Amendment 0001 W912PM-11-T-0021.pdf

PDF 52 KB Posted

Attached to
Grounds Maintenance Services at Falls Lake, Wake Forest, NC Federal contract opportunity
Solicitation number
W912PM-11-T-0021
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

Amendment 0001 to solicitation W912PM-11-T-0021.

View the file

Other files for this federal contract opportunity

Other files attached to Grounds Maintenance Services at Falls Lake, Wake Forest, NC, newest first.
File Type Posted
Contractor Questions and Government Answers 2-6.pdf PDF
Contractor Questions and Government Answers 1.pdf PDF
Site Visit List of Attendees.pdf PDF
W912PM-11-T-0021.pdf PDF
Map of Falls Lake Property.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81LJ812027326

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Please see attached.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Aug-2011

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-11-T-0021

X 9B. DATED (SEE ITEM 11)

21-Jul-2011

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Aug-2011

CODE

U S ARMY CORPS OF ENGINEERS

WILMINGTON DISTRICT

ATTN: CHARLENNE FIGGINS

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM-11-T-0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment to solicitation W912PM-11-T-0021 is to makes changes to Section 13 and 18 of the Statement of Work.

All other requirements of the subject solicitation remain unchanged.

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

STATEMENT OF WORK

STATEMENT OF WORK

U.S. ARMY CORPS OF ENGINEERS

WILMINGTON DISTRICT

GROUNDS MAINTENANCE

FALLS LAKE DAM, TAILRACE, AND VISITOR ASSISTANCE CENTER

WAKE FOREST, NC

1. Scope of Work

Services to be performed under this contract provide for grass mowing, bush hogging, herbicide application, landscape maintenance and snow removal for designated areas at the Falls Lake Visitor Assistance Center, 11405 Falls of Neuse Road, Wake Forest, NC 27587.

Grass mowing will consist of furnishing all labor, equipment, vehicles, fuel and materials to cut grass, weeds, and other vegetation, and aerate lawn in the public use and administrative areas listed herein. The attached map of the locations shows the approximate limits (Group A highlighted in green, Group B highlighted in light green) of areas to be mowed. Grass clippings shall be removed or mulched when visible after mowing. All improved grounds shall look well manicured at all times. The Contractor shall maintain the growth of grass height on improved grounds between 1.5 and 4 inches. Mowing frequencies shall be at the Contractors’ discretion in order to maintain grass at the designated height. However, consecutive mowings shall not occur any closer than ten days during the months of April, May, June, July and August; and consecutive mowings shall not occur any closer than 14 days during the months of March, September, and October. Specialized mechanical cutting equipment (high-flotation power brush cutter) will be required as noted in section 12 d. of this scope of work.

Landscape maintenance consists of furnishing all labor, equipment, vehicles, fuel, and materials to maintain ornamental plants and planting beds through pruning, mulching, and weed removal (Group 1); to rake and remove leaves and fallen limbs from selected grass mowing areas

(Group 2); and to turn wood chips at the playground adjacent to Falls Dam (Group 3). Landscape maintenance will require the use of leaf blowers, rakes, pruning equipment, and other hand tools.

Herbiciding consists of furnishing all labor, equipment, vehicles fuel and materials to apply approved herbicides to grasses, weeds, vines, briars, etc. as specified in section 14 of this scope of work.

Snow Removal will consist of furnishing all labor, equipment, vehicles, fuel, and materials to clear roadways of accumulated snow and ice using mechanized equipment, and to shovel snow and ice from designated walkways. Removal of material shall result in thoroughly cleared roadways, parking lots, and walkways. Care shall be taken to avoid damaging pavement, concrete, vegetation, and other Government property. Any damage to Government roadways, walkways, or other facilities shall result in repair of those facilities to their former condition at the expense of the Contractor. A map showing locations and limits of areas to be cleared is attached.

2. Period of Services

Mowing services are required from March 1 through October 31 only.

