BID TOTAL
| EU-00032-5J INSTALL VEHICLE BARRIERS | | | | | | | | | | | | | |
| | | Quantity/Quantità | | Material Cost/Costo Materiale | | | Labor Cost/Costo Manodopera | | | Total Cost/Costo Totale | | |
| Item | DESCRIPTION | Unit | "K" | "L" | Unit | "K" | "L" | Unit | "K" | "L" | "K" | "L" | "K+L" |
| | Unità | | | Unità | Euro | Euro | Unità | Euro | Euro | Euro | Euro | Euro |
| 1 | Total civil work - Totale lavoro civile | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | € 0.00 | € 0.00 | € 0.00 |
| 3 | Total electrical work - Totale lavoro elettrico | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | € 0.00 | € 0.00 | € 0.00 |
| 4 | Design efforts | % | | | | | | 8% | 8% | € 0.00 | € 0.00 | € 0.00 |
| TOTAL WORK | | | | | € 0.00 | € 0.00 | € 0.00 |
| | | | | $0.00 | $0.00 | $0.00 |
| RATE | $1.0000 | = | € 0.9329 | | | |
| | | | | | Contingencies | € 0.00 |
| | | | | | Overhead | € 0.00 |
| | | | | | Profit | € 0.00 |
| | | | | | GRAND TOTAL | € 0.00 |
| | | | | | | $0.00 |
| 1 | CIVIL WORK-LAVORI CIVILI | | | | | | | | | | | | |
| General Conditions | | | | | | | | | | | | |
| REMOVAL OF EXISTING BARRIER 1 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| REMOVAL OF EXISTING BARRIER 2 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| REMOVAL OF EXISTING BARRIER 3 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| REMOVAL OF EXISTING BARRIER 4 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| A10 | Foundations | | | | | | | | | | | | |
| Demolition (Asphalt) For Barrier 1 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Demolition (Asphalt) For Barrier 2 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Demolition (Asphalt) For Barrier 3 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Demolition (Asphalt) For Barrier 4 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation Barrier 1 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation Barrier 2 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation Barrier 3 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation Barrier 4 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| G10 | Site Preparations | | | | | | | | | | | | |
| Demolition | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Topographic Survey at Barrier 1 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Topographic Survey at Barrier 2 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Topographic Survey at Barrier 3 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Topographic Survey at Barrier 4 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| G1030 | Site Earthwork | | | | | | | | | | | | |
| Demolition | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Removal of unsuitable materials and transportation Barrier 1 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Removal of unsuitable materials and transportation Barrier 2 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Removal of unsuitable materials and transportation Barrier 3 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Removal of unsuitable materials and transportation Barrier 4 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| G2010 | Roadways | | | | | | | | | | | | |
| Demolition | LS | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Roadways restoration, paving and stripping Barrier 1 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Roadways restoration, paving and stripping Barrier 2 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Roadways restoration, paving and stripping Barrier 3 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Roadways restoration, paving and stripping Barrier 4 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| G2030 | Pedestrian Paving | | | | | | | | | | | | |
| Demolition | LS | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Sidewalk restoration Barrier 1 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Sidewalk restoration Barrier 2 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Sidewalk restoration Barrier 3 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Sidewalk restoration Barrier 4 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Total civil work - Totale lavoro civile | | | | | | € 0.00 | € 0.00 | | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
3 ELECTRICAL WORK-LAVORI ELETTRICI
| D5030 | Communication & Security | | | | | | | | | | | | |
| Demolition | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation of infrastructure to support Camera 1 | LM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation of infrastructure to support Camera 2 | LM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation of infrastructure to support Camera 3 | LM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation of infrastructure to support Camera 4 | LM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| E10 | Equipment | | | | | | | | | | | | |
