W912PL0B0012_Amendment0003.pdf

PDF 1 MB Posted

Attached to
Murrieta Creek Phase 1 & Phase 2A Sediment Removal Federal contract opportunity
Solicitation number
W912PL20B0012
Issued by
Department of the Army Corps of Engineers Engineering District Los Angeles

About this file

This solicitation is for sediment removal services along Murrieta Creek in Temecula, California. The scope of work includes removing approximately 105,000 cubic yards of silt to sandy soils from 10 acres of the creek channel. Vegetation removal is also required for established riparian trees and shrubs across the site. The project value is estimated between $1 million to $5 million. The solicitation is restricted to 8(a) small businesses with offices in Orange County, Los Angeles, or San Diego. Responses are due in accordance with the standard solicitation process run by the U.S. Army Corps of Engineers, Los Angeles District.

View the file

Other files for this federal contract opportunity

Other files attached to Murrieta Creek Phase 1 & Phase 2A Sediment Removal, newest first.
File Type Posted
Bid Abstract_W912PL20B0012_Murrieta Sediment_FINAL_signed_.pdf PDF
W912PL20B0012_Amendment0002.pdf PDF
Site Visit Sign In Sheet 20200819.pdf PDF
Amd 0001 final.pdf PDF
W912PL20B0012_Solicitation_Specifications.pdf PDF
W912PL20B0012_Solicitation_Plans.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 50

0003 Sep 3, 2020

USACE-LOS ANGELES DISTRICT

CONTRACTING DIVISION, WEST REGION BRANCH

915 WILSHIRE BLVD, SUITE 1440

LOS ANGELES, CA 90017

W912PL20B0012

Aug 10, 2020

Murrieta Creek – Phase 1 & Phase 2A, Sediment Removal, Murrieta Creek, Riverside County, California

See Summary of Changes Continuation Sheet

INSTRUCTIONS

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code) . Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date) .

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By) . Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor) . For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated ). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data) .

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B . The contracting officer's signature is not required on solicitation amendments. The contracting offier's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13 . Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification) .

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

Total contract price increased by $

Total contract price decreased by $

Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

A reference to the letter determination; and

A statement of the net amount determined to be due in settlement of the contract.

(g)

(h)

(i)

(ii)

(1)

(2)

(3)

(4)

(5)

(6)

(i)

(ii)

(iii)

STANDARD FORM 30 (REV. 10-83) BACK

(1) Accounting classification Net increase $

Murrieta Creek Project Phase I and Phase IIA, Sediment Removal W912PL20B0012 Riverside County, CA

SF 30 CONTINUATION PAGE 1 OF 2

3 September 2020 Amendment 0003

SF 30 BLOCK 14 CONTINUATION

SUMMARY OF CHANGES

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Section Number Section Title

00 01 10 TABLE OF CONTENTS

00 21 13 INSTRUCTIONS TO BIDDERS

DIVISION 01 – 48 - TECHNICAL SPECIFICATIONS

Section Number Section Title

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

31 00 00 EARTHWORK

Murrieta Creek Project Phase I and Phase IIA, Sediment Removal

W912PL20B0012

AM2

00 01 05

00 01 10 AM2 AM3

00 10 00 AM2

00 20 00

00 21 00 INSTRUCTIONS AM2

00 21 13 AM1AM2 AM3

00 21 16 AM2

00 45 00 AM2

00 70 00 CONDITIONS OF THE CONTRACT AM2

00 73 00 AM2

00 73 46

01 11 00 AM2

01 22 00 01 32 01

01 33 00 AM2

01 35 26 01 42 00 01 45 00 01 45 01

01 50 00

01 57 19 AM2 AM3

01 74 19

01 78 00

31 00 00 AM3

31 11 00

DIVISION 31 - EARTHWORK

EARTHWORK

CLEARING AND GRUBBING

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

TEMPORARY ENVIRONMENTAL CONTROLS

CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

CLOSEOUT SUBMITTALS

RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS

SUBMITTAL PROCEDURES

GOVERNMENTAL SAFETY REQUIREMENTS

SOURCES FOR REFERENCE PUBLICATIONS

QUALITY CONTROL

DIVISION 01 - GENERAL REQUIREMENTS

SUMMARY OF WORK

PRICE AND PAYMENT PROCEDURES

PROJECT SCHEDULE

SECTION 00 01 10

TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

WAGE RATES

CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

CERTIFICATION PAGE

SF-1442

TABLE OF CONTENTS

INSTRUCTIONS FOR PROCUREMENT

INSTRUCTIONS TO BIDDERS

DELETED

REPRESENTATIONS AND CERTIFICATIONS

SUPPLEMENTARY CONDITIONS

3 September 2020

TABLE OF CONTENTS PAGE 1

Amendment 0003

SECTION 00 21 13 Page 1 3 September 2020 Amendment 0003

Section 00 21 13

Instructions to Bidders

Table of Contents

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)—ALTERNATE I (FEB 1995)

52.0000-4010 INQUIRIES

SPECIAL INSTRUCTIONS PERTAINING TO SUBMISSION OF ELECTRONIC BIDS (APR 2020)

INSTRUCTIONS FOR SUBMITTING ELECTRONIC BIDS:

INSTRUCTIONS TO FOLLOW ON THE SAFE WEBSITE:

RECEIPT OF SUBMISSIONS:

FORMAT AND CONTENTS OF ELECTRONIC BID

VIRTUAL BID OPENING PROCEDURES AND INSTRUCTIONS FOR BIDDER’S PARTICIPATON

CONTRACTOR REPONSIBILITY, PRE-AWARD SURVEY

OFFEROR'S CHECKLIST

SECTION 00 21 13 Page 2

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)—ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) A site visit is scheduled for this project on Wednesday, August 19, 2020 at 10:00 am.

Location: Temecula Community Center – Parking Lot, 28816 Pujol St., Temecula, CA 92590.

(c) Offerors interested in attending the site visit should contact Derek.O.Walker@usace.army.mil or 213.452.3687 (office) or 213.300.8106 (cell). The e-mail or phone interest is to be received by Corps of Engineers personnel no later than 48 hours preceding the site visit. Include in the e-mail the person’s name, company name, and Driver License numbers of all people attending the Site Visit.

The e-mail shall include a day-time telephone number. If there are any changes to the site visit date or location, or if special procedures are to be implemented, people who have registered to attend the site visit will be informed. Following are the USACE e-mail addresses:

(End of provision)

52.0000-4010 INQUIRIES

Any prospective offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders/offerors before submission of their bids/offers. Oral explanations or instructions given before award of a contract are not binding. Any information given to a prospective offeror concerning a solicitation will be furnished promptly to all other prospective offerors as an amendment to the solicitation, if that information is necessary in submitting offers or if lack of it would be prejudicial to other prospective bidders/offerors.

1. All inquiries relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet/

A. To submit and review bid inquiry items, offerors will need to be a current registered user, self register into the ProjNet system.

To access the Bid Inquiry system, go to the ProjNet web page and fill in:

- Managing Agency – USACE

- Email address

- Key Access (this is the Bidder Inquiry Key – see below for key)

- Click on “Sign In”

SECTION 00 21 13 Page 3

- You will be prompted for the answer to your secret question on the next screen

If this is your first time accessing ProjNet, you will be directed to a screen titled, “User account not found. Please create one using the form below.” Fill in the requested information (name, company, city, phone #, etc.).

B. From this page, you may view all bidder inquiries or add an inquiry. Please note:

Offerors shall only submit one question per inquiry. All inquiries containing multiple questions may be rejected.

C. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

The Solicitation Number is: W912PL-20-B-0012

The Bidder Inquiry Key is: NVT7WD-K8JZQR

2. The Bidder Inquiry System will be unavailable for new inquires up to 5 business days prior to bid/proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.

3. Offerors are requested to review the specifications in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

4. The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the ProjNet Call Center is 800-428-HELP.

5. Responses on the Bidder Inquiry System do not revise, change, amend or supersede the provisions of the solicitation. Changes to the solicitation must be by written amendment thereto.

Any Bidder Inquiry System response that can be interpreted to be in conflict with the solicitation or amendment, shall be subordinate to the conflicting provision, term, and/or note, wherever it appears in the solicitation, until revised or altered by a written amendment to the solicitation.

Additionally, offerors may not anticipate a change to the solicitation until the change, revision, correction, or alteration of the solicitation is actually made, in writing and published as an amendment to the solicitation.

(End of Provision)

SECTION 00 21 13 Page 4

SPECIAL INSTRUCTIONS PERTAINING TO SUBMISSION OF ELECTRONIC BIDS

(APR 2020)

The Bidder’s bid shall be submitted electronically, as described below. The IFB will provide the Government address and receipt date for bid submittal. The Bidder’s bid shall not contain classified data. The use of hyperlinks in bids is prohibited.

NOTE: The only authorized transmission method for bids in response to this solicitation is electronically via SAFE online submission. NO OTHER TRANSMISSION METHODS

(EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.

The Bidder’s bid must be received by the Government by the date/time specified in the solicitation. Bidders shall email their bid using the following link: https://safe.apps.mil/

Please send bids using the link above to

Contract Specialist Wendell.L.Mendoza@usace.army.mil AND to Contracting Officer Patricia.B.Bonilla@usace.army.mil .

INSTRUCTIONS FOR SUBMITTING ELECTRONIC BIDS:

In an effort to reduce paperwork and cost, all bids shall be submitted electronically through the SAFE site. Submission shall be in Adobe PDF format. You are limited to five (5) maximum files per upload (total size cannot exceed 2GB). If you have a large number of files, recommend that you combine or ZIP your files before uploading to the SAFE site. Bidders may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

REQUEST FOR UPLOAD CODE: Bidders must email Contract Specialist Wendell.L.Mendoza@usace.army.mil and to Contracting Officer Patricia.B.Bonilla@usace.army.mil no later than five (5) working days prior to the bid due date to receive a request code which will allow for file uploads via the SAFE site. Bidders who fail to email for request a code five (5) working days before bid submission date may not be able to receive a request code in time to upload their submission.

FILE DESCRIPTION: Include a “File Description” for each file(s) you upload. The “File Description” will be included in the email notice to each of the recipients you choose to have access your file(s). NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.) Submission shall be in Adobe PDF format.

SECTION 00 21 13 Page 5

INSTRUCTIONS TO FOLLOW ON THE SAFE WEBSITE:

1. Once at the SAFE website select the “Drop-off” icon. This allows users without a CAC or users whose computer is not configured to read a CAC the option to access the SAFE site as a guest.

2. After selecting the “Click Here” link you will be prompted to add your personal information, file information, recipient (Government representative) information and email settings.

3. When completing your file information for transmittal via the SAFE website, you will be required to enter the email address for all recipients. For this solicitation, the recipients are the Contract Specialist and the Contracting Officer. The Contract Specialist for this solicitation is Wendell.L.Mendoza@usace.army.mil and the Contracting Officer is Patricia.B.Bonilla@usace.army.mil . The E-Mail address of the Government Employee who initiated the request code will be automatically entered. The Proposer must enter the E-Mail address for both the Contracting Officer and Specialist. The Proposer can enter an additional E- Mail address if desired. After entering the email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your proposal is submitted, a notification will be sent to the recipients you added.

NOTE: Do NOT send the SAFE site packages to group email accounts. Even if you successfully upload your bid to the SAFE site, notification will not be sent to the government recipients until you verify your email address. Entering an incorrect email may result in the rejection of your submission for lateness. A Proposer can confirm proper submission by the ‘Drop-Off Completed” screen which generates based on proper file submission.

NOTE: It has been reported that documents are more quickly uploaded into the SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Bidders will have more success utilizing any particular browser.

RECEIPT OF SUBMISSIONS:

For the purposes of establishing whether a bid submission is considered timely, the government considers the date and time the submission is completely uploaded into the SAFE website. For bids larger than the 2GB capacity of the SAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded into the SAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.

SECTION 00 21 13 Page 6

The government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive bids. Bidders are responsible for ensuring that bids are submitted so as to reach the designated recipient. Bidders are responsible for allowing sufficient time for the bid to be received in accordance with the instructions provided.

(End of statement)

FORMAT AND CONTENTS OF ELECTRONIC BID

The only authorized transmission method for bids in response to this solicitation is electronically via SAFE online submission. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.

The Bidder’s bid must be received by the Government by the date/time specified in the solicitation. Bidders shall email their bid using the following link: https://safe.apps.mil/

The bid shall be organized as indicated below, and shall be comprised of the following items:

#1 A completed SF 1442, “Solicitation, Offer and Award” including the Certification of Corporate principals, Section 00 01 05. The SF 1442 and the Certifications shall be completed by the bidder and duly executed with an original signature by an official authorized to bind the company in accordance with instructions at FAR 4.102.

#2 Section 00 10 00, Solicitation, Contract Line Item Number (CLIN) Schedule. The complete Solicitation, Contract Line Item Number (CLIN) Schedule with the bidder’s proposed contract line item prices inserted in the appropriate spaces. Prices must be proposed for all contract line items and prices sub-line items, if any. Unit prices are to be extended to the actual “dollar and cents” amounts (i.e., to two decimal places). Do not round off to the nearest dollar. Check your pricing submissions very carefully for mathematical and clerical errors prior to submission.

#3 Official Online System for Award Management Representations & Certifications or completed Section 00 45 00.

#4 A fully executed Bid Guarantee, Standard Form 24, “Bid Bond.”

SECTION 00 21 13 Page 7

VIRTUAL BID OPENING PROCEDURES AND INSTRUCTIONS FOR BIDDER’S

PARTICIPATON

a. The electronic bids for this project are due on the date and time as specified on the SF 1442, block 13.

b. In order to allow the bid opening officer sufficient time to download the bids after bids are due, the virtual bid opening will be held two hours after the time bids are due.

c. At the bid opening teleconference, bids and the Independent Government Estimate will be read aloud, just as in a traditional bid opening.

d. The Abstract of Bids will be posted to beta.SAM.gov as soon as practicable, typically within 24 hours of bid opening.

e. To participate in the Virtual Bid Opening, the following information is provided:

Call-in toll-free number (ATT Audio Conference): 1-877.873.8018

Access Code: 533 383 1

Security code is 1234

CONTRACTOR REPONSIBILITY, PRE-AWARD SURVEY

In accordance with FAR 9.103(a)…”contracts shall be awarded to responsible, prospective contractors only.” In order to determine a contractor’s responsibility for purposes of contract award in accordance with FAR Part 9, a statement regarding previous experience in performing comparable work, and/or plant to be used in performing the work is required. After the bid opening, the Government will request this information and set a due date for its submission.

OFFEROR'S CHECKLIST

All information required by the terms of the Solicitation must be furnished. MISTAKES OR OMISSIONS CAN BE COSTLY. Important items for you to check are included in but not limited to, those listed below. This checklist is furnished only to assist you in submitting a complete Bid. Check as you read.

SECTION 00 21 13 Page 8

[ ] Have you acknowledged all amendments?

[ ] Is your SF-1442, Certificate of Corporate Principal and CLIN Schedule (Section 00 10 00), properly completed and signed?

[ ] Is a fully executed SF-24 bid bond included with your bid? (A late bid bond is treated the same as a late bid.)

[ ] Is your bid bond in the proper amount? (20% of total bid price or $3,000,000 whichever is less)

[ ] Is the bond properly signed by both the Offeror and Surety and are all required seals affixed?

[ ] Is the name in which you submitted the bid the same on your bid as on your bid bond?

[ ] Are all erasures or corrections initialed by the person signing the bid?

[ ] Have you restricted your bid by altering the provisions of the solicitation?

[ ] Have you completed the Representations, Certifications, and Other Statements of Bidders/Offerors (Section 00 45 00) or copy of your ORCA.

[ ] Will your bid arrive on time? Late bids or modifications will be handled in accordance with 52.214-7 Late Submissions, Modifications and Withdrawals of Bids

End of Section

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 57 19

TEMPORARY ENVIRONMENTAL CONTROLS

11/15

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.2.1 Class I and II Ozone Depleting Substance (ODS)

1.2.2 Contractor Generated Hazardous Waste

1.2.3 Electronics Waste

1.2.4 Environmental Pollution and Damage

1.2.5 Environmental Protection

1.2.6 Hazardous Debris

1.2.7 Hazardous Materials

1.2.8 Hazardous Waste

1.2.9 Deleted

1.2.10 Land Application

1.2.11 Municipal Separate Storm Sewer System (MS4) Permit

1.2.12 National Pollutant Discharge Elimination System (NPDES)

1.2.13 Oily Waste

1.2.14 Pesticide

1.2.15 Pesticide Treatment Plan

1.2.16 Pests

1.2.17 Project Pesticide Coordinator

1.2.18 Regulated Waste

1.2.19 Sediment

1.2.20 Solid Waste

1.2.20.1 Debris

1.2.20.2 Green Waste

1.2.20.3 Material not regulated as solid waste

1.2.20.4 Non-Hazardous Waste

1.2.20.5 Recyclables

1.2.20.6 Surplus Soil

1.2.20.7 Scrap Metal

1.2.20.8 Wood

1.2.21 Surface Discharge

1.2.22 Wastewater

1.2.22.1 Stormwater

1.2.23 Waters of the United States

1.2.24 Wetlands

1.2.25 Universal Waste

1.3 SUBMITTALS

1.4 ENVIRONMENTAL PROTECTION REQUIREMENTS

1.4.1 Conformance with the Environmental Management System

1.5 SPECIAL ENVIRONMENTAL REQUIREMENTS

1.6 QUALITY ASSURANCE

1.6.1 Preconstruction Survey and Protection of Features

1.6.2 Regulatory Notifications

1.6.3 Environmental Brief

SECTION 01 57 19 Page 1

1.6.4 Environmental Manager

1.6.5 Employee Training Records

1.6.5.1 Pest Control Training

1.6.6 Non-Compliance Notifications

1.7 ENVIRONMENTAL PROTECTION PLAN

1.7.1 General Overview and Purpose

1.7.1.1 Descriptions

1.7.1.2 Duties

1.7.1.3 Procedures

1.7.1.4 Communications

1.7.1.5 Contact Information

1.7.2 General Site Information

1.7.2.1 Drawings

1.7.2.2 Work Area

1.7.2.3 Documentation

1.7.3 Management of Natural Resources

1.7.3.1 Land Resources

1.7.3.2 Tree Protection

1.7.3.3 Replacement of Damaged Landscape Features

1.7.3.4 Temporary Construction

1.7.3.5 Stream Crossings

1.7.3.6 Fish and Wildlife Resources

1.7.3.7 Wetland Areas

1.7.4 Protection of Historical and Archaeological Resources

1.7.4.1 Objectives

1.7.4.2 Methods

1.7.5 Stormwater Management and Control

1.7.6 Protection of the Environment from Waste Derived from

Contractor Operations

1.7.7 Prevention of Releases to the Environment

1.7.8 Regulatory Notification and Permits

1.7.9 Clean Air Act Compliance

1.7.9.1 Haul Route

1.7.9.2 Pollution Generating Equipment

1.7.9.3 Stationary Internal Combustion Engines

1.7.9.4 Refrigerants

1.7.9.5 Air Pollution-engineering Processes

1.7.9.6 Monitoring

1.7.9.7 Compliant Materials

1.8 LICENSES AND PERMITS

1.9 ENVIRONMENTAL RECORDS BINDER

1.10 PESTICIDE DELIVERY, STORAGE, AND HANDLING

1.10.1 Delivery and Storage

1.10.2 Handling Requirements

1.11 Deleted

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 PROTECTION OF NATURAL RESOURCES

3.1.1 Flow Ways

3.1.2 Vegetation

3.1.3 Streams

3.2 STORMWATER

3.2.1 Construction General Permit

3.2.1.1 Stormwater Pollution Prevention Plan

3.2.1.2 Stormwater Notice of Intent for Construction Activities

SECTION 01 57 19 Page 2

3.2.1.3 Inspection Reports

3.2.1.4 Stormwater Pollution Prevention Plan Compliance Notebook

3.2.1.5 Stormwater Notice of Termination for Construction Activities

3.2.2 Erosion and Sediment Control Measures

3.2.2.1 Erosion Control

3.2.2.2 Sediment Control Practices

3.2.3 Work Area Limits

3.2.4 Contractor Facilities and Work Areas

3.2.5 Municipal Separate Storm Sewer System (MS4) Management

3.3 SURFACE AND GROUNDWATER

3.3.1 Cofferdams, Diversions, and Dewatering

3.3.2 Waters of the United States

3.4 PROTECTION OF CULTURAL RESOURCES

3.4.1 Archaeological Resources

3.4.2 Historical Resources

3.5 AIR RESOURCES

3.5.1 Deleted

3.5.2 Deleted

3.5.3 Burning

3.5.4 Fire Suppression

3.5.5 Deleted

3.5.6 Deleted

3.5.7 Dust Control

3.5.7.1 Particulates

3.5.7.2 Deleted

3.5.8 Odors

3.6 WASTE MINIMIZATION

3.6.1 Salvage, Reuse and Recycle

3.6.2 Nonhazardous Solid Waste Diversion Report

3.7 WASTE MANAGEMENT AND DISPOSAL

3.7.1 Deleted

3.7.2 Deleted

3.7.3 Deleted

3.7.4 Deleted

3.7.5 Deleted

3.7.6 Deleted

3.8 HAZARDOUS MATERIAL MANAGEMENT

3.9 PETROLEUM, OIL, LUBRICANT (POL) STORAGE AND FUELING

3.10 INADVERTENT DISCOVERY OF PETROLEUM-CONTAMINATED SOIL OR HAZARDOUS

WASTES

3.11 PEST MANAGEMENT

3.11.1 Application

3.11.2 Pesticide Treatment Plan

3.12 SOUND INTRUSION

3.13 POST CONSTRUCTION CLEANUP

-- End of Section Table of Contents --

SECTION 01 57 19 Page 3

SECTION 01 57 19

TEMPORARY ENVIRONMENTAL CONTROLS

11/15

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.120 Hazardous Waste Operations and Emergency Response

40 CFR 50 National Primary and Secondary Ambient Air Quality Standards

40 CFR 60 Standards of Performance for New Stationary Sources

40 CFR 63 National Emission Standards for Hazardous Air Pollutants for Source Categories

40 CFR 64 Compliance Assurance Monitoring

40 CFR 112 Oil Pollution Prevention

40 CFR 122.26 Storm Water Discharges (Applicable to State NPDES Programs, see section 123.25)

40 CFR 152 Pesticide Registration and Classification Procedures

40 CFR 152 - 186 Pesticide Programs

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 261.7 Residues of Hazardous Waste in Empty Containers

40 CFR 263 Standards Applicable to Transporters of Hazardous Waste

40 CFR 265 Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

SECTION 01 57 19 Page 4

40 CFR 268 Land Disposal Restrictions

40 CFR 273 Standards for Universal Waste Management

40 CFR 279 Standards for the Management of Used Oil

49 CFR 171 General Information, Regulations, and Definitions

49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements

49 CFR 173 Shippers - General Requirements for Shipments and Packagings

1.2 DEFINITIONS

1.2.1 Class I and II Ozone Depleting Substance (ODS)

Class I ODS is defined in Section 602(a) of The Clean Air Act. A list of Class I ODS can be found on the EPA website at the following weblink.

https://www.epa.gov/ozone-layer-protection/ozone-depleting-substances .

Class II ODS is defined in Section 602(s) of The Clean Air Act. A list of Class II ODS can be found on the EPA website at the following weblink.

https://www.epa.gov/ozone-layer-protection/ozone-depleting-substances .

1.2.2 Contractor Generated Hazardous Waste

Contractor generated hazardous waste is materials that, if abandoned or disposed of, may meet the definition of a hazardous waste. These waste streams would typically consist of material brought on site by the Contractor to execute work, but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e. methyl ethyl ketone, toluene), waste thinners, excess paints, excess solvents, waste solvents, excess pesticides, and contaminated pesticide equipment rinse water.

1.2.3 Electronics Waste

Electronics waste is discarded electronic devices intended for salvage, recycling, or disposal.

1.2.4 Environmental Pollution and Damage

Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life;

affect other species of importance to humankind; or degrade the environment aesthetically, culturally or historically.

1.2.5 Environmental Protection

Environmental protection is the prevention/control of pollution and habitat disruption that may occur to the environment during construction. The control of environmental pollution and damage requires consideration of land, water, and air; biological and cultural resources; and includes

SECTION 01 57 19 Page 5 management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.

1.2.6 Hazardous Debris

As defined in paragraph SOLID WASTE, debris that contains listed hazardous waste (either on the debris surface, or in its interstices, such as pore structure) in accordance with 40 CFR 261 . Hazardous debris also includes debris that exhibits a characteristic of hazardous waste in accordance with

40 CFR 261 .

1.2.7 Hazardous Materials

Hazardous materials as defined in 49 CFR 171 and listed in 49 CFR 172 .

Hazardous material is any material that: Is regulated as a hazardous material in accordance with 49 CFR 173 ; or requires a Safety Data Sheet (SDS) in accordance with 29 CFR 1910.120 ; or during end use, treatment, handling, packaging, storage, transportation, or disposal meets or has components that meet or have potential to meet the definition of a hazardous waste as defined by 40 CFR 261 Subparts A, B, C, or D.

Designation of a material by this definition, when separately regulated or controlled by other sections or directives, does not eliminate the need for adherence to that hazard-specific guidance which takes precedence over this section for "control" purposes. Such material includes ammunition, weapons, explosive actuated devices, propellants, pyrotechnics, chemical and biological warfare materials, medical and pharmaceutical supplies, medical waste and infectious materials, bulk fuels, radioactive materials, and other materials such as asbestos, mercury, and polychlorinated biphenyls (PCBs).

1.2.8 Hazardous Waste

Hazardous Waste is any material that meets the definition of a solid waste and exhibit a hazardous characteristic (ignitability, corrosivity, reactivity, or toxicity) as specified in 40 CFR 261 , Subpart C, or contains a listed hazardous waste as identified in 40 CFR 261 , Subpart D.

1. 2. 9 Deleted

1.2.10 Land Application

Land Application means spreading or spraying discharge water at a rate that allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, discharge into defined drainage areas, or discharge into the "waters of the United States" must occur.

Comply with federal, state, and local laws and regulations.

1.2.11 Municipal Separate Storm Sewer System (MS4) Permit

MS4 permits are those held by installations to obtain NPDES permit coverage for their stormwater discharges.

1.2.12 National Pollutant Discharge Elimination System (NPDES)

The NPDES permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States.

SECTION 01 57 19 Page 6

1.2.13 Oily Waste

Oily waste are those materials that are, or were, mixed with Petroleum, Oils, and Lubricants (POLs) and have become separated from that POLs. Oily wastes also means materials, including wastewaters, centrifuge solids, filter residues or sludges, bottom sediments, tank bottoms, and sorbents which have come into contact with and have been contaminated by, POLs and may be appropriately tested and discarded in a manner which is in compliance with other state and local requirements.

This definition includes materials such as oily rags, "kitty litter" sorbent clay and organic sorbent material. These materials may be land filled provided that: It is not prohibited in other state regulations or local ordinances; the amount generated is "de minimus" (a small amount); it is the result of minor leaks or spills resulting from normal process operations; and free-flowing oil has been removed to the practicable extent possible. Large quantities of this material, generated as a result of a major spill or in lieu of proper maintenance of the processing equipment, are a solid waste. As a solid waste, perform a hazardous waste determination prior to disposal. As this can be an expensive process, it is recommended that this type of waste be minimized through good housekeeping practices and employee education.

1.2.14 Pesticide

Pesticide is any substance or mixture of substances intended for preventing, destroying, repelling, or mitigating any pest, or intended for use as a plant regulator, defoliant or desiccant.

1.2.15 Pesticide Treatment Plan

A plan for the prevention, monitoring, and control to eliminate pest infestation.

1.2.16 Pests

Pests are non-native invasive plants, arthropods, birds, rodents, nematodes, fungi, bacteria, viruses, algae, snails, marine borers, snakes, weeds and other organisms (except for human or animal disease-causing organisms) that adversely affect readiness, military operations, or the well-being of personnel and animals; attack or damage real property, supplies, equipment, or vegetation; or are otherwise undesirable.

1.2.17 Project Pesticide Coordinator

The Project Pesticide Coordinator (PPC) is an individual who resides at a Civil Works Project office and who is responsible overseeing of pesticide application on project grounds.

1.2.18 Regulated Waste

Regulated waste are solid wastes that have specific additional federal, state, or local controls for handling, storage, or disposal.

1.2.19 Sediment

Refer to Section 31 00 00 EARTHWORK, paragraph DEFINITIONS, subparagraph Sediment.

SECTION 01 57 19 Page 7

1.2.20 Solid Waste

Solid waste is a solid, liquid, semi-solid or contained gaseous waste. A solid waste can be a hazardous waste, non-hazardous waste, or non-Resource Conservation and Recovery Act (RCRA) regulated waste. Types of solid waste typically generated at construction sites may include:

1.2.20.1 Debris

Debris is non-hazardous solid material generated during the construction, demolition, or renovation of a structure that exceeds 2.5-inch particle size that is: a manufactured object; non-native plant or animal matter; or natural geologic material (for example, cobbles and boulders), broken or removed concrete, masonry, and rock asphalt paving; ceramics; roofing paper and shingles. Inert materials may not be reinforced with or contain ferrous wire, rods, accessories and weldments. A mixture of debris and other material such as soil or sludge is also subject to regulation as debris if the mixture is comprised primarily of debris by volume, based on visual inspection.

1.2.20.2 Green Waste

Refer to Section 31 00 00 EARTHWORK, paragraph DEFINITIONS, subparagraph Organic Material.

1.2.20.3 Material not regulated as solid waste

Material not regulated as solid waste is nuclear source or byproduct materials regulated under the Federal Atomic Energy Act of 1954 as amended;

suspended or dissolved materials in domestic sewage effluent or irrigation return flows, or other regulated point source discharges; regulated air emissions; and fluids or wastes associated with natural gas or crude oil exploration or production.

1.2.20.4 Non-Hazardous Waste

Non-hazardous waste is waste that is excluded from, or does not meet, hazardous waste criteria in accordance with 40 CFR 263 .

1.2.20.5 Recyclables

Recyclables are materials, equipment and assemblies such as doors, windows, door and window frames, plumbing fixtures, glazing and mirrors that are recovered and sold as recyclable, wiring, insulated/non-insulated copper wire cable, wire rope, and structural components. It also includes commercial-grade refrigeration equipment with Freon removed, household appliances where the basic material content is metal, clean polyethylene terephthalate bottles, cooking oil, used fuel oil, textiles, high-grade paper products and corrugated cardboard, stackable pallets in good condition, clean crating material, and clean rubber/vehicle tires. Metal meeting the definition of lead contaminated or lead based paint contaminated may not be included as recyclable if sold to a scrap metal company. Paint cans that meet the definition of empty containers in accordance with 40 CFR 261.7 may be included as recyclable if sold to a scrap metal company.

1.2.20.6 Surplus Soil

Surplus soil is existing soil that is in excess of what is required for

SECTION 01 57 19 Page 8 this work, including aggregates intended, but not used, for on-site mixing of concrete, mortars, and paving. Contaminated soil meeting the definition of hazardous material or hazardous waste is not included and must be managed in accordance with paragraph HAZARDOUS MATERIAL MANAGEMENT.

1.2.20.7 Scrap Metal

This includes scrap and excess ferrous and non-ferrous metals such as reinforcing steel, structural shapes, pipe, and wire that are recovered or collected and disposed of as scrap. Scrap metal meeting the definition of hazardous material or hazardous waste is not included.

1.2.20.8 Wood

Wood is dimension and non-dimension lumber, plywood, chipboard, hardboard.

Treated or painted wood that meets the definition of lead contaminated or lead based contaminated paint is not included. Treated wood includes, but is not limited to, lumber, utility poles, crossties, and other wood products with chemical treatment.

1.2.21 Surface Discharge

Surface discharge means discharge of water into drainage ditches, storm sewers, creeks or "waters of the United States". Surface discharges are discrete, identifiable sources and require a permit from the governing agency. Comply with federal, state, and local laws and regulations.

1.2.22 Wastewater

Wastewater is the used water and solids from a community that flow to a treatment plant.

1.2.22.1 Stormwater

Stormwater is any precipitation in an urban or suburban area that does not evaporate or soak into the ground, but instead collects and flows into storm drains, rivers, and streams.

1.2.23 Waters of the United States

Waters of the United States means Federally jurisdictional waters, including wetlands, that are subject to regulation under Section 404 of the Clean Water Act or navigable waters, as defined under the Rivers and Harbors Act.

1.2.24 Wetlands

Wetlands are those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions.

1.2.25 Universal Waste

The universal waste regulations streamline collection requirements for certain hazardous wastes in the following categories: batteries, pesticides, mercury-containing equipment (for example, thermostats), and lamps (for example, fluorescent bulbs). The rule is designed to reduce hazardous waste in the municipal solid waste (MSW) stream by making it

SECTION 01 57 19 Page 9 easier for universal waste handlers to collect these items and send them for recycling or proper disposal. These regulations can be found at

40 CFR 273 .

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Office symbol is as follows:

PDR - Planning Division, Environmental Resources Branch

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Preconstruction Survey ; G, PDR

Regulatory Notifications ; G, PDR

Environmental Protection Plan ; G, PDR

Stormwater Pollution Prevention Plan (SWPPP); G, PDR

Stormwater Notice of Intent (for NPDES coverage under the general permit for construction activities); G, PDR

Dirt and Dust Control Plan

Employee Training Records ; G

Environmental Manager Qualifications

SD-06 Test Reports

Inspection Reports

SD-07 Certificates

Employee Training Records ; G, PDR

Certificate of Competency

Erosion and Sediment Control Inspector Qualifications

SD-11 Closeout Submittals

Stormwater Pollution Prevention Plan Compliance Notebook ; G, PDR

Stormwater Notice of Termination (for NPDES coverage under the general permit for construction activities); G, PDR

Assembled Employee Training Records ; G, PDR

Regulatory Notifications ; G, PDR

SECTION 01 57 19 Page 10

As-Built Topographic Survey

1.4 ENVIRONMENTAL PROTECTION REQUIREMENTS

Provide and maintain, during the life of the contract, environmental protection as defined. Plan for and provide environmental protective measures to control pollution that develops during construction practice.

Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Protect the environmental resources within the project boundaries and those affected outside the limits of permanent work during the entire duration of this Contract. Comply with federal, state, and local regulations pertaining to the environment, including water, air, solid waste, hazardous waste and substances, oily substances, and noise pollution.

Tests and procedures assessing whether construction operations comply with Applicable Environmental Laws may be required. Analytical work must be performed by qualified laboratories; and where required by law, the laboratories must be certified.

1.4.1 Conformance with the Environmental Management System

Perform work under this contract consistent with the policy and objectives identified in the installation's Environmental Management System (EMS).

Perform work in a manner that conforms to objectives and targets of the environmental programs and operational controls identified by the EMS.

Support Government personnel when environmental compliance and EMS audits are conducted by escorting auditors at the Project site, answering questions, and providing proof of records being maintained. Provide monitoring and measurement information as necessary to address environmental performance relative to environmental, energy, and transportation management goals. In the event an EMS nonconformance or environmental noncompliance associated with the contracted services, tasks, or actions occurs, take corrective and preventative actions. In addition, employees must be aware of their roles and responsibilities under the installation EMS and of how these EMS roles and responsibilities affect work performed under the contract.

Coordinate with the installation's EMS coordinator to identify training needs associated with environmental aspects and the EMS, and arrange training or take other action to meet these needs. Provide training documentation to the Contracting Officer. The Installation Environmental Office will retain associated environmental compliance records. Make EMS Awareness training completion certificates available to Government auditors during EMS audits and include the certificates in the Employee Training Records. See paragraph EMPLOYEE TRAINING RECORDS.

1.5 SPECIAL ENVIRONMENTAL REQUIREMENTS

Comply with the special environmental requirements listed here.

Minimize environmental pollution and damage that may occur as the result of construction operations. Protect (avoid) environmental resources outside the limits of the project boundaries during the entire duration of this contract. Comply with all applicable environmental Federal, State, and local laws and regulations. Repair or restore any damage to environmental resources caused by unauthorized encroachments within and outside of the project boundaries (which include designated temporary construction

SECTION 01 57 19 Page 11 easements, haul routes, staging areas and other designated work areas.

All vegetation clearing must occur from August 15 through March 15, outside of the bird nesting season, unless authorized by the Contracting Officer.

Best management practices must be implemented to prevent the discharge or dispersal of crude oil, petroleum products, or other toxic substances or hazardous materials into the creek. Inspect the Project area to ensure it is free from petroleum products and contaminant spills prior to and during the implementation of the Project.

Channel construction and maintenance activities must not be conducted if bank to bank flows exist and during rain events to reduce the potential for significant impacts to water quality. Monitor and record weather reports for any indication of potential rain events. The Contractor must divert the low flow channel consistent with the SWPPP and regulatory permits to minimize working within the live channel.

Channel construction and maintenance activities must not be conducted from December 1 through February 28 in order to avoid winter rains and to correspondingly reduce the potential for significant water quality impacts.

(original to the 2000 EIS, Section 401 permit, and Section 7 Biological Opinion Permit(2019)).

Construction is expected to be completed by December 1st, 2020, however, if due to extraordinary circumstances (i.e. weather or other events that may delay activities) consult with the resource agencies to obtain approval to continue construction.

I f const r uct i on act i v i t i es must be schedul ed t o occur af t er December 1st 2020 t o avoi d and mi ni mi ze unaut hor i zed i nj ur y or deat h t o l east Bel l ' s v i r eo ( Vireo bellii pusillus) , a qual i f i ed gover nment Bi ol ogi cal Moni t or must be pr esent dur i ng al l const r uct i on act i v i t i es bet ween Mar ch 15 and August 15.

To avoid and minimize unauthorized injury or death of western pond turtle (Actinemys pallida), prior to construction, coordinate with the Contracting Officer and Corps Biologist to confirm capture/relocation and surveys have been completed. The Phase I designated work area within the maintenance channel must be clearly staked and enclosed with a silt fence exclusion barrier for protection of the turtles. Silt fence exclusion barrier must meet CALTRANS Standard Plan T51 for location parallel to channel flow and T60 for locations perpendicular to channel flow. A Government biological monitor will be present at the start of and during construction activity to prevent impacts to southwestern pond turtles. To minimize impacts to any turtles remaining within the Project Area, construction work must start at the upstream end where access is located and proceed downstream. All exclusionary silt fencing must be removed and disposed of upon completion of construction.

1.6 QUALITY ASSURANCE

1.6.1 Preconstruction Survey and Protection of Features

This paragraph supplements SUPPLEMENTARY CONDITION 52.236-9 PROTECTION OF

EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS.

Prior to start of any onsite construction activities, perform a Preconstruction Survey of the project site with the Contracting Officer, and take photographs showing existing environmental conditions in and

SECTION 01 57 19 Page 12 adjacent to the site. Submit a report for the record. Include in the report a plan describing the features requiring protection under the provisions of the Contract Clauses, which are not specifically identified on the drawings as environmental features requiring protection along with the…