Amendment 0008 to W912PP-14-R-0015

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

W912PP

PROJECT: FY14 Replace Hydrant Fuel System, Holloman Air Force Base, Ortero County, New Mexico

1. This is Amendment No. 0008 to Solicitation No. W912PP-14-R-0015. The following revisions shall be incorporated into the specifications. All other provisions shall remain unchanged.

U.S. ARMY ENGINEER DISTRICT, ALBUQUERQUE

CORPS OF ENGINEERS

4101 JEFFERSON PLAZA, N.E.

ALBUQUERQUE, NEW MEXICO 87109-3435

See Item 6

J

W912PP-14-R-0015

1 3

10/10/2014

04/25/2014

W912PP-14-R-0015

Amendment No.0008

2. SOLICITATION, OFFER, AND AWARD, Standard Form 1442: In Block 13A, change the date for Receipt of Proposal from “13 Jun 2014” to “10 Nov 2014”. Time remains unchanged.

3. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages or sections, changes have been identified by "[*Am-8]" in areas of revisions. Revisions are tracked with colored strikeout for deletions and underline for additions. (All portions of reissued specification pages shall apply whether or not changes thereon have been indicated by "[*Am-8]".)

Pages or Sections Deleted Pages or Sections Substituted or Added

SF1442 SF1442

Pricing Schedule Pricing Schedule Project Table of Contents, Project Table of Contents, Volume 1, 2, and 3 Volume 1, 2, and 3 Register (Section 01 33 00) Register (Section 01 33 00) 33 05 23.19 33 05 23.19 33 05 23.20 (New Section Added) 31 00 00AT – 33 through 69 (insert after Page 32)

4. Drawings (Not Reissued). The following drawings are revised as indicated below with latest revision date of 10 October 2014. These drawings are not reissued with this amendment.

(1) SITE, Sheet CS502, delete this sheet in its entirety.

(2) SITE, Sheet MS207, delete this sheet in its entirety.

5. Drawings (Reissued and New). The following drawings are revised with latest revision date of 10 October 2014, and reissued with this amendment. Sheets are reissued, unless noted as Drawings (New).

GENERAL

G-002 INDEX (1 OF 3)

G-003 INDEX (2 OF 3)

G-004 INDEX (3 OF 3)

SITE

CS102 SITE PLAN AREA 2

CS401 TRUCK OFFLOADS AND FILLSTANDS ENLARGED PLAN

CS402 OPERATIONAL FUEL ASTS ENLARGED PLAN

CS501 OPERATIONAL FUEL AST CONTAINMENT DETAILS

CS507 TYPE 1 AST CONTAINMENT STAIRS DETAILS

CS508 TYPE 2 AST CONTAINMENT STAIRS DETAILS

CS509 TYPE 2 AST CONTAINMENT STAIRS DETAILS

CS510 TYPE 3 AST CONTAINMENT STAIRS DETAILS

CP100 OVERALL PAVING PLAN

CP401 PAVING PLAN AND JOINT LAYOUT - OFFLOADS AND FILLSTANDS

CP402 PAVING PLAN AND JOINT LAYOUT - AST CONTAINMENT

W912PP-14-R-0015

Amendment No.0008

CP501 PAVEMENT DETAILS

CG100 OVERALL GRADING PLAN

CG101 ENLARGED GRADING PLAN AREA A

CG102 ENLARGED GRADING PLAN AREA B

SS504 CONTAINMENT BASIN PIPE SUPPORTS

MS101 FUELS COMPOSITE PLAN

MS102 TRANSFER LINE OVERALL SITE LAYOUT SHEET 1 OF 2

MS103 TRANSFER LINE OVERALL SITE LAYOUT SHEET 2 OF 2

MS104 TRANSFER LINE PIPING PLAN SHEET 1 OF 4

MS105 TRANSFER LINE PIPING PLAN SHEET 2 OF 4

MS106 TRANSFER LINE PIPING PLAN SHEET 3 OF 4

MS107 TRANSFER LINE PIPING PLAN SHEET 4 OF 4

MS108 PRESSURIZED HYDRANT FUELING SYSTEM AND FUEL LOOPS

MS109 PRESSURIZED HYDRANT FUELING SYSTEM SITE LAYOUT

MS110 PRESSURIZED HYDRANT FUELING SYSTEM FILLSTAND AND OFFLOAD

MS201 TRANSFER LINE PIPING PROFILE

MS202 TRANSFER LINE PIPING PROFILE

MS205 TRANSFER LINE PIPING PROFILE

MS206 TRUCK OFFLOAD PIPING PROFILE

MS505 TRUCK OFFLOAD SECTIONS AND DETAILS

ES101 ELECTRICAL SITE PLAN - WEST HYDRANT AREA

EG101 MISCELLANEOUS SYSTEM GROUND LAYOUT

TANKS

X-104 TANK FOUNDATION & INTERSTITIAL PIPING PLAN

X-105 TANK FOUNDATION SECTION & DETAILS

X-106 STAIR DETAILS

ARCHITECTURAL (LOCATION IDENTIFICATION NUMBER D)

