W912PB-16-T-3128Amendment.pdf
PDF 171 KB Posted
- Attached to
- Buses and Truck rental
- Solicitation number
- W912PB-16-T-3128
About this file
Updated Statement of work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PB-16-T-3128_Buses_and_Truck_rental.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See attached summary of changes
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PB-16-T-3128
X 9B. DATED (SEE ITEM 11)
14-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0001
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-May-2016
CODE
ECC RCO BAVARIA
AMERIKANISCHE BESCHAFFUNGSSTELLE
GEB 542
92655 GRAFENWOEHR LAGER
GERMANY
W912PB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PB-16-T-3128
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
Government POCs:
RCO POC: Contract Specialist: SSG Reonel Delacruz
TEL/FAX: 475-8685/8558 (09641-83-8685/8558)
Email: reonel.t.delacruz.mil@mail.mil
Description of requirements:
Buses and trucks
SUMMARY OF CHANGES
The purpose of this amendment is to update the Statement of Work.
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
STATEMENT OF WORK FOR BUS AND TRUCK TRANSPORTATION BETWEEN
KAZANLAK/SOFIA BULGARIA AND DRAWSKO POMORSKIE/ CHELMNO TRAIING AREA,
POLAND IN SUPPORT OF ANAKONDA 16
1 .General Scope. The Contractor must:
1.1Provide sufficient quantities of safe, clean, and comfortable intercity passenger bus, truck and low flatbed trailer transportation of Bulgarian Armed Forces personnel and equipment. The Contractor is responsible for all labor, fuel, management, supervision, vehicles, remedial/preventive maintenance, insurance, and liability for personal injury and property damage.
1.2Ensure all contractors allow sufficient time for a Government quality assurance and vehicle inspection of the interior and exterior areas of the bus, and truck before Bulgarian Armed Forces personnel to be transported can board the bus and equipment get loaded. It is anticipated that quality assurance and vehicle inspections will take 10 to 15 minutes and will be conducted by a representative of the Bulgarian Armed Forces for the respective participating units in Kazanlak/Sofia, Bulgaria to ensure safety standards are met.
1.3The unit of issue for this mission is JOB. One JOB is equal to a single round-trip rotation from
Kazanlak/Sofia, Bulgaria to Drawsko Pomorskie / Chelmno Training Area, Poland and back to Kazanlak/Sofia, Bulgaria.
1.4This mission requires two TRIPS. The movement details are described below and further details are contained in the Transportation Plan for Bus Convoy:
1.4.1. On 1/3 June 2016, the first TRIP will involve:
1.4.1.1. Picking up 50 soldiers (Advance Party) from 2/61 Mechanized Brigade in one 50-seat bus and their weapons and other equipment in one 7-ton HAZMAT truck from 1, Felix Vojeli St., Kazanlak, Bulgaria, as follows: 09:00 on 30 May: HAZMAT truck arrives 1, Felix Vojeli St., Kazanlak, Bulgaria, loads equipment until 14:00, clears customs, gets sealed and secured. At 05:30 on 31 May 2016 bus picks up 50 pax until 06:00. 06:00 on 31 May: bus and truck depart for Kalotina border crossing point, estimated time of arrival 12:00 – 13:00. At 13:30 on 31 May the convoy consisting of bus, truck and trailers (separate SOW and transportation plan) departs Kalotina for Drawsko Pomorskie Training Area (DPTA), Poland; estimated time of arrival 15:30-16:30 on 1 Jun 2016. Itinerary: Kalotina – Serbia – Hungary – Slovakia – Drawsko Pomorskie Training Area (DPTA), Poland or by contractor proposal. Note: truck loading and customs clearance need to be completed prior to the convoy departing on 31 May.
1.4.1.2. Picking up 16 ea 68th SOF Brigade soldiers in one bus and their weapons and ammunition in one 5-ton HAZMAT truck from 2, Gen Radko Dimitriev Str., Plovdiv, Bulgaria as follows: 08:30 bus and truck depart for Kalotina border crossing point, estimated time of arrival 14:00 – 15:00. At 15:30 on 1 June the convoy will depart Kalotina for Podwidz AB, Polan, estimated time of arrival 10:30-12:30 on 3 Jun 2016. Itinerary: Kalotina
– Serbia – Hungary – Slovakia – Powidz AB, Poland or by contractor proposal. Note: truck loading and customs clearance need to be completed prior to the convoy departing on 1 June.
1.4.1.3. Picking up 177 ea soldiers in four 50-seat buses and their weapons and ammunition in two 7 ton trucks (one is HAZMAT and the other one – not) from 1, Felix Vojeli St., Kazanlak, Bulgaria as follows: 09:00 on 2 June 2016: two 7-ton trucks arrive 1, Felix Vojeli St., Kazanlak, Bulgaria, load equipment until 14:00, get sealed and secured. 06:00 - 06:30 on 3 June: four buses pick up 177 soldiers; 06:30 on 3 June 2016 four 50-seat buses and two trucks depart for Kalotina border crossing point, estimated time of arrival 1200 - 1300. At 13:30 on 3 June the convoy will depart Kalotina for DPTA, estimated time of arrival 15:30-16:30 on 4 Jun 2016. Itinerary:
Kalotina – Serbia – Hungary – Slovakia – Chelmno, Poland or by contractor proposal. Note: truck loading and customs clearance need to be completed prior to the convoy departing on 3 June.
1.4.1.4. Picking up 25 ea Military Police soldiers in one 50-seat bus and their weapons and ammunition in one 5 ton HAZMAT truck for weapons and equipment from 2, Asen Yordanov St., Sofia, Bulgaria as follows: 06:00 bus picks up 25 soldiers; 06:30 on 3 June 2016 bus and HAZMAT truck depart for Kalotina border crossing point, estimated time of arrival and meeting up with the Kazanlak convoy 1200 - 1300. At 13:30 on 3 June the convoy consisting of one 50-seat bus and one HAZMAT truck will depart Kalotina for Chelmno, Poland, estimated time of arrival 15:30-16:30 on 4 Jun 2016. Itinerary: Kalotina – Serbia – Hungary – Slovakia – DPTA, Poland or by contractor proposal. Note: truck loading and customs clearance need to be completed prior to the convoy departing on 3 June.
1.4.2. On 18 June 2016 the second TRIP will involve:
1.4.2.1. Departure of 16 soldiers on bus and truck following the itinerary Podwidz AB, Poland – Slovakia - Hungary –Serbia –Kalotina – Kazanlak or by contractor proposal. Estimated arrival in Plovdiv, Bulgaria: 19 June 2016.
1.4.2.2. Departure of 177 soldiers on four buses and one truck following the itinerary DPTA, Poland – Slovakia - Hungary –Serbia –Kalotina – Kazanlak or by contractor proposal. Estimated arrival in Kazanlak, Bulgaria: 19 June 2016.
1.4.2.3. Departure of 25 soldiers on one bus and one HAZMAT truck following the itinerary Chelmno, Poland –
Slovakia - Hungary –Serbia –Kalotina – Kazanlak or by contractor proposal. Estimated arrival in Sofia, Bulgaria:
19 June 2016.
1.4.2.4. Departure of 50 AP soldiers on four buses and one 5-7-ton HAZMAT truck following the itinerary DPTA, Poland – Slovakia - Hungary –Serbia –Kalotina – Kazanlak or by contractor proposal. Estimated arrival in Kazanlak, Bulgaria: 19 June 2016.
1.5. The estimated date for the main body equipment loading on the trucks in Kazanlak, Plovdiv and Sofia, Bulgaria is scheduled for the day prior to departure; processing and secure parking through days of departure, 1/3 June 2016. The dates for passenger pickup are 1/3 June 2016. Round trip travel is estimated at four days, with two drivers, appropriate rest periods along the way and no stop-overs. The turnaround destinations are Drawsko Pomorskie Training Area / Chelmno / Podwidz, Poland. The return leg of the first trip also being afforded two days to travel from Drawsko Pomorskie / Chelmno Training Area, Podwidz, Poland to Kazanlak/Plovidv/Sofia, Bulgaria. The estimated date for the loading, processing and departure of the convoys is scheduled for 18 June 2016.
Total number of personnel: 268 PAX; total number of vehicles: 7 buses (7- 50-seaters) and 5 trucks (three 7-ton HAZMAT truck for equipment; two 5-ton HAZMAT trucks).
2.Period of Performance: 30 May – 19 June 2016.
3.PARKING. The Contractor is permitted to park vehicles used in the performance of this contract entirely at its own risk. The Government assumes no liability for theft or damage of Contractor's vehicles parked on Government property.
4. VEHICLES.
4.1All buses will be the intercity touring type equipped with high-back reclining seats, restroom, and air-conditioning. Seats will be supported and padded to optimize rider comfort. Seats, aisles, overhead racks, temperature control, restroom, and lighting will be in functional working order.
4.2All vehicles will have radios and or cellular phones permitting communication with other vehicles and command leadership during the performance of this contract.
4.3Prior to departure of vehicles from the Contractor's facility, the bus will be serviced so as to be in proper operating condition. The interior and exterior must be thoroughly cleaned.
4.4Prior to contract performance, the Contractor will obtain all necessary passport, registration and customs documentation for international travel between Bulgaria and Poland, with transit in Serbia, Hungary and Austria or contractor-proposed alternate route.
5.SAFETY AND QUALITY ASSURANCE.
5.1The Contractor will comply with generally accepted commercial standards for bus operation and maintenance practices. As a minimum, the Contractor shall comply with all provisions of applicable statutes and agreements that may affect safety, and with international regulations, directives, orders, rules and standards. Compliance with published standards may not, standing alone, constitute compliance with generally accepted commercial standards of operation, driver training, passenger comfort, and maintenance.
5.2The Contractor will keep the equipment clean, orderly, and in a good state of repair. The Government may refuse to accept vehicles that are unsafe, unclean, have an offensive odor, or provide unsatisfactory passenger comfort.
5.3The Government reserves the right to inspect the offeror's vehicles prior to contract award and the right to inspect the Contractor's vehicles at any time during performance of the contract.
6.DRIVERS.
6.1The driver will have in his possession a properly completed, current certificate of medical examination in accordance with Bulgarian national regulations.
6.2A visitor pass must be obtained by each driver at the main gate to Drawsko Pomorskie/Chelmo. To obtain a visitor pass, the contractor must supply, each driver’s name, driver’s license number and passport number. At the time the visitor pass is issued, each driver may be requested to provide a valid passport.
6.3The Contractor will record, maintain, update, and provide a complete and comprehensive master listing of driver personnel used in the performance of the requirements of this contract and requiring access to the Drawsko Pomorskie/Chelmo. The master listing shall be submitted to the Office of Defense Cooperation Bulgaria for dissemination to Drawsko Pomorskie/Chelmo Security/Sentry officials. The Contractor’s personnel/access list, at a minimum, shall contain the following information:
a. The effective date(s) of the listing
b. Driver’s name (first, middle initial and last)
c. Driver’s License Number
d. Driver’s corresponding Passport number
6.4Whenever drivers or new information is added, modified, or deleted from the Contractor’s previously submitted personnel/access listing, the Contractor shall resubmit to the ODC Bulgaria, in its entirety, a new personnel/access listing. The ODC Bulgaria shall disseminate the new personnel/access listing to the required security officials.
7.SECURITY, SAFETY, HEALTH AND ENVIRONMENTAL COMPLIANCE. The Contractor will not dump, discharge, or permit leaks of any fuel, lubricant, coolant, solid waste, water, or trash while on US Military/NATO training bases. The Contractor will comply with all safety and security requirements imposed by Drawsko Pomorskie.
8.CONTINGENCY FOR VEHICLE BREAKDOWN DURING OPERATION. In the event that a bus becomes inoperable when scheduled to transport or while transporting passengers, the Contractor will immediately dispatch a replacement bus if the estimated time of repair exceeds 6 hours. In no event will passengers wait more than 6 hours from the time of bus breakdown until the arrival of alternate transportation. Substitute service is entirely at the expense of the Contractor.
9.Accident Report. If a bus in involved in an accident that results in an injury, fatality, or substantial property damage, the Contractor will immediately, by verbal means and within two hours of the incident, inform the Office of Defense Cooperation, Bulgaria. The Contractor shall submit a written report within five working days of each occurrence.
9.1The Contractor shall not disclose to the public the names and extent of injury or death of passengers, pending notification of the next of kin by the Bulgarian Government. The Contractor may make announcements about its own employees at the Contractor’s discretion.
TRANSPORTATION PLAN
І. Itinerary (Land Forces ADVANCE PART) DEPLOYNMENT: KAZANLAK – KALOTINA – SERBIA – HUNGARY – SLOVKIA - DRAWSKO POMORSKIE TRAIING AREA, POlAND OR BY CONTRACTOR
PROPOSAL
Participants: – 50 pax from 2/ 61 MBDE
1 bus for (passengers) and 1truck 7-tons (for equipment)
1. On 30 MAY 2016 1(one) 7-ton truck arrive at 2 mech battalion military area in Kazanlak, at 09.00 and start loading equipments (weapon, and other equipments) until 14.00 часа, customs clearance, sealing and security. The will stay at the military base till 31 MAY 2016.
2. On 31 MAY 2016, 1 (one) 50 pax bus arrive in the military base Kazanlak to pick up advance part – 50 pax, at about 05.30.
3. On 31 MAY 2016 at 06.00 the bus with people and the loaded truck with equipment will join to trailers column and will depart from Kazanlak military base in direction to Kalotina border crossing point. The convoy will be secured by Military police.
4. On 31 MAY 2016 between 12.00 and 13.00 convoy will arrive at Kalotina border.
5. On 31 MAY between 13.30 – 14.30, the bus and the truck will depart from Kalotina border crossing point to Drawsko Pomorskie Training Area, Poland.
Itinerary І
Date Time Vehicles From To Note
1. 30 MAY 2016 09.00 Truck - Military base Kazanlak
Loads equipments from
2/61 from Kazanlak until 14.00, sealing and security.
2. 31 MAY 2016 05.30 One 50 seats bus Kazanlak - Bus will pick up 50 pax until
06.00
3. 31 MAY 2016 06.00 One bus with one truck Kazanlak, str
.“Eng. Felix Vojeli” № 1
Kalotina border crossing point
Expected arriving time between 12.00 and 13.00 at
Kalotina border crossing point
4. 31 MAY 2016 13.30 One bus with one truck
Kalotina border crossing point to
Serbia – Hungary, Slovenia – Poland
Drawsko Pomorskie
Training area, Poland
Arrive at DPTA on 01 JUN 2016
15.30-16.30
Total for convoy: 1 (one) 50 seats bus ad 1 (one) 7 ton truck (for equipment)
І. Itinerary (Land Forces ADVANCE PART) REDEPLOYNMENT I: DPTA - SLOVKIA – HUNGARY –
SERBIA –KALOTINA – KAZANLAK OR BY CONTRACTOR PROPOSAL;
REDEPLOYNMENT: Depart DPTA, POLAND on 18 JUNE 2016 Arrive in Bulgaria: on 19 JUNE 2016
IІ. Itinerary (Land Forces MAIN BODY) DEPLOYNMENT: KAZANLAK – KALOTINA – SERBIA – HUNGARY – SLOVAKIA - DRAWSKO POMORSKIE TRAIING AREA, POlAND OR BY
CONTRACTOR PROPOSAL
Participants: – 177 PAX from 2/ 61 MBDE 4 (five) 50 seats passenger buses and 2 (two) trucks (1 for equipment and 1 for ammunitions)
1. On 02 June 2016 2(two) 7-ton trucks arrive at 2 mech battalion military area in Kazanlak, at 09.00 and start loading equipments (weapon, ammunitions and other equipments) until 14.00 часа, customs clearance, sealing and security. The will stay at the military base till 03 June 2016.
2. On 03 JUNE 2016, 4 (four) 50 seats buses should arrive in the military base Kazanlak to pick up Land Forces main body – 177 PAX, at about 06.00.
3. On 03 JUNE 2016 at 06.30 the 4 (four) buses column will join with the 2 (two) tracks column and will depart Kazanlak military base in direction to Kalotina border crossing point. The convoy will be secured by Military police.
4. On 03 JUNE 2016 between 12.00 and 13.00 convoy will arrive at Kalotina border.
5. On 03 JUNE between 13.30 – 14.30, the convoy will depart Kalotina border crossing point to Drawsko Pomorskie Training Area, Poland.
Itinerary І
Date Time Vehicles From To Note
1. 02 JUNE 2016 09.00 2 Trucks 7t - Kazanlak Loads equipments from 2/61 from Kazanlak until 14.00, sealing and security.
2. 03 JUNE 2016 06.00 4 (four) 50 seats buses, 2 Trucks 7t
Kazanlak - Buses will pick up 206 pax until
06.30
3. 03 JUNE 2016 06.30 4 (four) 50 seats buses, 2 Trucks 7t
Kazanlak, str .“Eng. Felix Vojeli” № 1
Kalotina border crossing point
Expected arriving time between 12.00 and 13.00 at
Kalotina border crossing point
4. 03 JUNE 2016 13.30 4 (four) 50 seats buses, 2 Trucks 7t
Kalotina border crossing point via
Slovakia – Poland
Drawsko Pomorskie
Training area, Poland
Arrive at DPTA on 04 JUN 2016
Total for convoy: 4 (four) 50 seats buses and 2 trucks 7 t (1 for ammunitions and 1 for weapons and equipment).
Remark:
2(two) 7tons trucks or 1 truck with trailer for (ammunitions)
IІ. Itinerary (Land Forces MAIN BODY) REDEPLOYNMENT I: DPTA – SLOVAKIA - HUNGARY –
SERBIA –KALOTINA – KAZANLAK OR BY CONTRACTOR PROPOSAL;
REDEPLOYNMENT: Depart DPTA, POLAND on 18 JUNE 2016 Arrive in Bulgaria: on 19 JUNE 2016
ІII. Itinerary (Land Forces - SOF) PLOVDIV – KALOTINA – SERBIA – HUNGARY – SLOVAKIA –
POLWIDZ AB, POLAND OR BY CONTRACTOR PROPOSAL
Participants: 16 pax from 68 SOF BDE.
1 bus (for weapon, and others equipments) and 1 small truck (for ammunitions ).
1. On 01 JUNE 2016 at 07.30 bus and truck should arrive at 68 SOF BDE, Gen Radko Dimitriev Str. № 2, Plovdiv.
2. On 01 JUNE at 08.30 group will depart from 68 SOF BDE, Plovdiv, Gen Radko Dimitriev Str. № 2, Plovdiv and move to Kalotina border crossing point.
3. On 01 JUNE between 14.00 and 15.00 group will arrive at Kalotina border crossing point.
4. On 01 JUNE between 15.30 – 16.30 the group will depart from Kalotina border crossing point to POLWIDZ AB, Poland.
Itinerary ІII
№ Date Time Vehicles From To Note
1. 01 JUNE 2016 08.30 One bus and one small truck 5 t
2, Gen Radko Dimitriev Str., Plovdiv
Kalotina border crossing point
Arrive 14.00- 15.00
2. 01 JUNE 2016 15.30 One bus and one small truck 5 t
Kalotina checkpoint – via
POLWIDZ AB,
Polnad
Arrive
POWIDZ AB
03 JUNE 2016
10.30-12.30
Total for convoy: 1 (one) 50 seats bus (for weapon, and others equipments), 1(one) small truck 5t (for ammunitions ).
IІI. Itinerary (Land Forces - SOF) REDEPLOYNMENT I: POLWIDZ AB – SLOVAKIA - HUNGARY –
SERBIA –KALOTINA – PLOVDIV OR BY CONTRACTOR PROPOSAL
REDEPLOYNMENT: Depart POLWIDZ AB, POLAND on 18 JUNE 2016 Arrive in Bulgaria: on 19 JUNE 2016
ІV. Itinerary (MILITARY POLICE) SOFIA – KALOTINA – SERBIA – HUNGARY – SLOVAKIA –
CHELMNO , POLAND OR BY CONTRACTOR PROPOSAL
Participants: 25 pax from Military Police.
1 (one) 50 seats bus (for personnel) and 1 (one) truck 5 t (for weapon, and others equipments).
1. On 03 JUNE 2016 at 06.00 one bus pick up personnel from Sofia, str. Asen Yordanov №2. The equipment will be load on the 1 (one) truck 5 t
2. On 03 JUNE at 06.30 group will depart Sofia, str. Asen Yordanov №2 and move to Kalotina border crossing point.
3. On 03 JUNE between 12.00 and 13.00 the group will arrive at Kalotina border crossing point and meet main body from Kazanlak.
4. On 03 JUNE between 13.30 – 14.30 the group will depart Kalotina border crossing point and together with Land Forces main body group will travel to CHELMNO, Poland.
Itinerary ІII № Date Time Vehicles From To Note
1. 03 JUNE 2016 06.30 One bus, one truck 5 t
Sofia, str. Asen Yordanov №2.
Kalotina border crossing point
Arrive 12.00-
13.00 and meet up main body convoy
2. 03 JUNE 2016 13.30 One bus
One truck 5 t Kalotina checkpoint – via
CHELMNO, Polnad Arrive CHELMNO on
04 JUNE 2016
Total for convoy: 1 (one) 50 seats bus for personnel, 1 (one) truck 5 t for equipment
IІI. Itinerary (Land Forces - SOF) REDEPLOYNMENT I: CHELMNO – SLOVAKIA - HUNGARY –
SERBIA –KALOTINA – SOFIA OR BY CONTRACTOR PROPOSAL
REDEPLOYNMENT: Depart CHELMNO AB, POLAND on 18 JUNE 2016 Arrive in Bulgaria: on 19 JUNE 2016
Total number of buses for ANAKONDA 16, POLAND:
4 (four) 50 seats buses for 2/61 BDE, Kazanlak-DPTA;
1 (one) 50 seats bus for 2/61 BDE, Kazanlak-DPTA;
1 (one) 50 seats bus for 68th BDE, Plovdiv;
1 (one) 50 seats bus for military police, Sofia;
3 (three) 7 tonstrucks for 2/61 BDE, Kazanlak-DPTA;
1 (one) 5 tons truck for 68 BDE, 68th BDE, Plovdiv;
1 (one) 5 tonstruck for military police, Sofia;
(End of Summary of Changes)
File details come from the government source that posted it. Updated .