Text version
0010846310
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
See Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
Y 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Mar-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PB-17-R-3007
X 9B. DATED (SEE ITEM 11)
09-Feb-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Mar-2017
CODE
ECC RCO BAVARIA
AMERIKANISCHE BESCHAFFUNGSSTELLE
GEB 542
92655 GRAFENWOEHR LAGER
GERMANY
W912PB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PB-17-R-3007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
1. The following CLIN nomenclature chnages are:
CLIN 0004
The CLIN extended description has changed from:
Maintennace, Repair and InspectionVilseck AFH IAW with Bid Schedule ELINS V002AB, V004AB, V010AB, V012AB, and V013AB. Period of Performance (POP) is 30 March 2017 to 29 March 2018.
To:
Maintennace, Repair and InspectionVilseck AFH IAW with Bid Schedule ELINS V002AB, V004AB, V009AB, V010AB, V012AB, and V013AB. Period of Performance (POP) is 30 March 2017 to 29 March 2018..
CLIN 0010
Maintenance, Repair and Inspection Grafenwoehr AFH IAW with Bid Schedule ELINS G002AB, G004AB, G007AB, G010AB, G011AB, and G014AA. Period of Performance (POP) is 30 March 2017 to 29 March 2018.
Maintenance, Repair and Inspection Grafenwoehr AFH IAW with Bid Schedule ELINS G002AB, G004AB, G007AB, G008AB, G010AB, G011AB, and G014AA. Period of Performance (POP) is 30 March 2017 to 29
March 2018..
CLIN 0019
Maintenance, Repair and Inspection Garmisch OHA IAW with Bid Schedule ELINS P001, P002, P003, P004AA, P005, P006, P007AA, P008AA, and P010AA. Period of Performance (POP) is 30 March 2017 to 29 March 2018.
Maintenance, Repair and Inspection Garmisch OHA IAW with Bid Schedule ELINS P001, P002, P003, P004AA, P005, P006, P007AA, P008AA, P010AA, and P011AA. Period of Performance (POP) is 30 March 2017 to 29
March 2018..
CLIN 0022
Maintenance, Repair and Inspection Garmisch AFH IAW with Bid Schedule ELIN P004AB. Period of
Performance (POP) is 30 March 2017 to 29 March 2018.
Maintenance, Repair and Inspection Garmisch AFH IAW with Bid Schedule ELIN P004AB, P010AB, and P011AB.
Period of Performance (POP) is 30 March 2017 to 29 March 2018..
CLIN 1004
1st Option Year Maintenance, Repair and InspectionVilseck AFH IAW with Bid Schedule ELINS V102AB, V104AB, V110AB, V112AB, and V113AB. Period of Performance (POP) is 30 March 2018 to 29 March 2019.
1st Option Year Maintenance, Repair and InspectionVilseck AFH IAW with Bid Schedule ELINS V102AB, V104AB, V109AB, V110AB, V112AB, and V113AB. Period of Performance (POP) is 30 March 2018 to 29 March
2019..
CLIN 1010
1st Option Year Maintenance Repair and Inspection Grafenwoehr AFH IAW with Bid Schedule ELINS G102AB, G104AB, G107AB, G110AB, G111AB, and G114AA. Period of Performance (POP) is 30 March 2018 to 29 March
2019.
1st Option Year Maintenance Repair and Inspection Grafenwoehr AFH IAW with Bid Schedule ELINS G102AB, G104AB, G107AB, G108AB, G110AB, G111AB, and G114AA. Period of Performance (POP) is 30 March 2018 to
29 March 2019..
CLIN 1019
1st Option Year Maintenance, Repair and Inspection Garmisch OMA IAW with Bid Schedule ELINS P101, P102, P103, P104AA, P105, P106, P107AA, P108AA, and P110AA. Period of Performance (POP) is 30 March 2018 to
29 March 2019.
1st Option Year Maintenance, Repair and Inspection Garmisch OMA IAW with Bid Schedule ELINS P101, P102, P103, P104AA, P105, P106, P107AA, P108AA, P110AA, and P111AA. Period of Performance (POP) is 30 March
2018 to 29 March 2019..
CLIN 1022
1st Option Year Maintenance, Repair and Inspection Garmisch AFH AW with Bid Schedule ELIN P104AB.
Period of Performance (POP) is 30 March 2018 to 29 March 2019.
1st Option Year Maintenance, Repair and Inspection Garmisch AFH AW with Bid Schedule ELIN P104AB, P110AB, and P111AB. Period of Performance (POP) is 30 March 2018 to 29 March 2019..
CLIN 2004
2nd Option Year Maintenance, Repair and Inspection Vilseck AFH AW with Bid Schedule ELINS V202AB, V204AB, V210AB, V212AB and V213AB. Period of Performance (POP) is 30 March 2019 to 29 March 2020.
2nd Option Year Maintenance, Repair and Inspection Vilseck AFH AW with Bid Schedule ELINS V202AB, V204AB, V209AB, V210AB, V212AB and V213AB. Period of Performance (POP) is 30 March 2019 to 29 March
2020..
CLIN 2010
2nd Option Year Maintenance, Repair and Inspection Grafenwoehr AFH IAW with Bid Schedule ELINS G202AB, G204AB, G207AB, G210AB, G211AB, and G214AA. Period of Performance (POP) is 30 March 2019 to 29 March
2020.
2nd Option Year Maintenance, Repair and Inspection Grafenwoehr AFH IAW with Bid Schedule ELINS G202AB, G204AB, G207AB, G208AB, G210AB, G211AB, and G214AA. Period of Performance (POP) is 30 March 2019 to
29 March 2020..
CLIN 2019
2nd Option Year Maintenance, Repair and Inspection Garmisch OMA IAW with Bid Schedule ELINS P201, P202, P203, P204AA, P205, P206, P207AA, P208AA, and P210AA. Period of Performance (POP) is 30 March 2019 to
29 March 2020.
2nd Option Year Maintenance, Repair and Inspection Garmisch OMA IAW with Bid Schedule ELINS P201, P202, P203, P204AA, P205, P206, P207AA, P208AA, P210AA, P211AA. Period of Performance (POP) is 30 March
2019 to 29 March 2020..
CLIN 2022
2nd Option Year Maintenance, Repair and Inspection Garmisch AFH IAW with Bid Schedule ELIN P204AB.
Period of Performance (POP) is 30 March 2019 to 29 March 2020.
2nd Option Year Maintenance, Repair and Inspection Garmisch AFH IAW with Bid Schedule ELIN P204AB, P210AB and P211AB. Period of Performance (POP) is 30 March 2019 to 29 March 2020..
2. Include three (3) Bid Schedule excel sheets: 1. BidScheduleMarch 2. Bid Schedule1stOptionMarch 3. Bid
Schedule2ndOptionMarch
3. All other terms and conditions to remain unchanged. Proposals still due 10 March 2017 at 1300.
(End of Summary of Changes)