CSRM_OIB_RTA_PLANS_locked-1.pdf
PDF 12 MB Posted
- Solicitation number
- W912PM21B0010
About this file
This document provides details on a federal contract solicitation by the U.S. Army Corps of Engineers Wilmington District. The solicitation is for Coastal Storm Risk Management services at Ocean Isle Beach, North Carolina, number W912PM21B0010. The work includes dredging, transporting, placing and shaping beach fill, as well as pre and post construction beach surveys. The borrow area is located in Shallotte Inlet. The North American Industry Classification System code is 237990 for other heavy and civil engineering construction, and the size standard is $30,000,000. Interested parties must register in the System for Award Management to be eligible for award. The solicitation is unrestricted with no additional media provided and no paper copies available. Questions may be directed to the listed contract specialist and contract administrator by phone or email.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O
V E
R
S
H E
E T
ISSUE DATE: AUGUST 2021
US Army Corps of Engineers
Wilmington District
Approval Recommended: *
Approved: *
DATE
DATE
CHIEF, ENGINEERING BRANCH
* THIS PROJECT WAS DESIGNED BY THE U.S. ARMY CORPS OF ENGINEERS,
WILMINGTON DISTRICT. INDIVIDUALS WHOSE SIGNATURES AND REGISTRATION
DESIGNATIONS APPEAR ON THESE DOCUMENTS ARE OPERATING WITHIN THE
SCOPE OF THEIR EMPLOYMENT. SIGNATURES ARE REQUIRED BY ER 1110-1-8152.
CHIEF, DESIGN and GENERAL ENGINEERING SECTION
OCEAN ISLE BEACH
BRUNSWICK COUNTY, NORTH CAROLINA
G-000-O
COASTAL STORM RISK MANAGEMENT
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION
AND APPROVAL OF ALL DRAWINGS IN THIS SET AS INDEXED ON SHEET G-001-O.
AMENDMENTS:
IFB NO.:
CONTRACT NO.:
G d w g
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
T
N
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
C O
A S
T A
L
S
T O
R M
I S
K
M
A N
A G
E M
E N
T
O C
E A
N
I S
L E
B
A
C H
B R
U N
S W
I C
K
C
O U
N T
Y
N
O R
H
A R
O L
I N
A
SHEET ID
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
W I L
M I N
G T
D
S
T R
I C
T
R
L I N
G T
V E
N U
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
D R
A W
I N
G
C
O D
E
US Army Corps of Engineers
F I
M
E
O
W P
M B
T B
D
A U
G U x
RTA
C O
N T
R O
L L
U
C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
C
U I
CUI
CUI
J
C
A R
T E
R
H
W
I L D
E
J
M
A N
N I N
G
J
C
A R
T E
R
W912PM21B0010
13 AUGUST 2021
13 AUGUST 2021
OCEAN ISLE BEACH
PLATE TITLE
PENDER
BLADEN
COLUMBUS
SHALLOTTE
BRUNSWICK
WILMINGTON
HANOVER
NEW
SOUTHPORT
OCEAN ISLE BEACH
WRIGHTSVILLE
BEACH
0 10 20
SCALE IN MILES
PROJECT LOCATION
HYDE
BEAUFORT
PITT
EDGECOMBE
WASHINGTON
TYRREL
DARE
PAMLICO
CRAVEN
JONES
ONSLOW
DUPLIN
PENDER
N
E
W
H
A
N
O
V
E
R
BRUNSWICK
COLUMBUS
BLADEN
ROBESON
HOKE
M O
O R
E
LEE
CHATHAM
A L
A M
A N
C E
C A
S W
E L
L
PERSON
ORANGE
DURHAM
WAKE
JOHNSTON
FRANKLIN
VANCE
WARREN
HALIFAX
NORTHAMPTON
HERTFORD
GATES
NASH
WILSON
SAMPSON
CUMBERLAND
CARTERET
G R
A N
V I L
L E
P
E
R
Q
U
I
M
A
N
S
P
A
S
Q
U
O
T
A
N
K
C
A
M
D
E
N
C
U
R
R
I
T
U
C
K
MARTIN
BERTIE
PAMLICO SOUND
ATLANTIC O
CEAN
GREENE
LENOIR
WAYNE
V I R G I N I A
S O U T H C A R O L I N A
HARNETT
NOT TO SCALE
Wilmington
Manteo
Elizabeth City
Cape Hatteras
Cape Lookout
Rodanthe
PROJECT
Morehead
City
CAROLINA BEACH
PROJECT OVERVIEW
C a p e e a r i v e r
BALD HEAD
ISLAND
DRAWING INDEX
G-001-O
G D
W G
COVER SHEET
DRAWING INDEX
SHALLOTTE INLET BORROW AREA
OCEAN ISLE BEACH LOCATION MAP
OCEAN ISLE BEACH GENERAL PLAN STA. -1+66.3 TO STA 25+00
OCEAN ISLE BEACH GENERAL PLAN STA. 25+00 TO STA. 53+00
OCEAN ISLE BEACH GENERAL PLAN STA. 53+00 TO STA. 80+00
OCEAN ISLE BEACH TYPICAL SECTIONS
OCEAN ISLE BEACH CROSS SECTIONS STA. -1+66.30 TO STA. 14+00
OCEAN ISLE BEACH CROSS SECTIONS STA. 16+00 TO STA. 32+00
OCEAN ISLE BEACH CROSS SECTIONS STA. 34+00 TO STA. 50+00
OCEAN ISLE BEACH CROSS SECTIONS STA. 52+00 TO STA. 68+00
OCEAN ISLE BEACH CROSS SECTIONS STA. 70+00 TO STA. 80+00
G-000-O
G-001-O
G-101-O
G-102-O
C-101-O
C-102-O
C-103-O
C-301-O
C-302-O
C-303-O
C-304-O
C-305-O
C-306-O
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
C O
A S
T A
L
S
T O
S
K
M
A N
A G
E M
E N
T
O C
E A
N
I S
A
C H
B R
U N
S W
I C
K
C
O U
N T
Y
N
O R
R
O L
I N
A
SHEET ID
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L
M I N
G T
S
T R
I C
T
R
L I N
G T
E
N U
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
D R
A W
I N
G
C
O D
E
US Army Corps of Engineers
F I
M
E
O
W P
M B
T B
D
J U
Y x
RTA
C O
N T
R O
L L
C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
C
U I
CUI
CUI
J
C
A R
T E
R
J
C
A R
T E
R
H
W
I L
D E
J
M
A N
N I N
G
AutoCAD SHX Text
DRAWING INDEX
AutoCAD SHX Text
ROANOKE
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
NEUSE
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
CHOWAN
AutoCAD SHX Text
CAPE
AutoCAD SHX Text
FEAR
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
MEAN HIGHER HIGH WATER (MHHW)
MEAN HIGH WATER (MHW)
NORTH AMERICAN VERTICAL DATUM-1988 (NAVD)
MEAN SEA LEVEL (MSL)
MEAN TIDE LEVEL (MTL)
NATIONAL GEODETIC VERTICAL DATUM-1929 (NGVD)
LOCAL MEAN LOW WATER (MLW)
MEAN LOWER LOW WATER (MLLW)
STA 50+79.87 CENTERLINE
BORROW AREA
N 52,997.2
E 2,188,049.1
LEGEND
WIDTH VARIES
DREDGING LIMITS
WIDTH VARIES
G103
OCEAN ISLE BEACH
STA. 0+00 CENTERLINE
BORROW AREA
N 57,775.0
E 2,186,797.3
ROCK AND/OR
HARD MATERIAL
AREA SEE NOTE 7
0' MLLW
-15' MLLW
H
V
H
V
NOT TO SCALE
A
EXISTING
BOTTOM
HOLDEN BEACH
= 4.73'
= 4.40'
= 2.78'
= 2.32'
= 2.28'
= 1.72'
= 0.15'
= 0.00'
DREDGING LIMITS
HARD MATERIAL AREA
PIPELINE ROUTE
ELEVATIONS OF TIDAL DATUMS REFERRED TO
NORTH AMERICAN VERTICAL DATUM-1988 (NAVD 88)
ARE AS FOLLOWS:
BOREHOLE LOCATION (2009)
WAYPOINT 1
WAYPOINT 2
WAYPOINT 3
WAYPOINT 4
WAYPOINT 5
WAYPOINT 6
0 250 500
SCALE: 1" = 250'
TYPICAL SECTION - SHALLOTTE INLET
NOTES:
1. ELEVATIONS ARE IN FEET AND REFER TO NOAA'S REPORTED MEAN LOWER LOW WATER (MLLW )
RELATIVE TO THE 1983-2001 TIDAL EPOCH.
2. DATE OF IMAGERY: JANUARY 2021.
3. DATE OF SURVEY: APRIL 26, 2021 AND JUNE 16 AND 30, 2021.
4. PROJECT SURVEYED WITH DISTRICT SURVEY VESSEL "POTTER" AND "ROGERS", USING
RTK-G.P.S. HORIZONTAL POSITIONING EQUIPMENT AND 200 KHZ SOUNDING EQUIPMENT.
5. ALL COORDINATES ARE BASED ON NORTH CAROLINA STATE PLANE FEET (NAD83).
VERTICAL DATUM BASED ON MLLW, FEET.
6. TIDE GAGE FOR SHALLOTTE INLET SURVEY LOCATED AT: LIGHT 83.
7. THE DREDGING SHALL BE ACCOMPLISHED SO THAT THE MOST SUITABLE MATERIAL AVAILABLE FOR
BEACH RENOURISHMENT IS PLACED WITHIN THE PRESCRIBED SECTION. THIS MATERIAL SHOULD BE
PREDOMINATELY OF SAND (SP, SP-SM) GRAIN SIZE WITH NO MORE THAN 10% BY WEIGHT PASSING THE
NO. 200 SIEVE. SHOULD THE MATERIAL BEING PLACED ON THE BEACH CONTAIN AN AMOUNT OF SILT AND
CLAY THAT EXCEEDS THE 10% BY WEIGHT PASSING THE NO. 200 SEIVE AND CONSIDERED NOT SUITABLE
FOR PLACEMENT ON THE BEACH , THE CONTRACTOR SHALL MOVE THE DREDGE TO A MORE SUITABLE
LOCATION WITHIN THE BORROW AREA AND NOTIFY THE CONTRACTING OFFICER OF THE LOCATION OF
THE UNSUITABLE MATERIAL WITHIN THE BORROW AREA.
8. CONTRACTORS DREDGING SHALLOTTE INLET AND THE AIWW IN THE PAST HAVE ENCOUNTERED ROCK
AND/OR HARD MATERIAL WITHIN THE HATCHED AREA AS SHOWN AND AT ELEVATIONS ABOVE THE BORROW AREA
EXCAVATION LIMITS (-15' MLW) AS SHOWN ON THE PLANS. THE APPROXIMATE LOCATION OF THIS ROCK AND/OR
HARD MATERIAL IS WITHIN THE HATCHED AREA AND BETWEEN THE EAST END OF OCEAN ISLE BEACH AND THE
BORROW AREA DREDGING LIMITS AND WITHIN THE AREA BETWEEN THE BORROW AREA DREDGING LIMITS AND
THE ADJACENT AIWW CHANNEL LIMITS.
I
N
T
R
A
C
O
A
S
T
W
T
E
R
W
A
Y
TANGENT 19
A T
L A
N
T I C
TA
NG
EN
T
STA. 18+56.6464
CENTERLINE
BORROW AREA
N 56,210.6
E 2,187,797.1
SHI-V-09-12
SHI-V-09-14
SHI-V-09-13
SHI-V-09-15
SHI-V-09-16
SHI-V-09-8
SHI-V-09-7
SHI-V-09-05
SHI-V-09-06
SHI-V-09-4
SHI-V-09-3
SHI-V-09-11
SHI-V-09-9
SHI-V-09-1
SHI-V-09-2
SHI-V-09-10
SHI-V-09-17
2-
3-
2-
2-
9-
8-
0-
4 -
7 -
8 -
4 -
0 -
1 -
4 -
3 -
4 -
0 -
1 -
3 -
5 -
9 -
6 -
6 -
5 -
8 -
7 -
2 -
9 -
1 -
6 -
3 -
5 -
5 -
3 -
2 -
2 -
8 -
6 -
3 -
7 -
3-
5 -
0 -
5 -
6 -
2 -
8 -
5 -
0 -
8 -
0 -
9 -
3 -
2 -
0-
3 -
3 -
9 -
2 -
8-
8-
5-
7 -
1-
1 -
7 -
7 -
5 -
7 -
9 -
9 -
N: 56196.3
E: 2187293.5
N: 56487.8
E: 2186993.7
N: 56759.8
E: 2186785.7
N: 56873.7
E: 2187005.2
N: 57053.3
E: 2186852.4
N: 57242.5
E: 2187078.3
N: 56593.4
E: 2186956.8
N: 57655.2
E: 2186814.5
N: 57869.5
E: 2187048.6
N: 56896.8
E: 2187648.9
N: 56691.9
E: 2187859.7
N: 55024.4
E: 2187296.3
N: 55047.2
E: 2187587.4
N: 52973.7
E: 2187750.1
N: 53005.0
E: 2188148.8
BOREHOLE LOCATION (2021)
SHI-V-21-001
SHI-V-21-002
SHI-V-21-003
SHI-V-21-004
SHI-V-21-005
SHI-V-21-006
SHI-V-21-007
SHI-V-21-008
SHI-V-21-009
SHI-V-21-010
SHI-V-21-011
SHI-V-21-012
SHI-V-21-013
SHI-V-21-014
SHI-V-21-015
SHI-V-21-016
SHI-V-21-017
SHI-V-21-018
SHI-V-21-019
SHI-V-21-020
SHI-V-21-021
SHI-V-21-022
G-101-O
S H
A L L O
T T
E
I N
L E
T
B O
R R
W
E
A
J
C
A R
T E
R
J
C
A R
T E
R
H
W
I L D
E
J
M
A N
N I N
G
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
C O
A S
T A
L
S
T O
S
K
M
A N
A G
E M
E N
T
O C
E A
N
I S
A
C H
B R
U N
S W
I C
K
C
O U
N T
Y
N
O R
R
O L
I N
A
SHEET ID
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L
M I N
G T
S
T R
I C
T
R
L I N
G T
E
N U
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
D R
A W
I N
G
C
O D
E
US Army Corps of Engineers
F I
M
E
O
W P
M B
T B
D
J U x
RTA
C O
N T
R O
L L
C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
C
U I
CUI
CUI
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
60+0070+0080+0090+00
E 4TH ST
E 4TH ST
E 4TH ST
E 4TH ST
S
H
A
L
L
O
T
V
D
A
S
H
E
V
I L
C
H
A
R
L
O
T
H
I G
H
P
O
I
R
A
L E
I G
C H
A D
B O
U R
N
S
T
G O
L D
S B
O R
O
S
T
L E
L A
C
C
C103
BASE CONTRACT BEACH FILL AREA
OPTION ITEM 1
BEACH FILL
AREA
S T
A
S T
A
S T
A
ATLANTIC INTRACOASTAL WATERWAY
H
O
L
D
A
C
H
G-102-O
O C
E A
N
I S
A
C H
L O
C A
T I O
N
M
A P
J
C
A R
T E
R
J
C
A R
T E
R
H
W
I L D
E
J
M
A N
N I N
G
STATION EASTING(FT) NORTHING(FT)
OCEAN ISLE BEACH
BASELINE STATION
G.P.S. POINTS
0+00.76 2,184,881-X 54,374-Y
9+99.99 2,183,890-X 54,241-Y
30+20.99 2,181,887-X 53,974-Y
39+92.97 2,181,010-X 53,555-Y
50+34.10 2,179,991-X 53,338-Y
59+70.37 2,179,090-X 53,084-Y
70+47.24 2,178,062-X 52,763-Y
80+42.34 2,178,062-X 52,467-Y
EXISTING BASELINE
BEACH FILL (NEW WORK)
LEGEND
APPROXIMATE SLOPE INTERCEPT
PROPOSED PIPELINE ROUTE
1. SAND RAMPS SHALL BE CONSTRUCTED OVER PIPE ALONG THE PIPELINE ROUTE AT EACH BEACH ACCESS.
IN NO CASE SHALL DISTANCE BETWEEN RAMPS EXCEED 400 FEET. CONTRACTOR MAY BE REQUIRED TO
BURY PIPE AT HANDICAPPED RAMPS OR VEHICULAR BEACH ACCESS POINTS.
2. TILLING OF THE BEACH FILL SHALL BE PERFORMED IN ACCORDANCE WITH CONTRACT
SPECIFICATION SECTION 01 57 19 AS DIRECTED BY THE CONTRACTING OFFICER
REPRESENTATIVE.
3. HORIZONTAL CONTROL IN FEET, N.C. STATE PLANE COORDINATES NAD 83. VERTICAL CONTROL
IN FEET NAVD 88.
4. IMAGERY DATE: JANUARY 2021.
5. PIPELINE ROUTE ON THE OCEAN ISLE BEACH PORTION OF THE PROJECT SHALL BE
COORDINATED WITH THE TOWN OF OCEAN ISLE BEACH AND RESOURCE AGENCIES AND
BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION. POINT OF CONTACT
WITH THE TOWN OF OCEAN ISLE BEACH IS MS. DAISEY IVEY, TOWN ADMINISTRATOR PHONE No. 910-579-2166.
THE CONTRACTOR IS REQUIRED TO GIVE CONTRACTING OFFICER 15 DAY ADVANCE NOTICE OF NEED OF
PIPELINE DELINEATION .
6. ALL CONTRACTOR OPERATIONS SHALL BE PERFORMED IN A MANNER THAT AVOIDS DAMAGE TO
EXISTING SANDBAGS, STRUCTURES AND ROADS. SANDBAGS, STRUCTURES AND ROADS DAMAGED
BY CONTRACTOR OPERATIONS SHALL BE REPAIRED TO THE SATISFACTION OF THE CONTRACTING
OFFICER OR HIS/HER DESIGNATED REPRESENTATIVE AT NO COST TO GOVERNMENT OR THE OWNERS
OF THE DAMAGED PROPERTY. IN ORDER TO MINIMIZE THE RISK OF DAMAGE, WHEELED OR TRACKED
EARTH MOVING EQUIPMENT SHALL NOT WORK CLOSER THAN 10 FEET FROM SANDBAGS AND STRUCTURES
DURING ALL WORK INCLUDING DISTRIBUTION AND MOVEMENT OF BEACH FILL MATERIAL. IN AREAS
WHERE IT IS NOT POSSIBLE TO TIE INTO THE 6-FOOT CONTOUR, THE CONTRACTOR SHALL CONSTRUCT THE
BACKSLOPE AT 5 HORIZONTAL TO 1 VERTICAL.
7. PAST STORMS IN THE NORTH CAROLINA AREA SINCE THE CONTRACT SURVEYS WERE TAKEN
MAY HAVE ERODED PORTIONS OF THE PROJECT AREA AND PIPELINE ROUTE. ALL CONTRACTORS
ARE ENCOURAGED TO VISIT THE SITE PRIOR TO SUBMITTING A BID TO INVESTIGATE POTENTIAL
PIPELINE ROUTES. ALL PIPELINE ROUTES MUST BE APPROVED PRIOR TO ANY PLACEMENT OF
MATERIAL ON THE BEACH.
NOTES
SHALLOTTE INLET
BORROW AREA
HARD MATERIAL AREA
APPROXIMATE PIPELINE ROUTE
PROJECT BASELINE
TERMINAL GROIN
(TO BE CONSTRUCTED
BY OTHERS)
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
C O
A S
T A
L
S
T O
S
K
M
A N
A G
E M
E N
T
O C
E A
N
I S
A
C H
B R
U N
S W
I C
K
C
O U
N T
Y
N
O R
R
O L
I N
A
SHEET ID
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L
M I N
G T
S
T R
I C
T
R
L I N
G T
E
N U
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
D R
A W
I N
G
C
O D
E
US Army Corps of Engineers
F I
M
E
O
W P
M B
T B
D
J U x
RTA
C O
N T
R O
L L
C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
C
U I
CUI
CUI
BORROW AREA
HARD MATERIAL
OPTION ITEM 1 AREA
Feet
0 1000 2000
-1+66.30 2,185,047-X 54,395-Y
20+00.00 2,182,898-X 54,109-Y
1 2,184,996.2 54,868.5
2 2,184,899.9 54,857.4
3 2,184,912.6 54,758.1
4 2,184,812.8 54,744.9
5 2,184,825.9 54,645.0
6 2,184,387.1 54,525.0
7 2,184,337.6 54,518.0
8 2,184,089.7 54,518.0
9 2,184,102.8 54,386.1
10 2,183,934.8 54,364.2
11 2,183,835.0 54,451.3
12 2,183,450.6 54,399,7
13 2,183,473.6 54,201.2
14 2,183,234.1 54,107.5
15 2,183,185.7 54,101.0
16 2,183,135.8 54,094.5
17 2,183,085.6 54,087.9
18 2,183,036.2 54,081.4
19 2,182,986.6 54,074,9
20 2,182,938.2 54,068.5
21 2,180,887.6 54,061.9
22 2,182,839.6 54,055.6
23 2,182,789.0 54,049.0
24 2,182,738.2 54,042.3
25 2,182,738.3 54,041.9
26 2,182,689.9 54,035.9
27 2,182,639.5 54,028.9
28 2,182,652.5 53,926.9
29 2,182,604.4 53,920.7
30 2,182,601.9 53,894.0
31 2,182,552.5 53,890.6
32 2,182,503.7 53,887.2
33 2,182,500.0 53,880.4
34 2,182,453.3 53,981.1
35 2,182,404.0 53,969.5
OCEAN ISLE BEACH
EASEMENT LINE
POINT EASTING(FT) NORTHING(FT)
36 2,182,403.3 53,894.0
37 2,182,378.5 53,890.6
38 2,182,353.8 53,887.2
39 2,182,303.5 53,880.4
40 2,182,291.3 53,981.1
41 2,182,194.3 53,969.5
42 2,182,230.8 53,790.2
43 2,182,132.4 53,743.7
44 2,181,925.1 53,693.4
45 2,181,756.9 53,659.5
46 2,181,528.9 53,613.4
47 2,181,330.4 53,576.4
48 2,180,945.7 53,460.5
49 2,180,953.2 53,425.2
50 2,180,797.5 53,392.8
51 2,180,794.9 53,402.2
52 2,180,740.3 53,390.0
53 2,180,735.5 53,411.6
54 2,180,603.2 53,385.5
55 2,180,557.3 53,356.6
56 2,180,563.5 53,329.1
57 2,180,520.5 53,319.4
58 2,180,416.8 53,293.7
59 2,180,102.9 53,228.1
60 2,180,016.6 53,229.0
61 2,180,018.7 53,212.8
62 2,179,677.7 53,115.7
63 2,179,538.3 53,091.1
64 2,179,489.5 53,062.1
65 2,179,199.4 52,969.9
66 2,179,109.5 52,926.6
67 2,179,022.5 52,889.9
68 2,179,028.8 52,868.5
69 2,178,961.5 52,848.7
70 2,178,953.1 52,877.2
OCEAN ISLE BEACH
EASEMENT LINE
POINT EASTING(FT) NORTHING(FT)
71 2,178,811.3 52,850.1
72 2,178,618.5 52,790.3
73 2,178,476.1 52,751.5
74 2,178,435.6 52,730.2
75 2,178,100.4 52,622.7
76 2,177,677.2 52,486.5
77 2,177,434.8 52,410.4
78 2,177,388.5 52,393.9
79 2,177,129.7 52,309.3
80 2,176,914.2 52,248.1
OCEAN ISLE BEACH
EASEMENT LINE
POINT EASTING(FT) NORTHING(FT)
EASEMENT LINE
-1+66.30-1+00 0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+0023+0024+0025+00
E 4TH ST
E 4TH ST
E 4TH ST
3RD ST
S H
A L L O
T T
E
B
L V
D
A S
H E
V I L
3RD ST
C H
A R
L O
T T
E
S
T
D U
R H
E 2ND ST
E 4TH ST
H
V
A
S S
U
M
E D
S L O
P E
H
V
A
S S
U M
E D
S L O
P E
M
H
W
M H
W
M
H W
STA: 0+00.76
N: 54373.76
E: 2184881.02
STA: 20+00.90
N: 54109.35
E: 2182898.44
STA: 9+99.99
N: 54241.72
E: 2183890.55
STA. -1+66.30
N: 54395.08
E: 2185046.71
N: 54149.3
E: 2183902.9
N: 53849.5
E: 2183236.7
N: 53951.3
E: 2183463.0
N: 53974.4
E: 2183926.2
N: 54068.3
E: 2184418.1
N
' 3
.5
E
50H:1 V
SLOPE T
O
TERM
IN
AL
GROIN
C-101-O
O C
E A
N
I S
A
C H
G E
N E
R A
L
P
L A
N
S T
A
T
O
S
T A
J
C
A R
T E
R
J
C
A R
T E
R
H
W
I L D
E
J
M
A N
N I N
G
NOTES:
1. THE WIDTH OF THE CONSTRUCTION BERM IS DEPENDENT UPON THE PROPORTIONAL QUANTITY OF SAND TO BE PLACED
AT THE TIME OF CONSTRUCTION. THE WIDTH OF THE CONSTRUCTION BERM MAY BE ADJUSTED DURING CONSTRUCTION
BASED ON THE CONTRACT BEACH PROFILE SURVEY AND THE SLOPE OF THE MATERIAL DURING PLACEMENT.
2. THE CONSTRUCTION BERM SLOPE IS DEPENDENT UPON MATERIAL PROPERTIES AND WAVE ENVIRONMENT DURING PLACEMENT.
3. EXISTING BEACH SURVEY CONDUCTED IN MAY 2021. HORIZONTAL DATUM IS IN FEET, NAD 83 AND VERTICAL DATUM IS IN FEET, NAVD 88.
4. THE CONTRACTOR SHALL CONSTRUCT SAND RAMPS OVER PIPE ALONG THE BEACH PIPELINE ROUTE. SAND RAMPS SHALL
BE PLACED AT EACH BEACH ACCESS AS A MINIMUM, BUT IN NO CASE SHALL DISTANCE BETWEEN RAMPS EXCEED 400 FEET.
THE SAND RAMPS SHALL BE REPAIRED IF ERODED BY WEATHER OR BEACH TRAFFIC.
5. EXISTING DUNES AND BEACH GRASS SHALL BE PROTECTED FROM DAMAGE DUE TO CONSTRUCTION. THE CONTRACTOR SHALL
PROTECT ALL EXISTING STRUCTURES ON THE BEACH, INCLUDING ACCESS RAMPS, SIGNAGE, FENCES, ETC. FROM DAMAGE
DUE TO CONSTRUCTION.
6. THE CONTRACTOR SHALL CONDUCT DAILY OPERATIONS TO CLEAN UP TRASH AND DEBRIS PUMPED ON TO THE BEACH BY
DREDGING OPERATIONS AND/OR FOUND ON THE BEACH WITHIN THE LIMITS OF CONSTRUCTION. DEBRIS AND WASTE SHALL
BE PROPERLY SECURED AND DISPOSED OF ON A WEEKLY BASIS.
7. THE CONTRACTOR SHALL BE REQUIRED TO PERFORM SAFETY PATROL TO MINIMIZE PEDESTRIAN TRAFFIC THRU THE LIMITS OF
CONSTRUCTION AT LEAST 500' AHEAD AND BEHIND THE POINT OF DISCHARGE. MEASURES TO INCLUDE MOVEABLE SAFETY
FENCE AT THESE LMITS TO EXTEND FROM DUNE TO THE WATERS EDGE, CLOSURE OF ANY PEDESTRIAN ACCESS RAMPS WITHIN
THE DIRECT VICINITY OF THE DREDGING OPERATIONS, AND WARNING SIGNS AT ALL PEDESTRIAN RAMPS AND PUBLIC ACCESS WAYS.
OPTION ITEM 1
CONSTRUCTION BERM
ELEVATION +6.0' (NAVD 88)
CONSTRUCTION BERM
ELEVATION +6.0' (NAVD 88)
SANDBAGS
PROJECT BASELINE
SANDBAGS
TERMINAL GROIN
(TO BE CONSTRUCTED
BY OTHERS)
EXISTING BASELINE
BEACH FILL (NEW WORK)
LEGEND
APPROXIMATE SLOPE INTERCEPT
EXISTING MEAN HIGH WATER LINE (APPROX.)
EXISTING INDEX CONTOURS
EXISTING INTERMEDIATE CONTOURS
MHW
CONTRACT OPTION WORK AREA
APPROXIMATE
END OF SANDBAGS
STA. 19+50 (TO BE
FIELD VERFIED)
M A
T C
H L
I N
E
S
T A
S
E
O
Feet
0 100 200
NOTES CONTINUED:
8. NO BEACH FILL MATERIAL SHALL BE PLACED LANDWARD OF THE TEMPORARY CONSTRUCTION
EASEMENT LINE, OR WITHIN 10 FEET OF OR UNDERNEATH ANY RESIDENTIAL BUILDINGS.
THE CONTRACTOR SHALL BE REQUIRED TO SLOPE (5H:1V) THE LANDWARD SIDE OF THE BERM
WHERE NECESSARY TO AVOID PLACING BEACH FILL MATERIAL LANDWARD OF THE TEMPORARY
CONSTRUCTION EASEMENT LINE, OR WITHIN 10 FEET OF OR UNDERNEATH ANY RESIDENTIAL BUILDINGS.
9. THE CONTRACTOR SHALL EXTEND 6.0' NAVD BERM CREST HORIZONTALLY LANDWARD, WHERE POSSIBLE
TO THE POINT OF INTERSECTION WITH THE EXISTING GROUND OR DUNE EXCEPT AT LOCATIONS AS NOTED
BY THE TYPICAL SECTIONS AND/OR AS DIRECTED BY THE CONTRACTING OFFICER.
10. SANDBAGS HAVE BEEN PLACED ALONG THE BEACH AND IN FRONT OF EXISTING STRUCTURES BETWEEN
THE PROJECT START AND DURHAM ST. THE CONTRACTOR SHALL NOT DIRECTLY PLACE SAND EITHER
HYDRAULICALLY OR MECHANICALLY , ON ANY EXPOSED SANDBAGS, PRIOR TO BEGINNING WORK ON
OCEAN ISLE BEACH, THE CONTRACTOR SHALL CONDUCT AN ONSITE MEETING WITH THE CONTRACTING
OFFICER OR HIS/HER REPRESENTATIVE AND A REPRESENTATIVE FROM THE NC DIVISION OF COASTAL
MANAGEMENT TO IDENTIFY AND DISCUSS NECESSARY MEASURES TO BE TAKEN REGARDING WORK AROUND
THE SAND BAGS.
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
C O
A S
T A
L
S
T O
S
K
M
A N
A G
E M
E N
T
O C
E A
N
I S
A
C H
B R
U N
S W
I C
K
C
O U
N T
Y
N
O R
R
O L
I N
A
SHEET ID
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L
M I N
G T
S
T R
I C
T
R
L I N
G T
E
N U
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
D R
A W
I N
G
C
O D
E
US Army Corps of Engineers
F I
M
E
O
W P
M B
T B
D
J U x
RTA
C O
N T
R O
L L
C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
C
U I
CUI
CUI
B A
N
T R
A C
T
S T
A R
T
S
T A
700' TRANSITION SECTION
START STA. 17+00 END STA. 10+00
v
PUBLIC BEACH ACCESS (STAR)
IF VEHICLE ACCESS (V)
LIMITS OF
BEACH PLACEMENT
25+0026+0027+0028+0029+0030+00
L U
M B
E R
T O
N
S
T
H I G
H P
O I N
T
S
T
E
N D
S T
E F
IR
S
T S
R
G R
E E
N S
B O
R A
L E
I G
H
S
T
4TH ST
H
V
A
S S
U
M
E D
S L O
P E
H
V
A
S
S
U
M
E
D
S
L
O
P
E
STA: 30+20.99
N: 53974.49
E: 2181887.30
STA: 39+92.97
N: 53555.88
E: 2181010.08
STA: 50+34.10
N: 53338.72
E: 2179991.84 M
H
W
M
H
W
M
H
W
N: 53127.7
E: 2180763.1
N: 53006.5
E: 2180426.1
N: 53254.0
E: 2181067.3
N: 53582.5
E: 2182226.6
N: 53550.0
E: 2182105.7
N: 52818.9
E: 2179818.4
C-102-O
O C
E A
N
I S
A
C H
G E
N E
R A
L
P
L A
N
S T
A
T
O
S
T A
J
C
A R
T E
R
J
C
A R
T E
R
H
W
I L D
E
J
M
A N
N I N
G
NOTES:
1. THE WIDTH OF THE CONSTRUCTION BERM IS DEPENDENT UPON THE PROPORTIONAL QUANTITY OF SAND TO BE PLACED
AT THE TIME OF CONSTRUCTION. THE WIDTH OF THE CONSTRUCTION BERM MAY BE ADJUSTED DURING CONSTRUCTION
BASED ON THE CONTRACT BEACH PROFILE SURVEY AND THE SLOPE OF THE MATERIAL DURING PLACEMENT.
2. THE CONSTRUCTION BERM SLOPE IS DEPENDENT UPON MATERIAL PROPERTIES AND WAVE ENVIRONMENT DURING PLACEMENT.
3. EXISTING BEACH SURVEY CONDUCTED IN MAY 2021. HORIZONTAL DATUM IS IN FEET, NAD 83 AND VERTICAL DATUM IS IN FEET, NAVD 88.
4. THE CONTRACTOR SHALL CONSTRUCT SAND RAMPS OVER PIPE ALONG THE BEACH PIPELINE ROUTE. SAND RAMPS SHALL
BE PLACED AT EACH BEACH ACCESS AS A MINIMUM, BUT IN NO CASE SHALL DISTANCE BETWEEN RAMPS EXCEED 400 FEET.
THE SAND RAMPS SHALL BE REPAIRED IF ERODED BY WEATHER OR BEACH TRAFFIC.
5. EXISTING DUNES AND BEACH GRASS SHALL BE PROTECTED FROM DAMAGE DUE TO CONSTRUCTION. THE CONTRACTOR SHALL
PROTECT ALL EXISTING STRUCTURES ON THE BEACH, INCLUDING ACCESS RAMPS, SIGNAGE, FENCES, ETC. FROM DAMAGE
DUE TO CONSTRUCTION.
6. THE CONTRACTOR SHALL CONDUCT DAILY OPERATIONS TO CLEAN UP TRASH AND DEBRIS PUMPED ON TO THE BEACH BY
DREDGING OPERATIONS AND/OR FOUND ON THE BEACH WITHIN THE LIMITS OF CONSTRUCTION. DEBRIS AND WASTE SHALL
BE PROPERLY SECURED AND DISPOSED OF ON A WEEKLY BASIS.
7. THE CONTRACTOR SHALL BE REQUIRED TO PERFORM SAFETY PATROL TO MINIMIZE PEDESTRIAN TRAFFIC THRU THE LIMITS OF
CONSTRUCTION AT LEAST 500' AHEAD AND BEHIND THE POINT OF DISCHARGE. MEASURES TO INCLUDE MOVEABLE SAFETY
FENCE AT THESE LMITS TO EXTEND FROM DUNE TO THE WATERS EDGE, CLOSURE OF ANY PEDESTRIAN ACCESS RAMPS WITHIN
THE DIRECT VICINITY OF THE DREDGING OPERATIONS, AND WARNING SIGNS AT ALL PEDESTRIAN RAMPS AND PUBLIC ACCESS WAYS.
CONSTRUCTION BERM
ELEVATION +6.0' (NAVD 88)
PROJECT BASELINE
EXISTING BASELINE
BEACH FILL (NEW WORK)
LEGEND
APPROXIMATE SLOPE INTERCEPT
EXISTING MEAN HIGH WATER LINE (APPROX.)
EXISTING INDEX CONTOURS
EXISTING INTERMEDIATE CONTOURS
MHW
M A
T C
H L
I N
E
S
T A
S
E
O
M
A
T
C
H
L I
A
S
E
O
Feet
0 100 200
NOTES CONTINUED:
8. NO BEACH FILL MATERIAL SHALL BE PLACED LANDWARD OF THE TEMPORARY CONSTRUCTION
EASEMENT LINE, OR WITHIN 10 FEET OF OR UNDERNEATH ANY RESIDENTIAL BUILDINGS.
THE CONTRACTOR SHALL BE REQUIRED TO SLOPE (5H:1V) THE LANDWARD SIDE OF THE BERM
WHERE NECESSARY TO AVOID PLACING BEACH FILL MATERIAL LANDWARD OF THE TEMPORARY
CONSTRUCTION EASEMENT LINE, OR WITHIN 10 FEET OF OR UNDERNEATH ANY RESIDENTIAL BUILDINGS.
9. THE CONTRACTOR SHALL EXTEND 6.0' NAVD BERM CREST HORIZONTALLY LANDWARD, WHERE POSSIBLE
TO THE POINT OF INTERSECTION WITH THE EXISTING GROUND OR DUNE EXCEPT AT LOCATIONS AS NOTED
BY THE TYPICAL SECTIONS AND/OR AS DIRECTED BY THE CONTRACTING OFFICER.
10 SANDBAGS HAVE BEEN PLACED ALONG THE BEACH AND IN FRONT OF EXISTING STRUCTURES BETWEEN
THE PROJECT START AND DURHAM ST. THE CONTRACTOR SHALL NOT DIRECTLY PLACE SAND EITHER
HYDRAULICALLY OR MECHANICALLY , ON ANY EXPOSED SANDBAGS, PRIOR TO BEGINNING WORK ON
OCEAN ISLE BEACH, THE CONTRACTOR SHALL CONDUCT AN ONSITE MEETING WITH THE CONTRACTING
OFFICER OR HIS/HER REPRESENTATIVE AND A REPRESENTATIVE FROM THE NC DIVISION OF COASTAL
MANAGEMENT TO IDENTIFY AND DISCUSS NECESSARY MEASURES TO BE TAKEN REGARDING WORK AROUND
THE SAND BAGS.
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
C O
A S
T A
L
S
T O
S
K
M
A N
A G
E M
E N
T
O C
E A
N
I S
A
C H
B R
U N
S W
I C
K
C
O U
N T
Y
N
O R
R
O L
I N
A
SHEET ID
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L
M I N
G T
S
T R
I C
T
R
L I N
G T
E
N U
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
D R
A W
I N
G
C
O D
E
US Army Corps of Engineers
F I
M
E
O
W P
M B
T B
D
J U x
RTA
C O
N T
R O
L L
C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
C
U I
CUI
CUI
TYPICAL BEACH SECTION
CHANGE OVER LOCATION
STA. 27+00
v
PUBLIC BEACH ACCESS (STAR)
IF VEHICLE ACCESS (V)
53+00
54+00
55+00
56+00
57+00
58+00
59+00
60+0061+0062+0063+0064+0065+0066+0067+0068+0069+0070+0071+0072+0073+0074+0075+0076+0077+0078+0079+0080+0081+00
E FIRST ST
W I N
N A
B O
W
S
T
S A
N F
O R
D
S
T
C H
A D
B O
U R
N
S
T
S O
U T
H P
O R
T
S
T
G O
L D
S B
O R
O
S
T
E 2ND ST
E 2ND ST
E FIRST ST
-10
-10
H
V
A
S S
U M
E D
S L O
P E
STA: 59+70.37
N: 53084.41
E: 2179090.78
STA: 80+42.34
N: 52467.62
E: 2177112.75
STA: 70+47.24
N: 52763.85
E: 2178062.72
MHW
MHW
MHW
N: 52125.2
E: 2177263.7
N: 52536.5
E: 2178916.3
N: 52818.9
E: 2179818.4
C-103-O
O C
E A
N
I S
A
C H
G E
N E
R A
L
P
L A
N
S T
A
T
O
S
T A
J
C
A R
T E
R
J
C
A R
T E
R
H
W
I L D
E
J
M
A N
N I N
G
NOTES:
1. THE WIDTH OF THE CONSTRUCTION BERM IS DEPENDENT UPON THE PROPORTIONAL QUANTITY OF SAND TO BE PLACED
AT THE TIME OF CONSTRUCTION. THE WIDTH OF THE CONSTRUCTION BERM MAY BE ADJUSTED DURING CONSTRUCTION
BASED ON THE CONTRACT BEACH PROFILE SURVEY AND THE SLOPE OF THE MATERIAL DURING PLACEMENT.
2. THE CONSTRUCTION BERM SLOPE IS DEPENDENT UPON MATERIAL PROPERTIES AND WAVE ENVIRONMENT DURING PLACEMENT.
3. EXISTING BEACH SURVEY CONDUCTED IN MAY 2021. HORIZONTAL DATUM IS IN FEET, NAD 83 AND VERTICAL DATUM IS IN FEET, NAVD 88.
4. THE CONTRACTOR SHALL CONSTRUCT SAND RAMPS OVER PIPE ALONG THE BEACH PIPELINE ROUTE. SAND RAMPS SHALL
BE PLACED AT EACH BEACH ACCESS AS A MINIMUM, BUT IN NO CASE SHALL DISTANCE BETWEEN RAMPS EXCEED 400 FEET.
THE SAND RAMPS SHALL BE REPAIRED IF ERODED BY WEATHER OR BEACH TRAFFIC.
5. EXISTING DUNES AND BEACH GRASS SHALL BE PROTECTED FROM DAMAGE DUE TO CONSTRUCTION. THE CONTRACTOR SHALL
PROTECT ALL EXISTING STRUCTURES ON THE BEACH, INCLUDING ACCESS RAMPS, SIGNAGE, FENCES, ETC. FROM DAMAGE
DUE TO CONSTRUCTION.
6. THE CONTRACTOR SHALL CONDUCT DAILY OPERATIONS TO CLEAN UP TRASH AND DEBRIS PUMPED ON TO THE BEACH BY
DREDGING OPERATIONS AND/OR FOUND ON THE BEACH WITHIN THE LIMITS OF CONSTRUCTION. DEBRIS AND WASTE SHALL
BE PROPERLY SECURED AND DISPOSED OF ON A WEEKLY BASIS.
7. THE CONTRACTOR SHALL BE REQUIRED TO PERFORM SAFETY PATROL TO MINIMIZE PEDESTRIAN TRAFFIC THRU THE LIMITS OF
CONSTRUCTION AT LEAST 500' AHEAD AND BEHIND THE POINT OF DISCHARGE. MEASURES TO INCLUDE MOVEABLE SAFETY
FENCE AT THESE LMITS TO EXTEND FROM DUNE TO THE WATERS EDGE, CLOSURE OF ANY PEDESTRIAN ACCESS RAMPS WITHIN
THE DIRECT VICINITY OF THE DREDGING OPERATIONS, AND WARNING SIGNS AT ALL PEDESTRIAN RAMPS AND PUBLIC ACCESS WAYS.
CONSTRUCTION BERM
ELEVATION +6.0' (NAVD 88)
PROJECT BASELINE
EXISTING BASELINE
BEACH FILL (NEW WORK)
LEGEND
APPROXIMATE SLOPE INTERCEPT
EXISTING MEAN HIGH WATER LINE (APPROX.)
EXISTING INDEX CONTOURS
EXISTING INTERMEDIATE CONTOURS
MHW
Feet
0 100 200
M A
T C
H L I N
E
S
T A
S
E
O
NOTES CONTINUED:
8. NO BEACH FILL MATERIAL SHALL BE PLACED LANDWARD OF THE TEMPORARY CONSTRUCTION
EASEMENT LINE, OR WITHIN 10 FEET OF OR UNDERNEATH ANY RESIDENTIAL BUILDINGS.
THE CONTRACTOR SHALL BE REQUIRED TO SLOPE (5H:1V) THE LANDWARD SIDE OF THE BERM
WHERE NECESSARY TO AVOID PLACING BEACH FILL MATERIAL LANDWARD OF THE TEMPORARY
CONSTRUCTION EASEMENT LINE, OR WITHIN 10 FEET OF OR UNDERNEATH ANY RESIDENTIAL BUILDINGS.
9. THE CONTRACTOR SHALL EXTEND 6.0' NAVD BERM CREST HORIZONTALLY LANDWARD, WHERE POSSIBLE
TO THE POINT OF INTERSECTION WITH THE EXISTING GROUND OR DUNE EXCEPT AT LOCATIONS AS NOTED
BY THE TYPICAL SECTIONS AND/OR AS DIRECTED BY THE CONTRACTING OFFICER.
10. SANDBAGS HAVE BEEN PLACED ALONG THE BEACH AND IN FRONT OF EXISTING STRUCTURES BETWEEN
THE PROJECT START AND DURHAM ST. THE CONTRACTOR SHALL NOT DIRECTLY PLACE SAND EITHER
HYDRAULICALLY OR MECHANICALLY , ON ANY EXPOSED SANDBAGS, PRIOR TO BEGINNING WORK ON
OCEAN ISLE BEACH, THE CONTRACTOR SHALL CONDUCT AN ONSITE MEETING WITH THE CONTRACTING
OFFICER OR HIS/HER REPRESENTATIVE AND A REPRESENTATIVE FROM THE NC DIVISION OF COASTAL
MANAGEMENT TO IDENTIFY AND DISCUSS NECESSARY MEASURES TO BE TAKEN REGARDING WORK AROUND
THE SAND BAGS.
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
C O
A S
T A
L
S
T O
S
K
M
A N
A G
E M
E N
T
O C
E A
N
I S
A
C H
B R
U N
S W
I C
K
C
O U
N T
Y
N
O R
R
O L
I N
A
SHEET ID
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L
M I N
G T
S
T R
I C
T
R
L I N
G T
E
N U
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
D R
A W
I N
G
C
O D
E
US Army Corps of Engineers
F I
M
E
O
W P
M B
T B
D
J U x
RTA
C O
N T
R O
L L
C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
C
U I
CUI
CUI
B A
N
T R
A C
T
E N
D
S
T A
1700' TRANSITION SECTION
START STA. 63+00 END STA. 80+00
v
PUBLIC BEACH ACCESS (STAR)
IF VEHICLE ACCESS (V)
H
V
H
V
-5
-10
-15
E L E
V A
T I O
N
E
T
0 50 100 150 200 250 300 350 400 450 500 550-50
DISTANCE IN FEET FROM BASELINE
-5
-10
-15
E L E
V A
T I O
N
E
T
0 50 100 150 200 250 300 350 400 450 500 550-50
DISTANCE IN FEET FROM BASELINE
+6.0'
CONSTRUCTION
BERM
H
V
DISTANCE VARIES
-5
-10
-15
E L E
V A
T I O
N
E
T
0 50 100 150 200 250 300 350 400 450 500 550-50
DISTANCE IN FEET FROM BASELINE
TYPICAL OPTIONAL BEACH BERM SECTION
TYPICAL BEACH BERM SECTION
H
V
+6.0'
+6.0'
TYPICAL BEACH TRANSITION SECTION
SOUTH END
STA. 63+00 TO STA. 80+00
DISTANCE VARIES - SEE SHEET C-103-O
SLOPE
INTERCEPT
ASSUMED
SLOPE DURING
CONSTRUCTION
SEE NOTE 1
APPROXIMATE
EXISTING BEACH
PROFILE
CORPS OF ENGINEERS
BASELINE
ASSUMED
SLOPE DURING
CONSTRUCTION
SEE NOTE 1
APPROXIMATE
EXISTING BEACH
PROFILE
CORPS OF ENGINEERS
BASELINE
ASSUMED
SLOPE DURING
CONSTRUCTION
SEE NOTE 1
APPROXIMATE
EXISTING BEACH
PROFILE
CORPS OF ENGINEERS
BASELINE
CONSTRUCTION
BERM WIDTH
VARIES
STA. 19+50 TO STA. 27+00
SAND BAGS
SEE NOTE 2
SLOPE
INTERCEPT
SLOPE
INTERCEPT
DISTANCE VARIES
H
V
-5
-10
-15
E L E
V A
T I O
N
E
T
0 50 100 150 200 250 300 350 400 450 500 550-50
DISTANCE IN FEET FROM BASELINE
TYPICAL BEACH BERM SECTION
+6.0'
SLOPE
INTERCEPT
CORPS OF ENGINEERS
BASELINE
APPROXIMATE
EXISTING BEACH
PROFILE
ASSUMED
SLOPE DURING
CONSTRUCTION
SEE NOTE 1
STA. 27+00 TO STA. 63+00
STA. -1+66.3 TO STA. 10+00
PLUS
TOLERANCE
MINUS
TOLERANCE
MHW (+1.79' NAVD 88)
MHW (+1.79' NAVD 88)
PLUS
TOLERANCE
MINUS
TOLERANCE
PLUS
TOLERANCE
MINUS
TOLERANCE
MHW (+1.79' NAVD 88)
PLUS
TOLERANCE
MINUS
TOLERANCE
MHW (+1.79' NAVD 88)
DISTANCE VARIES - SEE SHEET C-101-O
H
V
-5
-10
-15
E L E
V A
T I O
N
E
T
0 50 100 150 200 250 300 350 400 450 500 550-50
DISTANCE IN FEET FROM BASELINE
TYPICAL BEACH BERM SECTION
+6.0'
ASSUMED
SLOPE DURING
CONSTRUCTION
SEE NOTE 1
APPROXIMATE
EXISTING BEACH
PROFILE
CORPS OF ENGINEERS
BASELINE
SAND BAGS
SEE NOTE 2
SLOPE
INTERCEPT
STA. 10+00 TO STA. 19+50
MHW (+1.79' NAVD 88)
PLUS
TOLERANCE
MINUS
TOLERANCE
DISTANCE VARIES - SEE SHEET C-101-O
H
V
OPTIONAL
ITEM 1
OPTIONAL
ITEM 1
DISTANCE VARIES - SEE SHEETS C-102-O AND C-103-O
CORPS OF ENGINEERS
EASEMENT LINE
C-301-O
C
D
W G
O C
E A
N
I S
A
C H
T Y
P I C
A L
S
E C
T I O
N S
0 100
SCALE IN FEET
010 10 20 30
HORZ.
VERT.
50 50
NOTES:
1. THE WIDTH OF THE CONSTRUCTION BERM IS DEPENDENT UPON THE PROPORTIONAL QUANTITY OF
SAND TO BE PLACED AT THE TIME OF CONSTRUCTION. THE BASIS FOR DETERMINING THE WIDTH OF
THE CONSTRUCTION BERM WILL BE THE GOVERNMENT'S INTERPRETATION OF THE BORROW AREA
AND BEACH PROFILE SURVEY, AND THE SLOPE OF THE MATERIAL DURING PLACEMENT.
2. THERE SHALL BE NO CONSTRUCTION OR BEACH FILL PLACED BEYOND THE LANDWARD SIDE OF THE SANDBAGS.
SANDBAG LIMITS SHOWN ARE APPROXIMATE AND SHALL BE FIELD VERIFIED BY THE CONTRACTOR.
3. THE CONSTRUCTION BERM SLOPE IS DEPENDENT UPON MATERIAL PROPERTIES AND WAVE ENVIRONMENT
DURING PLACEMENT. THE 15H:1V SEAWARD SLOPE IS THE INITIAL ASSUMED SLOPE FOR PAYMENT AND
QUANTITY PURPOSES.
4. EXISTING BEACH SURVEY COMPLETED IS MAY 2021. HORIZONTAL DATUM IS IN FEET, NAD 83 AND VERTICAL
DATUM IS IN FEET, NAVD 88.
5. TYPICAL BEACH SECTION STATION LIMITS ARE APPROXIMATE AND ARE SUBJECT TO CHANGE BASED ON
EXISTING BEACH CONDITIONS.
6. THE CONTRACTOR SHALL NOT REMOVE OR RELOCATE ANY EXISTING BEACH MATERIAL THAT IS ABOVE
THE BEACH FILL PROFILE PRIOR TO CONSTRUCTION.
7. AS AN OPTION TO THE CONTRACT AND AT THE DIRECTION OF THE CONTRACTING OFFICER, THE CONTRACTOR
SHALL TILL ANY FILL AREAS IDENTIFIED BY THE CONTRACTING OFFICER. BEACH TILLING LIMITS SHALL BE ALONG
THE ENTIRE LENGTH OF THE BEACH FILL AREA FROM THE SEAWARD TOE OF THE STORM BERM TO MEAN HIGH
WATER (ELEV. +1.79' NAVD88)
8. A VERTICAL TOLERANCE OF +/- 0.5' ABOVE AND BELOW THE PRESCRIBED BERM AND DUNE GRADE AND SLOPES
LINE SHALL BE PERMITTED IN THE FINISHED SURFACE. BELOW THE MEAN HIGH WATER LINE (+/-1.79' NAVD88) THE
FILL MATERIAL WILL BE ALLOWED TO ASSUME ITS NATURAL SLOPE RESULTING FROM THE EFFECTS OF WAVE AND
WATER LEVEL CONDITIONS. FOR PAYMENT PURPOSES, THE TOLERANCE LINE SHALL EXTEND THE ENTIRE
BERM AND SLOPES (LANDWARD, INTERMEDIATE, AND ASSUMED SEAWARD SLOPE) TO THE
INTERSECTION OF THE LANDWARD AND ASSUMED SEAWARD SLOPE AND PRE-CONSTRUCTION SURVEYED
CONDITION, SEE SPECIFICATION SECTION 35 20 23 FOR MEASUREMENT AND PAYMENT AND ALLOWABLE TOLERANCE.
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
C O
A S
T A
L
S
T O
S
K
M
A N
A G
E M
E N
T
O C
E A
N
I S
A
C H
B R
U N
S W
I C
K
C
O U
N T
Y
N
O R
R
O L
I N
A
SHEET ID
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L
M I N
G T
S
T R
I C
T
R
L I N
G T
E
N U
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
D R
A W
I N
G
C
O D
E
US Army Corps of Engineers
F I
M
E
O
W P
M B
T B
D
J U x
RTA
C O
N T
R O
L L
C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
C
U I
CUI
CUI
J
C
A R
T E
R
J
C
A R
T E
R
H
W
I L D
E
J
M
A N
N I
G
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. -1+66.30
-20
-10
-20
-10
0 100 200 3000-100-200-300-400-500
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 0+00
-20
-10
-20
-10
0 100 200 3000-100-200-300-400-500
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 2+00
-20
-10
-20
-10
0 100 200 3000-100-200-300-400-500
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 4+00
-30
-20
-10
-30
-20
-10
0 100 2000-100-200-300-400-500
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 6+00
-30
-20
-10
-30
-20
-10
0 100 2000-100-200-300-400-500
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 8+00
-30
-20
-10
-30
-20
-10
0 100 2000-100-200-300-400-500
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 10+00
-30
-20
-10
-30
-20
-10
0 100 2000-100-200-300-400-500
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 12+00
-30
-20
-10
-30
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 14+00
-30
-20
-10
-30
-20
-10
00-100-200-300-400-500-600-700
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
X
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
M M
M M
M M
M M
M
Y
Y Y
Y
W I L M
I N
G T
O N
N
O R
R
O L I N
A
D
A R
L I N
G T
E
N U
E
W I L M
I N
G T
S
T R
I C
T
B R
U N
S W
I C
K
C
O U
N T
Y
N
O R
R
O L I N
A
O C
E A
N
I S
A
C H
C O
A S
T A
L
S
T O
S
K
M
A N
A G
E M
E N
T
BCOES REVIEW
C-302
O C
E A
N
I S
A
C H
C R
O S
S
S
E C
T I O
N S
S T
A
T
O
S
T A
J
C
A R
T E
R
J
C
A R
T E
R
H
W
I L D
E
J
M
A N
N I N
G
MHW
MHW
MHW
MHW
MHW
MHW
MHW
MHW
MHW
EL. +6.0
EL. +6.0 EL. +6.0
EL. +6.0EL. +6.0EL. +6.0
EL. +6.0
EL. +6.0
BASE CONTRACT
BEACH FILL (TYP.)
OPTIONAL CONTRACT
BEACH FILL (TYP.)
NOTES:
1. SANDBAGS NOT SHOWN FOR CLARITY.
2. VERTICAL DATUM IS IN FEET, NAVD 88.
EXISTING BEACH PROFILE
Feet
0 300 600
Feet
0 30 60
VERTICAL UNITS: 1" = 15' HORIZONTAL UNITS: 1" = 150'
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 16+00
-30
-20
-10
-30
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 18+00
-30
-20
-10
-30
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 20+00
-30
-20
-10
-30
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 22+00
-30
-20
-10
-30
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 24+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 26+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 28+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 30+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 32+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
X
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
M M
M M
M M
M M
M
Y
Y Y
Y
W I L M
I N
G T
O N
N
O R
R
O L I N
A
D
A R
L I N
G T
E
N U
E
W I L M
I N
G T
S
T R
I C
T
B R
U N
S W
I C
K
C
O U
N T
Y
N
O R
R
O L I N
A
O C
E A
N
I S
A
C H
C O
A S
T A
L
S
T O
S
K
M
A N
A G
E M
E N
T
BCOES REVIEW
C-303
O C
E A
N
I S
A
C H
C R
O S
S
S
E C
T I O
N S
S T
A
T
O
S
T A
J
C
A R
T E
R
J
C
A R
T E
R
H
W
I L D
E
J
M
A N
N I N
G
EL. +6.0
MHW
EL. +6.0
MHW
EL. +6.0
MHW
EL. +6.0
MHW
EL. +6.0
MHW
EL. +6.0
EL. +6.0EL. +6.0EL. +6.0
MHW
MHW MHW
MHW
EXISTING BEACH PROFILE
BASE CONTRACT
BEACH FILL (TYP.)
Feet
0 300 600
Feet
0 30 60
VERTICAL UNITS: 1" = 15' HORIZONTAL UNITS: 1" = 150'
NOTES:
1. SANDBAGS NOT SHOWN FOR CLARITY.
2. VERTICAL DATUM IS IN FEET, NAVD 88.
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 34+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 36+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 38+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 40+00
-30
-20
-10
-30
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 42+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 44+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 46+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 48+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 50+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
X
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
M M
M M
M M
M M
M
Y
Y Y
Y
W I L M
I N
G T
O N
N
O R
R
O L I N
A
D
A R
L I N
G T
E
N U
E
W I L M
I N
G T
S
T R
I C
T
B R
U N
S W
I C
K
C
O U
N T
Y
N
O R
R
O L I N
A
O C
E A
N
I S
A
C H
C O
A S
T A
L
S
T O
S
K
M
A N
A G
E M
E N
T
BCOES REVIEW
C-304
O C
E A
N
I S
A
C H
C R
O S
S
S
E C
T I O
N S
S T
A
T
O
S
T A
J
C
A R
T E
R
J
C
A R
T E
R
H
W
I L D
E
J
M
A N
N I N
G
EL. +6.0
MHW
EXISTING BEACH PROFILE
BASE CONTRACT
BEACH FILL (TYP.)
EL. +6.0 EL. +6.0 EL. +6.0
EL. +6.0
EL. +6.0
EL. +6.0 EL. +6.0 EL. +6.0
MHW
MHW MHW MHW
MHW
MHWMHWMHW
Feet
0 300 600
Feet
0 30 60
VERTICAL UNITS: 1" = 15' HORIZONTAL UNITS: 1" = 150'
NOTES:
1. VERTICAL DATUM IS IN FEET, NAVD 88.
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 52+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 54+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 56+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 58+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 60+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 62+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 64+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 66+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 68+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
X
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
M M
M M
M M
M M
M
Y
Y Y
Y
W I L M
I N
G T
O N
N
O R
R
O L I N
A
D
A R
L I N
G T
E
N U
E
W I L M
I N
G T
S
T R
I C
T
B R
U N
S W
I C
K
C
O U
N T
Y
N
O R
R
O L I N
A
O C
E A
N
I S
A
C H
C O
A S
T A
L
S
T O
S
K
M
A N
A G
E M
E N
T
BCOES REVIEW
C-305
O C
E A
N
I S
A
C H
C R
O S
S
S
E C
T I O
N
S T
A
T
O
S
T A
J
C
A R
T E
R
J
C
A R
T E
R
H
W
I L D
E
J
M
A N
N I N
G
EL. +6.0
MHW
EXISTING BEACH PROFILE
BASE CONTRACT
BEACH FILL (TYP.)
EL. +6.0
EL. +6.0 EL. +6.0 EL. +6.0
EL. +6.0
EL. +6.0EL. +6.0EL. +6.0
MHW MHW MHW
MHWMHW
MHW MHW MHW
Feet
0 300 600
Feet
0 30 60
VERTICAL UNITS: 1" = 15' HORIZONTAL UNITS: 1" = 150'
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 70+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 72+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 74+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 76+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 78+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
E L
E V
A T
I O
N
E
T
CL
DISTANCE IN FEET
STA. 80+00
-20
-10
-20
-10
00-100-200-300-400-500-600-700
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
X
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
M M
M M
M M
M M
M
Y
Y Y
Y
W I L M
I N
G T
O N
N
O R
R
O L I N
A
D
A R
L I N
G T
E
N U
E
W I L M
I N
G T
S
T R
I C
T
B R
U N
S W
I C
K
C
O U
N T
Y
N
O R
R
O L I N
A
O C
E A
N
I S
A
C H
C O
A S
T A
L
S
T O
S
K
M
A N
A G
E M
E N
T
BCOES REVIEW
C-306
O C
E A
N
I S
A
C H
C R
O S
S
S
E C
T I O
N S
S T
A
T
O
S
T A
J
C
A R
T E
R
J
C
A R
T E
R
H
W
I L D
E
J
M
A N
N I N
G
EL. +6.0
MHW
EXISTING BEACH PROFILE
BASE CONTRACT
BEACH FILL (TYP.)
MHW MHW MHW
MHWMHW
EL. +6.0EL. +6.0
EL. +6.0 EL. +6.0 EL. +6.0
Feet
0 300 600
Feet
0 30 60
VERTICAL UNITS: 1" = 15' HORIZONTAL UNITS: 1" = 150'
| G-000-O RTA COVER SHEET |
| G-001-O DRAWING INDEX |
| G-101-O SHALLOTTE INLET BORROW AREA |
| G-102-O OCEAN ISLE BEACH LOCATION MAP |
| C-101-O OCEAN ISLE BEACH GENERAL PLAN STA. -1+66.3 TO STA. 25+00 |
| C-102-O OCEAN ISLE BEACH GENERAL PLAN STA. 25+00 TO STA. 53+00 |
| C-103-O OCEAN ISLE BEACH GENERAL PLAN STA. 53+00 TO STA. 81+00 |
| C-301-O OCEAN ISLE BEACH TYPICAL SECTIONS |
| C-302 OCEAN ISLE BEACH CROSS SECTIONS STA. -1+66.30 TO STA. 14+00 |
| C-303 OCEAN ISLE BEACH CROSS SECTIONS STA. 16+00 TO STA. 32+00 |
| C-304 OCEAN ISLE BEACH CROSS SECTIONS STA. 34+00 TO STA. 50+00 |
| C-305 OCEAN ISLE BEACH CROSS SECTIONS STA. 52+00 TO STA. 68+00 |
| C-306 OCEAN ISLE BEACH CROSS SECTIONS STA. 70+00 TO STA. 86+00 |
File details come from the government source that posted it. Updated .