| Barrier 1 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Barrier 2 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Barrier 3 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Barrier 4 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Fixed Bollard for Barrier 1 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Fixed Bollard for Barrier 2 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Fixed Bollard for Barrier 3 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Fixed Bollard for Barrier 4 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Camera for Barrier 1 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Camera for Barrier 2 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Camera for Barrier 3 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Camera for Barrier 4 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Safety Lights for Barrier 1 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Safety Lights for Barrier 2 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Safety Lights for Barrier 3 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Safety Lights for Barrier 4 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| G4010 | Electrical Distribuition | | | | | | | | | | | | |
| Demolition | LM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation of infrastructure to support Barrier 1 | LM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation of infrastructure to support Barrier 2 | LM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation of infrastructure to support Barrier 3 | LM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation of infrastructure to support Barrier 4 | LM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Total electrical work - Totale lavoro elettrico | | | | | | € 0.00 | € 0.00 | | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
Page &P of &N
BID BASE
| EU-00032-5J INSTALL VEHICLE BARRIERS | | | | | | | | | | | | | |
| | | Quantity/Quantità | | Material Cost/Costo Materiale | | | Labor Cost/Costo Manodopera | | | Total Cost/Costo Totale | | |
| Item | DESCRIPTION | Unit | "K" | "L" | Unit | "K" | "L" | Unit | "K" | "L" | "K" | "L" | "K+L" |
| | Unità | | | Unità | Euro | Euro | Unità | Euro | Euro | Euro | Euro | Euro |
| 1 | Total civil work - Totale lavoro civile | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | € 0.00 | € 0.00 | € 0.00 |
| 3 | Total electrical work - Totale lavoro elettrico | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | € 0.00 | € 0.00 | € 0.00 |
| 4 | Design efforts | % | | | | | | 8% | 8% | € 0.00 | € 0.00 | € 0.00 |
| TOTAL WORK | | | | | € 0.00 | € 0.00 | € 0.00 |
| | | | | $0.00 | $0.00 | $0.00 |
| RATE | $1.0000 | = | € 0.9329 | | | |
| | | | | | Contingencies | € 0.00 |
| | | | | | Overhead | € 0.00 |
| | | | | | Profit | € 0.00 |
| | | | | | GRAND TOTAL | € 0.00 |
| | | | | | | $0.00 |
| 1 | CIVIL WORK-LAVORI CIVILI | | | | | | | | | | | | |
| General Conditions | | | | | | | | | | | | |
| REMOVAL OF EXISTING BARRIER 1 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| REMOVAL OF EXISTING BARRIER 2 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| REMOVAL OF EXISTING BARRIER 3 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| A10 | Foundations | | | | | | | | | | | | |
| Demolition (Asphalt) For Barrier 1 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Demolition (Asphalt) For Barrier 2 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Demolition (Asphalt) For Barrier 3 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation Barrier 1 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation Barrier 2 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation Barrier 3 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| G10 | Site Preparations | | | | | | | | | | | | |
| Demolition | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Topographic Survey at Barrier 1 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Topographic Survey at Barrier 2 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Topographic Survey at Barrier 3 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| G1030 | Site Earthwork | | | | | | | | | | | | |
| Demolition | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Removal of unsuitable materials and transportation Barrier 1 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Removal of unsuitable materials and transportation Barrier 2 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Removal of unsuitable materials and transportation Barrier 3 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| G2010 | Roadways | | | | | | | | | | | | |
| Demolition | LS | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Roadways restoration, paving and stripping Barrier 1 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Roadways restoration, paving and stripping Barrier 2 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Roadways restoration, paving and stripping Barrier 3 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| G2030 | Pedestrian Paving | | | | | | | | | | | | |
| Demolition | LS | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Sidewalk restoration Barrier 1 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Sidewalk restoration Barrier 2 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Sidewalk restoration Barrier 3 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Total civil work - Totale lavoro civile | | | | | | € 0.00 | € 0.00 | | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
3 ELECTRICAL WORK-LAVORI ELETTRICI
| D5030 | Communication & Security | | | | | | | | | | | | |
| Demolition | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation of infrastructure to support Camera 1 | LM | 0.00 | 0.00 | € 10.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation of infrastructure to support Camera 2 | LM | 0.00 | 0.00 | € 10.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation of infrastructure to support Camera 3 | LM | 0.00 | 0.00 | € 10.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| E10 | Equipment | | | | | | | | | | | | |
| Barrier 1 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Barrier 2 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Barrier 3 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Fixed Bollard for Barrier 1 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Fixed Bollard for Barrier 2 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Fixed Bollard for Barrier 3 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Camera for Barrier 1 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Camera for Barrier 2 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Camera for Barrier 3 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Safety Lights for Barrier 1 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Safety Lights for Barrier 2 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Safety Lights for Barrier 3 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| G4010 | Electrical Distribuition | | | | | | | | | | | | |
| Demolition | LM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation of infrastructure to support Barrier 1 | LM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation of infrastructure to support Barrier 2 | LM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation of infrastructure to support Barrier 3 | LM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Total electrical work - Totale lavoro elettrico | | | | | | € 0.00 | € 0.00 | | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
BID OPTION
| EU-00032-5J INSTALL VEHICLE BARRIERS | | | | | | | | | | | | | |
| | | Quantity/Quantità | | Material Cost/Costo Materiale | | | Labor Cost/Costo Manodopera | | | Total Cost/Costo Totale | | |
| Item | DESCRIPTION | Unit | "K" | "L" | Unit | "K" | "L" | Unit | "K" | "L" | "K" | "L" | "K+L" |
| | Unità | | | Unità | Euro | Euro | Unità | Euro | Euro | Euro | Euro | Euro |
| 1 | Total civil work - Totale lavoro civile | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | € 0.00 | € 0.00 | € 0.00 |
| 3 | Total electrical work - Totale lavoro elettrico | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | € 0.00 | € 0.00 | € 0.00 |
| 4 | Design efforts | % | | | | | | 8% | 8% | € 0.00 | € 0.00 | € 0.00 |
| TOTAL WORK | | | | | € 0.00 | € 0.00 | € 0.00 |
| | | | | $0.00 | $0.00 | $0.00 |
| RATE | $1.0000 | = | € 0.9329 | | | |
| | | | | | Contingencies | € 0.00 |
| | | | | | Overhead | € 0.00 |
| | | | | | Profit | € 0.00 |
| | | | | | GRAND TOTAL | € 0.00 |
| | | | | | | $0.00 |
| 1 | CIVIL WORK-LAVORI CIVILI | | | | | | | | | | | | |
| General Conditions | | | | | | | | | | | | |
| REMOVAL OF EXISTING BARRIER 4 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| A10 | Foundations | | | | | | | | | | | | |
| Demolition (Asphalt) For Barrier 4 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation Barrier 4 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| G10 | Site Preparations | | | | | | | | | | | | |
| Demolition | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Topographic Survey at Barrier 4 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| G1030 | Site Earthwork | | | | | | | | | | | | |
| Demolition | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Removal of unsuitable materials and transportation Barrier 4 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| G2010 | Roadways | | | | | | | | | | | | |
| Demolition | LS | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Roadways restoration, paving and stripping Barrier 4 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| G2030 | Pedestrian Paving | | | | | | | | | | | | |
| Demolition | LS | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Sidewalk restoration Barrier 4 | SQM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Total civil work - Totale lavoro civile | | | | | | € 0.00 | € 0.00 | | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
3 ELECTRICAL WORK-LAVORI ELETTRICI
| D5030 | Communication & Security | | | | | | | | | | | | |
| Demolition | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation of infrastructure to support Camera 4 | LM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| E10 | Equipment | | | | | | | | | | | | |
| Barrier 4 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Fixed Bollard for Barrier 4 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Camera for Barrier 4 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Safety Lights for Barrier 4 | EA | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| G4010 | Electrical Distribuition | | | | | | | | | | | | |
| Demolition | LM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Installation of infrastructure to support Barrier 4 | LM | 0.00 | 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |
| Total electrical work - Totale lavoro elettrico | | | | | | € 0.00 | € 0.00 | | € 0.00 | € 0.00 | € 0.00 | € 0.00 | € 0.00 |