AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W912PM-16-B-0021 is hereby amended to incoporate the follow ing technical changes:
See Technical Summary of Changes
All other terms and conditons remain in full force and effect
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-16-B-0021
X 9B. DATED (SEE ITEM 11)
02-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Aug-2016
CODE
U S ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PM-16-B-0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
W912PM-16-B-0021
Amendment 0001
TECHNICAL SUMMARY OF CHANGES
A. TECHNICAL SPECIFICATION CHANGES: The revised Sections listed below (revised by Amendment No. 0001) is hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out and/or printed in bold. Revisions can be located in the appropriate volume of specifications by searching for asterisks and amendment number (i.e., *** Amendment 0001 ***).
• PROJECT TABLE OF CONTENTS. Delete Page 1 in its entirety and replace with revised enclosed Page 1 and Page 2.
• 01 33 00 – SUBMITTAL PROCEDURES. Attachment 1, ENG 4288, Delete existing
Pages 1 thru 6 in their entirety and replace with revised enclosed like-numbered Pages.
• 09 51 00 – ACOUSTICAL CEILINGS. ADD Section in its entirety.
B. CONTRACT DRAWINGS: Delete existing Drawing Numbers in their entirety and replace with revised enclosed:
• ED101, EP101, G003, and MH101
Encls As stated
AHU-16 Replacement, Building O190M, SOTF (SF-00008-14) W912PM-16-B-0021
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
STANDARD FORM 1442
00 10 00 SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
00 21 00 INSTRUCTIONS
00 21 13 INSTRUCTIONS TO BIDDERS
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 70 00 CONDITIONS OF THE CONTRACT
00 73 00 SUPPLEMENTARY CONDITIONS
00 01 15 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 05 GENERAL AND SPECIAL PROVISIONS
01 00 60 SECURITY PROCEDURES GUIDE
01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
01 14 00 WORK RESTRICTIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 62 35 RECYCLED / RECOVERED MATERIALS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
*** Amendment 0001 ***
DIVISION 09 - FINISHES
09 51 00 ACOUSTICAL CEILINGS
*** Amendment 0001 ***
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 73 13.00 40 MODULAR OUTDOOR CENTRAL-STATION AIR-HANDLING UNITS
PROJECT TABLE OF CONTENTS Page 1 (Revised by Amendment 0001)
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 20 00 INTERIOR DISTRIBUTION SYSTEM
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2 (Revised by Amendment 0001)
SUBMITTAL REGISTER (ER 415-1-10) TITLE AND LOCATION DATE
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
AHU-16 Design Bldg O-1900-M, SOTF
W912PM-16-B-0021 NA
18 Aug 2016
SORT : SECTION & ITEMRANGE : ALL
SECTION - 01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
1 01 10 00.10 38 1.8 List of Subcontractors PRECON SUBMTL FIO
2 01 10 00.10 38 1.8 Quality Control Plan PRECON SUBMTL GA
3 01 10 00.10 38 1.8 Certificate of Insurance PRECON SUBMTL FIO
4 01 10 00.10 38 1.6 PROGRESS SCHEDULE PRODUCT DATA FIO
5 01 10 00.10 38 1.8 Completion of Corps CQC Course CERTIFICATES FIO
6 01 10 00.10 38 1.8 Letter Appointing Superintendent CERTIFICATES FIO
7 01 10 00.10 38 commercial testing laboratory CERTIFICATES FIO
8 01 10 00.10 38 Contractor's testing laboratory CERTIFICATES GA
9 01 10 00.10 38 SYSTEM AS-BUILT DRAWINGS CLOSEOUT SUBMTL GA
SECTION - 01 14 00 WORK RESTRICTIONS
1 01 14 00 1.3.1.1 List of Contact Personnel PRECON SUBMTL FIO
SECTION - 01 32 01.00 10 PROJECT SCHEDULE
1 01 32 01.00 10 1.3 Project Scheduler Qualifications PRECON SUBMTL GA
2 01 32 01.00 10 3.4.1 Preliminary Project Schedule PRECON SUBMTL GA
3 01 32 01.00 10 3.4.2 Initial Project Schedule PRECON SUBMTL GA
4 01 32 01.00 10 3.6.2 Periodic Schedule Update PRECON SUBMTL GA
SECTION - 01 33 00 SUBMITTAL PROCEDURES
1 01 33 00 1.7 Submittal Register PRECON SUBMTL GA
SECTION - 01 33 29 LEED(TM) DOCUMENTATION
1 01 33 29 1.5.3.1 Preliminary Sustainability Notebook PRECON SUBMTL GA
2 01 33 29 1.5.3.1 Preliminary High Performance and Sustain PRECON SUBMTL FIO
3 01 33 29 1.5.3.1 Final Sustainability Notebook CLOSEOUT SUBMTL GA
4 01 33 29 1.5.3.1 Final High Performance and Sustainable B CLOSEOUT SUBMTL GA
SECTION - 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
1 01 35 26 1.7 Accident Prevention Plan (APP) PRECON SUBMTL GA
2 01 35 26 1.4 Monthly Exposure Reports TEST REPORTS FIO
3 01 35 26 1.12 Notifications and Reports TEST REPORTS FIO
4 01 35 26 1.12.2 Accident Reports TEST REPORTS GA
5 01 35 26 1.12.3 LHE Inspection Reports TEST REPORTS FIO
6 01 35 26 1.6.1.5 Crane Operators/Riggers CERTIFICATES FIO
7 01 35 26 1.7.2.2 Standard Lift Plan CERTIFICATES GA
8 01 35 26 1.7.2.3 Critical Lift Plan CERTIFICATES GA
9 01 35 26 1.8 Activity Hazard Analysis (AHA) CERTIFICATES FIO
10 01 35 26 1.9.1 Confined Space Entry Permit CERTIFICATES FIO
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
AHU-16 Design Bldg O-1900-M, SOTF
W912PM-16-B-0021 NA
18 Aug 2016
SORT : SECTION & ITEMRANGE : ALL
11 01 35 26 1.9.1 Hot Work Permit CERTIFICATES FIO
12 01 35 26 1.12.4 Certificate of Compliance CERTIFICATES FIO
SECTION - 01 45 00.00 10
1 01 45 00.00 10 3.2 Contractor Quality Control (CQC) Plan PRECON SUBMTL GA
2 01 45 00.00 10 3.9 Verification Statement TEST REPORTS FIO
SECTION - 01 50 00 Temporary Construction Facilities And Controls 1 01 50 00 1.3 Construction Site Plan PRECON SUBMTL FIO
2 01 50 00 3.4.1 Traffic Control Plan PRECON SUBMTL FIO
SECTION - 01 57 19 Temporary Environmental Controls 1 01 57 19 1.5.1 Preconstruction Survey PRECON SUBMTL FIO
2 01 57 19 1.8 Solid Waste Management Permit PRECON SUBMTL GA
3 01 57 19 1.5.2 Regulatory Notifications PRECON SUBMTL GA
4 01 57 19 1.6 Environmental Protection Plan PRECON SUBMTL GA
5 01 57 19 1.6.9.1 Dirt and Dust Control Plan PRECON SUBMTL GA
6 01 57 19 1.5.4 Employee Training Records PRECON SUBMTL GA
7 01 57 19 1.5.4 Employee Training Records CERTIFICATES FIO
8 01 57 19 3.7.1 Waste Determination Documentation CLOSEOUT SUBMTL FIO
9 01 57 19 3.7.2.6 Disposal Documentation for Hazardous and CLOSEOUT SUBMTL FIO
10 01 57 19 1.5.4 Assembled Employee Training Records CLOSEOUT SUBMTL GA
11 01 57 19 1.8 Solid Waste Management Permit CLOSEOUT SUBMTL GA
12 01 57 19 3.7.2.1 Hazardous Waste/Debris Management CLOSEOUT SUBMTL GA
13 01 57 19 1.5.2 Regulatory Notifications CLOSEOUT SUBMTL GA
SECTION - 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
1 01 74 19 1.6 Waste Management Plan PRECON SUBMTL GA
2 01 74 19 1.7 Records CLOSEOUT SUBMTL FIO
SECTION - 01 78 00 CLOSEOUT SUBMITTALS
1 01 78 00 1.7.1 Warranty Management Plan PRODUCT DATA FIO
2 01 78 00 1.7.5 Warranty Tags PRODUCT DATA FIO
3 01 78 00 1.5 Spare Parts Data PRODUCT DATA FIO
4 01 78 00 1.7.1 Instructions MFRS INSTR FIO
5 01 78 00 3.6 Operation and Maintenance Manuals O&M DATA GA
6 01 78 00 3.3 Record Drawings CLOSEOUT SUBMTL GA
7 01 78 00 2.3 Certification of EPA Designated Items CLOSEOUT SUBMTL GA
8 01 78 00 3.8 Interim DD FORM 1354 CLOSEOUT SUBMTL GA
9 01 78 00 3.8 Checklist for DD FORM 1354 CLOSEOUT SUBMTL GA
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
AHU-16 Design Bldg O-1900-M, SOTF
W912PM-16-B-0021 NA
18 Aug 2016
SORT : SECTION & ITEMRANGE : ALL
SECTION - 02 41 00 DEMOLITION
1 02 41 00 1.9 Existing Conditions PRECON SUBMTL GA
2 02 41 00 1.2.1 Demolition Plan CERTIFICATES GA
3 02 41 00 1.6 Notification CERTIFICATES GA
SECTION - 09 51 00 ACOUSTICAL CEILINGS
1 09 51 00 1.2 Suspension system SHOP DRAWINGS GA
2 09 51 00 1.2.4 Acoustical Ceiling Systems PRODUCT DATA GA
3 09 51 00 1.4 Certification PRODUCT DATA FIO
4 09 51 00 2.1 Acoustical Units SAMPLES GA
5 09 51 00 1.2.1 Ceiling Attenuation Class and Test TEST REPORTS FIO
6 09 51 00 2.1 Acoustical Units CERTIFICATES FIO
SECTION - 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
1 23 00 00 1.4.5 Detail Drawings SHOP DRAWINGS GA
2 23 00 00 2.9.1.1 Metallic Flexible Duct PRODUCT DATA FIO
3 23 00 00 2.11 Air Handling Units PRODUCT DATA GA
4 23 00 00 2.12.1.1 Variable Volume, Single Duct, Fan-Powere PRODUCT DATA GA
5 23 00 00 2.12.1.3 Reheat Units PRODUCT DATA GA
6 23 00 00 3.9 Performance Tests TEST REPORTS GA
7 23 00 00 3.8 Damper Acceptance Test TEST REPORTS GA
8 23 00 00 3.2 Manufacturer's Installation Instructions MFRS INSTR FIO
9 23 00 00 3.11.1 Operation and Maintenance Manuals O&M DATA FIO
10 23 00 00 2.11 Air Handling Units O&M DATA GA
11 23 00 00 2.12.1.1 Variable Volume, Single Duct, Fan-Powere O&M DATA GA
SECTION - 23 05 15 COMMON PIPING FOR HVAC
1 23 05 15 3.1 Installation Drawings SHOP DRAWINGS FIO
2 23 05 15 2.1 Pipe and Fittings PRODUCT DATA FIO
3 23 05 15 2.2 Piping Specialties PRODUCT DATA FIO
4 23 05 15 2.3 Valves PRODUCT DATA FIO
5 23 05 15 2.4 Miscellaneous Materials PRODUCT DATA FIO
6 23 05 15 2.5 Supporting Elements PRODUCT DATA FIO
7 23 05 15 3.8 Operation and Maintenance Manuals O&M DATA FIO
SECTION - 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
1 23 05 93 1.3 Equipment and Performance Data PRODUCT DATA GA
2 23 05 93 1.5.3.3 TAB Related HVAC Submittals PRODUCT DATA GA
3 23 05 93 1.5.2 TAB Procedures PRODUCT DATA FIO
(Revised by Amendment 0001)
K7EPEOAF
Highlight
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
AHU-16 Design Bldg O-1900-M, SOTF
W912PM-16-B-0021 NA
18 Aug 2016
SORT : SECTION & ITEMRANGE : ALL
4 23 05 93 1.5.2 Calibration PRODUCT DATA GA
5 23 05 93 3.3.4 Pre-Final DALT report TEST REPORTS GA
6 23 05 93 3.3.7 Final DALT report TEST REPORTS GA
7 23 05 93 1.5.4.2 TAB report for Season 1 TEST REPORTS GA
8 23 05 93 1.5.4.2 TAB report for Season 2 TEST REPORTS GA
9 23 05 93 1.5.3.1 TAB Firm TEST REPORTS FIO
10 23 05 93 1.5.1 Independent TAB Agency and Personnel QuaTEST REPORTS FIO
SECTION - 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
1 23 07 00 3.2.2.4 MICA Plates SHOP DRAWINGS GA
2 23 07 00 2.3 Pipe Insulation Systems SHOP DRAWINGS FIO
3 23 07 00 3.2 Pipe Insulation Systems SHOP DRAWINGS FIO
4 23 07 00 3.3 Duct Insulation Systems SHOP DRAWINGS FIO
5 23 07 00 2.3 Pipe Insulation Systems PRODUCT DATA GA
6 23 07 00 3.2 Pipe Insulation Systems PRODUCT DATA GA
7 23 07 00 3.3 Duct Insulation Systems PRODUCT DATA GA
8 23 07 00 2.2.1.3 Thermal Insulation SAMPLES GA
9 23 07 00 3.1.1 Display Samples SAMPLES GA
10 23 07 00 2.3 Pipe Insulation Systems MFRS INSTR GA
11 23 07 00 3.2 Pipe Insulation Systems MFRS INSTR GA
12 23 07 00 3.3 Duct Insulation Systems MFRS INSTR GA
SECTION - 23 09 23 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER LOCAL BUILDING SYSTEMS 1 23 09 23 3.3.1 DDC Contractor Design Drawings SHOP DRAWINGS GA
2 23 09 23 3.3.2 Draft As-Built Drawings SHOP DRAWINGS GA
3 23 09 23 3.3.3 Final As-Built Drawings SHOP DRAWINGS GA
4 23 09 23 2.1.1 Manufacturer's Catalog Data PRODUCT DATA GA
5 23 09 23 2.13.1 Manufacturer's Catalog Data PRODUCT DATA GA
6 23 09 23 2.13.5 Programming Software PRODUCT DATA GA
7 23 09 23 2.13.5 GPPC Application Programs PRODUCT DATA GA
8 23 09 23 2.13.6 AGC Application Programs PRODUCT DATA GA
9 23 09 23 2.13.1 XIF files PRODUCT DATA GA
10 23 09 23 3.6.2 Draft LNS Database PRODUCT DATA GA
11 23 09 23 1.3.1 Final LNS Database PRODUCT DATA GA
12 23 09 23 3.7.4 Final LNS Database PRODUCT DATA GA
13 23 09 23 2.13.4 LNS Plug-in PRODUCT DATA GA
14 23 09 23 2.13.6 LNS Plug-in PRODUCT DATA GA
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
AHU-16 Design Bldg O-1900-M, SOTF
W912PM-16-B-0021 NA
18 Aug 2016
SORT : SECTION & ITEMRANGE : ALL
15 23 09 23 3.1 Existing Conditions Report TEST REPORTS GA
16 23 09 23 3.6.1 Start-Up and Start-Up Testing Report TEST REPORTS GA
17 23 09 23 3.7.1 PVT Procedures TEST REPORTS GA
18 23 09 23 3.7.3 PVT Report TEST REPORTS GA
19 23 09 23 1.6 Pre-Construction QC Checklist TEST REPORTS GA
20 23 09 23 1.6 Post-Construction QC Checklist TEST REPORTS GA
21 23 09 23 1.8 Operation and Maintenance (O&M) Instruct O&M DATA GA
22 23 09 23 3.9.1 Training Documentation O&M DATA GA
23 23 09 23 1.6 Closeout QC Checklist CLOSEOUT SUBMTL GA
SECTION - 23 73 13.00 40 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS
1 23 73 13.00 40 3.1 Installation Drawings SHOP DRAWINGS FIO
2 23 73 13.00 40 2.1 Equipment and Performance Data PRODUCT DATA GA
3 23 73 13.00 40 3.1 Listing of Product Installations CERTIFICATES FIO
4 23 73 13.00 40 1.3.1 Certificates of Conformance CERTIFICATES GA
5 23 73 13.00 40 2.3 Unit Cabinet CERTIFICATES FIO
6 23 73 13.00 40 2.4 Fan CERTIFICATES FIO
7 23 73 13.00 40 2.5 Drain Pans CERTIFICATES FIO
8 23 73 13.00 40 2.6 Insulation CERTIFICATES FIO
9 23 73 13.00 40 2.7 Plenums CERTIFICATES FIO
10 23 73 13.00 40 2.8 Draw-Through AHU CERTIFICATES FIO
11 23 73 13.00 40 2.1 Spare Parts CERTIFICATES FIO
12 23 73 13.00 40 1.5 Warranty CERTIFICATES GA
13 23 73 13.00 40 3.5 Operation and Maintenance Manuals O&M DATA GA
SECTION - 26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
1 26 05 00.00 40 1.5 Material, Equipment, and Fixture Lists PRECON SUBMTL FIO
2 26 05 00.00 40 3.1 Conduits, Raceways and Fittings PRECON SUBMTL FIO
3 26 05 00.00 40 2.2 Wire and Cable PRECON SUBMTL FIO
4 26 05 00.00 40 2.3 Splices and Connectors PRECON SUBMTL FIO
5 26 05 00.00 40 2.4 Switches PRECON SUBMTL FIO
6 26 05 00.00 40 2.5 Outlets, Outlet Boxes, and Pull Boxes PRECON SUBMTL FIO
7 26 05 00.00 40 2.6 Circuit Breakers PRECON SUBMTL FIO
8 26 05 00.00 40 3.1 Conduits, Raceways and Fittings PRODUCT DATA GA
9 26 05 00.00 40 2.2 Wire and Cable PRODUCT DATA GA
10 26 05 00.00 40 2.3 Splices and Connectors PRODUCT DATA GA
11 26 05 00.00 40 2.4 Switches PRODUCT DATA GA
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
AHU-16 Design Bldg O-1900-M, SOTF
W912PM-16-B-0021 NA
18 Aug 2016
SORT : SECTION & ITEMRANGE : ALL
12 26 05 00.00 40 2.5 Outlets, Outlet Boxes, and Pull Boxes PRODUCT DATA GA
13 26 05 00.00 40 2.6 Circuit Breakers PRODUCT DATA GA
14 26 05 00.00 40 1.4 Spare Parts PRODUCT DATA GA
15 26 05 00.00 40 1.5 Certification PRODUCT DATA GA
16 26 05 00.00 40 3.7 Continuity Test TEST REPORTS GA
17 26 05 00.00 40 3.7 Phase-Rotation Tests TEST REPORTS GA
18 26 05 00.00 40 3.7 Insulation Resistance Test TEST REPORTS GA
19 26 05 00.00 40 1.5 Manufacturer's Instructions MFRS INSTR FIO
SECTION - 26 20 00 INTERIOR DISTRIBUTION SYSTEM
1 26 20 00 2.7 Switches PRODUCT DATA GA
2 26 20 00 2.9 Manual motor starters PRODUCT DATA GA
3 26 20 00 3.2.2 600-volt wiring test TEST REPORTS GA
4 26 20 00 2.8 Fuses CERTIFICATES GA
**** Amendment 0001 ****
SECTION TABLE OF CONTENTS
DIVISION 09 - FINISHES
SECTION 09 51 00
ACOUSTICAL CEILINGS
08/10
PART 1 GENERAL
1.1 REFERENCES
1.2 SYSTEM DESCRIPTION
1.2.1 Ceiling Attenuation Class and Test
1.2.2 Ceiling Sound Absorption
1.2.3 Light Reflectance
1.2.4 Other Submittals Requirements
1.3 SUBMITTALS
1.4 SUSTAINABLE DESIGN CERTIFICATION
1.5 DELIVERY, STORAGE. AND HANDLING
1.6 ENVIRONMENTAL REQUIREMENTS
1.7 SCHEDULING
1.8 WARRANTY
1.9 EXTRA MATERIALS
PART 2 PRODUCTS
2.1 ACOUSTICAL UNITS
2.1.1 Affirmative Procurement
2.1.2 Units for Exposed-Grid System
2.1.2.1 Type
2.1.2.2 Flame Spread
2.1.2.3 Pattern
2.1.2.4 Minimum NRC
2.1.2.5 Minimum Light Reflectance Coefficient
2.1.2.6 Nominal Size
2.1.2.7 Edge Detail
2.1.2.8 Finish
2.1.2.9 Minimum CAC
2.2 SUSPENSION SYSTEM
2.3 HANGERS
2.3.1 Wires
2.3.2 Straps
2.3.3 Rods
2.3.4 Eyebolts
2.3.5 Masonry Anchorage Devices
2.4 FINISHES
2.5 COLORS AND PATTERNS
2.6 ACOUSTICAL SEALANT
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Suspension System
3.1.1.1 Plumb Hangers
SECTION 09 51 00 Page 1 (ADDED by Amendment 0001)
3.1.1.2 Splayed Hangers
3.1.2 Wall Molding
3.1.3 Acoustical Units
3.1.4 Caulking
3.2 CLEANING
3.3 RECLAMATION PROCEDURES
-- End of Section Table of Contents --
SECTION 09 51 00 Page 2
**** Amendment 0001 ****
SECTION 09 51 00
ACOUSTICAL CEILINGS
08/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A1008/A1008M (2015) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy and High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardened
ASTM A489 (2012) Standard Specification for Carbon Steel Lifting Eyes
ASTM A641/A641M (2009a; R 2014) Standard Specification for Zinc-Coated (Galvanized) Carbon Steel Wire
ASTM A653/A653M (2015) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM B633 (2015) Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel
ASTM C423 (2009a) Sound Absorption and Sound Absorption Coefficients by the Reverberation Room Method
ASTM C635/C635M (2013a) Manufacture, Performance, and Testing of Metal Suspension Systems for Acoustical Tile and Lay-In Panel Ceilings
ASTM C636/C636M (2013) Standard Practice for Installation of Metal Ceiling Suspension Systems for Acoustical Tile and Lay-In Panels
ASTM C834 (2014) Latex Sealants
ASTM E1264 (2014) Acoustical Ceiling Products
ASTM E1414/E1414M (2011a; E 2014) Airborne Sound Attenuation Between Rooms Sharing a Common Ceiling
SECTION 09 51 00 Page 3
Plenum
ASTM E1477 (1998a; R 2013) Luminous Reflectance Factor of Acoustical Materials by Use of Integrating-Sphere Reflectometers
ASTM E795 (2005; R 2012) Mounting Test Specimens During Sound Absorption Tests
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS Scientific Certification Systems (SCS)Indoor Advantage
UL ENVIRONMENT (ULE)
ULE Greenguard UL Greenguard Certification Program
UNDERWRITERS LABORATORIES (UL)
UL Fire Resistance (2014) Fire Resistance Directory
1.2 SYSTEM DESCRIPTION
Provide sound controlling units mechanically mounted on a ceiling suspension system for acoustical treatment. The unit size, texture, finish, and color must be as specified. The location and extent of acoustical treatment shall be as shown on the approved detail drawings.
Submit drawings showing suspension system, method of anchoring and fastening, details, and reflected ceiling plan. Coordinate with paragraph RECLAMATION PROCEDURES for reclamation of mineral fiber acoustical ceiling panels to be removed from the job site.
1.2.1 Ceiling Attenuation Class and Test
Provide a ceiling system with an attenuation class (CAC) as scheduled when determined in accordance with ASTM E1414/E1414M. Provide fixture attenuators over light fixtures and other ceiling penetrations, and provide acoustical blanket insulation adjacent to partitions, as required to achieve the specified CAC. Provide test ceiling continuous at the partition and assembled in the suspension system in the same manner that the ceiling will be installed on the project.
1.2.2 Ceiling Sound Absorption
Determine the Noise Reduction Coefficient (NRC) in accordance with ASTM C423 Test Method.
1.2.3 Light Reflectance
Determine light reflectance factor in accordance with ASTM E1477 Test Method.
1.2.4 Other Submittals Requirements
The following shall be submitted:
a. Manufacturer's data indicating percentage of recycle material in acoustic ceiling tiles to verify affirmative procurement compliance.
SECTION 09 51 00 Page 4
b. Total weight and volume quantities of acoustic ceiling tiles with recycle material.
c. Manufacturer's catalog showing UL classification of fire-rated ceilings giving materials, construction details, types of floor and roof constructions to be protected, and UL design number and fire protection time rating for each required floor or roof construction and acoustic ceiling assembly.
d. Reports by an independent testing laboratory attesting that acoustical ceiling systems meet specified sound transmission requirements. Data attesting to conformance of the proposed system to Underwriters Laboratories requirements for the fire endurance rating listed in UL Fire Resistance may be submitted in lieu of test reports.
e. Certificate attesting that the mineral based acoustical units furnished for the project contain recycled material and showing an estimated percent of such material.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Suspension system; G
SD-03 Product Data
Acoustical Ceiling Systems; G
Certification
SD-04 Samples
Acoustical Units; G
SD-06 Test Reports
Ceiling Attenuation Class and Test
SD-07 Certificates
Acoustical Units
1.4 SUSTAINABLE DESIGN CERTIFICATION
Product shall be third party certified in accordance with ULE Greenguard, SCS Scientific Certification Systems Indoor Advantage or equal.
Certification shall be performed annually and shall be current.
SECTION 09 51 00 Page 5
1.5 DELIVERY, STORAGE. AND HANDLING
Deliver materials to the site in the manufacturer's original unopened containers with brand name and type clearly marked. Carefully handle and store materials in dry, watertight enclosures. Immediately before installation, store acoustical units for not less than 24 hours at the same temperature and relative humidity as the space where they will be installed in order to assure proper temperature and moisture acclimation.
1.6 ENVIRONMENTAL REQUIREMENTS
Maintain a uniform temperature of not less than 60 degrees F nor more than 85 degrees F and a relative humidity of not more than 70 percent for 24 hours before, during, and 24 hours after installation of acoustical units.
1.7 SCHEDULING
Complete and dry interior finish work such as plastering, concrete and terrazzo work before ceiling installation. Complete mechanical, electrical, and other work above the ceiling line; install and start operating heating, ventilating, and air conditioning systems in order to maintain temperature and humidity requirements.
1.8 WARRANTY
Provide manufacturer's standard performance guarantees or warranties that extend beyond a one year period. Include an agreement to repair or replace acoustical panels that fail within the warranty period in the standard performance guarantee or warranty. Failures include, but are not limited to, sagging and warping of panels; rusting and manufacturers defects of grid system.
1.9 EXTRA MATERIALS
Furnish spare tiles, from the same lot as those installed, of each color at the rate of 5 tiles for each 1000 tiles installed.
PART 2 PRODUCTS
2.1 ACOUSTICAL UNITS
Comply with EPA requirements in accordance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit two samples of each type of acoustical unit and each type of suspension grid tee section showing texture, finish, and color. Conform acoustical units to ASTM E1264, Class A, and the following requirements:
2.1.1 Affirmative Procurement
Mineral Wool, Cellulose, and Laminated Paperboard used in acoustical units are materials listed in the EPA's Comprehensive Procurement Guidelines (CPG) (http://www.epa.gov/cpg/). EPA's recommended Recovered Materials Content Levels for Mineral Wool, Cellulose, Structural Fiberboard and Laminated Paperboard are:
SECTION 09 51 00 Page 6
Product Material Percent of Post Consumer Materials
Percent of Total Recovered Materials
Laminate Paperboard
Post Consumer Paper
100 100
Rock Wool Slag 75
Cellulose Post Consumer Paper
75 75
a. The recommended recovered materials content levels are based on the weight (not volume) of materials in the insulating core only.
b. Submit recycled material content data for acoustic ceiling tiles indicating compliance with affirmative procurement.
c. Submit total weight and volume quantities of acoustic ceiling tiles with recycle material.
2.1.2 Units for Exposed-Grid System
2.1.2.1 Type
III (non-asbestos mineral fiber with painted finish).
2.1.2.2 Flame Spread
Class A, 25 or less
2.1.2.3 Pattern
C D
2.1.2.4 Minimum NRC
0.55 when tested on mounting Type E-400 of ASTM E795.
2.1.2.5 Minimum Light Reflectance Coefficient
LR-1, 0.82 or greater.
2.1.2.6 Nominal Size
24 by 24 inch
2.1.2.7 Edge Detail
Square.
2.1.2.8 Finish
Factory-applied standard finish.
2.1.2.9 Minimum CAC
33.
SECTION 09 51 00 Page 7
2.2 SUSPENSION SYSTEM
Provide standard exposed-grid standard width flange suspension system conforming to ASTM C635/C635M for intermediate-duty systems. Provide surfaces exposed to view of aluminum or steel with a factory-applied white color baked-enamel finish. Provide wall molding having a flange of not less than 15/16 inch. Provide inside and outside corner caps. Suspended ceiling framing system must have the capability to support the finished ceiling, light fixtures, air diffusers, and accessories, as shown. Provide a suspension system with a maximum deflection of 1/360 of the span length.
2.3 HANGERS
Provide hangers and attachment capable of supporting a minimum 300 pound ultimate vertical load without failure of supporting material or attachment.
2.3.1 Wires
Conform wires to ASTM A641/A641M, Class 1, 0.08 inch (12 gauge) in diameter.
2.3.2 Straps
Provide straps of 1 by 3/16 inch galvanized steel conforming to ASTM A653/A653M, with a light commercial zinc coating or ASTM A1008/A1008M with an electrodeposited zinc coating conforming to ASTM B633, Type RS.
2.3.3 Rods
Provide 3/16 inch diameter threaded steel rods, zinc or cadmium coated.
2.3.4 Eyebolts
Provide eyebolts of weldless, forged-carbon-steel, with a straight-shank in accordance with ASTM A489.
2.3.5 Masonry Anchorage Devices
Comply with ASTM C636/C636M for anchorage devices.
2.4 FINISHES
Use manufacturer's standard textures, patterns and finishes as specified for acoustical units and suspension system members. Treat ceiling suspension system components to inhibit corrosion.
2.5 COLORS AND PATTERNS
Use colors and patterns for acoustical units and suspension system components indicated in Drawing Schedules.
2.6 ACOUSTICAL SEALANT
Conform acoustical sealant to ASTM C834, nonstaining.
SECTION 09 51 00 Page 8
PART 3 EXECUTION
3.1 INSTALLATION
Examine surfaces to receive directly attached acoustical units for unevenness, irregularities, and dampness that would affect quality and execution of the work. Rid areas, where acoustical units will be cemented, of oils, form residue, or other materials that reduce bonding capabilities of the adhesive. Complete and dry interior finish work such as plastering and concrete work before installation. Complete and approve mechanical, electrical, and other work above the ceiling line prior to the start of acoustical ceiling installation. Provide acoustical work complete with necessary fastenings, clips, and other accessories required for a complete installation. Do not expose mechanical fastenings in the finished work.
Lay out hangers for each individual room or space. Provide hangers to support framing around beams, ducts, columns, grilles, and other penetrations through ceilings. Keep main runners and carrying channels clear of abutting walls and partitions. Provide at least two main runners for each ceiling span. Wherever required to bypass an object with the hanger wires, install a subsuspension system so that all hanger wires will be plumb.
3.1.1 Suspension System
Install suspension system in accordance with ASTM C636/C636M and as specified herein. Do not suspend hanger wires or other loads from underside of steel decking.
3.1.1.1 Plumb Hangers
Install hangers plumb and not pressing against insulation covering ducts and pipes. Where lighting fixtures are supported from the suspended ceiling system, provide hangers at a minimum of four hangers per fixture and located not more than 6 inch from each corner of each fixture.
3.1.1.2 Splayed Hangers
Where hangers must be splayed (sloped or slanted) around obstructions, offset the resulting horizontal force by bracing, countersplaying, or other acceptable means.
3.1.2 Wall Molding
Provide wall molding where ceilings abut vertical surfaces. Miter corners where wall moldings intersect or install corner caps. Secure wall molding not more than 3 inch from ends of each length and not more than 16 inch on centers between end fastenings. Provide wall molding springs at each acoustical unit in semi-exposed or concealed systems.
3.1.3 Acoustical Units
Install acoustical units in accordance with the approved installation instructions of the manufacturer. Ensure that edges of acoustical units are in close contact with metal supports, with each other, and in true alignment. Arrange acoustical units so that units less than one-half width are minimized. Hold units in exposed-grid system in place with manufacturer's standard hold-down clips, if units weigh less than 1 psf or if required for fire resistance rating.
SECTION 09 51 00 Page 9
3.1.4 Caulking
Seal all joints around pipes, ducts or electrical outlets penetrating the ceiling. Apply a continuous ribbon of acoustical sealant on vertical web of wall or edge moldings.
3.2 CLEANING
Following installation, clean dirty or discolored surfaces of acoustical units and leave them free from defects. Remove units that are damaged or improperly installed and provide new units as directed.
3.3 RECLAMATION PROCEDURES
Neatly stack ceiling tile, designated for recycling by the Contracting Officer, on 4 by 4 foot pallets not higher than 4 foot. Panels must be completely dry. Shrink wrap and symmetrically stack pallets on top of each other without falling over.
**** Amendment 0001 **** -- End of Section --
SECTION 09 51 00 Page 10
| Amendment 0001 - |
| TECHNICAL SUMMARY OF CHANGES |
| PROJECT TABLE OF CONTENTS |
| ENG FORM 4288 |
| 09 51 00 - ACOUSTICAL CEILINGS |