Landscape services are required once during May (Group 1), once in January (Group 2), and once each quarter for Group 3.

Herbiciding services are required to be performed once per period in late June or early July.

Snow removal services are required on an “as needed” basis. The Government does not guarantee a minimum quantity of snow removal service orders, and will only pay for those snow removal services that are ordered.

3. Site Investigation and Representation

The Contractor shall become familiar with the nature and location of the work by inspection of the site; noting the local conditions, facilities and equipment required for the work, and all other factors which may affect the work or costs to perform the work. Any failure by the contractor to review all the available information concerning these conditions will not relieve the contractor from the responsibility for properly estimating the difficulty or cost of successfully performing the work.

4. Pre-work Conference

Prior to commencement of work and at the beginning of each contract period, a conference will be scheduled at the Falls Lake Visitor Assistance Center on a mutually convenient date.

5. Work Schedule

The attached map of the locations shows the approximate limits (Group A highlighted in green, Group B highlighted in light green) of areas to be mowed. Grass clippings shall be removed or mulched when visible after mowing. All improved grounds shall look well manicured at all times. The Contractor shall maintain the growth of grass height on improved grounds between

1.5 and 4 inches. Mowing frequencies shall be at the Contractors’ discretion in order to maintain grass at the designated height. However, consecutive mowings shall not occur any closer than ten days during the months of April, May, June, July and August; and consecutive mowings shall not occur any closer than 14 days during the months of March, September, and October.

Group C grass mowing shall be conducted as follows:

Radio tower area: minimum of one bush hogging per period Right-of-way to tower: minimum of one bush hogging per period Drainage areas (2): one bush hogging per period

Group D grass mowing shall be conducted as follows:

Spillway: one mowing per period

Landscape Maintenance – Group 1 services shall be required once per period during the month of May. Group 2 services shall be performed once per period during the month of January, as directed by the COR. Group 3 services shall be performed quarterly, in coordination with the

COR.

Herbiciding - required to be performed once per period in late June or early July.

Snow removal will be performed on an “as needed” basis, with no minimum guaranteed quantities.

6. Continuity of Services

When the Contractor initiates any service (Group A mowing, etc.) the work shall be continued through completion without interruption (except for weather delays). The Contractor shall not allow any days to elapse between initiating a service and completion of that service. Should a mowing be incomplete at the close of a business day, the work shall recommence the following morning. Mowings conducted on Fridays that are incomplete at the close of business shall be recommenced on Saturday morning.

7. Contractor Supervision and Quality Control

The Contractor shall provide 100 percent on-site supervision during the work in progress required under this contract. The Contractor may provide his personnel superintendent or foreman with written authority to act on his behalf, however the superintendent or foreman must speak English fluently and thoroughly understand the contract Scope of Work.

a. The Contractor shall report his presence at the work site each day by contacting the Visitor Assistance Center office.

8. Contractor Personnel

The Contractor will be required to remove personnel from the job site for the following reasons:

a. Disrespect to either Corps employees or members of the visiting public during performance of the contract.

b. Personal conditions, such as being under the influence of intoxicating beverages, drugs, etc. which may interfere with the performance of services.

c. Misconduct of any kind.

Under circumstances set out in subparagraphs a through c above, the Contractor will be responsible for the immediate removal of his employees. When it is necessary to remove personnel, the Contractor will immediately furnish a replacement (or replacements) to perform the required services.

9. Contractor Equipment

The Contractor shall have a sufficient number of vehicles, mowers, and other equipment to comply with the terms of this contract. Equipment shall be kept clean, painted, and in good mechanical condition. Contractor equipment shall not be left on the work site when the Contractor is not present. The Contractor may gain permission from the COR for overnight storage of equipment (mowers, tractors, etc.) inside a secured Government compound.

10. Inspection and Acceptance

Inspection of services rendered will be performed by the Contracting Officer’s Representative.

Any work not meeting acceptable standards will be remedied to the satisfaction of the inspector prior to payment.

11. Safety Requirements

The Contractor shall perform the work in a safe and environmentally acceptable manner, and furnish and require employees to use such safety devices, methods and measures as are required to protect employees or others against bodily injury or damage to property. The Contractor shall submit an Accident Prevention Plan to the Contracting Officer’s Representative utilizing guidelines from Table 1-1, page 3 of the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1 September 2008 edition), which is available by downloading from the following web site:

http://www.hq.usace.army.mil/soh/hqusace_soh.htm All contractor operations shall be in compliance with this manual, and all other applicable federal and state laws. Corps inspectors have the authority to stop work due to safety violations.

The following referenced paragraphs from the safety manual are applicable to grass mowing operations, but may not be all-inclusive:

a. Provide rollover protective structure (ROPS) sec. 16.B.12.

b. Provide and use seat belts (tractors equipped with ROPS) sec. 18.B.03

c. Provide reverse signal alarm sec. 16.B.01

d. Use high visibility work vests when working on or near roadways, or near heavy equipment. High visibility apparel shall comply with ANSI/ISEA 107, Class 2 requirements. sec. 5.A.11.

e. Use approved safety containers for gasoline, sec. 9.B.08 through sec. 9.B.20

f. MACHINE GUARDS AND SAFETY DEVICES. Lawn maintenance equipment, including weed eaters, chainsaws, chippers, grinders, pruning equipment and any other equipment shall not be operated without guards and safety devices in place as recommended by the manufacturer. sec.16.B.

g. The minimum clothing worn shall be short sleeve shirts and long pants (The wearing of shorts is not approved), and leather or other protective work shoes or boots, sec .5.A.07.

for this contract.

h. Use safety shoes when using mower, string trimmer, etc. sec. 5.A.08

i. Use eye/face/hearing protection devices, sec. 5. All eye and face protection equipment shall meet the requirements of ANSI Z87.1 and bear a legible and permanent “Z87” logo to indicate compliance with the standard. Hearing protection shall meet the requirements of ANSI S3.19. Hearing protection shall be worn by all involved in grass mowing and trimming.

j. Provide revolving or flashing caution lights on roadway-used tractors, sec. 10.C.02

k. TRAFFIC CONTROL SIGNS. Traffic control shall be accomplished in accordance with

DOT Federal Highway Administrator’s Manual on Uniform Traffic Control Devices for Streets and Highways. The Contractor shall be responsible for providing, erecting, maintaining, and removal of all traffic signs and other traffic control devices necessary for employee and traffic safety. Signs shall primarily consist of “MEN WORKING” warning signs.

l. All vehicles and equipment trailers shall have working brake lights, turn signal lights, and emergency flashers. Emergency flashers shall be used whenever vehicles and/or equipment trailers are parked on roadways or road shoulders.

m. No person shall be required or instructed to work in surroundings or under conditions that are unsafe or dangerous to his or her health.

n. The employer shall be responsible for maintaining a safety program that complies with all Federal and State safety standards and the requirements specified herein.

o. Contractors with non-English speaking workers shall have a person(s) fluent in English to interpret and translate as needed.

p. EMERGENCY PLANNING. Employees working alone shall be provided an effective means of emergency communications. This may be by cellular phone, two-way radio, or other acceptable means. The selected means of communications must be readily available, and must be in working condition.

q. DRINKING WATER. Employees shall be provided an adequate supply of potable drinking water in all places of employment. Cool water shall be provided during hot weather. Workers shall be encouraged to drink water when working in hot environments.

r. FIRST AID AND CPR. When a medical facility or physician is not accessible within 5 minutes of an injury to a group of two or more employees, at least two employees on each shift shall be certified to administer first aid and CPR. At least one Type III, 16-unit first aid kit shall be provided.

s. No alcohol or drugs are permitted during work hours.

t. No swimming will be permitted during work hours.

u. Report the following to the Contracting Officer’s Representative (COR) within one working day: all accidents resulting in lost time, incidents resulting in property damage of $250.00 or more, or any accident regardless of consequences if it is suspected that it will result in unfavorable criticism of the Corps of Engineers. Accidents resulting in loss of life, partial or total physical disability, or any incidents with public visitors are to be immediately reported to the COR.

v. Provide suitable size (minimum rating of 6 BC) fire extinguisher on equipment which is immediately accessible, par. 13.A.01

12. Grass Mowing Procedures

a. Immediately prior to each grass cutting operation, the area to be cut will be inspected and all trash, litter, and debris will be collected and placed in available refuse containers. Grass will be cut to a height of not more than 4 inches or less than 1.5 inches above ground. Mower blades shall be sharpened periodically to ensure clean cuts. Grass shall be neatly trimmed around buildings, fences, poles, posts, guardrails, boulders, guard stones, sidewalks, parking lot bumper blocks, and other structures. In addition, the Contractor shall mow areas along roads, paved walkways, and walk areas around buildings in such a manner as to prevent mowed clippings and residue from being deposited on those surfaces. The road shoulder area between the paved access road and the gravel walking trail shall be neatly mowed and trimmed. A 140-foot long section of hiking trail shall be mowed or trimmed a minimum of four (4) feet wide during each Group A mowing.

Mowing in an area shall be performed in one continual operation until completed. Trimming shall immediately precede or follow the mowing in order to leave each area in a neatly mowed condition. Mowing will not be considered complete until trimming is completed and grass clippings removed from paved surfaces.

b. The Contractor shall take necessary precautions to prevent damage to trees, shrubs, fences, buildings, piping, speed bumps, and other facilities. Damage to the aforementioned shall be repaired or replaced by the Contractor to the satisfaction of the Contracting Officer’s Representative, at no additional expense to the Government.

c. The Contractor shall mow the slopes of Falls Dam using walk-behind mowers. Following a rain event, it may be necessary to wait a few days in order to mow safely. Prior to mowing the slopes of the dam, the Contractor shall consult with the Corps representative to determine if conditions (dryness, etc.) are satisfactory. Any rutted or otherwise damaged areas resulting from mowing shall be repaired to the satisfaction of the Contract Officer's Representative, at no additional expense to the Government. Ruts will be filled, smoothed, fertilized, seeded, and mulched. Displaced turf will be replaced in a manner to present smooth slope surfaces.

In all instances of reseeding, fertilizer and mulch shall be applied at industry-recommended rates. Any damage to piezometer tubes or covers resulting from mowing shall be repaired by the contractor.

d. Group D mowing in the emergency spillway near Falls of Neuse Road bridge and the Neuse

River is difficult due to persistent wetness. Wet conditions will prevent access with traditional tractors, therefore the removal of vegetation will require specialized high flotation cutting machinery (Fecon Bull Hog Mulcher or equivalent).

13. Areas to be Mowed and Approximate Acreage:

Group A “Public Use and Administrative Areas” (Marked in green on attached map) Office lawn: 0.70 Office loop road: 0.40 Tailrace Fishing Access Area: 0.81 Tailrace guardrail and roadside: 0.12 Dam terminus: 0 .27 Dam road: 2.21 Wellhouse area 0.03 Maintenance compound entrance road 0.21 Maintenance compound and rear embankment 0.62 Front gate area: 0.32 Entrance road: 1.85 Boathouse access road: .023 Hiking trail: 0.05

TOTAL ACREAGE: 7.82

Group B (Marked in light green on attached map) Dam slopes: 4.0

TOTAL ACREAGE: 4.0

Group C (Marked in yellow on attached map) Drainage areas (2) 2.0 Radio tower area: .75 Right-of-way to tower: .60

TOTAL ACREAGE: 3.35

Group D (Marked in red on attached map) Spillway: 3.15

TOTAL ACREAGE: 3.15

14. Herbicide Application

The work will be conducted adjacent to Falls Lake, which is the main drinking water supply for the City of Raleigh. Diligent care shall be taken to prevent herbicides from entering into Falls Lake either directly or indirectly. Neuse River buffer rules administered by the North Carolina Division of Water Quality will apply. Except for one area (upper compound), the application of herbicides will consist of spot treatment rather than area treatment.

The Contractor shall not spray when weather conditions prevent effective treatment. In the case of rainfall received after the COR’s request for services, but prior to the application of herbicides, the application time frame may be modified, as directed. A post-emergent application will be performed in late June or early July (see the list of areas for application below).

Following the application of herbicides, the Contractor shall perform an inspection within 30 days to ensure that targeted undesirable vegetation has been eliminated. Should an additional herbicide application be necessary to eliminate persistent undesirable vegetation, the Contractor shall apply the additional herbicide at no cost to the Government.

Method of Application

a. Herbicides used shall be water-soluble, and shall be applied in accordance with label instructions.

b. Care shall be taken to prevent chemicals from entering streams or ditches.

c. Care shall be taken to prevent chemicals from contacting stems and leaves of desirable plants.

d. Care shall be taken to prevent chemical drift.

e. Contractor shall calibrate equipment properly and shall ensure uniform coverage of areas to be treated.

f. An inert carrier dye shall be used along with the herbicide. The type of dye used shall be approved by the Contracting Officer’s Representative (COR) prior to the start of work.

g. Water may be utilized from Falls Lake for mixing with chemicals, but all mixing must be done away from the shoreline.

h. Areas accessible to the visiting public will be posted by the Contractor with signs for a minimum of 24 hours and a maximum of 48 hours, cautioning that herbicides have been applied.

i. At the completion of spraying, equipment shall not be cleaned on the project. The cleaning of tank, hoses, and gun shall be done away from government property.

Operator Qualifications: The Contractor shall, without additional expense to the Government, be responsible for obtaining any and all necessary licenses and permits, and for complying with any applicable federal, state or local laws, codes or ordinances in connection with the performance of the work. The Contractor shall provide a current North Carolina Department of Agriculture, Pest Control Division certified applicator license to the Contracting Officer’s Representative (COR) prior to the start of work. The applicator license shall include certification in the Aquatic Pest Control category as defined by the North Carolina Department of Agriculture.

Reports by the Contractor

The Contractor shall provide a log of the herbicide and /or pest application. This log shall include as a minimum:

1) Name of herbicide(s) used, and percent solution

2) Total quantity of herbicides applied.

3) List of areas treated.

4) Total area treated (spot treatment over __ acres).

At a minimum, herbicides shall be applied (post-emergent) to the following areas:

Falls Dam (riprap) upstream and downstream slopes

Riprap on south bank of Neuse River below Falls Dam

Riprap at ditches and culvert drainage at Tailrace

Concrete ditches

Cracks in pavement (sidewalks, roadways, maintenance area, and intake tower area)

Fences at the Falls Visitor Assistance Center maintenance area and upper compound

Interior of upper compound

Radio tower perimeter fence and tiedowns for guywires

Rocky area directly west of the radio tower

Landscape timber borders around picnic shelters and gravel walkways

Tailrace parking lot slopes (areas adjacent to parking lot that slope downward)

Areas surrounding two public restroom buildings

Trails (spot and edge treatment as needed to eliminate vines, briars, multi-floral rose and invading grasses)

Approximate area sizes are as follows:

Location Area

Dam riprap (upstream slope) 3.16 acres Dam riprap (downstream abutments) 1.2 acres Neuse River riprap (South bank) 0.05 acres Concrete ditches on roadways 1330 linear feet Concrete Groin ditches (downstream side) 600 linear feet Pavement cracks 10,810 linear feet (roads, sidewalks, parking lots) Fences at two compounds 1570 linear feet Upper compound interior 0.93 acres Radio tower fence and 0.01 acres guywire tiedowns Rock at radio tower 0.03 acres Landscape timber borders at 0.007 acres picnic shelters and gravel walkways Restroom building perimeters (2) 216 linear feet Gravel trail 0.13 acres Gravel haul road 0.16 acres Planting beds at VAC office 0.08 acres Tailrace parking lot slopes 0.30 acres

15. Landscape Maintenance:

Group 1 includes removal of volunteer plants/weeds and one (1) periodly application of a uniform layer (minimum of 4”) of pine straw to established planting beds and around ornamental trees outside the Visitor Assistance Center office. The approximate total plant bed size is 21,000 square feet. The planting boxes near the VAC office entrance will be mulched with a uniform triple-shred hardwood mulch to a depth of 2-4 inches. The periodly application of pine straw and mulch shall occur during May. Weeds and grass shall be completely removed from around ornamental shrubs, trees and ground covers, including the removal of grass and weeds from planter boxes, slopes and plant beds. Weeds and grass shall be removed from plant beds out to the original limits of the bed. Weeds and grass shall be removed from around individual trees and shrubs in a circle for a minimum distance of two (2) feet from the base of the plants. A pine needle or shredded bark mulch shall be placed around individual trees and shrubs for a distance of 2 feet and to a depth of 2-4 inches. Mulch shall be placed so as not to touch the base of trees.

Mulch shall be kept out of crowns of shrubs and off buildings, sidewalks, light poles and other structures. Mulch shall be free from weeds, mold, and other deleterious materials.

Group 2 includes raking and removing leaves from lawn areas at the Visitor Assistance Center office, access road shoulders, and Dam terminus. Leaf removal also is required from boundaries of planters or established plant beds. Leaves shall be removed once per period in January, as directed by the Contracting Officer’s Representative. Approximate area sizes are as follows:

Location Acres

Access Road Shoulders 1.50 Office Area 0.70 Dam Terminus 0.25

TOTAL ACREAGE: 2.45

Group 3 includes turning of wood chips at the playground adjacent to Falls Dam. This shall be completed quarterly. Woodchips shall be turned using hand tools to an approximate depth of 12 inches, taking care to avoid the landscape fabric beneath the chips. Any mechanical alternatives to hand turning must be approved in advance by the COR. After chips are turned, the area shall be smoothed to uniform grade. Trash, rocks, cement, or other hard materials encountered while turning the chips shall be removed from the play area and disposed of in coordination with the

COR.

18. Snow Removal

Group A snow removal includes: The access road from Falls of the Neuse Road to the VAC office (entire loop, including office parking spaces), the road to the maintenance compound, the paved surface inside the fenced maintenance compound, and the parking lot adjacent to Falls of the Neuse Road. Total linear roadway distance (excluding parking spaces) is 1.0 miles.

Group A also includes the clearing of two walkways/stairways at the Visitor Assistance Center office: one at the employee entrance (back side of office), and one at the front office entrance (public entrance).

Group B snow removal includes the roadway on top of Falls Dam, including parking spaces.

Total linear roadway distance (excluding parking spaces) is 0.5 miles.

Group C snow removal includes the Tailrace Fishing Area, including parking spaces and restroom sidewalks. Total linear roadway distance (excluding parking spaces) is 0.1 miles.

Sanding and salting is required only on all walkways, all stairways, and all other pedestrian areas.

The Contractor will take necessary precautions to prevent damage to pavement, concrete, speed bumps, vegetation, fences, buildings, piping, and other Government property. Damage to the aforementioned shall be repaired or replaced by the Contractor to the satisfaction of the Contracting Officer’s Representative, at no additional expense to the Government.

The contractor shall commence work within four hours after the Government’s request for service.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .