W912PM-17-R-0010-0001_PN89035_SF-30.pdf

PDF 794 KB Posted

Attached to
PN 89035 SOF Training Building H-2313
Solicitation number
W912PM-17-R-0010
Issued by

About this file

Amendment 0001 - SF-30

View the file

Other files

File Type Posted
Example_3_Past_Performance.docx DOCX document
Example_2_Key_Personnel.docx DOCX document
BXCET601.pdf PDF
W912PM-17-R-0001-0001_PN89034_Conformed.pdf PDF
Example_1_Past_Experience.docx DOCX document
H2313-Location_Map-03Mar17.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912PM-17-R-0010

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912PM-17-R-0010 - PN 89035, SOF Training Building H-2313, Ft. Bragg, Cumberland County, NC is amended as follow s:

1.) Change the time for the reciept of proposals from 12:00 AM to 2:00 PM, 03 July 2017 in Block 13 of the SF1442.

2.) Provide a revised w orksheet for Appendix A, Example 3. This w orksheet w ill be incorporated into the Section 01 00 00. In addition, a revised copy shall be posted to FBO. In addition, w orksheets for Appendix A Example 1 and Appendix A Example 2 w ill be posted to FBO.

3.) See Technical Summary of Changes.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 26

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Jun-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-17-R-0010

X 9B. DATED (SEE ITEM 11)

01-Jun-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Jun-2017

CODE

U S ARMY CORPS OF ENGINEERS, WILMINGTON

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

The required response date/time has changed from 03-Jul-2017 12:00 AM to 03-Jul-2017 02:00 PM.

SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS

The following have been modified:

INSTRUCTIONS AND REQUIREMENTS

eGENERAL PROPOSAL SUBMISSION INSTRUCTIONS & REQUIREMENTS

W912PM-17-R-0010

PN89035

SOF Training Building H-2313

Fort Bragg, NC

Amendment 0001

1. OVERVIEW.

1.1 This Request for Proposal (RFP) solicits the renovation of the Basement Level of Building H-2313. The new space will consist of a 2,400 square foot (SF) vestibule and an open space for secure area office work, and will include modifications to existing perimeter walls, windows, ceilings, mechanical systems, electrical systems, secure and non-secure communications systems. The work will require communications extensions to other existing spaces in the Basement Level of the building. Renovated open area space will contain workstations, a conference table, COP (Common Operating Picture, whiteboards, and video screens.

Antiterrorism/Force protection measures and sustainment mandates will be incorporated.

The period of performance is 240 calendar days for the base bid; the total contract duration shall not exceed 240 calendar days. Work location is Fort Bragg, North Carolina.

Antiterrorism/Force protection measures and sustainment mandates will be incorporated. The resultant contract will be Firm-Fixed Price (FFP).

1.2 The purpose of the Source Selection plan is to establish a uniform evaluation procedure for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Source Selection Authority (SSA) using the Lowest Price Technically Acceptable Source Selection Process (See Federal Acquisition Regulation 15.101-2). The proposal shall describe the capability of the offeror to perform the contract. The proposal should be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract.

2. GENERAL INSTRUCTIONS.

In accordance with FAR Clause 52.215-1, Instructions to Offerors – Competitive Acquisitions, the Government reserves the right to make award without discussions. Therefore, offerors should submit their best technical and price terms in their initial offer and not automatically assume that they will have an opportunity to participate in discussions or to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interests of the Government.

In accordance with 15.306(c) (1) and FAR Clause 52.215-1(f) (4), Instructions to Offerors – Competitive Acquisitions, the Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

2.1 Contractor Team Arrangements. The Government will recognize the integrity and validity of contractor teaming arrangements, provided the arrangements are identified and company relationships are fully disclosed in the offer. As further described in paragraph 2.3, below, the Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned CAGE Code.

2.2 If applicable, a 8(a) Joint Venture or SBA/DoD approved Mentor-Protégé must submit all required documentation with their offer to be considered responsive, IAW the requirements set forth in Title 13 Code of Federal Regulations (CFR) Part 125.8.

2.3 The Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned CAGE Code. However, IAW CFR 125.8(e), the Government will also evaluate past performance and past performance submitted by the individual firms that make up a joint venture.

2.4 Notwithstanding the specific requirements of any other area of the RFP, information submitted about any company other than the offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractor, WILL NOT be evaluated for any factor.

2.5 Offerors shall submit their proposal in accordance with the Section 3. General Proposal Format, paragraph 3.4.

2.6 Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.

3. GENERAL PROPOSAL FORMAT.

3.1 Cover Page. Include the title of the solicitation, solicitation number, offeror name, and date of the submittal.

3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents. If more than one Adobe PDF file is used for a volume, the complete table of contents shall be included in each. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.

3.3 All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not cross-reference similar material in the Price Proposal, or vice versa. No dollar amounts from the Price Proposal are to be included in the Technical proposal.

3.4 Each offeror must submit Price, Technical, and Past Performance Proposals via the AMRDEC SAFE website. No hard paper copies will be accepted or evaluated. The Price, Technical, and Past Performance Proposals must be received by the closing date and time set for receipt of proposals.

In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically.

All submissions shall be in Adobe PDF format and shall be on 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Title the file(s) in the following format:

W912PM-17-R-0008_COMPANY NAME_VOLUME I

W912PM-17-R-0008_COMPANY NAME_VOLUME II

W912PM-17-R-0008_COMPANY NAME_VOLUME III

Submit the Price, Technical, and Past Performance Proposals electronically via the AMRDEC SAFE website at: https://safe.amrdec.army.mil/SAFE/welcome.aspx. At the AMRDEC SAFE website, select the blue button labeled ‘Click Here’, below the ‘Non-CAC Users’ title. Register, access the site and submit your proposal(s). [Note: It has been reported that documents are more quickly uploaded into the AMRDEC SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that offerors will have more success utilizing any particular browser.

When your proposals are submitted via the AMRDEC SAFE website, the website will provide notification of the submittal to the Government recipients. When completing the information for transmittal at the AMRDEC SAFE website, you will be required to enter email addresses for the recipients. For this solicitation, the recipients will be the Contracting Officer and Contract Specialist. The Contract Specialist for this project is Carol Jayroe: email address is carol.b.jayroe@usace.army.mil. The Contracting Officer for this project is Mr. John Hill:

email address is john.t.hill@usace.army.mil. BOTH of these email addresses are the ones you will enter as recipients.

In addition, after uploading your documents, you will be required to verify your email address before AMRDEC will send notification to the Government recipients. This is a very important step – even if you successfully upload your proposal to AMRDEC SAFE, notification will not be sent to the Government until you verify your email address, which may result in the rejection of your proposal for lateness. Follow the instructions on the AMRDEC website and confirmation emails you receive from AMRDEC.

Proposal due Date and Time:

Request For Proposal No: W912PM-17-R-0008 Due Date of Proposal: 03 July 2017 Time by which Proposals are Due: 2:00 P.M. (Eastern Time) Title of Project: PN 89035, SOF Training Building H-2313) Fort Bragg, NC

The date and time of delivery will be established by the time of receipt of the email notification to the Contract Specialist and Contracting Officer by the AMRDEC SAFE website, not by the date and time of uploading of the proposal into the AMRDEC SAFE website. Do not assume that electronic communication is instantaneous – in fact, it can take several minutes or even hours in some cases. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ email inboxes until after the deadline, the submission will be considered late. The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.

3.5 The offeror is responsible for including sufficient details in its proposal to permit a complete and accurate evaluation. Accordingly, the offeror shall be clear and concise in its proposal. The Government will not make assumptions concerning the offeror’s intent.

3.6 The technical data criteria specified for each factor identified herein and as described in these instructions shall be submitted as part of the proposal. Failure to submit all the data required by the RFP, and these instructions may be cause for determining a proposal incomplete and, therefore, not considered for award.

3.7 Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to the submission of the offer.

3.8 Tabs. Proposal shall be organized and tabbed as follows:

3.8.1 VOLUME I: OFFEROR’S CERTIFICATIONS AND PRICE (FACTOR 1)

One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted and one (1) original copy of the bid guarantee in both electronic and hardcopy shall be submitted.

TAB CONTENTS OF THE PRICE PROPOSAL

A The Proposal Cover Sheet

B Standard Form 1442

C Acknowledgement of Amendments (If Applicable)

D FACTOR 1: PRICE

E Section 00 45 00 – Representations and Certifications F Teaming Arrangement (If Applicable)

G Bid Guarantee (Bid Bond)

TAB A – The proposal cover sheet is required by FAR 52.215-1 (c)(2) and must be submitted by all offerors. The format for the proposal cover sheet is as follows:

PROPOSAL COVER SHEET

1. The solicitation number;

2. The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

4. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and

5. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

Offerors should ensure telephone number; fax number, e-mail address, DUNS number and CAGE Code are all included. DUNS number will be used to access Contractor Performance Assessment Reporting System (CPARS) data. Offerors should also provide any other assigned number that identifies them in the CPARS database. If a separate DUNS has been created for a joint venture (J-V) it must be submitted. The offeror should also submit their Tax ID number on the proposal data Sheet.

TAB B - Standard Form 1442, completed and signed by authorized individual(s) of the offeror.

Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.

TAB C - If applicable - All amendments must be acknowledged by all offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR 4.102.

TAB D – Factor 1 - Price. Proposed price schedule is to be completed in its entirety by all offerors to include the Subtotals and Totals section as found in Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule.

TAB E - Section 00 45 00 – Representations and Certifications. Offerors shall include any narratives as it pertains to the requirement at 2.2 to document any teaming arrangement the offeror has or will enter into.

TAB F - Teaming Agreement, if applicable. See paragraph 2.1 and 2.2 Note to 8(a)—SBA must approve a joint venture agreement prior to the award of an 8(a) contract on behalf of the joint venture.

TAB G - Offerors shall provide a fully executed Bid Bond as required by FAR Clause 52.228-1, Bid Guarantee in both Hard copy and electronically in Tab G.

For the purposes of this Request for Proposal, please note that in accordance with (IAW) FAR 28.001:

“Bond means a written instrument executed by a bidder or contractor (the “principal”), and a second party (the “surety” or “sureties”) (except as provided in 28.204), to assure fulfillment of the principal’s obligations to a third party (the “obligee” or “Government”), identified in the bond. If the principal’s obligations are not met, the bond assures payment, to the extent stipulated, of any loss sustained by the obligee.”

Bonds shall therefore be executed in the name of the legal entity, whether a joint venture, partnership or the Prime Contractor of an informal teaming arrangement, with whom the government would enter into a contract for a successful offeror. The entity named on the bond must be able to acquire bonding capacity on its own merits, and not as the result of indemnification from a subcontractor or third party.

3.8.2 VOLUME II: TECHNICAL PROPOSAL (FACTORS 2-3)

One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted.

TAB CONTENTS OF THE TECHNICAL PROPOSAL

A Factor 2: Past Experience B Factor 3: Key Personnel

Page Limitations: The following page limitations are established for each factor described above:

Factor 2: Past Experience – Limited to 20 pages (maximum of 5 forms) Factor 3: Key Personnel – Limited to 5 pages per individual resume

3.8.3 VOLUME III: PAST PERFORMANCE PROPOSAL (FACTOR 4)

One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted.

TAB CONTENTS OF THE TECHNICAL PROPOSAL

A Factor 4: Past Performance

Page Limitations: Limited to no more than five (5) questionnaires/projects; each past performance questionnaire shall not exceed four (4) five (5) pages.

4. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME II: TAB A—FACTOR 2 – PAST EXPERIENCE.

4.1 SUBMISSION/MINIMUM REQUIREMENTS:

4.1.1 The offeror shall demonstrate the experience as a prime contractor on relevant and recent projects of similar size, scope, and complexity.

4.1.1.1 RELEVANCY: The minimum requirement for a project of similar size, scope, or complexity is defined as having all of the following criteria:

Renovation or new construction of secured facilities such as:

Open Storage, Temporary SCIFS (TWSA), Secured Work Areas, OR SIPR rooms

AND

Working within an occupied space with access control

Occupied building is defined as a building in which the user is present during regular hours, while construction is occurring inside. Reference 1.9.1.6 of Section 00 14 00.

4.1.1.2 RECENCY: The projects must have been completed within the last six (6) years or at least fully designed and at least 50% construction progress completed at the time of the proposal receipt, with scopes of similar size, and complexity.

4.1.2 The offeror shall complete a minimum of two (2), but no more than five (5), “Experience Information” forms, (See Appendix A, Example 1), in response to this factor. All projects submitted must be at least 50% complete at the time of proposal receipt, within the last six (6) years.

4.1.3 Offerors shall utilize Experience Information Form in Appendix A, Example 1.

4.1.4 If the offeror is a Joint Venture (J-V), relevant project experience should be submitted for projects completed by the Joint Venture entity, or the individual firms that make up the joint venture. Offerors that are part of the DoD Mentor Protégé program may only submit one (1) recent and relevant project completed by the Mentor. Offerors are still limited to a total of five (5) projects. Experience of proposed subcontractors to be utilized on this project will not be considered.

4.2 EVALUATION CRITERIA:

4.2.1 The Government will evaluate the extent of recent, relevant experience of the prime contractor as identified in paragraph 4.1.2. Projects that were awarded on an individual task/delivery order basis will not be aggregated for purposes of meeting minimum or additional criteria. Federal Government project experience will not be rated inherently more important than non-Federal Government project experience.

4.2.2 To be considered eligible for award, the Government will verify that each offeror has submitted a minimum of two (2) projects which meet the minimum criteria of paragraph 4.1.2.

4.2.3 The offeror’s Past Experience will be evaluated based on the Government’s assessment of each submitted project’s similarity (in terms of size, scope and complexity) to the work described in this RFP.

4.2.4 The Government will review the project experience of the offeror on projects provided in response to the Past Experience Factor. Offerors must meet all of the minimum acceptability standards to receive an “ACCEPTABLE” rating on this factor.

5. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME II: TAB B —FACTOR 3 – KEY PERSONNEL.

5.1 SUBMISSION/MINIMUM REQUIREMENTS:

5.1.1 Each offeror shall provide resumes for the following Key Personnel proposed for this contract. Resumes shall not exceed five (5) pages per person. The proposed position of each person shall be clearly stated at the beginning of the resume.

Project Superintendent:

Minimum of ten (10) years’ of experience; at least five (5) of those years as superintendent on projects similar in size and complexity Assigned as Project Superintendent, but can have duties as Construction Security

Manager, if meets the requirements As listed in 1.3.2 of Section 01 30 00

CQC System Manager/ SSHO

Minimum of eight (8) years of experience in related work - projects similar in size and complexity

Assigned as CQC System Manager, but can have duties as Site Safety and Health Officer (SSHO)

As listed in 3.4.2 of Section 01 45 00

Contract Construction Security Manager/CCSM Must have active secret security clearance Minimum of two (2) years of related experience in SIPRnet installation, SCIF construction, or ICD 705 Assigned as Construction Security Manager, but can have duties as Project

Superintendent, if meets the requirements of CCSM

As listed in 1.2.5 of Section 01 14 00

Failure to demonstrate the minimally acceptability standards under this factor will result in an “UNACCEPTABLE” rating and possible elimination from further consideration for contract award.

5.1.2 Sample suggested resume format is included with this RFP (Appendix A, Example 2). If offerors elect not to use the suggested resume format, all information identified on the sample format is still required for each resume submitted under this Factor. Proposals that fail to include resumes or that fail to include all required information on these resumes may be rejected as unacceptable.

5.1.3 The Key Personnel identified must be used on the project. No deviations will be permitted unless they meet the same qualifications and experience of those individuals proposed and are expressly approved by the Contracting Officer in advance. An offeror’s use of different personnel than those proposed without approval from the Contracting Officer will be grounds for a Termination for Default.

5.2 EVALUATION CRITERIA:

5.2.1 The Government will review the resumes provided in response to the Personnel Factor.

Offerors must demonstrate all of the following minimum acceptability standards to receive an “ACCEPTABLE” rating on this factor.

5.2.2 The offeror must demonstrate in all resumes that the key personnel proposed meet the minial acceptability standards in the following roles: Project Superintendent, CQC System Manager/SSHO, and Contract Construction Security Manager/CCSM).

5.2.3 Failure to demonstrate the minimally acceptability standards under this factor will result in an “UNACCEPTABLE” rating and possible elimination from further consideration for contract award.

6. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME III: TAB A—FACTOR 4 – PAST PERFORMANCE.

6.1 SUBMISSION/MINIMUM REQUIREMENTS:

6.1.1 Past performance refers to the quality of recent and relevant project experience from the owner’s perspective. The offeror shall complete and provide a Past Performance Assessment Questionnaire (Appendix A, Example 3) on no fewer than two (2) and no more than five (5) projects. Projects submitted under this factor must first be deemed recent and relevant.

6.1.1.1 RELEVANCY: The minimum requirement for a project of similar size, scope, or

Temporary SCIFS (TWSA), Secured Work Areas, OR

SIPR rooms

AND

Working within an occupied space with access control Occupied building is defined as a building in which the user is present during

6.1.1.2 RECENCY: The projects must have been completed within the last six (6) years or at least fully designed and at least 50% construction progress completed at the time of proposal reciept, with scopes of similar size, and complexity.

6.1.2 Though not required, ideally project past performance information submitted under this factor would be on the same projects submitted for consideration under FACTOR 2, PAST EXPERIENCE. Individual project Past Performance Assessment Questionnaires shall not exceed four (4) five (5); Government evaluators will review and evaluate only the information contained on the first four (4) five (5) pages. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer. The Government will call and confirm information provided by the offeror on the Past Performance Assessment Questionnaire with the points of contact, to the extent necessary to conduct a meaningful evaluation. The Government reserves the right to interview other individuals if the point of contact is not available.

6.1.3 The Government may contact sources other than those provided by the offeror for information with respect to past performance. These other sources may include but are not limited to: Contract Performance Assessment Report (CPAR), Past Performance Information Retrieval System (PPIRS), other Government sources, and interviews with organizations or individuals familiar with the offeror’s performance.

6.1.4 Offerors shall utilize the Past Performance Assessment Questionnaire in Appendix A, Example 3.

6.1.5 If the offeror is a Joint Venture (J-V), relevant project experience should be submitted for projects completed by the Joint Venture entity, or the individual firms that make up the joint venture. Offerors that are part of the DoD Mentor Protégé program may only submit one (1) recent and relevant project completed by the Mentor. Offerors are still limited to a total of five (5) projects. Experience of proposed subcontractors to be utilized on this project will not be considered.

6.2 EVALUATION CRITERIA:

6.2.1 The Government will consider past performance of the prime construction contractor. If a firm has multiple functions or divisions, the Government will only evaluate the past performance of the unit or division submitting the offer. Where the Government views an offeror’s role, or that of its team members, if any, as not significant or as not clearly defined, the Government reserves the right to view this lack of involvement, or clarity, as a risk which may impact an offeror’s rating for this factor despite the quality of recent, relevant past performance information.

6.2.2 Past performance shall be initially evaluated to determine whether the offeror’s present/past performance is recent, and relevant or not relevant to the effort to be acquired.

6.2.2.1 RELEVANCY: The minimum requirement for a project of similar size, scope, or

Temporary SCIFS (TWSA), Secured Work Areas, OR SIPR rooms

AND

Working within an occupied space with access control

Occupied building is defined as a building in which the user is present during

6.2.2.2 RECENCY: The projects must have been completed within the last six (6) years or at least fully designed and at least 50% construction progress completed, with scopes of similar size, and complexity.

6.2.3 The Government will evaluate ONLY recent and relevant past performance based on the elements listed below to assign a confidence rating of acceptable/unacceptable.

6.2.4 Second, the past performance evaluation shall determine how well the offeror performed on the prior contracts. The contractor shall have no “unsatisfactory” or “marginal” ratings in the following criteria in Contract Performance Assessment Report (CPAR): quality, schedule, cost control, management, and utilization of small business, regulatory compliance, and safety. If the offeror is a joint venture, this requirement will apply to the joint venture and each partner firm.

(1) Quality of Construction. The Government will evaluate all information available with respect to the quality of the actual construction undertaken and the offeror’s ability to maintain quality control and accuracy of quality control documentation.

(2) Schedule. The Government will evaluate all information available with respect to the completion of projects within the scheduled completion times.

(3) Cost Control. The Government will evaluate all information available with respect to the offeror’s ability to efficiently utilize resources and demonstrate cost responsibility.

(4) Management. The Government will evaluate all information available with respect to the offeror’s ability to manage resources and key personnel.

(5) Utilization of Small Business. The Government will evaluate all information available with respect to the offeror’s ability to meet small business subcontracting plan goals.

(6) Regulatory Compliance. The Government will evaluate all information available with respect the offeror’s ability to enforce laws and regulations, correct deficiencies when noncompliant, and communicate laws and regulations to subcontractors.

(7) Safety. The Government will evaluate all information available with respect to the contractor’s safety program or efforts.

6.2.5 Failure to demonstrate the minimally acceptability standards under this factor will result in an “UNACCEPTABLE” rating and possible elimination from further consideration for contract award.

7. EVALUATION STANDARDS.

7.1 The Government will evaluate proposals using the Lowest Price Technically Acceptable Source Selection Process of FAR 15.101-2.

7.2 Proposals will be evaluated for acceptability, but not ranked using non-cost/price factors.

7.3 Tradeoffs will not be permitted.

7.4 Each evaluation factor and its risk rating combined will be determined and assigned using the adjectival and color descriptions contained herein. Upon assessment of each individual sub- factor and its risk rating, the appropriate overall rating for the technical proposal will be assigned using these acceptable and unacceptable (pass/fail) ratings as defined below:

Color Rating Description

Green Acceptable Proposal clearly meets the minimum requirements of the solicitation.

Red Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.

7.5 Upon assessment of past performance information, the appropriate overall rating for past performance will be assigned using these acceptable and unacceptable (pass/fail) ratings as defined below:

Color Rating Description

Green Acceptable

Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown (see note below).

Red Unacceptable

Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.

7.6 In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a) (2) (iv)). Therefore, the offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “acceptable.”

7.7 To be considered technically acceptable, no technical factor in the proposal may be determined to be unacceptable. The failure of a proposal to meet any of the acceptability standards for non-cost factors will result in a technically unacceptable rating and preclude award.

8. RELATIVE IMPORTANCE OF FACTORS.

8.1 Evaluation factors other than cost or price are of equal importance. An unacceptable rating on any non-price factor will render a proposal ineligible for award.

9. PROPOSAL EVALUATION

9.1 Proposals must meet all the criteria stated in this RFP in order to be eligible for award, to include responsiveness, technical acceptability, and responsibility.

9.2 The Government will evaluate each proposal independently from other proposals using only the RFP evaluation criteria.

10. EXCEPTIONS.

10.1 Exceptions to the contractual terms and conditions of the solicitation (e.g., standard company terms and conditions) may result in a determination to reject a proposal.

11. RESTRICTIONS.

11.1 Failure to submit all the data in the format indicated in this section may be cause for determining a proposal incomplete and, therefore, not considered for evaluation, and for subsequent award.

12. PRICE.

12.1 Price analysis will be performed to determine fairness and reasonableness as well as to assure an understanding of the work and ability to execute the task order at the price proposed.

The evaluation will determine the extent to which the price proposal is realistic and consistent with the requirements of the RFP, to include limitations of the specified CCL, if any, reflect a clear understanding of the requirements, and are consistent with the information provided by the offeror.

13. BASIS FOR AWARD.

13.1 Award will be made on the basis of the lowest evaluated price of technically acceptable proposals meeting or exceeding the acceptability standards for non-cost factors.

13.2 The proposal that provides the lowest price and is otherwise technically acceptable in all factors will be selected for award.

APPENDIX A, EXAMPLE 1

EXPERIENCE INFORMATION

(To be completed by Contractor)

1. Contractor:

Name:

Address:

2. Contract /Task Order(TO) /Purchase Order (PO) Number:

3. Contract/TO/PO Dollar Value:

4. Contract/TO /PO Status: Active Complete

Completion Date (w/ extensions):

5. Project Title:

Location:

6. Project Description-- to include the role of the contractor on the project and specific responsibilities of the contractor in performance of the effort:

7. Project Owner or Project Manager for the Client – provide:

Name:

Address:

Telephone Number and E-mail:

APPENDIX A, EXAMPLE 2

KEY PERSONNEL RESUME /

EXPERIENCE

Name and Title

Name of your firm

No. of years: With this firm With other firms’ Education (Degree(s)/Year/Specialization Active Registration: No. State

Your specific experience and qualifications relevant to this project. Include a POC with phone number for the two most recent projects described:

#1 – Project Name and Location:

General Scope of Project:

Your Role in the Project and a Description of the Duties You Performed:

Owner’s POC for reference (name and phone number):

PERSONNEL RESUME/EXPERIENCE (Continued)

#2 – Project Name and Location:

#3 – Project Name and Location:

(End of Summary of Changes)

Amendment 0001

Technical Summary of Changes

SPECIFICATIONS

09 51 00 – ACOUSTICAL CEILINGS

Delete existing pages 1 thru 9 in their entirety and replace with revised pages 1 thru 10.

NOTE:

Text that is added or revised by this amendment is identified with ***Amendment 0001(beginning and ending of revision/addition) and printed in bold.

The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.

DRAWINGS

Delete existing sheet ET601 and replace with revised ET601 dated 6-22-17.

-- End of Summary of Changes- -

Encls As Stated

Building H2313 SAR Renovation PN 89035 Fort Bragg, N.C.

SECTION TABLE OF CONTENTS

DIVISION 09 - FINISHES

SECTION 09 51 00

ACOUSTICAL CEILINGS

08/10

PART 1 GENERAL

1.1 REFERENCES

1.2 SYSTEM DESCRIPTION

1.2.1 Ceiling Attenuation Class and Test

1.2.2 Ceiling Sound Absorption

1.2.3 Light Reflectance

1.2.4 Other Submittals Requirements

1.3 SUBMITTALS

1.4 SUSTAINABLE DESIGN CERTIFICATION

1.5 DELIVERY, STORAGE. AND HANDLING

1.6 ENVIRONMENTAL REQUIREMENTS

1.7 SCHEDULING

1.8 WARRANTY

1.9 EXTRA MATERIALS

PART 2 PRODUCTS

2.1 ACOUSTICAL UNITS

2.1.1 Affirmative Procurement

2.1.2 Units for Exposed-Grid System

2.1.2.1 Type

2.1.2.2 Flame Spread

2.1.2.3 Pattern

2.1.2.4 Minimum NRC

2.1.2.5 Minimum Light Reflectance Coefficient

2.1.2.6 Nominal Size

2.1.2.7 Edge Detail

2.1.2.8 Finish

2.1.2.9 Minimum CAC

2.2 SUSPENSION SYSTEM

2.3 HANGERS

2.3.1 Wires

2.3.2 Straps

2.3.3 Masonry Anchorage Devices

2.4 FINISHES

2.5 COLORS AND PATTERNS

2.6 ACOUSTICAL SEALANT

PART 3 EXECUTION

3.1 INSTALLATION

3.1.1 Suspension System

3.1.1.1 Plumb Hangers

3.1.1.2 Splayed Hangers

3.1.2 Wall Molding

SECTION 09 51 00 Page 1 Revised by ****Amendment 0001****

3.1.3 Acoustical Units

3.1.4 Caulking

3.2 CLEANING

3.3 RECLAMATION PROCEDURES

-- End of Section Table of Contents --

SECTION 09 51 00 Page 2

SECTION 09 51 00

ACOUSTICAL CEILINGS

08/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A1008/A1008M (2016) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy and High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardened

ASTM A641/A641M (2009a; R 2014) Standard Specification for Zinc-Coated (Galvanized) Carbon Steel Wire

ASTM A653/A653M (2015; E 2016) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

ASTM B633 (2015) Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel

ASTM C423 (2009a) Sound Absorption and Sound Absorption Coefficients by the Reverberation Room Method

ASTM C635/C635M (2013a) Manufacture, Performance, and Testing of Metal Suspension Systems for Acoustical Tile and Lay-In Panel Ceilings

ASTM C636/C636M (2013) Standard Practice for Installation of Metal Ceiling Suspension Systems for Acoustical Tile and Lay-In Panels

ASTM C834 (2014) Latex Sealants

ASTM E1264 (2014) Acoustical Ceiling Products

ASTM E1414/E1414M (2011a; E 2014) Airborne Sound Attenuation Between Rooms Sharing a Common Ceiling Plenum

ASTM E1477 (1998a; R 2013) Luminous Reflectance Factor of Acoustical Materials by Use of Integrating-Sphere Reflectometers

SECTION 09 51 00 Page 3

ASTM E580/E580M (2014) Standard Practice for Installation of Ceiling Suspension Systems for Acoustical Tile and Lay-in Panels in Areas Subject to Earthquake Ground Motions

ASTM E795 (2005; R 2012) Mounting Test Specimens During Sound Absorption Tests

SCIENTIFIC CERTIFICATION SYSTEMS (SCS)

SCS SCS Global Services (SCS)Indoor Advantage

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-310-04 (2013) Seismic Design for Buildings

UL ENVIRONMENT (ULE)

ULE Greenguard UL Greenguard Certification Program

UNDERWRITERS LABORATORIES (UL)

UL Fire Resistance (2014) Fire Resistance Directory

1.2 SYSTEM DESCRIPTION

Provide sound controlling units mechanically mounted on a ceiling suspension system for acoustical treatment. The unit size, texture, finish, and color must be as specified. The location and extent of acoustical treatment shall be as shown on the approved detail drawings.

Submit drawings showing suspension system, method of anchoring and fastening, details, and reflected ceiling plan. Coordinate with paragraph RECLAMATION PROCEDURES for reclamation of mineral fiber acoustical ceiling panels to be removed from the job site.

1.2.1 Ceiling Attenuation Class and Test

Provide a ceiling system with an attenuation class (CAC) of 25 when determined in accordance with ASTM E1414/E1414M. Provide fixture attenuators over light fixtures and other ceiling penetrations, and provide acoustical blanket insulation adjacent to partitions, as required to achieve the specified CAC. Provide test ceiling continuous at the partition and assembled in the suspension system in the same manner that the ceiling will be installed on the project.

1.2.2 Ceiling Sound Absorption

Determine the Noise Reduction Coefficient (NRC) in accordance with ASTM C423 Test Method.

1.2.3 Light Reflectance

Determine light reflectance factor in accordance with ASTM E1477 Test Method.

1.2.4 Other Submittals Requirements

The following shall be submitted:

SECTION 09 51 00 Page 4

a. Manufacturer's data indicating percentage of recycle material in acoustic ceiling panels to verify affirmative procurement compliance.

b. Total weight and volume quantities of acoustic ceiling panels with recycle material.

c. Manufacturer's catalog showing UL classification of fire-rated ceilings giving materials, construction details, types of floor and roof constructions to be protected, and UL design number and fire protection time rating for each required floor or roof construction and acoustic ceiling assembly.

d. Reports by an independent testing laboratory attesting that acoustical ceiling systems meet specified sound transmission requirements. Data attesting to conformance of the proposed system to Underwriters Laboratories requirements for the fire endurance rating listed in UL Fire Resistance may be submitted in lieu of test reports.

e. Certificate attesting that the mineral based acoustical units furnished for the project contain recycled material and showing an estimated percent of such material.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Approved Detail Drawings; G

SD-03 Product Data

Acoustical Ceiling Systems; G Certification

SD-04 Samples

Acoustical Units; G

SD-06 Test Reports

Ceiling Attenuation Class and Test

SD-07 Certificates

Acoustical Units Acoustic Ceiling Panels

1.4 SUSTAINABLE DESIGN CERTIFICATION

Product shall be third party certified in accordance with ULE Greenguard, SCS Scientific Certification Systems Indoor Advantage or equal.

SECTION 09 51 00 Page 5

Certification shall be performed annually and shall be current.

1.5 DELIVERY, STORAGE. AND HANDLING

Deliver materials to the site in the manufacturer's original unopened containers with brand name and type clearly marked. Carefully handle and store materials in dry, watertight enclosures. Immediately before installation, store acoustical units for not less than 24 hours at the same temperature and relative humidity as the space where they will be installed in order to assure proper temperature and moisture acclimation.

1.6 ENVIRONMENTAL REQUIREMENTS

Maintain a uniform temperature of not less than 60 degrees F nor more than 85 degrees F and a relative humidity of not more than 70 percent for 24 hours before, during, and 24 hours after installation of acoustical units.

1.7 SCHEDULING

Complete and dry interior finish work such as plastering, concrete and terrazzo work before ceiling installation. Complete mechanical, electrical, and other work above the ceiling line; install and start operating heating, ventilating, and air conditioning systems in order to maintain temperature and humidity requirements.

1.8 WARRANTY

Provide manufacturer's standard performance guarantees or warranties that extend beyond a one year period. Include an agreement to repair or replace acoustical panels that fail within the warranty period in the standard performance guarantee or warranty. Failures include, but are not limited to, sagging and warping of panels; rusting and manufacturers defects of grid system.

1.9 EXTRA MATERIALS

Furnish spare panels, from the same lot as those installed, of each color at the rate of 5 panels for each 500 panels installed.

PART 2 PRODUCTS

2.1 ACOUSTICAL UNITS

Comply with EPA requirements in accordance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit two samples of each type of acoustical panel unit and each type of suspension grid tee section showing texture, finish, and color. Conform acoustical units to ASTM E1264, Class A, and the following requirements:

2.1.1 Affirmative Procurement

Mineral Wool, Cellulose, and Laminated Paperboard used in acoustic ceiling panels are materials listed in the EPA's Comprehensive Procurement Guidelines (CPG) (http://www.epa.gov/cpg/). EPA's recommended Recovered Materials Content Levels for Mineral Wool, Cellulose, Structural Fiberboard and Laminated Paperboard are:

SECTION 09 51 00 Page 6

Product Material Percent of Post Consumer Materials

Percent of Total Recovered Materials

Laminate Paperboard

Post Consumer Paper

100 100

Rock Wool Slag 75

Cellulose Post Consumer Paper

75 75

a. The recommended recovered materials content levels are based on the weight (not volume) of materials in the insulating core only.

b. Submit recycled material content data for acoustic ceiling panels indicating compliance with affirmative procurement.

c. Submit total weight and volume quantities of acoustic ceiling panels with recycle material.

2.1.2 Units for Exposed-Grid System

2.1.2.1 Type

III (non-asbestos mineral fiber with painted finish) or IV (non-asbestos mineral fiber with membrane-faced overlay).

2.1.2.2 Flame Spread

Class A, 25 or less

2.1.2.3 Pattern

C E

2.1.2.4 Minimum NRC

0.70 when tested on mounting Type E-400 of ASTM E795.

2.1.2.5 Minimum Light Reflectance Coefficient

LR-1, 0.75 or greater.

2.1.2.6 Nominal Size

24 by 24 inch

****Amendment 0001****

2.1.2.7 Edge Detail

Square

****Amendment 0001****

2.1.2.8 Finish

Factory-applied standard finish.

SECTION 09 51 00 Page 7

2.1.2.9 Minimum CAC

****Amendment 0001****

2.2 SUSPENSION SYSTEM

Provide standard width flange suspension system conforming to ASTM C635/C635M for intermediate-duty systems. Provide surfaces exposed to view of aluminum with a clear anodized finish. Provide wall molding having a flange of not less than 15/16 inch. Provide inside and outside corner caps. Suspended ceiling framing system must have the capability to support the finished ceiling, light fixtures, air diffusers, and accessories, as shown. Provide a suspension system with a maximum deflection of 1/360 of the span length. Conform seismic details to the guidance in UFC 3-310-04 and ASTM E580/E580M for seismic category "B.".

****Amendment 0001****

2.3 HANGERS

Provide hangers and attachment capable of supporting a minimum 300 pound ultimate vertical load without failure of supporting material or attachment.

2.3.1 Wires

Conform wires to ASTM A641/A641M, Class 1, 0.08 inch (12 gauge).

2.3.2 Straps

Provide straps of 1 by 3/16 inch galvanized steel conforming to ASTM A653/A653M, with a light commercial zinc coating or ASTM A1008/A1008M with an electrodeposited zinc coating conforming to ASTM B633, Type RS.

2.3.3 Masonry Anchorage Devices

Comply with ASTM C636/C636M.

2.4 FINISHES

Use manufacturer's standard textures, patterns and finishes as specified for acoustical units and suspension system members. Treat ceiling suspension system components to inhibit corrosion.

2.5 COLORS AND PATTERNS

Use colors and patterns for acoustical units and suspension system components as indicated on Drawings Finish Key.

2.6 ACOUSTICAL SEALANT

Conform acoustical sealant to ASTM C834, nonstaining.

SECTION 09 51 00 Page 8

PART 3 EXECUTION

3.1 INSTALLATION

Examine surfaces to receive directly attached acoustical units for unevenness, irregularities, and dampness that would affect quality and execution of the work. Complete and dry interior finish work such as plastering, concrete, and terrazzo work before installation. Complete and approve mechanical, electrical, and other work above the ceiling line prior to the start of acoustical ceiling installation.

This is the start of the file's text. The full file is on GovTribe.