A-101 CANOPY PLAN AND ELEVATIONS

A-102 OFFLOAD CANOPY FLOOR PLAN AND ELEVATIONS - Drawings (New)

ELECTRICAL (LOCATION IDENTIFICATION NUMBER B)

EP601 ONE LINE DIAGRAM

EP603 CABLE AND CONDUIT SCHEDULES

EI601 CONTROL SYSTEM DIAGRAMS

////////LAST ITEM////////

Solicitation No. W912PP-14-R-0015; FY14 Replace hydrant Fuel System, Holloman Air Force Base, Otero County, New Mexico.

This acquisition is unrestricted, open to both large and small business concerns. Sealed technical proposal (Volume I), original and four copies and one electronic (CD) copy, and sealed price proposal (Volume II), one original copy and one electronic (CD) copy, are due at the place and time specified in Block 13. See section 00 21 16 for information pertaining to the Pre-Proposal Conference & Site Visit. For technical questions, see the Local Provisions (Section 00 21 16) pertaining to ProjNet. As this is not a sealed bid, offers w ill not be opened publically. Offerors are required to sign in upon entry to the building, therefore all suff icient time for turning in your proposal. Offerors are advised that this requirement may be delayed, cancelled, or revised at any time during the solicitation or aw ard process and is subject to the availability of funds.

DIANA M KEERAN 505-342-3263

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

24-Apr-2014

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________00 73 00

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________5 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________10 Nov 2014 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY ENGINEER DISTRICT, ALBUQUERQUE

4101 JEFFERSON PLAZA NE

ALBUQUERQUE NM 87109-3435

W912PP

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

505-342-3496FAX:TEL: TEL: FAX:

W912PP-14-R-0015 81

W912PP-14-R-0015 Am #0008

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Solicitation No. W912PP-14-R-0015 Amendment #0008 Page 3 of 81

Project No: DESC 1407 Title: Replace Hydrant Fuel System Location: Holloman AFB, NM

CONTRACT LINE ITEM PRICING SCHEDULE

(To be attached to SF1442)

Item No. Description of Item Estimated

Quantity Unit Unit Price Amount

BASIC ITEMS

0001 All work to replace the hydrant fuel system at Holloman

AFB, NM including associated demolition and new construction of fuel transfer line, operating tanks with containment, 2400 GPM pumphouse, POL operations area (fuels laboratory, truck offloads, fillstands, associated parking for R-11’s and GOVs, and other required appurtenances, excluding Basic Items 0002 and 0003 and Options listed below.

JOB

XXX

0002 All work complete for rough-in (conduit, wire and backboard) for Two (2) Automatic Tank Gauge Systems (ATG’s) as indicated on the drawings.

Excavation, Stockpiling and Handling of Contaminated Soil (Includes Preparation of Stockpile Area).

0003AA

For the First 500 Cubic Yards

CY

0003AB

Over 500 Cubic Yards.

Total Amount Item 0003

TOTAL BASIC AMOUNT ITEMs 0001, 0002 AND 0003

Amendment #0008 Page 3a of 81

CONTRACT LINE ITEM PRICING SCHEDULE (Cont’d)

OPTION ITEMS

Option 1 – Disposal of contaminated soil indicated in Item 0003.

0004AA

For the First 500 Cubic Yards

0004AB

Over 500 Cubic Yards.

Total Amount Item 0004

0005 All work complete for Equipment for two (2) ATG systems.

0006 Additional amount for Microtunnel #1 in lieu of Jack and Bore #1 as shown on Sheets MS104 and MS201

0007 Additional amount for Microtunnel #2 in lieu of Jack and Bore #2 as shown on Sheets MS105 and MS202

0008 Additional amount for Microtunnel #3 in lieu of Jack and Bore #3 as shown on Sheets MS107 and MS205

TOTAL AMOUNT OPTION ITEMS 0004, 0005, 0006, 0007 and 0008

TOTAL AMOUNT (BASIC PLUS ALL OPTION ITEMS)

CY = Cubic Yards

Notes:

1. Offerors must insert a price on all numbered items of the CLIN pricing schedule. Failure to do so may result in the offer being unacceptable. Additions will be subject to verification by the Government. In case of variation between the job-sum prices and the total amount, the job-sum prices will be considered the price. In case of variation between the unit prices and the extensions, the unit prices will be considered the price submitted.

Offerors must provide a cost breakdown of each job-sum price (management, labor hours, materials and other direct charges). The Government reserves the right to exercise the options anytime during excavation of soils for the contract. See FAR 52.217-5 Evaluation of Options. Option Items 0006, 0007 and 0008 will be exercised only if groundwater level is above the indicated Jack and Bore alignments. CLIN Items 0003 and 0004 - See Section 00

73 00 SUPPLEMENTARY CONDITIONS (SPECIAL CONTRACT REQUIREMENTS) (UAI 52.211-5001)

VARIATIONS IN ESTIMATED QUANTITIES – SUBDIVIDED ITEMS (MAR 1995).

2. The offeror agrees to perform the work required at the prices specified above in strict accordance with the terms of this scope of work, if this offer is accepted by the Government in writing within 60 calendar days after the date offers are due.

3. FAR 52.232-18 AVAILABILITY OF FUNDS (APR 1984)

Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

Amendment #0008 Page 3b of 81

CONTRACT LINE ITEM PRICING SCHEDULE (Cont’d)

4. PROGRESS PAYMENT REQUESTS made by the Contractor pursuant to the provisions of Contract Clause, PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS, shall be submitted on ENG FORM 93 to the administration office as designated in Block 26, Standard Form 1442, Solicitation, Offer and Award. ENG FORM 93 shall be submitted to that office on the 1st of each month in appropriate form and certified. Photocopies of the form shall be furnished on that same date to the Corps of Engineers offices designated at the Pre- Construction Conference.

5. ARITHMETIC DISCREPANCIES:

(a) For the purpose of initial evaluation of price proposals, the following will be utilized in the resolving arithmetic discrepancies found on the face of pricing schedule as submitted by the offeror:

(1) Obviously misplaced decimal points will be corrected;

(2) Discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected;

(4) Apparent errors in addition of job-sum and extended prices will be corrected.

(b) For the purposes of price evaluation, the government will proceed on the assumption that the offeror intends his proposal to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the proposal will be so reflected on the abstract of price submitted.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which offer is low. (local Provision)

6. ACCRUALS. In accordance with USACE Engineer Financial Regulation (ER) 37-1-30, and other applicable

Federal and DOD financial accounting standards, the Contractor must assist government personnel with providing reasonably accurate estimates of the value of goods and/or services rendered to the Government pursuant to this contract for each calendar month during which goods and services are delivered. Standard forms and instructions will be provided by the Government to assist with meeting this requirement. These monthly estimates, which facilitate timely entry of accruals, must be received by the Government on or before four (4) business days prior to each calendar month-end.

7. If a modification to a bid based on unit prices is submitted, which provides for a job-sum adjustment to the total estimated cost, the application of the job-sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the job-sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.

-- End of Section --

00 01 10 - 1 PROJECT TABLE OF CONTENTS

SPECIFICATIONS FOR CONSTRUCTION OF

REPLACE HYDRANT FUEL SYSTEM

DESC 1407

HOLLOMAN AFB, NEW MEXICO

PROJECT TABLE OF CONTENTS

VOLUME 1 OF 3

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 10 00 SOLICITATION, OFFER, AND AWARD, SF 1442 AND PRICING SCHEDULE

00 20 00 INSTRUCTIONS FOR PROCUREMENT

00 21 16 INSTRUCTIONS TO PROPOSERS

00 22 16 SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 50 00 CONTRACTING FORMS AND SUPPLEMENTS

00 70 00 CONDITIONS OF THE CONTRACT

00 73 00 SUPPLEMENTARY CONDITIONS (SPECIAL CONTRACT REQUIREMENTS)

DIVISION 01 - GENERAL REQUIREMENTS

01 04 00 MECHANICAL ROOM LAYOUT AND COORDINATION

01 20 00 INTERFACE WITH OTHER WORK

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

REGISTER SUBMITTAL REGISTER

E4025 ENG FORM 4025 TRANSMITTAL FORM

01 33 23.33 AVIATION FUEL SYSTEM SPECIFIC SUBMITTAL REQUIREMENTS

01 33 29 LEED(TM) DOCUMENTATION

01 33 29AT LEED ATTACHMENTS

01 33 29DLA DEFENSE LOGISTICS AGENCY (DLA) SUSTAINABILITY AND ENERGY EFFICIENCY

POLICY

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 26AT 01 35 26 ALBUQUERQUE SECTION FORMS

01 35 29.13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR

CONTAMINATED SITES

01 41 26.10 24 NEW MEXICO NPDES PERMIT REQUIREMENTS FOR STORM WATER

DISCHARGES FROM CONSTRUCTION SITES

01 41 26.10 24AT NPDES GENERAL PERMIT

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.00 10AT SAMPLE QUALITY CONTROL REPORT

01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)

01 51 00 UTILITIES

01 54 00 SECURITY

01 54 00AT HAFB SECURITY FORMS

01 57 20.00 10 ENVIRONMENTAL PROTECTION

00 01 10 - 2 PROJECT TABLE OF CONTENTS

01 58 00 PROJECT IDENTIFICATION

01 58 00AT SIGNAGE

01 62 35 RECYCLED/RECOVERED MATERIALS

01 72 00 AS-BUILT DRAWINGS

01 72 80 TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY

01 72 80AT DD FORM 1354

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 23.33 OPERATION AND MAINTENANCE MANUALS FOR AVIATION FUEL SYSTEMS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 56 13 CONTAINMENT GEOMEMBRANE

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

02 65 00 ABOVEGROUND STORAGE TANK REMOVAL

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES

02 82 14.00 10AT ASBESTOS DATA

02 82 33.13 20 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

DIVISION 04 - MASONRY

04 20 00 MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 19 OPEN WEB STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORM METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 59 10 ROLLING COVER FOR AVIATION REFUELING VAULTS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

00 01 10 - 3 PROJECT TABLE OF CONTENTS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 60 00 FLASHING AND SHEET METAL

07 61 15.00 20 ALUMINUM STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 51 13 ALUMINUM WINDOWS

08 51 23 STEEL WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

VOLUME 2 OF 3

DIVISION 09 - FINISHES

09 06 90 COLOR SCHEDULE

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 00 CERAMIC TILE, QUARRY TILE

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM

09 68 00 CARPET

09 90 00 PAINTS AND COATINGS

09 97 13.17 THREE COAT EPOXY INTERIOR COATING OF WELDED STEEL PETROLEUM

FUEL TANKS

09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES

DIVISION 10 - SPECIALTIES

10 10 00 VISUAL COMMUNICATIONS SPECIALTIES

10 14 01 EXTERIOR SIGNAGE

10 14 02 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 26 13 CORNER GUARDS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

00 01 10 - 4 PROJECT TABLE OF CONTENTS

DIVISION 11 - EQUIPMENT

11 31 13 ELECTRIC KITCHEN EQUIPMENT

11 53 00 LABORATORY EQUIPMENT AND FUMEHOODS

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

12 35 70 LABORATORY CASEWORK

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 20 METAL CANOPY SYSTEMS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 13 17.00 10 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 07 19.00 40 PLUMBING PIPING INSULATION

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 23 00 REFRIGERANT PIPING

23 31 13.00 40 METAL DUCTS

23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLES

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

23 82 46.00 40 ELECTRIC UNIT HEATERS

DIVISION 25 - INTEGRATED AUTOMATION

25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 23 00 SWITCHBOARDS AND SWITCHGEAR

26 32 15.00 10 DIESEL-GENERATOR SET STATIONARY 100-2500 KW, WITH AUXILIARIES

00 01 10 - 5 PROJECT TABLE OF CONTENTS

26 41 01.00 10 LIGHTNING PROTECTION SYSTEM

26 42 17.00 10 CATHODIC PROTECTION SYSTEM (IMPRESSED CURRENT)

26 51 00 INTERIOR LIGHTING

26 55 53.00 10 EXTERIOR LIGHTING INCLUDING SECURITY AND CCTV APPLICATIONS

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 00.00 10 FIRE DETECTION AND ALARM SYSTEM, DIRECT CURRENT LOOP

VOLUME 3 OF 3

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 00 00AT FINAL GEOTECHNICAL REPORT

31 05 19 GEOTEXTILE

DIVISION 32 - EXTERIOR IMPROVEMENTS

[*Am-8]

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS

32 11 16 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING

32 11 23 AGGREGATE BASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY

PAVEMENTS

32 13 15.20 CONCRETE PAVEMENT FOR CONTAINMENT DIKES**SECTION DELETED**

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 23.00 20 PAVEMENT MARKINGS

32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES

DIVISION 33 - UTILITIES

[*Am-8]

33 01 50.01 CLEANING FUEL STORAGE TANKS

33 05 23.19 TRENCHLESS EXCAVATION USING MICROTUNNELING

33 05 23.20 TRENCHLESS EXCAVATION USING BORING AND JACKING

33 08 53 AVIATION FUEL DISTRIBUTION SYSTEM START-UP

33 08 53CET CHECKLIST FOR EQUIPMENT TESTS

33 08 53CT COMMISSIONING TESTS (PERFORMANCE PROCEDURES)

33 09 53 AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM

33 11 00 WATER DISTRIBUTION

33 12 33.00 30 WATER UTILITY METERING

33 24 00 MONITORING WELL PROTECTION, MODIFICATION, ABANDONMENT, OR

RELOCATION

33 30 00 SANITARY SEWERS

00 01 10 - 6 PROJECT TABLE OF CONTENTS

33 32 13.14 PACKAGED SEWAGE LIFT STATIONS, GRINDER PUMP TYPE

33 34 00 FORCE MAINS; SEWER

33 40 00 STORM DRAINAGE UTILITIES

33 52 43.11 AVIATION FUEL MECHANICAL EQUIPMENT

33 52 43.12 AVIATION FUEL PANTOGRAPHS

33 52 43.13 PIPE, MANUAL VALVES, AND FITTINGS, AVIATION FUELING SYSTEM

33 52 43.14 AVIATION FUEL CONTROL VALVES

33 52 43.23 AVIATION FUEL PUMPS

33 52 43.28 FILTER SEPARATOR AND FUEL QUALITY MONITOR, AVIATION FUELING

SYSTEM

33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS

33 56 13.13 STEEL TANKS WITH FIXED ROOFS

33 56 13.15 UNDERTANK INTERSTITIAL SPACE

33 57 00 BULK FUEL RECEIVING/DISPENSING EQUIPMENT

33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.24 BRIDGE CRANES, OVERHEAD HAND OPERATED, UNDER RUNNING

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 97 PAGES

Replace Hydrant Fuel System, Holloman AFB, New Mexico

01 04 00 SD-01 Preconstruction Submittals G ROMechanical Room Plan

01 20 00 SD-01 Preconstruction Submittals G ROArea Use Plan

01 32 01.00 10 SD-01 Preconstruction Submittals

3.4 G ROProject Schedule

01 33 00 SD-01 Preconstruction Submittals

1.9 G ROSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.4 G ROLEED Implementation Plan

SD-11 Closeout Submittals

1.5 G ROLEED Documentation Notebook

01 35 26 SD-01 Preconstruction Submittals

1.6 G ROZero Accident Program (ZAP)

1.7 G ROAccident Prevention Plan (APP)

1.8 G ROActivity Hazard Analysis (AHA)

1.7.1 G ROCrane Critical Lift Plan

1.5.1.3 G ROCrane Operators

SD-06 Test Reports 1.12Notifications and Reports 1.12.2Accident Reports 1.12.3Crane Reports

SD-07 Certificates 1.9Confined Space Entry Permit 1.9Hot work permit

License Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 97 PAGES

01 35 29.13 SD-01 Preconstruction Submittals

1.6 G DOACCIDENT PREVENTION

PLAN/SITE SAFETY AND

HEALTH PLAN

SD-02 Shop Drawings

1.28.1 G DOWork Zones;

1.29.1 G DODecontamination Facilities

SD-03 Product Data 1.13Exposure Monitoring/Air

Sampling Program 1.28.2Site Control Log 1.12.4Employee Certificates

01 41 26.10 24 SD-01 Preconstruction Submittals

3.2.2 G DOStormwater Pollution Prevention

Plan 3.2.1NPDES Notice of Intent 3.2.6NPDES Notice of Termination 3.2.4.1Inspector Qualifications

01 57 20.00 10 SD-06 Test Reports G DOBorrow Site Testing G DOPhase 1 ESA of Borrow Site

01 57 23 SD-07 Certificates 2.1.3Mill Certificate or Affidavit

01 72 00 SD-02 Shop Drawings

1.3 G ROWorking As-Built Drawings

3.1 G ROWorking As-Built Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 97 PAGES

01 72 00 SD-11 Closeout Submittals

1.4 G ROFinal As-Built Drawings

3.2 G ROFinal As-Built Drawings

01 72 80 SD-11 Closeout Submittals G RODD Form 1354

01 74 19 SD-01 Preconstruction Submittals

1.6 G DOWaste Management Plan

SD-11 Closeout Submittals 1.7Records

01 78 23.33 SD-10 Operation and Maintenance Data

2.1.1 G ROSystem Instructions

02 41 00 SD-01 Preconstruction Submittals

1.10 G ROExisting Conditions

1.2.1 G DODemolition Plan

SD-07 Certificates

1.6 G RONotification

SD-11 Closeout Submittals 3.3.3Receipts

02 56 13 SD-02 Shop Drawings G ROPenetration Detail Drawings G ROPanel Layout

1.2 G ROAs-Built Drawings

SD-03 Product Data

2.2 G ROTests, Inspections, and

Verifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 97 PAGES

02 56 13 3.3 G ROField Seaming

1.4 G ROQualifications

SD-04 Samples 3.4Samples

SD-06 Test Reports

2.1 G OMAMaterials

3.1.1 G ROSurface Preparation

3.5.1 G RONon-Destructive Field Seam

Continuity Testing

3.5.2 G RODestructive Field Seam Testing

3.6.1 G RODestructive Seam Test Repairs

3.5 G ROTests

SD-07 Certificates 3.4Samples

2.1 G ROMaterials

3.1.1 G ROSurface Preparation

3.5.2 G RODestructive Field Seam Testing

3.6.1 G RODestructive Seam Test Repairs

G ROInterface Friction Testing

3.5 G ROTests

02 61 13 SD-02 Shop Drawings G DOWork Plan

3.11 G DOClosure Report

SD-06 Test Reports

2.2 G DOBackfill

G DOSurveys

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 97 PAGES

02 61 13 3.5 G DOConfirmation Sampling and Analysis

3.7.1 G DOSampling of Stored Material

3.7.2 G DOSampling Liquid

3.9.2 G DOCompaction

02 65 00 SD-01 Preconstruction Submittals

1.5.4 G ROWork Plan

1.5.4.1 G ROSite safety and health plan

1.5.4.2 G ROExcavation and material handling

plan

1.5.4.3 G ROField sampling and laboratory

testing plan

1.5.4.4 G ROTank and piping removal and

disposal plan

1.5.4.5 G ROSpill and discharge control plan

1.5.1 G ROQualifications

1.5.2 G ROLaboratory Services

3.12.3 G ROState licensed hazardous waste

transporter SD-06 Test Reports

3.15 G ROLaboratory and field testing

reports

2.1 G ROBackfill Material

3.2 G ROTank Contents Verification

3.5.2 G ROContaminated Water Disposal

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 97 PAGES

02 65 00 3.10 G ROSoil Examination, Testing, and Analysis

3.11 G ROBackfilling

3.15 G ROTank Closure Report

SD-11 Closeout Submittals

3.15 G ROBuilding permit, inspection

permits, and other permits

3.15 G ROResults of excavation

3.15 G ROTank disposal paperwork

3.15 G ROContaminated soil disposal

paperwork

3.15 G ROContaminated water disposal

paperwork

3.15 G ROIdentification of tanks removed

and disposed of

3.12.4 G ROSalvage Rights

3.15 G ROStarting and ending dates of

reporting period

3.15 G ROTank Closure Report

3.15 G ROCumulative quantities of soil

excavated 02 81 00 SD-03 Product Data

3.1 G ROOnsite Hazardous Waste

Management

3.2Notices of Non-Compliance and Notices of Violation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 97 PAGES

02 81 00 2.1.1Packaging Notifications SD-06 Test Reports

3.7 G RORecordkeeping

3.8Spill Response

3.7 G ROException Report

SD-07 Certificates 1.4.3Certification 3.2.4Security Plan

1.4.1 G ROTransportation and Disposal

Coordinator

1.4.2 G ROTraining

3.2.2EPA Offsite Policy 3.2.5Certificates of Disposal

3.2.3 G ROShipping Documents and

Packagings Certification

3.6 G ROWaste Minimization

02 82 14.00 10 SD-02 Shop Drawings

1.4 G DODetailed Drawings

SD-03 Product Data

3.9.3.1 G DOAsbestos Waste Shipment

Records

1.1 G DOWeight Bills and Delivery Tickets

2.1 G DOEncapsulants

1.9.1 G DORespiratory Protection Program

3.9 G DOCleanup and Disposal

1.6.1 G DOQualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 97 PAGES

02 82 14.00 10 1.11Training Program

1.8.1 G DOLicenses, Permits and

Notifications SD-06 Test Reports

3.7 G DOExposure Assessment and Air

Monitoring

1.7.3Local Exhaust System SD-07 Certificates

1.7.3Local Exhaust System 1.9Medical Surveillance

Requirements 02 82 33.13 20 SD-03 Product Data

1.6.4 G ROVacuum Filters

1.6.1 G RORespirators

SD-06 Test Reports

1.5.2.3 G DOSampling results

1.5.2.3 G DOOccupational and Environmental

Assessment Data Report SD-07 Certificates

1.5.1.1 G DOQualifications of CP

1.5.1.3 G ROTesting Laboratory

3.1.1.1 G ROOccupant Notification

1.5.1.2 G ROTraining Certification

G RONotification of the Commencement of Hazard Abatement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 97 PAGES

02 82 33.13 20 1.5.1.4 G ROThird Party Consultant Qualifications

1.5.3 G DOlead-based paint/paint with lead

removal/control plan

1.6.3 G RORental equipment notification

1.5.2.6 G DORespiratory Protection Program

1.5.2.7 G ROHazard Communication Program

3.5.2 G DOState approved hazardous waste

treatment, storage, or disposal facility

1.5.2.8 G DOLead Waste Management Plan

1.6.4 G ROVacuum filters

3.5.1.1 G ROClearance Certification

SD-11 Closeout Submittals

3.5.2.1 G ROhazardous waste manifest

1.5.2.4 G ROMedical Examinations

1.5.1.2 G ROTraining Certification

3.5.2.1 G ROturn-in documents or weight

tickets 03 11 13.00 10 SD-02 Shop Drawings

3.1.1Formwork SD-03 Product Data

1.2Design 2.1Form Materials 2.1.4Form Releasing Agents

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 97 PAGES

03 11 13.00 10 3.5Inspection 3.4.1Formwork Not Supporting Weight of Concrete 03 15 00.00 10 SD-02 Shop Drawings

2.4 G OMAWaterstops

SD-03 Product Data

2.2Preformed Expansion Joint Filler Sealants:

2.3.1 G OMAField-Molded Type

2.3.2 G OMASingle-Component, Cold-Applied

Sealants 2.4Waterstops

SD-04 Samples 2.3.1Field-Molded Type 2.4.1Non-metallic Materials 2.4Waterstops

G ROSplicing Waterstops SD-07 Certificates Sealants:

2.3.1 G OMAField-Molded Type

2.3.2 G OMASingle-Component, Cold-Applied

Sealants 2.4Waterstops

03 20 00.00 10 SD-02 Shop Drawings

3.1 G OMAReinforcement

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 97 PAGES

03 20 00.00 10 1.3.1Welding SD-07 Certificates

2.3Reinforcing Steel 1.3.2Qualification of Steel Bar

Butt-Splicers 03 30 00.00 10 SD-03 Product Data

Part 2Recycled Content Products

1.3 G OMAPortland Cement

3.2 G OMAReady-Mixed Concrete

2.11 G ROVapor Retarder

1.3.6 G OMAFloor Finish

2.9 G OMAFloor Hardener

2.3 G OMAChemical Admixtures

2.7 G OMAEpoxy Resin

SD-04 Samples 2.3.5Surface Retarder

SD-05 Design Data

1.3.1 G OMAMixture Proportions

SD-06 Test Reports

3.10 G ROTesting and Inspection for CQC

SD-07 Certificates 1.5Qualifications

03 35 00.00 10 SD-03 Product Data Recycled Content Products

2.1 G OMAEpoxy Resin

03 39 00.00 10 SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 97 PAGES

03 39 00.00 10 3.2 G OMATesting and Inspection for CQC 04 20 00 SD-02 Shop Drawings

1.4.2 G OMADetail Drawings

SD-03 Product Data

1.2.1Local/Regional Materials 1.2.2Environmental Data

G OMACement

2.10 G OMAInsulation

1.6.2 G OMACold Weather Installation

2.4 G OMAWater-Repellant Admixture

SD-04 Samples

2.2 G OMAConcrete Masonry Units (CMU)

SD-05 Design Data G OMAPre-mixed Mortar

1.2.3.1 G OMAUnit Strength Method

2.7 G OMAPost-Installed Anchors in

Masonry G OMAGrout Mix Design

SD-06 Test Reports

3.22.1 G ROField Testing of Mortar

3.22.2 G ROField Testing of Grout

G ROPrism tests G ROMasonry Cement

2.2.3 G ROFire-rated CMU

G ROMasonry Inspector Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 97 PAGES

04 20 00 Single-Wythe Masonry Wall Water Penetration Test

SD-07 Certificates Concrete Brick

2.2Concrete Masonry Units (CMU) 2.6Anchors, Ties, and Bar

Positioners Expansion-Joint Materials

2.8Joint Reinforcement Masonry Cement

2.10Insulation 2.10Insulation

G OMAAdmixtures for Masonry Mortar

2.5.1 G OMAAdmixtures for Grout

1.4.1Contamination

SD-08 Manufacturer’s Instructions Masonry Cement

SD-10 Operation and Maintenance Data Plastic Identification

3.21.2Take-Back Program 05 12 00 SD-02 Shop Drawings

1.5.2.2 G ROErection Plan

1.5.1 G OMAFabrication drawings

SD-03 Product Data 2.4Shop primer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 97 PAGES

05 12 00 2.3.1Welding electrodes and rods SD-06 Test Reports

2.4Class B coating 2.2Bolts, nuts, and washers

SD-07 Certificates 2.1Steel 2.2Bolts, nuts, and washers 1.5.2.1Overhead, under running crane rail beam 1.5.2.3Welding procedures and qualifications 05 21 19 SD-01 Preconstruction Submittals

1.5.2Welder qualification 1.5.2Material Safety Data Sheet

SD-02 Shop Drawings

1.5.1 G OMASteel joist framing

SD-06 Test Reports 3.4.1Erection inspection 3.4.1Welding inspections

SD-07 Certificates 2.1Accessories 1.5.2Certification of Compliance

05 30 00 SD-02 Shop Drawings

1.3.5 G OMAFabrication Drawings

Cant Strips 2.3.2.1Ridge and Valley Plates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 97 PAGES

05 30 00 2.3.2.2Metal Closure Strips SD-03 Product Data

2.2 G OMAAccessories

2.1.3.1Galvanizing Repair Paint 2.1.6Galvanizing Repair Paint 2.1.5Joint Sealant Material 1.3.2Powder-Actuated Tool Operator

1.3.3 G ROWelder Qualifications

1.3.3Welding Equipment 1.3.3Welding Rods and Accessories

SD-04 Samples 2.3Metal Roof Deck Units 2.3Flexible Closure Strips 2.2Accessories

SD-05 Design Data G OMACalculations

SD-07 Certificates 1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance

05 40 00 SD-02 Shop Drawings

1.7.1 G OMAFraming Components

SD-03 Product Data

2.1 G OMAstuds

2.1.2 G OMACMU Post-Installed Anchors

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 97 PAGES

05 40 00 1.7.2 G OMAMetal framing calculations SD-07 Certificates

1.5Load-bearing cold-formed metal framing

05 50 13 SD-02 Shop Drawings

2.3 G OMAAccess doors and panels

2.1.5 G OMAFloor gratings

2.5 G OMAangles and plates

2.6 G OMAPumphouse Crossover Ramp

SD-03 Product Data 2.3Access doors and panels 2.1.5Floor gratings

05 59 10 SD-01 Preconstruction Submittals

2.6.2 G ROAssembly Tests

3.3 G ROAcceptance Testing

SD-02 Shop Drawings

1.4.3 G OMADetail Drawings

SD-03 Product Data

2.1.7 G OMAWheel Assemblies

1.4.3Materials List 2.4Welding 2.4.2Welding of Aluminum 2.4.4Steel Welding Repairs

SD-07 Certificates 1.4.1Welder Qualifications 2.4.2Welding of Aluminum

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 97 PAGES

06 10 00 SD-03 Product Data 1.8Fire-retardant treatment 2.3.1Adhesives

SD-06 Test Reports 1.4.3Preservative-treated

SD-07 Certificates 1.7Preservative treatment

Take-back program 1.10.1Local/Regional Materials 2.3.1Adhesives

06 20 00 SD-02 Shop Drawings 1.3Detail Drawings

SD-03 Product Data G OMAWood

SD-07 Certificates 1.4Certificates of grade 1.4Certificates of compliance

06 41 16.00 10 SD-02 Shop Drawings

1.4.2 G OMAShop Drawings

1.7 G OMAShop Drawings

2.9 G OMAShop Drawings

3.1Installation

SD-03 Product Data

2.1 G OMAWood Materials

2.7 G OMAWood Finishes

2.9.8.3 G OMAFinish Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 97 PAGES

06 41 16.00 10 1.4.3Certification SD-04 Samples

2.2 G OMAPlastic Laminates

2.4 G OMACabinet Hardware

SD-07 Certificates 1.4Quality Assurance 2.7Laminate Clad Casework 3.1Laminate Clad Casework

06 61 16 SD-02 Shop Drawings

1.4.2 G OMADetail Drawings

3.1 G ROInstallation

SD-03 Product Data 2.1Solid polymer material 1.4.1Qualifications 2.3Fabrications

SD-04 Samples

2.1 G OMAMaterial

2.3.5Counter and Vanity Tops

SD-06 Test Reports 2.1Solid polymer material

SD-07 Certificates 2.3Fabrications 1.4.1Qualifications

SD-10 Operation and Maintenance Data

3.2Clean-up

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 97 PAGES

07 13 53 SD-03 Product Data

2.1 G ROElastomeric waterproofing sheet

material

2.5 G ROProtection board

2.1 G ROPrimers, adhesives, and mastics

SD-04 Samples

2.1 G ROMaterials

SD-06 Test Reports

2.1 G ROElastomeric waterproofing sheet

material 3.6Field Quality Control 3.1Verification Of Conditions 3.7Protective Covering

SD-08 Manufacturer’s Instructions

2.1 G ROPrimers, adhesives, and mastics

07 21 13 SD-03 Product Data

2.1 G OMABlock or board insulation

2.2Vapor retarder 2.3Pressure sensitive tape 2.4Protection board or coating 2.5Accessories

SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation 2.5.1Adhesive

07 21 16 SD-03 Product Data 2.1Blanket insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .