AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912PM-16-B-0021 is hereby amended to incoporate the follow ing technical changes:

See Technical Summary of Changes

All other terms and conditons remain in full force and effect

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-16-B-0021

X 9B. DATED (SEE ITEM 11)

02-Aug-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Aug-2016

CODE

U S ARMY CORPS OF ENGINEERS

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM-16-B-0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

W912PM-16-B-0021

Amendment 0001

TECHNICAL SUMMARY OF CHANGES

A. TECHNICAL SPECIFICATION CHANGES: The revised Sections listed below (revised by Amendment No. 0001) is hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out and/or printed in bold. Revisions can be located in the appropriate volume of specifications by searching for asterisks and amendment number (i.e., *** Amendment 0001 ***).

• PROJECT TABLE OF CONTENTS. Delete Page 1 in its entirety and replace with revised enclosed Page 1 and Page 2.

• 01 33 00 – SUBMITTAL PROCEDURES. Attachment 1, ENG 4288, Delete existing

Pages 1 thru 6 in their entirety and replace with revised enclosed like-numbered Pages.

• 09 51 00 – ACOUSTICAL CEILINGS. ADD Section in its entirety.

B. CONTRACT DRAWINGS: Delete existing Drawing Numbers in their entirety and replace with revised enclosed:

• ED101, EP101, G003, and MH101

Encls As stated

AHU-16 Replacement, Building O190M, SOTF (SF-00008-14) W912PM-16-B-0021

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

STANDARD FORM 1442

00 10 00 SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

00 21 00 INSTRUCTIONS

00 21 13 INSTRUCTIONS TO BIDDERS

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 70 00 CONDITIONS OF THE CONTRACT

00 73 00 SUPPLEMENTARY CONDITIONS

00 01 15 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 05 GENERAL AND SPECIAL PROVISIONS

01 00 60 SECURITY PROCEDURES GUIDE

01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

01 14 00 WORK RESTRICTIONS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 62 35 RECYCLED / RECOVERED MATERIALS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

*** Amendment 0001 ***

DIVISION 09 - FINISHES

09 51 00 ACOUSTICAL CEILINGS

*** Amendment 0001 ***

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 COMMON PIPING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS

23 73 13.00 40 MODULAR OUTDOOR CENTRAL-STATION AIR-HANDLING UNITS

PROJECT TABLE OF CONTENTS Page 1 (Revised by Amendment 0001)

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL

26 20 00 INTERIOR DISTRIBUTION SYSTEM

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2 (Revised by Amendment 0001)

SUBMITTAL REGISTER (ER 415-1-10) TITLE AND LOCATION DATE

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

AHU-16 Design Bldg O-1900-M, SOTF

W912PM-16-B-0021 NA

18 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

SECTION - 01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

1 01 10 00.10 38 1.8 List of Subcontractors PRECON SUBMTL FIO

2 01 10 00.10 38 1.8 Quality Control Plan PRECON SUBMTL GA

3 01 10 00.10 38 1.8 Certificate of Insurance PRECON SUBMTL FIO

4 01 10 00.10 38 1.6 PROGRESS SCHEDULE PRODUCT DATA FIO

5 01 10 00.10 38 1.8 Completion of Corps CQC Course CERTIFICATES FIO

6 01 10 00.10 38 1.8 Letter Appointing Superintendent CERTIFICATES FIO

7 01 10 00.10 38 commercial testing laboratory CERTIFICATES FIO

8 01 10 00.10 38 Contractor's testing laboratory CERTIFICATES GA

9 01 10 00.10 38 SYSTEM AS-BUILT DRAWINGS CLOSEOUT SUBMTL GA

SECTION - 01 14 00 WORK RESTRICTIONS

1 01 14 00 1.3.1.1 List of Contact Personnel PRECON SUBMTL FIO

SECTION - 01 32 01.00 10 PROJECT SCHEDULE

1 01 32 01.00 10 1.3 Project Scheduler Qualifications PRECON SUBMTL GA

2 01 32 01.00 10 3.4.1 Preliminary Project Schedule PRECON SUBMTL GA

3 01 32 01.00 10 3.4.2 Initial Project Schedule PRECON SUBMTL GA

4 01 32 01.00 10 3.6.2 Periodic Schedule Update PRECON SUBMTL GA

SECTION - 01 33 00 SUBMITTAL PROCEDURES

1 01 33 00 1.7 Submittal Register PRECON SUBMTL GA

SECTION - 01 33 29 LEED(TM) DOCUMENTATION

1 01 33 29 1.5.3.1 Preliminary Sustainability Notebook PRECON SUBMTL GA

2 01 33 29 1.5.3.1 Preliminary High Performance and Sustain PRECON SUBMTL FIO

3 01 33 29 1.5.3.1 Final Sustainability Notebook CLOSEOUT SUBMTL GA

4 01 33 29 1.5.3.1 Final High Performance and Sustainable B CLOSEOUT SUBMTL GA

SECTION - 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

1 01 35 26 1.7 Accident Prevention Plan (APP) PRECON SUBMTL GA

2 01 35 26 1.4 Monthly Exposure Reports TEST REPORTS FIO

3 01 35 26 1.12 Notifications and Reports TEST REPORTS FIO

4 01 35 26 1.12.2 Accident Reports TEST REPORTS GA

5 01 35 26 1.12.3 LHE Inspection Reports TEST REPORTS FIO

6 01 35 26 1.6.1.5 Crane Operators/Riggers CERTIFICATES FIO

7 01 35 26 1.7.2.2 Standard Lift Plan CERTIFICATES GA

8 01 35 26 1.7.2.3 Critical Lift Plan CERTIFICATES GA

9 01 35 26 1.8 Activity Hazard Analysis (AHA) CERTIFICATES FIO

10 01 35 26 1.9.1 Confined Space Entry Permit CERTIFICATES FIO

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

AHU-16 Design Bldg O-1900-M, SOTF

W912PM-16-B-0021 NA

18 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

11 01 35 26 1.9.1 Hot Work Permit CERTIFICATES FIO

12 01 35 26 1.12.4 Certificate of Compliance CERTIFICATES FIO

SECTION - 01 45 00.00 10

1 01 45 00.00 10 3.2 Contractor Quality Control (CQC) Plan PRECON SUBMTL GA

2 01 45 00.00 10 3.9 Verification Statement TEST REPORTS FIO

SECTION - 01 50 00 Temporary Construction Facilities And Controls 1 01 50 00 1.3 Construction Site Plan PRECON SUBMTL FIO

2 01 50 00 3.4.1 Traffic Control Plan PRECON SUBMTL FIO

SECTION - 01 57 19 Temporary Environmental Controls 1 01 57 19 1.5.1 Preconstruction Survey PRECON SUBMTL FIO

2 01 57 19 1.8 Solid Waste Management Permit PRECON SUBMTL GA

3 01 57 19 1.5.2 Regulatory Notifications PRECON SUBMTL GA

4 01 57 19 1.6 Environmental Protection Plan PRECON SUBMTL GA

5 01 57 19 1.6.9.1 Dirt and Dust Control Plan PRECON SUBMTL GA

6 01 57 19 1.5.4 Employee Training Records PRECON SUBMTL GA

7 01 57 19 1.5.4 Employee Training Records CERTIFICATES FIO

8 01 57 19 3.7.1 Waste Determination Documentation CLOSEOUT SUBMTL FIO

9 01 57 19 3.7.2.6 Disposal Documentation for Hazardous and CLOSEOUT SUBMTL FIO

10 01 57 19 1.5.4 Assembled Employee Training Records CLOSEOUT SUBMTL GA

11 01 57 19 1.8 Solid Waste Management Permit CLOSEOUT SUBMTL GA

12 01 57 19 3.7.2.1 Hazardous Waste/Debris Management CLOSEOUT SUBMTL GA

13 01 57 19 1.5.2 Regulatory Notifications CLOSEOUT SUBMTL GA

SECTION - 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

1 01 74 19 1.6 Waste Management Plan PRECON SUBMTL GA

2 01 74 19 1.7 Records CLOSEOUT SUBMTL FIO

SECTION - 01 78 00 CLOSEOUT SUBMITTALS

1 01 78 00 1.7.1 Warranty Management Plan PRODUCT DATA FIO

2 01 78 00 1.7.5 Warranty Tags PRODUCT DATA FIO

3 01 78 00 1.5 Spare Parts Data PRODUCT DATA FIO

4 01 78 00 1.7.1 Instructions MFRS INSTR FIO

5 01 78 00 3.6 Operation and Maintenance Manuals O&M DATA GA

6 01 78 00 3.3 Record Drawings CLOSEOUT SUBMTL GA

7 01 78 00 2.3 Certification of EPA Designated Items CLOSEOUT SUBMTL GA

8 01 78 00 3.8 Interim DD FORM 1354 CLOSEOUT SUBMTL GA

9 01 78 00 3.8 Checklist for DD FORM 1354 CLOSEOUT SUBMTL GA

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

AHU-16 Design Bldg O-1900-M, SOTF

W912PM-16-B-0021 NA

18 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

SECTION - 02 41 00 DEMOLITION

1 02 41 00 1.9 Existing Conditions PRECON SUBMTL GA

2 02 41 00 1.2.1 Demolition Plan CERTIFICATES GA

3 02 41 00 1.6 Notification CERTIFICATES GA

SECTION - 09 51 00 ACOUSTICAL CEILINGS

1 09 51 00 1.2 Suspension system SHOP DRAWINGS GA

2 09 51 00 1.2.4 Acoustical Ceiling Systems PRODUCT DATA GA

3 09 51 00 1.4 Certification PRODUCT DATA FIO

4 09 51 00 2.1 Acoustical Units SAMPLES GA

5 09 51 00 1.2.1 Ceiling Attenuation Class and Test TEST REPORTS FIO

6 09 51 00 2.1 Acoustical Units CERTIFICATES FIO

SECTION - 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

1 23 00 00 1.4.5 Detail Drawings SHOP DRAWINGS GA

2 23 00 00 2.9.1.1 Metallic Flexible Duct PRODUCT DATA FIO

3 23 00 00 2.11 Air Handling Units PRODUCT DATA GA

4 23 00 00 2.12.1.1 Variable Volume, Single Duct, Fan-Powere PRODUCT DATA GA

5 23 00 00 2.12.1.3 Reheat Units PRODUCT DATA GA

6 23 00 00 3.9 Performance Tests TEST REPORTS GA

7 23 00 00 3.8 Damper Acceptance Test TEST REPORTS GA

8 23 00 00 3.2 Manufacturer's Installation Instructions MFRS INSTR FIO

9 23 00 00 3.11.1 Operation and Maintenance Manuals O&M DATA FIO

10 23 00 00 2.11 Air Handling Units O&M DATA GA

11 23 00 00 2.12.1.1 Variable Volume, Single Duct, Fan-Powere O&M DATA GA

SECTION - 23 05 15 COMMON PIPING FOR HVAC

1 23 05 15 3.1 Installation Drawings SHOP DRAWINGS FIO

2 23 05 15 2.1 Pipe and Fittings PRODUCT DATA FIO

3 23 05 15 2.2 Piping Specialties PRODUCT DATA FIO

4 23 05 15 2.3 Valves PRODUCT DATA FIO

5 23 05 15 2.4 Miscellaneous Materials PRODUCT DATA FIO

6 23 05 15 2.5 Supporting Elements PRODUCT DATA FIO

7 23 05 15 3.8 Operation and Maintenance Manuals O&M DATA FIO

SECTION - 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

1 23 05 93 1.3 Equipment and Performance Data PRODUCT DATA GA

2 23 05 93 1.5.3.3 TAB Related HVAC Submittals PRODUCT DATA GA

3 23 05 93 1.5.2 TAB Procedures PRODUCT DATA FIO

(Revised by Amendment 0001)

K7EPEOAF

Highlight

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

AHU-16 Design Bldg O-1900-M, SOTF

W912PM-16-B-0021 NA

18 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

4 23 05 93 1.5.2 Calibration PRODUCT DATA GA

5 23 05 93 3.3.4 Pre-Final DALT report TEST REPORTS GA

6 23 05 93 3.3.7 Final DALT report TEST REPORTS GA

7 23 05 93 1.5.4.2 TAB report for Season 1 TEST REPORTS GA

8 23 05 93 1.5.4.2 TAB report for Season 2 TEST REPORTS GA

9 23 05 93 1.5.3.1 TAB Firm TEST REPORTS FIO

10 23 05 93 1.5.1 Independent TAB Agency and Personnel QuaTEST REPORTS FIO

SECTION - 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

1 23 07 00 3.2.2.4 MICA Plates SHOP DRAWINGS GA

2 23 07 00 2.3 Pipe Insulation Systems SHOP DRAWINGS FIO

3 23 07 00 3.2 Pipe Insulation Systems SHOP DRAWINGS FIO

4 23 07 00 3.3 Duct Insulation Systems SHOP DRAWINGS FIO

5 23 07 00 2.3 Pipe Insulation Systems PRODUCT DATA GA

6 23 07 00 3.2 Pipe Insulation Systems PRODUCT DATA GA

7 23 07 00 3.3 Duct Insulation Systems PRODUCT DATA GA

8 23 07 00 2.2.1.3 Thermal Insulation SAMPLES GA

9 23 07 00 3.1.1 Display Samples SAMPLES GA

10 23 07 00 2.3 Pipe Insulation Systems MFRS INSTR GA

11 23 07 00 3.2 Pipe Insulation Systems MFRS INSTR GA

12 23 07 00 3.3 Duct Insulation Systems MFRS INSTR GA

SECTION - 23 09 23 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER LOCAL BUILDING SYSTEMS 1 23 09 23 3.3.1 DDC Contractor Design Drawings SHOP DRAWINGS GA

2 23 09 23 3.3.2 Draft As-Built Drawings SHOP DRAWINGS GA

3 23 09 23 3.3.3 Final As-Built Drawings SHOP DRAWINGS GA

4 23 09 23 2.1.1 Manufacturer's Catalog Data PRODUCT DATA GA

5 23 09 23 2.13.1 Manufacturer's Catalog Data PRODUCT DATA GA

6 23 09 23 2.13.5 Programming Software PRODUCT DATA GA

7 23 09 23 2.13.5 GPPC Application Programs PRODUCT DATA GA

8 23 09 23 2.13.6 AGC Application Programs PRODUCT DATA GA

9 23 09 23 2.13.1 XIF files PRODUCT DATA GA

10 23 09 23 3.6.2 Draft LNS Database PRODUCT DATA GA

11 23 09 23 1.3.1 Final LNS Database PRODUCT DATA GA

12 23 09 23 3.7.4 Final LNS Database PRODUCT DATA GA

13 23 09 23 2.13.4 LNS Plug-in PRODUCT DATA GA

14 23 09 23 2.13.6 LNS Plug-in PRODUCT DATA GA

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

AHU-16 Design Bldg O-1900-M, SOTF

W912PM-16-B-0021 NA

18 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

15 23 09 23 3.1 Existing Conditions Report TEST REPORTS GA

16 23 09 23 3.6.1 Start-Up and Start-Up Testing Report TEST REPORTS GA

17 23 09 23 3.7.1 PVT Procedures TEST REPORTS GA

18 23 09 23 3.7.3 PVT Report TEST REPORTS GA

19 23 09 23 1.6 Pre-Construction QC Checklist TEST REPORTS GA

20 23 09 23 1.6 Post-Construction QC Checklist TEST REPORTS GA

21 23 09 23 1.8 Operation and Maintenance (O&M) Instruct O&M DATA GA

22 23 09 23 3.9.1 Training Documentation O&M DATA GA

23 23 09 23 1.6 Closeout QC Checklist CLOSEOUT SUBMTL GA

SECTION - 23 73 13.00 40 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS

1 23 73 13.00 40 3.1 Installation Drawings SHOP DRAWINGS FIO

2 23 73 13.00 40 2.1 Equipment and Performance Data PRODUCT DATA GA

3 23 73 13.00 40 3.1 Listing of Product Installations CERTIFICATES FIO

4 23 73 13.00 40 1.3.1 Certificates of Conformance CERTIFICATES GA

5 23 73 13.00 40 2.3 Unit Cabinet CERTIFICATES FIO

6 23 73 13.00 40 2.4 Fan CERTIFICATES FIO

7 23 73 13.00 40 2.5 Drain Pans CERTIFICATES FIO

8 23 73 13.00 40 2.6 Insulation CERTIFICATES FIO

9 23 73 13.00 40 2.7 Plenums CERTIFICATES FIO

10 23 73 13.00 40 2.8 Draw-Through AHU CERTIFICATES FIO

11 23 73 13.00 40 2.1 Spare Parts CERTIFICATES FIO

12 23 73 13.00 40 1.5 Warranty CERTIFICATES GA

13 23 73 13.00 40 3.5 Operation and Maintenance Manuals O&M DATA GA

SECTION - 26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL

1 26 05 00.00 40 1.5 Material, Equipment, and Fixture Lists PRECON SUBMTL FIO

2 26 05 00.00 40 3.1 Conduits, Raceways and Fittings PRECON SUBMTL FIO

3 26 05 00.00 40 2.2 Wire and Cable PRECON SUBMTL FIO

4 26 05 00.00 40 2.3 Splices and Connectors PRECON SUBMTL FIO

5 26 05 00.00 40 2.4 Switches PRECON SUBMTL FIO

6 26 05 00.00 40 2.5 Outlets, Outlet Boxes, and Pull Boxes PRECON SUBMTL FIO

7 26 05 00.00 40 2.6 Circuit Breakers PRECON SUBMTL FIO

8 26 05 00.00 40 3.1 Conduits, Raceways and Fittings PRODUCT DATA GA

9 26 05 00.00 40 2.2 Wire and Cable PRODUCT DATA GA

10 26 05 00.00 40 2.3 Splices and Connectors PRODUCT DATA GA

11 26 05 00.00 40 2.4 Switches PRODUCT DATA GA

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

AHU-16 Design Bldg O-1900-M, SOTF

W912PM-16-B-0021 NA

18 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

12 26 05 00.00 40 2.5 Outlets, Outlet Boxes, and Pull Boxes PRODUCT DATA GA

13 26 05 00.00 40 2.6 Circuit Breakers PRODUCT DATA GA

14 26 05 00.00 40 1.4 Spare Parts PRODUCT DATA GA

15 26 05 00.00 40 1.5 Certification PRODUCT DATA GA

16 26 05 00.00 40 3.7 Continuity Test TEST REPORTS GA

17 26 05 00.00 40 3.7 Phase-Rotation Tests TEST REPORTS GA

18 26 05 00.00 40 3.7 Insulation Resistance Test TEST REPORTS GA

19 26 05 00.00 40 1.5 Manufacturer's Instructions MFRS INSTR FIO

SECTION - 26 20 00 INTERIOR DISTRIBUTION SYSTEM

1 26 20 00 2.7 Switches PRODUCT DATA GA

2 26 20 00 2.9 Manual motor starters PRODUCT DATA GA

3 26 20 00 3.2.2 600-volt wiring test TEST REPORTS GA

4 26 20 00 2.8 Fuses CERTIFICATES GA

**** Amendment 0001 ****

SECTION TABLE OF CONTENTS

DIVISION 09 - FINISHES

SECTION 09 51 00

ACOUSTICAL CEILINGS

08/10

PART 1 GENERAL

1.1 REFERENCES

1.2 SYSTEM DESCRIPTION

1.2.1 Ceiling Attenuation Class and Test

1.2.2 Ceiling Sound Absorption

1.2.3 Light Reflectance

1.2.4 Other Submittals Requirements

1.3 SUBMITTALS

1.4 SUSTAINABLE DESIGN CERTIFICATION

1.5 DELIVERY, STORAGE. AND HANDLING

1.6 ENVIRONMENTAL REQUIREMENTS

1.7 SCHEDULING

1.8 WARRANTY

1.9 EXTRA MATERIALS

PART 2 PRODUCTS

2.1 ACOUSTICAL UNITS

2.1.1 Affirmative Procurement

2.1.2 Units for Exposed-Grid System

2.1.2.1 Type

2.1.2.2 Flame Spread

2.1.2.3 Pattern

2.1.2.4 Minimum NRC

2.1.2.5 Minimum Light Reflectance Coefficient

2.1.2.6 Nominal Size

2.1.2.7 Edge Detail

2.1.2.8 Finish

2.1.2.9 Minimum CAC

2.2 SUSPENSION SYSTEM

2.3 HANGERS

2.3.1 Wires

2.3.2 Straps

2.3.3 Rods

2.3.4 Eyebolts

2.3.5 Masonry Anchorage Devices

2.4 FINISHES

2.5 COLORS AND PATTERNS

2.6 ACOUSTICAL SEALANT

PART 3 EXECUTION

3.1 INSTALLATION

3.1.1 Suspension System

3.1.1.1 Plumb Hangers

SECTION 09 51 00 Page 1 (ADDED by Amendment 0001)

3.1.1.2 Splayed Hangers

3.1.2 Wall Molding

3.1.3 Acoustical Units

3.1.4 Caulking

3.2 CLEANING

3.3 RECLAMATION PROCEDURES

-- End of Section Table of Contents --

SECTION 09 51 00 Page 2

**** Amendment 0001 ****

SECTION 09 51 00

ACOUSTICAL CEILINGS

08/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A1008/A1008M (2015) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy and High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardened

ASTM A489 (2012) Standard Specification for Carbon Steel Lifting Eyes

ASTM A641/A641M (2009a; R 2014) Standard Specification for Zinc-Coated (Galvanized) Carbon Steel Wire

ASTM A653/A653M (2015) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

ASTM B633 (2015) Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel

ASTM C423 (2009a) Sound Absorption and Sound Absorption Coefficients by the Reverberation Room Method

ASTM C635/C635M (2013a) Manufacture, Performance, and Testing of Metal Suspension Systems for Acoustical Tile and Lay-In Panel Ceilings

ASTM C636/C636M (2013) Standard Practice for Installation of Metal Ceiling Suspension Systems for Acoustical Tile and Lay-In Panels

ASTM C834 (2014) Latex Sealants

ASTM E1264 (2014) Acoustical Ceiling Products

ASTM E1414/E1414M (2011a; E 2014) Airborne Sound Attenuation Between Rooms Sharing a Common Ceiling

SECTION 09 51 00 Page 3

Plenum

ASTM E1477 (1998a; R 2013) Luminous Reflectance Factor of Acoustical Materials by Use of Integrating-Sphere Reflectometers

ASTM E795 (2005; R 2012) Mounting Test Specimens During Sound Absorption Tests

SCIENTIFIC CERTIFICATION SYSTEMS (SCS)

SCS Scientific Certification Systems (SCS)Indoor Advantage

UL ENVIRONMENT (ULE)

ULE Greenguard UL Greenguard Certification Program

UNDERWRITERS LABORATORIES (UL)

UL Fire Resistance (2014) Fire Resistance Directory

1.2 SYSTEM DESCRIPTION

Provide sound controlling units mechanically mounted on a ceiling suspension system for acoustical treatment. The unit size, texture, finish, and color must be as specified. The location and extent of acoustical treatment shall be as shown on the approved detail drawings.

Submit drawings showing suspension system, method of anchoring and fastening, details, and reflected ceiling plan. Coordinate with paragraph RECLAMATION PROCEDURES for reclamation of mineral fiber acoustical ceiling panels to be removed from the job site.

1.2.1 Ceiling Attenuation Class and Test

Provide a ceiling system with an attenuation class (CAC) as scheduled when determined in accordance with ASTM E1414/E1414M. Provide fixture attenuators over light fixtures and other ceiling penetrations, and provide acoustical blanket insulation adjacent to partitions, as required to achieve the specified CAC. Provide test ceiling continuous at the partition and assembled in the suspension system in the same manner that the ceiling will be installed on the project.

1.2.2 Ceiling Sound Absorption

Determine the Noise Reduction Coefficient (NRC) in accordance with ASTM C423 Test Method.

1.2.3 Light Reflectance

Determine light reflectance factor in accordance with ASTM E1477 Test Method.

1.2.4 Other Submittals Requirements

The following shall be submitted:

a. Manufacturer's data indicating percentage of recycle material in acoustic ceiling tiles to verify affirmative procurement compliance.

SECTION 09 51 00 Page 4

b. Total weight and volume quantities of acoustic ceiling tiles with recycle material.

c. Manufacturer's catalog showing UL classification of fire-rated ceilings giving materials, construction details, types of floor and roof constructions to be protected, and UL design number and fire protection time rating for each required floor or roof construction and acoustic ceiling assembly.

d. Reports by an independent testing laboratory attesting that acoustical ceiling systems meet specified sound transmission requirements. Data attesting to conformance of the proposed system to Underwriters Laboratories requirements for the fire endurance rating listed in UL Fire Resistance may be submitted in lieu of test reports.

e. Certificate attesting that the mineral based acoustical units furnished for the project contain recycled material and showing an estimated percent of such material.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Suspension system; G

SD-03 Product Data

Acoustical Ceiling Systems; G

Certification

SD-04 Samples

Acoustical Units; G

SD-06 Test Reports

Ceiling Attenuation Class and Test

SD-07 Certificates

Acoustical Units

1.4 SUSTAINABLE DESIGN CERTIFICATION

Product shall be third party certified in accordance with ULE Greenguard, SCS Scientific Certification Systems Indoor Advantage or equal.

Certification shall be performed annually and shall be current.

SECTION 09 51 00 Page 5

1.5 DELIVERY, STORAGE. AND HANDLING

Deliver materials to the site in the manufacturer's original unopened containers with brand name and type clearly marked. Carefully handle and store materials in dry, watertight enclosures. Immediately before installation, store acoustical units for not less than 24 hours at the same temperature and relative humidity as the space where they will be installed in order to assure proper temperature and moisture acclimation.

1.6 ENVIRONMENTAL REQUIREMENTS

Maintain a uniform temperature of not less than 60 degrees F nor more than 85 degrees F and a relative humidity of not more than 70 percent for 24 hours before, during, and 24 hours after installation of acoustical units.

1.7 SCHEDULING

Complete and dry interior finish work such as plastering, concrete and terrazzo work before ceiling installation. Complete mechanical, electrical, and other work above the ceiling line; install and start operating heating, ventilating, and air conditioning systems in order to maintain temperature and humidity requirements.

1.8 WARRANTY

Provide manufacturer's standard performance guarantees or warranties that extend beyond a one year period. Include an agreement to repair or replace acoustical panels that fail within the warranty period in the standard performance guarantee or warranty. Failures include, but are not limited to, sagging and warping of panels; rusting and manufacturers defects of grid system.

1.9 EXTRA MATERIALS

Furnish spare tiles, from the same lot as those installed, of each color at the rate of 5 tiles for each 1000 tiles installed.

PART 2 PRODUCTS

2.1 ACOUSTICAL UNITS

Comply with EPA requirements in accordance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit two samples of each type of acoustical unit and each type of suspension grid tee section showing texture, finish, and color. Conform acoustical units to ASTM E1264, Class A, and the following requirements:

2.1.1 Affirmative Procurement

Mineral Wool, Cellulose, and Laminated Paperboard used in acoustical units are materials listed in the EPA's Comprehensive Procurement Guidelines (CPG) (http://www.epa.gov/cpg/). EPA's recommended Recovered Materials Content Levels for Mineral Wool, Cellulose, Structural Fiberboard and Laminated Paperboard are:

SECTION 09 51 00 Page 6

Product Material Percent of Post Consumer Materials

Percent of Total Recovered Materials

Laminate Paperboard

Post Consumer Paper

100 100

Rock Wool Slag 75

Cellulose Post Consumer Paper

75 75

a. The recommended recovered materials content levels are based on the weight (not volume) of materials in the insulating core only.

b. Submit recycled material content data for acoustic ceiling tiles indicating compliance with affirmative procurement.

c. Submit total weight and volume quantities of acoustic ceiling tiles with recycle material.

2.1.2 Units for Exposed-Grid System

2.1.2.1 Type

III (non-asbestos mineral fiber with painted finish).

2.1.2.2 Flame Spread

Class A, 25 or less

2.1.2.3 Pattern

C D

2.1.2.4 Minimum NRC

0.55 when tested on mounting Type E-400 of ASTM E795.

2.1.2.5 Minimum Light Reflectance Coefficient

LR-1, 0.82 or greater.

2.1.2.6 Nominal Size

24 by 24 inch

2.1.2.7 Edge Detail

Square.

2.1.2.8 Finish

Factory-applied standard finish.

2.1.2.9 Minimum CAC

33.

SECTION 09 51 00 Page 7

2.2 SUSPENSION SYSTEM

Provide standard exposed-grid standard width flange suspension system conforming to ASTM C635/C635M for intermediate-duty systems. Provide surfaces exposed to view of aluminum or steel with a factory-applied white color baked-enamel finish. Provide wall molding having a flange of not less than 15/16 inch. Provide inside and outside corner caps. Suspended ceiling framing system must have the capability to support the finished ceiling, light fixtures, air diffusers, and accessories, as shown. Provide a suspension system with a maximum deflection of 1/360 of the span length.

2.3 HANGERS

Provide hangers and attachment capable of supporting a minimum 300 pound ultimate vertical load without failure of supporting material or attachment.

2.3.1 Wires

Conform wires to ASTM A641/A641M, Class 1, 0.08 inch (12 gauge) in diameter.

2.3.2 Straps

Provide straps of 1 by 3/16 inch galvanized steel conforming to ASTM A653/A653M, with a light commercial zinc coating or ASTM A1008/A1008M with an electrodeposited zinc coating conforming to ASTM B633, Type RS.

2.3.3 Rods

Provide 3/16 inch diameter threaded steel rods, zinc or cadmium coated.

2.3.4 Eyebolts

Provide eyebolts of weldless, forged-carbon-steel, with a straight-shank in accordance with ASTM A489.

2.3.5 Masonry Anchorage Devices

Comply with ASTM C636/C636M for anchorage devices.

2.4 FINISHES

Use manufacturer's standard textures, patterns and finishes as specified for acoustical units and suspension system members. Treat ceiling suspension system components to inhibit corrosion.

2.5 COLORS AND PATTERNS

Use colors and patterns for acoustical units and suspension system components indicated in Drawing Schedules.

2.6 ACOUSTICAL SEALANT

Conform acoustical sealant to ASTM C834, nonstaining.

SECTION 09 51 00 Page 8

PART 3 EXECUTION

3.1 INSTALLATION

Examine surfaces to receive directly attached acoustical units for unevenness, irregularities, and dampness that would affect quality and execution of the work. Rid areas, where acoustical units will be cemented, of oils, form residue, or other materials that reduce bonding capabilities of the adhesive. Complete and dry interior finish work such as plastering and concrete work before installation. Complete and approve mechanical, electrical, and other work above the ceiling line prior to the start of acoustical ceiling installation. Provide acoustical work complete with necessary fastenings, clips, and other accessories required for a complete installation. Do not expose mechanical fastenings in the finished work.

Lay out hangers for each individual room or space. Provide hangers to support framing around beams, ducts, columns, grilles, and other penetrations through ceilings. Keep main runners and carrying channels clear of abutting walls and partitions. Provide at least two main runners for each ceiling span. Wherever required to bypass an object with the hanger wires, install a subsuspension system so that all hanger wires will be plumb.

3.1.1 Suspension System

Install suspension system in accordance with ASTM C636/C636M and as specified herein. Do not suspend hanger wires or other loads from underside of steel decking.

3.1.1.1 Plumb Hangers

Install hangers plumb and not pressing against insulation covering ducts and pipes. Where lighting fixtures are supported from the suspended ceiling system, provide hangers at a minimum of four hangers per fixture and located not more than 6 inch from each corner of each fixture.

3.1.1.2 Splayed Hangers

Where hangers must be splayed (sloped or slanted) around obstructions, offset the resulting horizontal force by bracing, countersplaying, or other acceptable means.

3.1.2 Wall Molding

Provide wall molding where ceilings abut vertical surfaces. Miter corners where wall moldings intersect or install corner caps. Secure wall molding not more than 3 inch from ends of each length and not more than 16 inch on centers between end fastenings. Provide wall molding springs at each acoustical unit in semi-exposed or concealed systems.

3.1.3 Acoustical Units

Install acoustical units in accordance with the approved installation instructions of the manufacturer. Ensure that edges of acoustical units are in close contact with metal supports, with each other, and in true alignment. Arrange acoustical units so that units less than one-half width are minimized. Hold units in exposed-grid system in place with manufacturer's standard hold-down clips, if units weigh less than 1 psf or if required for fire resistance rating.

SECTION 09 51 00 Page 9

3.1.4 Caulking

Seal all joints around pipes, ducts or electrical outlets penetrating the ceiling. Apply a continuous ribbon of acoustical sealant on vertical web of wall or edge moldings.

3.2 CLEANING

Following installation, clean dirty or discolored surfaces of acoustical units and leave them free from defects. Remove units that are damaged or improperly installed and provide new units as directed.

3.3 RECLAMATION PROCEDURES

Neatly stack ceiling tile, designated for recycling by the Contracting Officer, on 4 by 4 foot pallets not higher than 4 foot. Panels must be completely dry. Shrink wrap and symmetrically stack pallets on top of each other without falling over.

**** Amendment 0001 **** -- End of Section --

SECTION 09 51 00 Page 10

Amendment 0001 -
TECHNICAL SUMMARY OF CHANGES