Bid Abstract.

View the file

Other files

File Type Posted
Am2_W912PL-16-B-0003.pdf PDF
Am1_W912PL-16-B-0003.pdf PDF
OS2015_03_pre-hydro.pts —
OS2015_04_post.pts —
OS2015_03_Loading_Ramp_LAND.txt TXT text file
Appdx_B_-_MCB_Pendleton_Launch_Ramp_2015_SAR.pdf PDF
Drawings_W912PL-16-B-0003.pdf PDF
Appdx_A_Oceanside_Final_Sampling_Report_2012.pdf PDF
Spec_W912PL-16-B-0003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912PL-16-B-0003

ABSTRACT OF BIDS

Invitation for Bid W912PL-16-B-0003 for

Oceanside Harbor Maintenance Dredging

San Diego County, California

With 2 Amendments

Bid Opening Date: 25 March 2016

1. CJW Construction Santa Ana, CA $ 11,493,000

2. Manson Construction Company Seattle, WA $ 11,716,000

3. The Dutra Group San Rafael, CA $ 23,151,500

Government Estimate $ 9,479,000

Bid Opening Date: 3/25/2016

CJW Construction (Small Business, Woman Owned Small Business, HUBZone) 841 E. Washington Ave, Suite B Santa Ana, CA 92701

1 Mobilization and Demobilization, First Cycle 1 Job Lump Sum $1,600,000.00

2A First 180,000 Cubic Yards 180,000 Cubic Yards $14.00 $2,520,000.00

2B Over 180,000 Cubic Yards 80,000 Cubic Yards $12.00 $960,000.00

$5,080,000.00

First Year Cycle Option

3 Camp Pendleton Loading Ramp - Area A

- Placement onto Oceanside Beach 7,000 Cubic Yards $15.00 $105,000.00

4 Camp Pendleton Loading Ramp - Area B

- Placement onto Oceanside Beach 12,000 Cubic Yards $14.00 $168,000.00

$273,000.00

Second Year Cycle Option

5 Mobilization and Demobilization, Second Cycle 1 Job Lump Sum $1,400,000.00

6A First 100,000 Cubic Yards 100,000 Cubic Yards $11.00 $1,100,000.00

6B Over 100,000 Cubic Yards 80,000 Cubic Yards $9.00 $720,000.00

$3,220,000.00

7 Mobilization and Demobilization, Third Cycle 1 Job Lump Sum $1,200,000.00

6 DREDGING THIRD YEAR CYCLE: ENTRANCE CHANNEL $16 746 000 00

8A First 100,000 Cubic Yards 100,000 Cubic Yards $10.00 $1,000,000.00

8B Over 100,000 Cubic Yards 80,000 Cubic Yards $9.00 $720,000.00

$2,920,000.00

$11,493,000.00

OCEANSIDE HARBOR MAINTENANCE DREDGING

San Diego County, California

2 Amendments

BASE BID

Item # Description Estimated Quantity

Unit of Measure Unit Price Amount

Third Year Cycle Option

Dredging, Third Year Cycle: Entrance Channel & Advance Maintenance Area, Del Mar and Oceanside Channels

Total 3rd Year Cycle Option Items

TOTAL ESTIMATED AMOUNT, Base Bid Plus Option Items:

Dredging, First Year Cycle: Entrance Channel & Advance Maintenance Area, Del Mar and Oceanside Channels

Total Base Bid

OPTION ITEMS

Total 1st Year Cycle Option Items

Dredging, Second Year Cycle: Entrance Channel & Advance Maintenance Area, Del Mar and Oceanside Channels

Total 2nd Year Cycle Option Items

Manson Construction Company (Large Business) 5209 E. Marginal Way S.

Seattle, WA 98134

1 Mobilization and Demobilization, First Cycle 1 Job Lump Sum $1,700,000.00

2A First 180,000 Cubic Yards 180,000 Cubic Yards $10.00 $1,800,000.00

2B Over 180,000 Cubic Yards 80,000 Cubic Yards $8.50 $680,000.00

$4,180,000.00

- Placement onto Oceanside Beach 7,000 Cubic Yards $38.00 $266,000.00

4 Camp Pendleton Loading Ramp - Area B

- Placement onto Oceanside Beach 12,000 Cubic Yards $15.00 $180,000.00

$446,000.00

Second Year Cycle Option

5 Mobilization and Demobilization, Second Cycle 1 Job Lump Sum $1,700,000.00

6A First 100,000 Cubic Yards 100,000 Cubic Yards $10.00 $1,000,000.00

6B Over 100,000 Cubic Yards 80,000 Cubic Yards $10.00 $800,000.00

$3,500,000.00

7 Mobilization and Demobilization, Third Cycle 1 Job Lump Sum $1,700,000.00

6 DREDGING THIRD YEAR CYCLE: ENTRANCE CHANNEL $16 252 000 00

8A First 100,000 Cubic Yards 100,000 Cubic Yards $10.50 $1,050,000.00

8B Over 100,000 Cubic Yards 80,000 Cubic Yards $10.50 $840,000.00

$3,590,000.00

$11,716,000.00

San Diego County, California

2 Amendments

BASE BID

Item # Description Estimated Quantity

Unit of Measure Unit Price Amount

Third Year Cycle Option

Dredging, Third Year Cycle: Entrance Channel & Advance Maintenance Area, Del Mar and Oceanside Channels

Total 3rd Year Cycle Option Items

TOTAL ESTIMATED AMOUNT, Base Bid Plus Option Items:

Dredging, First Year Cycle: Entrance Channel & Advance Maintenance Area, Del Mar and Oceanside Channels

Total Base Bid

OPTION ITEMS

Total 1st Year Cycle Option Items

Dredging, Second Year Cycle: Entrance Channel & Advance Maintenance Area, Del Mar and Oceanside Channels

The Dutra Group (Large Business) 2350 Kerner Boulevard, Suite 200 San Rafael, CA 94901

1 Mobilization and Demobilization, First Cycle 1 Job Lump Sum $3,500,000.00

2A First 180,000 Cubic Yards 180,000 Cubic Yards $28.50 $5,130,000.00

2B Over 180,000 Cubic Yards 80,000 Cubic Yards $28.50 $2,280,000.00

$10,910,000.00

- Placement onto Oceanside Beach 7,000 Cubic Yards $28.50 $199,500.00

4 Camp Pendleton Loading Ramp - Area B

- Placement onto Oceanside Beach 12,000 Cubic Yards $28.50 $342,000.00

$541,500.00

Second Year Cycle Option

5 Mobilization and Demobilization, Second Cycle 1 Job Lump Sum $720,000.00

6A First 100,000 Cubic Yards 100,000 Cubic Yards $28.50 $2,850,000.00

6B Over 100,000 Cubic Yards 80,000 Cubic Yards $28.50 $2,280,000.00

$5,850,000.00

7 Mobilization and Demobilization, Third Cycle 1 Job Lump Sum $720,000.00

6 DREDGING THIRD YEAR CYCLE: ENTRANCE $31 823 000 00

8A First 100,000 Cubic Yards 100,000 Cubic Yards $28.50 $2,850,000.00

8B Over 100,000 Cubic Yards 80,000 Cubic Yards $28.50 $2,280,000.00

$5,850,000.00

$23,151,500.00

TOTAL ESTIMATED AMOUNT, Base Bid Plus Option Items:

Dredging, Third Year Cycle: Entrance Channel & Advance Maintenance Area, Del Mar and Oceanside Channels

BASE BID

OPTION ITEMS

Unit Price Amount

Dredging, First Year Cycle: Entrance Channel & Advance Maintenance Area, Del Mar and Oceanside Channels

Dredging, Second Year Cycle: Entrance Channel & Advance Maintenance Area, Del Mar and Oceanside Channels

Total Base Bid

Total 2nd Year Cycle Option Items

Total 3rd Year Cycle Option Items

Item # Description Estimated Quantity

Unit of Measure

Total 1st Year Cycle Option Items

Third Year Cycle Option

W912PL-16-B-0003

2 Amendments

San Diego County, California

Independent Government Estimate

1 Mobilization and Demobilization, First Cycle 1 Job Lump Sum $1,177,000.00

2A First 180,000 Cubic Yards 180,000 Cubic Yards $8.00 $1,440,000.00

2B Over 180,000 Cubic Yards 80,000 Cubic Yards $7.00 $560,000.00

$3,177,000.00

- Placement onto Oceanside Beach 7,000 Cubic Yards $10.00 $70,000.00

4 Camp Pendleton Loading Ramp - Area B

- Placement onto Oceanside Beach 12,000 Cubic Yards $10.00 $120,000.00

$190,000.00

Second Year Cycle Option

5 Mobilization and Demobilization, Second Cycle 1 Job Lump Sum $1,224,000.00

6A First 100,000 Cubic Yards 100,000 Cubic Yards $11.00 $1,100,000.00

6B Over 100,000 Cubic Yards 80,000 Cubic Yards $9.00 $720,000.00

$3,044,000.00

7 Mobilization and Demobilization, Third Cycle 1 Job Lump Sum $1,248,000.00

6 DREDGING THIRD YEAR CYCLE: ENTRANCE CHANNEL $12 893 000 00

8A First 100,000 Cubic Yards 100,000 Cubic Yards $11.00 $1,100,000.00

8B Over 100,000 Cubic Yards 80,000 Cubic Yards $9.00 $720,000.00

$3,068,000.00

$9,479,000.00

San Diego County, California

2 Amendments

BASE BID

Item # Description Estimated Quantity

Unit of Measure Unit Price Amount

Third Year Cycle Option

Dredging, Third Year Cycle: Entrance Channel & Advance Maintenance Area, Del Mar and Oceanside Channels

Total 3rd Year Cycle Option Items

TOTAL ESTIMATED AMOUNT, Base Bid Plus Option Items:

Dredging, First Year Cycle: Entrance Channel & Advance Maintenance Area, Del Mar and Oceanside Channels

Total Base Bid

OPTION ITEMS

Total 1st Year Cycle Option Items

Dredging, Second Year Cycle: Entrance Channel & Advance Maintenance Area, Del Mar and Oceanside Channels

Summary of Bids
1 - CJW Construction
2 - Manson Construction
3 - Dutra Group
Government Estimate

File details come from the government source that posted it. Updated .