (SAT), contracting officers may solicit from one source if the contracting officer determines that the circumstances of the contract action deem only one source reasonably available (e.g. urgency, exclusive licensing agreements, brand name, or industrial mobilization.

81-16

5. Reason for Authority Cited: The C5I Systems Directorate has a requirement for services to support and maintain enterprise-wide systems running a broad range of Intranet Web applications based on PostgreSQL. This is to replace the annual license and software support for Oracle products at JIATFS and provide similar support for PostgreSQL. JIATF South has re-hosted their authoritative system of record from an Oracle DBMS to PostgreSQL. This change represents 75% cost savings over the Oracle support this replaces.The support will ensure JIATFS C5I Systems Directorate operational objectives are fully met by providing support for software patch releases to remain compliant with DISA STIG requirements. Failure to have this service will adversely impact critical mission applications and basic support of essential PostgreSQL software products and place our information systems at risk of non-compliance with DISA STIG requirements based on the ability to acquire, install and resolve issues with patches and updates to meet continuing IAVM issues.

6. Actions to Increase Competition:

None. All potential vendors were identified using published RFI through GSA, CHESS and FBO. All responding vendors will be notified when the synopsis/solicitation is released.

7. Market Research:

PostgreSQL is open source, as such, does not provide GSA schedule pricing for their products. RFI’s were posted on CHESS and FBO. CHESS contractors could not provide this service. However a list of 3rd party resellers was identified from the RFI on FBO.

8. Procurement History:

Previous Purchase Orders(s) or Contract(s): Yes No

9. Additional information to support the justification: None

10. T echnical / Requirements Certification: I certify that the supporting data under my cognizance which is included in this sole source justification is accurate and complete to the best of my knowledge and belief.

11. Fair and Reasonable Price Determination: As Contracting Officer, I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable. The fair and reasonable price will be determined by using one of the price analysis techniques. Certified cost and pricing data will not be required because the action is for a commercial item.

12. Review: I have reviewed this justification and have no legal objection.

13. Contracting Officer’s Approval: I hereby certify that this limited source justification is accurate and complete to the best of my knowledge and belief. Based on the foregoing, I approve this limited source justification subject to availability of funds, and provided that the services and supplies herein described have otherwise been authorized for acquisition.

File details come from the government source that posted it. Updated .