Evaluation_Factors_AV_Equipment.pdf

PDF 134 KB Posted

Attached to
AV Equipment Federal contract opportunity
Solicitation number
W912PM-15-T-0038
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

Evaluation Factors

View the file

Other files for this federal contract opportunity

Other files attached to AV Equipment, newest first.
File Type Posted
PN_69758_Corrected_Drawings.pdf PDF
SOW_AV_PN69758.pdf PDF
Drawings_PN69758.pdf PDF
Bid_Schedule_PN_69758.pdf PDF
W912PM-15-T-0038.pdf PDF
AV_Design_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION SENSITIVE INFORMATION

DISCLOSURE LIMITATIONS AS OUTLINED IN FAR 2.101 & 3.104 APPLY

Evaluation Factors Audio Visual (AV) Purchase and Installation

To Support PN69758 Brigade Headquarters Facility

1. Award will be made to the lowest priced, technically acceptable offer according to the criteria outlined below.

2. Technically acceptable is defined as:

a. Submission of Key Personnel and qualification documentation (such as current certifications) that meet or exceed all of the PWS requirements in Section 1.5 of AV Design Specifications Section 274100.

b. Submission with the offer of past performance reference information that can be verified by the Contracting Officer prior to award. A minimum of 5 years’ experience in large scale video systems, video projection, routing systems, video scaling systems, video and audio broadcast production systems, control systems, conference rooms, training venues and presentation systems. At minimum, two references are required; a maximum, of four references may be submitted. Any offeror unable to provide the minimum number will be determined non-responsive and eliminated from consideration.

i. References should list a point of contact, phone number, and email address for each previous contract past performance item within the last five years (defined as 01 September 2010 to 31 August 2015).

ii. Offerors are requested to provide references for federal government contract past performance. However, other past performance for state and local governments or for other private entities will be accepted in the absence of federal past performance.

iii. The overall average of the past performance for the five year period must be at a level of satisfactory or higher as defined in Appendix A below.

iv. Prior to award and after submission of offers, references will be contacted and interviewed by the Contracting Officer using the Definitions and Questions provided in Appendix A.

c. Offerors must be determined to be responsible per FAR 9.104

Appendix A

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub‐element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an

Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub‐element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the

Contractor successfully performed a significant event that was a benefit to the

Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub‐element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub‐element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U)

Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub‐element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the

Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not

Applicable

No information or did not apply to your contract Rating will be neither positive nor negative.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance

E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction

E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort

E VG S M U N

c) Government Property Control

E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel

E VG S M U N

e) Utilization of Small Business concerns

E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the

Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back‐up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements.

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues)

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor.