AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 4
0001 Aug 5, 2016
USACE-LOS ANGELES DISTRICT
CONTRACTING DIVISION, WEST REGION BRANCH
915 WILSHIRE BLVD, SUITE 1440
LOS ANGELES, CA 90017
W912PL-16-R-0064
Jul 28, 2016
Renovate Barracks 267, Fort Irwin, CA.
Barracks 267 will be upgraded to meet current building codes and standards.
The purpose of this amendment is to replace pages 31 and 45 from RFP W912PL-16-R-0064, changes are bold and underlined.
Replacement pages are attached and made part of this solicitation.
The due date for receipt of proposals remains unchanged.
INSTRUCTIONS
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code) . Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date) .
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By) . Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor) . For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated ). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data) .
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B . The contracting officer's signature is not required on solicitation amendments. The contracting offier's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13 . Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification) .
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
Total contract price increased by $
Total contract price decreased by $
Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
A reference to the letter determination; and
A statement of the net amount determined to be due in settlement of the contract.
(g)
(h)
(i)
(ii)
(1)
(2)
(3)
(4)
(5)
(6)
(i)
(ii)
(iii)
STANDARD FORM 30 (REV. 10-83) BACK
(1) Accounting classification Net increase $
Renovate Barracks 267 W912PL-16-R-0064 Fort Irwin, CA
00 22 00 – 6
AMENDMENT 0001
FACTOR 1 – CONSTRUCTION EXPERIENCE (Volume 2, Tab #1) Submission requirements:
For this factor, the offeror shall submit two (2) project summaries of construction projects which best illustrate his/her experience as prime contractor on projects, of a similar type as this project. Projects considered similar include: Repair or new construction projects that incorporated multi story buildings, with new EIFS wall system, new interior finishes, new windows meeting ATFP, new electrical, new plumbing, power and lighting, HVAC & fire protection (suppression) system and underground utilities. Each project summary should consist of a one or two page narrative of the project, discussing the project and providing specifics as noted herein. No more than two (2) projects may be submitted. If more than two (2) construction projects are submitted from the offeror, only the first two (2) submitted for the firm will be evaluated, starting from the most recent and working backwards in time. Each project cited should have a construction dollar value ranging from $1,000,000.00 - $5,000,000.00 and completed within five (5) years of the RFP issue date. An IDIQ contract may be submitted only if a single task order meets the requirements of this factor. Only projects that were constructed within the United States will be considered meeting the requirements of this section. Each project example shall demonstrate relevant experience to the proposed acquisition, with “relevant experience” being defined as experience on projects that are similar to this project. Summaries may also include non-government private sector projects of similar type. Each summary shall include the following: a description of the project; construction contract award amount; final construction cost; location;
date when the project was started; original contract finish date and actual finish date. All summaries shall contain the name, address, telephone and fax number of a representative of the owner (as well as one alternate individual not affiliated with your firm) familiar with your firm’s experience on the project that can verify the experience cited. (Attachment No. 2 is provided for your use).
Only projects that were constructed within the United States will be considered meeting the requirements of this section
FACTOR 2 – KEY PERSONNEL (Volume 2, Tab #2) Submission requirements:
All on-site project personnel shall be and verify U. S. Citizenship.
The offeror shall provide the names and resumes for key construction personnel with experience similar to this project that will be assigned to this project. Indicate who will be on-site full time (including estimated arrival and departure dates) and MAIN office management. In addition, the offeror shall provide a summary of the duties, responsibilities, and delegated authorities of these individuals. (Attachment 1 is provided for your use). Delegation of duties, responsibilities and authorities shall be provided to the Government with appointment letters from the President down the chain of command. In addition to meeting the personnel requirements and qualifications found in the Corps of Engineers Safety and Health requirements Manual EM 385-1-1, this section shall include data on the following personnel:
A). Project Superintendent: The proposed Project Superintendent position shall be independent of any other positions. No additional roles will be allowed (i.e. not allowed to serve as the Construction CQC or the Safety Manager as well as performing the Project Superintendent position). Project Superintendent is responsible for all on site day to day operations.
The proposed On-Site Project Superintendent shall be an experienced construction person with at least seven (7) years’ experience as a Project Superintendent (within the last ten (10) years) on projects similar to this project.
Project used as experience shall be complete or substantially complete within the last ten (10) years. A resume of projects worked the last 10 years shall be submitted that show the individual meets the requirements. The resume must include the dates and specific duties assigned for each project. Include all information that conveys the following, if applicable, in your resume’s project information: experience of a similar type as this project.
Renovate Barracks 267 W912PL-16-R-0064 Fort Irwin, CA
00 22 16 – 3
AMENDMENT 0001
4. EVALUATION CRITERIA AND RATING SCHEMES FOR VOLUME 2
General Evaluation Criteria. The government will evaluate and rate Volume 2, non -cost/ price technical information, using the rating schemes described below:
Table A-1. Technical Acceptable /Unacceptable Ratings, applicable to Factors 1, 2 and 4 Rating Description Acceptable Proposal clearly meets the minimum requirement of the solicitation.
Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation
Table A-2. Past Performance Evaluation Ratings, applicable to Factor 3 Rating Description Acceptable Based on the offerors’s past performance record, the
Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s past performance is unknown. (See note below)*
Unacceptable Based on the offeror’s past performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort
*NOTE: In case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so spare that no meaningful past performance rating can be reasonably assigned; the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “Acceptable.”
5. PROPOSAL EVALUATION
ACCEPTABILITY STANDARDS: In order to be considered technically acceptable, proposals must be submitted in writing and must meet the following minimum requirements:
FACTOR 1 -- CONSTRUCTION EXPERIENCE (VOLUME 2, TAB #1)
Evaluation Criteria:
The Source Selection Evaluation Board (SSEB) will evaluate both the extent and quality of recent experience for compliance with the minimum requirements identified in the offeror’s non-cost/price proposal. To receive an “acceptable” rating, the offeror shall submit 2 projects that have been completed or substantially complete within the last five (5) years of the RFP issue date, which are similar to this project in size and complexity. Projects considered similar to this project include: Any repair or new construction projects that incorporated multi story buildings, with new EIFS wall system, new interior finishes, new windows meeting ATFP, new electrical, new plumbing, power and lighting, HVAC & fire protection (suppression) system and underground utilities. Each project cited should have a construction dollar value ranging from $1,000,000 .00- $5,000,000.00, and completed within five (5) years of the RFP issue date. Prime contractor experience given that does not meet these requirements will be given a rating of “unacceptable” for this factor.
FACTOR 2 – KEY PERSONNEL (VOLUME 2, TAB #2)
Evaluation Criteria:
| SF30_4-combine |
| revisions to section W912PL-16-R-0064 div 0 Specs page 31 |
| revisions to section W912PL-16-R-0064 div 0 Specs page 45 |