W912PM-17-R-0007-0003
W912PM-17-R-0007 - SOF STS Operations Facilities, Ft. Bragg, Cumberland County, NC
This procurement is being solicited and procured using the Best Value Performance Price Trade-Off Request for Proposal in accordance w ith FAR Part 15.101-1.
------This is a 100% Small Business Set Aside------
The Magnitude of Construction is betw een $10,000,000.00 and $25,000,000.00.
Point of Contact:
Carol Jayroe carol.b.jayroe@usace.army.mil
CAROL B. JAYROE 910-251-4110
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
07-Apr-2017
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________540 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________00 73 00
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________17 May 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U S ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
ATTN: JOHN HILL
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
910-251-4454FAX:TEL: 910-251-4451 TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912PM-17-R-0007
Section 00 00 00 - Procurement and Contracting Requirements
DB WAGE DETERMINATIONS
IAW 52.222-6 – Construction Wage Rate Requirements, the following Davis-Bacon Wage Determination applies to this solicitation and any resulting contract award:
NC170025 – 01/06/2017
Offerors are reminded that wage determinations are subject to change prior to award. All proposed pricing shall include the most current wage rates. All Offerors are encouraged to review wage rates established by the Department of Labor prior to submitting proposals. Wage Determinations are available for viewing by using the following link:
http://www.wdol.gov/
If a Contractor plans on employing positions not covered by the Wage Determination, it is the responsibility of the contractor to request a Wage Determination through the Department of Labor via the above hyperlink.
SITE VISIT INFORMATION
IAW FAR 52.236-27 Site Visit (Construction), an organized site visit will be held on April 14, 2017 at 2:00PM EST..
Offerors shall meet at:
Bldg 2-2414 Woodruff Street, Fort Bragg, North Carolina.
POC: Christopher.B.Whitley@usace.army.mil
This site visit IS NOT mandatory.
TECHNICAL MATTERS
***AMENDMENT 0001***
Technical inquiries and questions relating to proposal procedures or bonds shall be submitted via Bidder Inquiry in ProjNet at www.projnet.org\projnet.
Offerors shall not submit their proposals via ProjNet. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.
To submit and review bid inquiry items, bidders will need to be a current registered user or selfregister into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue. From this page you may view all bidder inquiries or add inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been reviewed and response approved by the Contracting Officer.
i. The Solicitation Number is: W912PM-17-R-0007
ii. The Bidder Inquiry Key is: 649C53-GT4NVD 5VFSKX-7UKSET
Bidders/Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The name of the submitter or firm is not published for the public on the report of all Bidder Inquiries. Bidders/ Offerors are on notice of, and assumed to be aware of, all inquiries, responses, and information posted in the Bidder Inquiry System up to the date of bid submission, whether the inquiry was generated by the Bidder themselves or another potential Bidder/Offeror.
Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment to the solicitation is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment.
The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled ten (10) calendar days prior to the closing date stated in the solicitation. The Government reserves the right to not respond to questions/inquiries received after this date. No inquiries will be accepted by the Bidder Inquiry system within ten (10) calendar days prior to the date of bid opening. However, the Bidder Inquiry system may still be accessed to view answers/replies to previous inquiries until the proposal due date.
AT OPSEC
Access and General Protection/Security Policy and Procedures. This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility or area. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within XX calendar days of contract award and within YY calendar days of new employees commencing performance with the results reported to the COR NLT XX calendar days after contract award.
Eligibility Verification for Employment. E-Verify is an Internet-based system that compares information from an employee's Form I-9, Employment Eligibility Verification, to data from U.S. Department of Homeland Security and Social Security Administration records to confirm employment eligibility. The U.S. Department of Homeland Security is working to stop unauthorized employment. By using E-Verify to determine the employment eligibility of their employees, companies become part of the solution in addressing this problem. All U.S.
employers must complete and retain a Form I-9 for each individual they hire for employment in the United States. This includes citizens and noncitizens. On the form, the employer must examine the employment eligibility and identity document(s) an employee presents to determine whether the document(s) reasonably appear to be genuine and relate to the individual and record the document information on the Form I-9. The list of acceptable documents can be found on the last page of the form. E-Verify is mandatory for employers with federal contracts or subcontracts that contain the Federal Acquisition Regulation E-Verify clause.
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job BASE: Design of Special Tactics BuildingFOB: Destination
NET AMT
0002 1 Job BASE: Construction Cost for Special Tactics Team Building
(PEMB with Metal Siding and Bag Insulation) FOB: Destination
0003 1 Job BASE:Site Development from Five (5) Foot Line to Construction Limits
0004 1 Job
OPTION OPTIONAL BID ITEM 1:
Construction Cost for Special Tactics Team Building (Block Walls and Veneer)
ALL COSTS IN EXCESS OF THE BASE BID AMOUNT (CLIN 0002).
OPTION OPTIONAL BID ITEM 2:
Human Performance Training Center Building
**INFORMATION ONLY - DO NOT BID THIS LINE ITEM**
0005AA 1 Job OPTION Design of Human Performance Training Center Building
0005AB 1 Job OPTION Construction of Human Performance Training Center Building
(PEMB with Metal Siding and Bag Insulation)
0006 1 Job
OPTION OPTIONAL BID ITEM 3:
Human Performance Training Center Building (Block Walls and Veneer)
ALL COSTS IN EXCESS OF CLIN 0005AB.
OPTION OPTIONAL BID ITEM 4:
Contractor Furnished/Contractor Installed (CFCI) FF&E Package Special Tactics Team Building
0007AA 1 Job OPTION Procurement of CFCI FF&E Package
Special Tactics Team Building
0007AB 1 Job OPTION Installation of CFCI FF&E Package
0007AC 1 Job OPTION Installation of GFCI FF&E Package
OPTION OPTIONAL BID ITEM 5:
Contractor Furnished/Contractor Installed (CFCI) FF&E Package - Human Performance Training Center
0008AA 1 Job OPTION Procurement of CFCI
FF&E Package - Human Performance Training Center
0008AB 1 Job OPTION Installation of CFCI
0008AC 1 Job OPTION Installation of GFCI
NOTICE TO OFFERORS
NOTE 1:
FOR OPTIONAL BID ITEMS 1-5 (CLINS 0004-0008) IF EXERCISED, THE
PERIOD OF PERFORMANCE SHALL NOT BE EXTENDED. PERFORMANCE
SHALL RUN CONCURRENTLY WITH THE BASE BID ITEMS’ CONTRACT
DURATION.
NOTE 2:
OPTIONAL BID ITEMS 1 AND 3 (CLINS 0004 AND 0006) ARE ALTERNATIVE BID
ITEMS TO BASE BID REQUIREMENTS.
NOTE 3:
OPTIONAL BID ITEMS 1, 2 AND/OR 3 (CLINS 0004-0006), IF EXERCISED, SHALL
BE DONE AT TIME OF CONTRACT AWARD.
NOTE 4:
THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE OPTIONAL BID
ITEMS 4 AND/OR 5 (CLINS 0007-0008) NO LATER THAN 365 CALENDAR DAYS
AFTER ISSUANCE OF CONTRACT AWARD.
NOTE 4:
THE EXERCISE OF OPTIONAL BID ITEMS 1 THROUGH 5 (CLINS 0004-0008)
SHALL BE SUBJECT TO THE AVAILABILITY OF FUNDS.
SUBTOTALS
SUBTOTAL BASE (CLINS 0001-0003) $__________________
SUBTOTAL OPTIONS (CLINS 0004-0008) $__________________
SUBTOTAL BASE PLUS OPTIONS (CLINS 0001-0008) $__________________
Section 00 21 16 - Instructions to Proposers
INSTRUCTIONS TO PROPOSERS
GENERAL PROPOSAL SUBMISSION INSTRUCTIONS & REQUIREMENTS
TMKH003003, SOF Special Tactics Squadron (STS) Operations Facilities
Fort Bragg, NC
AMENDMENT 0003
1. OVERVIEW.
1.1 Provide a Special Tactics Squadron Operational Facilities complex that includes a Special Tactics Team Building with a covered Scuba Rinse/Drying area and a Human Performance Training Center (HPTC). The STS Operations Facilities functional areas will include operations, logistics, medical, team rooms, simulator room, physical therapy room, physical training areas, training room, associated staff offices, storage and staging areas, and restrooms. An existing exterior covered storage structure is to be demolished along with foundation as part of this project. The contract issued will be Firm Fixed Price. The period of performance is 540 calendar days for the base bid; the total contract duration shall not exceed 540 calendar days. Work location is Fort Bragg, North Carolina. Antiterrorism/Force protection measures and sustainment mandates will be incorporated. The resultant contract will be Firm-Fixed Price (FFP).
1.2 The proposal shall describe the capability of the offeror to perform the contract based on six
(6) evaluation factors. The proposal should be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract.
1.3 For the purposes of this solicitation, the Government will award a contract to the responsible offeror whose proposal is fair and reasonable and is determined to be the most advantageous to the Government in terms of price and non-price factors. The basis of award is the Best Value- Tradeoff process, as authorized by FAR 15.101-1. Proposals will be evaluated and ranked using non-cost/price factors for relative strengths, deficiencies, significant weaknesses, and risks.
Tradeoffs are permitted. The Government reserves the right to accept other than the lowest priced offer. The right is also reserved to reject any and all offers.
2. GENERAL INSTRUCTIONS.
In accordance with FAR Clause 52.215-1, Instructions to Offerors – Competitive Acquisitions, the Government reserves the right to make award without discussions. Therefore, offerors should submit their best technical and price terms in their initial offer and not automatically assume that they will have an opportunity to participate in discussions or to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interests of the Government.
In accordance with 15.306(c)(1) and FAR Clause 52.215-1(f)(4), Instructions to Offerors –
Competitive Acquisitions, the Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
2.1 Contractor Team Arrangements. The Government will recognize the integrity and validity of contractor teaming arrangements, provided the arrangements are identified and company relationships are fully disclosed in the offer. As further described in paragraph 2.3, below, the Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned CAGE Code.
AMENDMENT 0003
2.2 If applicable, a 8(a) Joint Venture or SBA/DoD approved Mentor-Protégé must submit all required documentation with their offer to be considered responsive, IAW the requirements set forth in Title 13 Code of Federal Regulations (CFR) Part 125.8
If applicable, the offeror shall submit evidence from the offeror’s SBA Servicing Agency that the offeror has notified and discussed the proposed joint venture for this project with the appropriate SBA personnel. For 8(a) set- aside procurements, all prospective Joint Ventures must comply with Title 13 Code of Federal Regulations (CFR) Part 124.513. For HUBZone set-aside procurements and awards to HUBZone SBCs through full and open competition after a price evaluation preference in favor of qualified HUBZone SBCs, a Joint Venture must comply with 13 CFR 126.616.
AMENDMENT 0003
2.3 2.2 The Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned CAGE Code. However, IAW CFR 125.8(e), the Government will also evaluate past performance and past performance submitted by the individual firms that make up a joint venture.
2.4 2.3 Notwithstanding the specific requirements of any other area of the RFP, information submitted about any company other than the offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractor, WILL NOT be evaluated for any factor.
2.5 2.4 Offerors shall submit their proposal via ARMDEC in accordance with the Section 3 General Proposal Format, paragraph 3.4.
2.6 2.5 Proposals are due no later than the time and date specified in Block 13 of Standard Form
1442.
3. GENERAL PROPOSAL FORMAT.
3.1 Cover Page. Include the title of the solicitation, solicitation number, offeror name, and date of the submittal.
3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents. If more than one Adobe PDF file is used for a volume, the complete table of contents shall be included in each. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.
3.3 All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not cross-reference similar material in the Price Proposal, or vice versa. No dollar amounts from the Price Proposal are to be included in the Technical proposal.
3.4 Each offeror must submit Price and Technical proposals via the AMRDEC SAFE website.
No hard paper copies will be accepted or evaluated. The Price and Technical proposals must be received by the closing date and time set for receipt of proposals.
In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically.
All submissions shall be in Adobe PDF format and shall be on 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
Title the file(s) in the following format:
W912PM-17-R-0007_COMPANY NAME_VOLUME I
W912PM-17-R-0007_COMPANY NAME_VOLUME II
Submit the Price and Technical proposals electronically via the AMRDEC SAFE website at:
https://safe.amrdec.army.mil/SAFE/welcome.aspx. At the AMRDEC SAFE website, select the blue button labeled ‘Click Here’, below the ‘Non-CAC Users’ title. Register, access the site and submit your proposal(s). [Note: It has been reported that documents are more quickly uploaded into the AMRDEC SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that offerors will have more success utilizing any particular browser.
When your proposals are submitted via the AMRDEC SAFE website, the website will provide notification of the submittal to the Government recipients. When completing the information for transmittal at the AMRDEC SAFE website, you will be required to enter email addresses for the recipients. For this solicitation, the recipients will be the Contracting Officer and Contract Specialist. The Contract Specialist for this project is Carol Jayroe, whose email address is carol.b.jayroe@usace.army.mil. The Contracting Officer for this project is Mr. John Hill, whose email address is john.t.hill@usace.army.mil. These email addresses are the ones you will enter as recipients.
In addition, after uploading your documents, you will be required to verify your email address before AMRDEC will send notification to the Government recipients. This is a very important step – even if you successfully upload your proposal to AMRDEC SAFE, notification will not be sent to the Government until you verify your email address, which may result in the rejection of your proposal for lateness. Follow the instructions on the AMRDEC website and confirmation emails you receive from AMRDEC.
AMENDMENT 0003
Proposal due Date and Time:
Request For Proposal No: W912PM-17-R-0007 Due Date of Proposal: 08 May 2017 17 May 2017 Time by which Proposals are Due: 2:00 P.M. 10:00 AM (Eastern Time) Title of Project: TMKH003003, SOF Special Tactics Squadron (STS) Operations Facilities Fort Bragg, NC
The date and time of delivery will be established by the time of receipt of the email notification to the Contract Specialist and Contracting Officer by the AMRDEC SAFE website, not by the date and time of uploading of the proposal into the AMRDEC SAFE website. Do not assume that electronic communication is instantaneous – in fact, it can take several minutes or even hours in some cases. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ email inboxes until after the deadline, the submission will be considered late. The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.
3.5 The contractor is responsible for including sufficient details in its proposal to permit a complete and accurate evaluation. Accordingly, the Contractor shall be clear and concise in its proposal. The Government will not make assumptions concerning the Contractor’s intent.
3.6 The technical data criteria specified for each factor identified herein and as described in these instructions shall be submitted as part of the proposal. Failure to submit all the data required by the RFP, and these instructions may be cause for determining a proposal incomplete and, therefore, not considered for award.
3.7 Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to the submission of the offer.
3.8 Tabs. Proposal shall be organized and tabbed as follows:
3.8.1 VOLUME I: OFFEROR’S CERTIFICATIONS AND PRICE (FACTOR 6)
One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted and one (1) original copy of the bid guarantee in both electronic and hardcopy shall be submitted.
TAB CONTENTS OF THE PRICE PROPOSAL
A The Proposal Cover Sheet B Standard Form 1442 C Acknowledgement of Amendments (If Applicable)
D FACTOR 1 FACTOR 6: PRICE
E Section 00 45 00 – Representations and F Teaming Arrangement (If Applicable) G Bid Guarantee (Bid Bond)
TAB A – The proposal cover sheet is required by FAR 52.215-1 (c) (2) and must be submitted by all offerors. The format for the proposal cover sheet is as follows:
PROPOSAL COVER SHEET
1. The solicitation number;
2. The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
4. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and
5. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
Offerors should ensure telephone number; fax number, e-mail address, DUNS number and CAGE Code are all included. DUNS number will be used to access Contractor Performance Assessment Reporting System (CPARS) data. Offerors should also provide any other assigned number that identifies them in the CPARS database. If a separate DUNS has been created for a joint venture (J-V) it must be submitted. The offeror should also submit their Tax ID number on the proposal data Sheet.
Be advised that only the information of the prime contractor will be evaluated for experience and past performance. In the event that a proposal from a J-V is received, the experience and past performance of the J-V will be evaluated and not that of the firms that make up the J-V.
TAB B - Standard Form 1442, completed and signed by authorized individual(s) of the offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.
TAB C - If applicable - All amendments must be acknowledged by all offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR 4.102.
AMENDMENT 0003
TAB D – Factor 5 Factor 6 - Price. Proposed price schedule is to be completed in its entirety by all offerors to include the Subtotals and Totals section as found in Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule.
TAB E - Section 00 45 00 – Representations and Certifications. Offerors shall include any narratives as it pertains to the requirement at 2.2 to document any teaming arrangement the offeror has or will enter into.
TAB F – Teaming Agreement Required Documentation, if applicable. See paragraph 2.1 and 2.2. Note to 8(a)—SBA must approve a joint venture prior to the award of an 8(a) contract on behalf of the joint venture.
TAB G - Offerors shall provide a fully executed Bid Bond as required by FAR Clause 52.228-1, Bid Guarantee in both HARD COPY and ELECTRONICALLY in Tab G.
For the purposes of this Request for Proposal, please note that in accordance with (IAW)
FAR 28.001:
“Bond means a written instrument executed by a bidder or contractor (the “principal”), and a second party (the “surety” or “sureties”) (except as provided in 28.204), to assure fulfillment of the principal’s obligations to a third party (the “obligee” or “Government”), identified in the bond. If the principal’s obligations are not met, the bond assures payment, to the extent stipulated, of any loss sustained by the obligee.”
Bonds shall therefore be executed in the name of the legal entity, whether a joint venture, partnership or the Prime Contractor of an informal teaming arrangement, with whom the government would enter into a contract for a successful offeror. The entity named on the bond must be able to acquire bonding capacity on its own merits, and not as the result of indemnification from a subcontractor or third party.
3.8.2 VOLUME II: TECHNICAL PROPOSAL (FACTORS 1-5)
One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted.
TAB Table of Contents Proposal A Factor 1, Sub-Factor 1A: Past Experience - Construction B Factor 1, Sub-Factor 1B: Past Experience - Design C Factor 2, Past Performance D Factor 3, Key Personnel E Factor 4, Building Systems and Materials F Factor 5, Site Design
3.8.3 Further Description of TABs A through F and further information of Factors 1, 2, 3, 4 & 5 can be found in the subsequent sections (paragraphs 5-8) of this section entitled the
GENERAL PROPOSAL SUBMISSION INSTRUCTIONS & REQUIREMENTS
4. SUMMARY - SUBMISSION REQUIREMENTS & EVALUATION FACTORS
Factor Sub-
Factor Location Description Relative Importance
1 A Vol. II TAB A Past Experience - Construction
More important than Sub- Factor B, Factor 1. Overall, Factor 1 is of equal importance to Factor 2, and more important than Factors 3, 4, and 5.
1 B Vol. II TAB B Past Experience - Design
Less important than Sub- Factor A, Factor 1. Overall, Factor 1 is of equal importance to Factor 2 and more important than Factors 3, 4, and 5.
Vol. II TAB C Past Performance Equal importance to Factor 1; more important than Factors 3, 4, and 5.
Vol. II TAB D Key Personnel Less important than Factors 1 and 2; more important than Factors 4 and 5.
Vol. II TAB E Building Systems and Materials
Less important than Factors 1, 2, and 3; more important than Factor 5.
Factor Sub-
Factor Location Description Relative Importance
5 Vo.l II TAB F Site Design Less important than Factors 1, 2, 3, and 4.
6 Vol. I TAB D Price Approximately equal to Factors 1, 2, 3, 4 and 5 combined.
5. FACTOR 1 - PAST EXPERIENCE
5.1 SUBMISSION/MINIMUM REQUIREMENTS: SUB-FACTOR A – CONSTRUCTION
5.1.1 Submit a minimum of three (3) and a maximum of five (5) relevant and recent construction projects that best demonstrate construction experience similar in size, scope, and complexity to the RFP
For purposes of this evaluation, a relevant project is further defined as:
5.1.2 Size: Project of a minimum $7,500,000 (construction contract value) with one facility of at least 20,000 square feet of gross space.
AMENDMENT 0002
5.1.3 Scope/Complexity: New general building construction or renovation to include but not limited to site development, mechanical, electrical, structural, etc. At least one (1) of the projects submitted shall illustrate site design conditions similar to the proposed project. Similar site conditions are considered projects with significant retaining wall systems, significant grading/earthwork or complex storm water management systems.
For purposes of this evaluation, a recent project is further defined as:
5.1.4 Projects submitted for the offeror must be at least 50% complete for current on-going projects and for projects that are 100% complete, these projects must have been completed within the last six (6) years.
5.1.5 A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather offerors shall submit the work performed under a task order as a project.
5.1.6 The attached Experience Information Form (Example 1) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed two (2) pages.
5.1.7 For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. Provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process.
AMENDMENT 0003
5.1.8 If the offeror is a Joint Venture (J-V), relevant project experience should be submitted for projects completed by the Joint Venture entity, or the individual firms that make up the joint venture. Offerors that are part of the DoD Mentor Protégé program may only submit one
(1) recent and relevant project completed by the Mentor. Offerors are still limited to a total of five (5) projects. Experience of proposed subcontractors to be utilized on this project will not be considered.
5.2 SUBMISSION/MINIMUM REQUIREMENTS: SUB-FACTOR B – DESIGN
5.2.1 Submit a minimum of three (3) and a maximum of five (5) relevant and recent design projects for the design team that best demonstrates design experience similar in size, scope, and complexity to the RFP.
For purposes of this evaluation, a relevant project is further defined as:
5.2.2 Size: Facility of at least 20,000 total square feet of gross space and minimum $7,500,000 construction contract value.
AMENDMENT 0002
5.2.3 Scope/Complexity: New general building construction or renovation, to include but not limited to site development, mechanical, electrical, structural, etc. At least one (1) of the projects submitted shall illustrate site design conditions similar to the proposed project. Similar site conditions are considered projects with significant retaining wall systems, significant grading/earthwork or complex storm water management systems
5.2.4 Projects submitted for the offeror must be at least 50% complete for current on-going projects and for projects that are 100% complete, these projects must have been completed within the last six (6) years.
5.2.5 A project is defined as a complete design effort performed under a single task order or contract/subcontract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather offerors shall submit the work performed under a task order as a project.
5.2.6 The attached Experience Information Form (Example 1) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed two (2) pages.
5.2.7 For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. Provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process.
AMENDMENT 0003
5.2.8 If the offeror is a Joint Venture (J-V), relevant project experience should be submitted for projects completed by the Joint Venture entity, or the individual firms that make up the joint venture. Offerors are still limited to a total of five (5) projects combined. Experience of proposed subcontractors to be utilized on this project will not be considered.
5.3 EVALUATION CRITERIA: FACTOR 1
5.3.1 The basis of evaluation will include the offeror’s demonstrated experience and depth of experience in performing relevant and recent construction and design projects as defined in the solicitation submittal requirements. The assessment of the offeror’s relevant experience will be used as a means of evaluating the capability of the offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects for construction and five (5) for design. Any projects submitted in excess of the five (5) for Construction Experience and five (5) for Design Experience will not be considered.
5.3.2 The Government places higher value on relevant projects of greater size and contract value.
5.3.3 Relevant projects where the offeror and the proposed design firm(s) have previously worked together may be considered more favorably than those that have not worked together.
5.3.4 Relevant projects that demonstrate design-build experience may be considered more favorably than those that do not have design-build experience.
6. FACTOR 2 – PAST PERFORMANCE
6.1 SUBMISSION/MINIMUM REQUIREMENTS:
6.1.1 Submit a minimum of three (3) and a maximum of five (5) relevant and recent projects that best demonstrates design experience similar in size, scope, and complexity to the RFP.
6.1.2 The Government will evaluate the offeror's past performance using the sources available to it including but not limited to: the example projects identified by the offeror and submitted on the Past Performance Questionnaires and any additional information received from references, CPAR or other sources. Offerors may be provided an opportunity to address any negative past performance information about which the offeror has not previously had an opportunity to respond if such information is determined to present an impact on the rating to be assessed.
AMENDMENT 0003
6.1.3 The Government will consider past performance of the prime construction contractor.
The government will also consider the individual past performance by each partner to the joint venture as well as any work previously done by the joint venture itself. Offerors that are part of the DoD Mentor Protégé program may only submit one (1) recent and relevant project completed by the Mentor Information submitted for this factor shall be drawn from projects for which the offeror is or was the prime contractor. Projects on which the offeror’s role was other than prime contractor will not be considered for evaluation. If a firm has multiple functions or divisions, the Government will only evaluate the past performance of the unit or division submitting the offer.
6.1.4 Projects submitted under this factor must first be deemed relevant and recent in accordance with the criteria listed below:
For purposes of this evaluation, a relevant project is further defined as:
Size: Project of a minimum $7,500,000 (construction contract value) with one facility of at least 20,000 square feet of gross space.
AMENDMENT 0002
Scope/Complexity: The projects submitted should also demonstrate that the Offeror and/or the team have performed a same/similar type of services: general building construction or renovation, to include but not limited to architectural, mechanical, electrical, structural, etc. At least one (1) of the projects submitted shall illustrate site design conditions similar to the proposed project. Similar site conditions are considered projects with significant retaining wall systems, significant grading/earthwork or complex storm water management systems.
For purposes of this evaluation, a recent project is further defined as:
All projects submitted must be at least 50% complete for current on-going projects and for projects that are 100% complete, these projects must have been completed within the last six (6) years.
6.1.5 Though not required, ideally project past performance information submitted under this factor would be on the same projects submitted for consideration under FACTOR 1, PAST EXPERIENCE. Individual project Past Performance Questionnaires shall not exceed five (5) four (4) pages; Government evaluators will review and evaluate only the information contained on the first four (4) pages. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer. The Government will call and confirm information provided by the offeror on the Past Performance Questionnaire with the points of contact, to the extent necessary to conduct a meaningful evaluation. The Government reserves the right to interview other individuals if the point of contact is not available.
6.1.6 Other Sources. The Government may contact sources other than those provided by the offeror for information with respect to past performance. These other sources may include but are not limited to: Contract Performance Assessment Report (CPAR), Past Performance Information Retrieval System (PPIRS), other Government sources, and interviews with organizations or individuals familiar with the offeror’s performance.
6.1.7 Offerors shall utilize the Past Performance Questionnaire in Example 2.
6.2 EVALUATION CRITERIA:
6.2.1 The Government will consider recent, relevant projects that are successfully completed, or substantially completed (fully designed and at least 50% construction progress completed) within six (6) years preceding the date of the solicitation. The Government will consider the currency and relevance of the information, source of the information, context of the data, and general trends in contractor performance.
6.2.1.1 The Government places a higher value on projects which provided particularly difficult or unique challenges and the innovative methods the offeror used to resolve problems successfully.
6.2.2 Offerors are cautioned that the submission of each past performance questionnaire shall not exceed five (5) pages and that Government evaluators will review and evaluate only the information contained on the first five pages.
6.2.3 The Government will evaluate past performance based on the elements listed below:
6.2.3.1 Quality of Construction. The Government will evaluate all information available with respect to the quality of the actual construction undertaken and the standards of workmanship exhibited by the offeror.
6.2.3.2 Timeliness of Performance. The Government will evaluate all information available with respect to the completion of projects within the scheduled completion times.
6.2.3.3 Customer Satisfaction. The Government will evaluate all information available with respect to customer satisfaction, cooperation with customers, and interaction on past projects.
6.2.3.4 Management. The Government will evaluate all information available with respect to effective management of subcontractors, suppliers and labor on past projects.
6.2.3.5 Cost. The Government will evaluate all information available with respect to the contractor’s ability to perform within the contractually agreed price.
6.2.3.6 Safety. The Government will evaluate all information available with respect to the contractor’s safety program or efforts.
6.2.3.7 General. The Government will evaluate all general information and comments provided by previous clients with respect to the contractor’s effort
6.2.3.8 If the Government does not obtain past performance information for the projects identified by the offeror and cannot establish a past performance record for the offeror through other sources, past performance will be rated neither favorably nor unfavorably.
7. FACTOR 3 – KEY PERSONNEL.
7.1 SUBMISSION/MINIMUM REQUIREMENTS:
7.1.1 Each offeror shall provide resumes for the following Key Personnel proposed for this contract. Resumes shall not exceed five (5) pages per person. The proposed position of each person shall be clearly stated at the beginning of the resume
DESIGN TEAM
o Project Manager o Architect o Civil Engineer o Structural Engineer o Mechanical Engineer o Electrical Engineer
CONSTRUCTION TEAM
o Project Superintendent (or Project Foreman) o Contractor’s Quality Control System Manager (CQC) o Site Safety and Health Officer (SSHO)
NOTE:
o The Project Superintendent, Site Safety and Health Officer, and Foreman and the
Contractor’s Quality Control System Managers’ responsibilities shall be assigned to individual resources (persons). One person shall not perform the duties of two or more of these roles; individual resources shall be assigned to these responsibilities.
7.1.2 A sample suggested resume format is included with this RFP (Example 3). If offerors elect not to use the suggested resume format, all information identified on the sample format is still required for each resume submitted under this Factor. Proposals that fail to include resumes or that fail to include all required information on these resumes may be rejected as unacceptable
7.1.3 The Key Personnel identified must be used on the project. No deviations will be permitted unless they meet the same qualifications and experience of those individuals proposed and are expressly approved by the Contracting Officer in advance. An offeror’s use of different personnel than those proposed without approval from the Contracting Officer will be grounds for a Termination for Default.
7.2 EVALUATION CRITERIA:
7.2.1 The Government will evaluate each offeror’s proposed Key Personnel submitted in response to Paragraph 7.1 assigning each a rating in accordance with the Combined Technical/Risk Rating in 11.2.
7.2.2 Minimum qualification requirements for Key Personnel are found in the specifications.
7.2.3 The Government places higher value on Key Personnel who have:
o Ten (10) years or more experience in assigned positions working on projects of similar size, scope, and complexity to the work described in this RFP.
o A degree or advanced degree in a field of study applicable to the assigned position (i.e.
construction management, engineering, architecture, or related fields).
o Five (5) years or more of experience in their assigned position while an employee of the prime contractor or the joint venture itself.
o Professional accreditations, licenses, or certifications applicable to the assigned position.
8. FACTOR 4 – QUALITY OF BUILDING SYSTEMS AND MATERIALS.
8.1 SUBMISSION/MINIMUM REQUIREMENTS:
8.1.1 Whether individual narratives or a single combined narrative is provided, the maximum total length for technical narratives under this section shall be ten (10) typewritten pages.
Drawings/Catalog Sheets WILL NOT count towards total number of pages.
8.1.2 Manufacturers’ catalog sheets that are submitted as part of the proposal will be used to evaluate offers based on their qualitative features and risk to the Government. Because all design efforts are not completed at the time of the proposal submission, it is expected that some specific models and capacities may not be indicated at the time of proposal submission.
However, manufacturers, product features, product lines and models can be proposed and qualitative and risk evaluations can and will be made by the Government. Those manufacturers, product features, product lines and models are to be included in the final design documents and will be incorporated into the construction contract.
8.2 EVALUATION CRITERIA:
8.2.1 Presentation Drawings:
o Provide building floor plans of each facility (base and option) with appropriate detail to show spatial relationships and overall dimensions o Provide exterior elevations of each facility clearly noting proposed materials, colors, and heights.
o Provide typical building sections and wall sections with appropriate details for each building type depicting the proposed building system and major materials. All proposals must be compliant with the Anti-Terrorism/Force Protection (ATFP) requirements.
8.2.2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .