05_-_Attachment_II_-_Drawings.pdf

PDF 1 MB Posted

Attached to
Replace Transformer Station #302, Bldg#3027, Field Camp Normandy, USAG Bavaria
Solicitation number
W912PB-16-B-8104
Issued by

About this file

Attachment II - Drawings

View the file

Other files

File Type Posted
03_-_Solicitation.pdf PDF
01-02_-_Cover_Letter_IFB.pdf PDF
04_-_Specification_Revised_10_May_2016.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE S PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla 1

Layout

N

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE S PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Layout

N

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

Ludwig Gruenwald

CALE

Layoout New Transformer Station 302 Bldg. 3027

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 302 Building # 3027 at Camp Normandy, Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

Ludwig Gruenwald

CALE

Layoout New Transformer Station 302 Bldg. 3027

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 302 Building # 3027 at Camp Normandy, S t a t io n n e w

T r a n s f o r m e r

.8

.4

.4

3.6

0.4

0.4

.2

.7

3.15

Paving / Traufpflaster t u r f b r ic k s t o n e s

R a s e n g it t e r s t e in e grass curb stones / Rasenkantensteine grass curb stones / Rasenkantensteine g r a s s c u r b s t o n e s e n k a n t e n s t e in e

01.04.2016 42A-01077-5P

John Alan Howard C/Engr Div

1 :50

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE S PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla 1

Layout

N

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE S PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Layout

N

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

Ludwig Gruenwald

CALE

Layoout New Transformer Station 302 Bldg. 3027

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 302 Building # 3027 at Camp Normandy, Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

Ludwig Gruenwald

CALE

Layoout New Transformer Station 302 Bldg. 3027 a t io n n a n s f o r m e r

.8

.4

.4

3.6

0.4

0.4

.2

.7

3.15

Paving / Traufpflaster t u r f b r ic k s t o n e s e n g it t e r s t e in e grass curb stones / Rasenkantensteine grass curb stones / Rasenkantensteine g r a s s c u r b s t o n e s e n k a n t e n s t e in e

01.04.2016 42A-01077-5P

John Alan Howard C/Engr Div

1 :50

1106070500.civ Typewritten Text Attachment II a t io n n a n s f o r m e r

.8

.4

.4

3.6

0.4

0.4

.2

3.15 t u r f b r ic k s t o n e s e n g it t e r s t e in a t io n n a n s f o r m e r

.8

.4

.4

3.6

0.4

0.4

.2

3.15 t u r f b r ic k s t o n e s e n g it t e r s t e in a t io n n a n s f o r m e r

.8

.4

.4

3.6

0.4

0.4

.2

3.15 t u r f b r ic k s t o n e s e n g it t e r s t e in a t io n n a n s f o r m e r

.8

.4

.4

3.6

0.4

0.4

.2

3.15 t u r f b r ic k s t o n e s e n g it t e r s t e in a t io n n a n s f o r m e r

.8

.4

.4

3.6

0.4

0.4

.2

3.15 t u r f b r ic k s t o n e s e n g it t e r s t e in a t io n n a n s f o r m e r

.8

.4

.4

3.6

0.4

0.4

.2

3.15 t u r f b r ic k s t o n e s e n g it t e r s t e in a t io n n a n s f o r m e r

.8

.4

.4

3.6

0.4

0.4

.2

3.15 t u r f b r ic k s t o n e s e n g it t e r s t e in a t io n n a n s f o r m e r

.8

.4

.4

3.6

0.4

0.4

.2

3.15 t u r f b r ic k s t o n e s e n g it t e r s t e in e

4 fold multiple pipeexisting cable pull shaft

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

01.04.2016

Ludwig Gruenwald

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 302 Building # 3027 at Camp Normandy, 42A-01077-5P

John Alan Howard C/Engr Div

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

01.04.2016

Ludwig Gruenwald 2

Conduit System EMCS

Layoout New Transformer Station 302 Bldg. 3027

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 302 Building # 3027 at Camp Normandy, 42A-01077-5P

John Alan Howard C/Engr Div

Conduit System EMCS conduit system EMCS

NNNN

1 : 100 a t io n n a n s f o r m e r

.8

.4

.4

3.6

0.4

0.4

.2

3.15 t u r f b r ic k s t o n e s e n g it t e r s t e in a t io n n a n s f o r m e r

.8

.4

.4

3.6

0.4

0.4

.2

3.15 t u r f b r ic k s t o n e s e n g it t e r s t e in a t io n n a n s f o r m e r

.8

.4

.4

3.6

0.4

0.4

.2

3.15 t u r f b r ic k s t o n e s e n g it t e r s t e in a t io n n a n s f o r m e r

.8

.4

.4

3.6

0.4

0.4

.2

3.15 t u r f b r ic k s t o n e s e n g it t e r s t e in a t io n n a n s f o r m e r

.8

.4

.4

3.6

0.4

0.4

.2

3.15 t u r f b r ic k s t o n e s e n g it t e r s t e in a t io n n a n s f o r m e r

.8

.4

.4

3.6

0.4

0.4

.2

3.15 t u r f b r ic k s t o n e s e n g it t e r s t e in a t io n n a n s f o r m e r

.8

.4

.4

3.6

0.4

0.4

.2

3.15 t u r f b r ic k s t o n e s e n g it t e r s t e in a t io n n a n s f o r m e r

.8

.4

.4

3.6

0.4

0.4

.2

3.15 t u r f b r ic k s t o n e s e n g it t e r s t e in e

4 fold multiple pipeexisting cable pull shaft

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

01.04.2016

Ludwig Gruenwald

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 302 Building # 3027 at Camp Normandy, 42A-01077-5P

John Alan Howard C/Engr Div

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

01.04.2016

Ludwig Gruenwald 2

Conduit System EMCS

Layoout New Transformer Station 302 Bldg. 3027

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 302 Building # 3027 at Camp Normandy, 42A-01077-5P

John Alan Howard C/Engr Div

Conduit System EMCS conduit system EMCS

NNNN

1 : 100

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

Ludwig Gruenwald 3

Ground Plan Sections and Elevations

1 : 25

John Alan Howard C/Engr Div

01.04.2016

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

Ludwig Gruenwald

Ground Plan Sections and Elevations

1 : 25

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 302 Building # 3027 at Camp Normandy, o3O

.0

0 1 .2

.7

.0

.8

.6

T r a f o

6.60

1.60

A

A

VIEWS / ANSICHTEN

o3O

NS

.0

0 1 .2

.7

.0

.8

.6

Trafo

T r a f o

MS1MS2MS3MS4

6.60

1.60

A

A

VIEWS / ANSICHTEN

GROUND PLAN / GRUNDRISS SECTIONAL VIEW / SCHNITT A - A

1.601.601.601.60

T r a f o

R e s e r v e z e lle

9.80

0.12

.2

.1

38.9015

RTRT

C E

E

New Transformer Station 302 Bldg. 3027

MS5

Res

Station

Station

BW

Station

RV

beleuchtung

Strassen

Kompensation

25 kVar

EMCS

42A-01077-5P

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

Ludwig Gruenwald 3

Ground Plan Sections and Elevations

1 : 25

John Alan Howard C/Engr Div

01.04.2016

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

Ludwig Gruenwald

Ground Plan Sections and Elevations

1 : 25

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 302 Building # 3027 at Camp Normandy, o3O

.0

0 1 .2

.7

.0

.8

.6

T r a f o

6.60

1.60

A

A

VIEWS / ANSICHTEN

o3O

NS

.0

0 1 .2

.7

.0

.8

.6

Trafo

T r a f o

MS1MS2MS3MS4

6.60

1.60

A

A

VIEWS / ANSICHTEN

GROUND PLAN / GRUNDRISS SECTIONAL VIEW / SCHNITT A - A

1.601.601.601.60

T r a f o

R e s e r v e z e lle

9.80

0.12

.2

.1

38.9015

RTRT

C E

E

New Transformer Station 302 Bldg. 3027

MS5

Res

Station

Station

BW

Station

RV

beleuchtung

Strassen

Kompensation

25 kVar

EMCS

42A-01077-5P

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

01.04.2016

Ludwig Gruenwald 4

Electrical Scheme

Legend:

M

630A/20kA

24kV

630A/16kA

3 20/50kA

1000A

I>>

A

0.4kV

630kVA

20kV

160A

P2

P1

24 kV Grounding Switch

24kV/400V Transformer

24 kV medium voltage circuit breaker with motor

24 kV Transformer Switch

400V Transformer Switch

400V Fuse Load Disconnector Switch

Overvoltage Protector

Distance-Protection Relay / Earth-Leakage Relay

Amperemeter

Current Transformer

EMM Energy-Multi-Meter

Phasenueberwachungsrelais

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

Ludwig Gruenwald

Electrical Scheme

Legend:

3 20/50kA

24 kV Grounding Switch

24kV/400V Transformer

24 kV medium voltage circuit breaker with motor

24 kV Transformer Switch

400V Transformer Switch

400V Fuse Load Disconnector Switch

Overvoltage Protector

Distance-Protection Relay / Earth-Leakage Relay

Amperemeter

Layoout New Transformer Station 302 Bldg. 3027

L

K

N

X S

Y x x

NYY-O 8x1x240 qmm

A A A A A A A A A A A A A A A A A A

1 1 1 1 1 1 1 1 1 1 1 1 1

400A 400A 400A 400A 400A 400A 160A 160A 160A 160A

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3

20/50kA

24kV

24kV

630A/16kA

24kV

20/50kA

24kV

630A/16kA

24kV

20/50kA

Trafo 1

3 3 3

Einspeisefeld 1

Abgangsfeld 2Abgangsfeld 1

20 kV

400V

MS 1MS 2MS 3MS 4

20/50kA

Kabelschaltfeld Kabelschaltfeld

Niederspannungs-Klemmbock

Anschlussvorrichtung Erdungsgarnitur

Kabelschaltfeld

24kV

A A

1 1

400A

3 3

400A

400/230V, 3 Phasen/PEN, 50 Hz, 2000A

160A

3 3

R e s e r v

X S x

160A 160A 160A 160A

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3

20/50kA

24kV

24kV

630A/16kA

24kV

20/50kA

24kV

630A/16kA

24kV

20/50kA

Trafo 1

3 3 3

Einspeisefeld 1

Abgangsfeld 2Abgangsfeld 1

20 kV

Kabelschaltfeld Kabelschaltfeld

Niederspannungs-Klemmbock

Anschlussvorrichtung Erdungsgarnitur

Kabelschaltfeld

R e s e r v e

24kV

400A

3 3

R e s e r v e

R e s e r v e

1250A

3 3

NH00

63A

40/0.03A

16AC 16AC 10AC16AC 16AC

S t e c k d o s e r e c e p t a c le h e a t in g

H iz u n g

R e s e r v e

R e s e r v e

10AC

V

16AC

R e s e r v e

25 kvar

630A 630A

N Y

Y J x

N Y

Y J x

400A 400A

R e s e r v e

R e s e r v e

R e s e r v e

N Y

Y J x

160A

R e s e r v e

630kVAS t a t io n

S t a t

Trafo-Festkompensation

KBR

Dehnbloc maxi/S

Dehnsignal E3

D01D01

D01

16/10A16/10A16/6A

S t e u e r u n g

B e le u c h t u n g

D e h n s ig n a l

E

16/6A 3

RTRTCEE

L E

D h a n d la m p

D n d le u c h t e

C e c k d o s e

N Y

M J x .5

N Y

M J x .5

N Y

M J x .5

N Y

M J x .5

LWL L1

LWL L2

LWL L3

MS 4

Kabelschaltfeld

R e s e r

Kabelschaltfeld

R e s e r

Kabelschaltfeld

R e s e r

Kabelschaltfeld

R e s e r

630A/16kA

MS 5

G e b

N Y

Y J x

S t a t

G b

V

R e s e r v e

630A 630A

N Y

C W

Y J x

G e b

P

N Y

Y J x

H e iz h a u

N Y

Y J x

H e iz h a u

N Y

Y J x

G e

400A 400A

R e s e r v e

R e s e r v e

H e b e a n la g e

N Y

Y J x

R e s e r v e

S t a t

B u n d e s w e h r

RV GLT

New Transformer Station 302 Bldg. 3027

N Y

M J x .5

N Y

Y J x

S t a t b

Steuerschrank Strassenbeleuchtung

42A-01077-5P

N

X S

Y x x

N

X S

Y x x

N

X S

Y x x

John Alan Howard C/Engr Div

16AB

FI/LS

0.3A

FI 16A

0,03A

Y

Y J x

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

01.04.2016

Ludwig Gruenwald 4

Electrical Scheme

Legend:

3 20/50kA

24 kV Grounding Switch

24kV/400V Transformer

24 kV medium voltage circuit breaker with motor

24 kV Transformer Switch

400V Transformer Switch

400V Fuse Load Disconnector Switch

Overvoltage Protector

Distance-Protection Relay / Earth-Leakage Relay

Amperemeter

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

Ludwig Gruenwald

Electrical Scheme

Legend:

3 20/50kA

24 kV Grounding Switch

24kV/400V Transformer

24 kV medium voltage circuit breaker with motor

24 kV Transformer Switch

400V Transformer Switch

400V Fuse Load Disconnector Switch

Overvoltage Protector

Distance-Protection Relay / Earth-Leakage Relay

Amperemeter

Layoout New Transformer Station 302 Bldg. 3027

X S x

400A 400A 400A 400A 400A 400A 160A 160A 160A 160A

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3

20/50kA

24kV

24kV

630A/16kA

24kV

20/50kA

24kV

630A/16kA

24kV

20/50kA

Trafo 1

3 3 3

Einspeisefeld 1

Abgangsfeld 2Abgangsfeld 1

20 kV

Kabelschaltfeld Kabelschaltfeld

Niederspannungs-Klemmbock

Anschlussvorrichtung Erdungsgarnitur

Kabelschaltfeld

24kV

400A

3 3

400A

160A

3 3

R e s e r

X S x

160A 160A 160A 160A

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3

20/50kA

24kV

24kV

630A/16kA

24kV

20/50kA

24kV

630A/16kA

24kV

20/50kA

Trafo 1

3 3 3

Einspeisefeld 1

Abgangsfeld 2Abgangsfeld 1

20 kV

Kabelschaltfeld Kabelschaltfeld

Niederspannungs-Klemmbock

Anschlussvorrichtung Erdungsgarnitur

Kabelschaltfeld

R e s e r v e

24kV

400A

3 3

R e s e r v e

R e s e r v e

1250A

3 3

NH00

63A

40/0.03A

16AC 16AC 10AC16AC 16AC

S t e c k d o s e r e c e p t a c le h e a t in g iz u n g

R e s e r v e

R e s e r v e

10AC

V

16AC

R e s e r v e

25 kvar

630A 630A

N Y

Y J x

N Y

Y J x

400A 400A

R e s e r v e

R e s e r v e

R e s e r v e

N Y

Y J x

160A

R e s e r v e

630kVAS t a t

S t a t

Trafo-Festkompensation

KBR

Dehnbloc maxi/S

Dehnsignal E3

D01D01

16/10A16/10A16/6A

S t e u e r u n g

B e le u c h t u n g

D e h n s ig n a l

16/6A 3

RTRTCEE

L E

D h a n d la m p

D n d le u c h t e

C e c k d o s e

N Y

M J x .5

N Y

M J x .5

N Y

M J x .5

N Y

M J x .5

LWL L1

LWL L2

LWL L3

Kabelschaltfeld

R e s e r

Kabelschaltfeld

R e s e r

Kabelschaltfeld

R e s e r

Kabelschaltfeld

R e s e r

630A/16kA

MS 5

G e b

N Y

Y J x

S t a t b

R e s e r v e

630A 630A

N Y

C W

Y J x

G e

N Y

Y J x

H e iz h a u

N Y

Y J x

H e iz h a u

N Y

Y J x

G e

400A 400A

R e s e r v e

R e s e r v e

H e b e a n la g e

N Y

Y J x

R e s e r v e

S t a t

B u n d e s w e h r

RV GLT

New Transformer Station 302 Bldg. 3027

N Y

M J x .5

N Y

Y J x

S t a t b

Steuerschrank Strassenbeleuchtung

42A-01077-5P

N

X S

Y x x

N

X S

Y x x

N

X S

Y x x

John Alan Howard C/Engr Div

16AB

FI/LS

0.3A

FI 16A

0,03A

Y

Y J x

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

01.04.2016

Ludwig Gruenwald 5

EMCS Scheme

Layoout New Transformer Station 302 Bldg. 3027

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 302 Building # 3027 at Camp Normandy, Transformatorschutz

Erdungsschalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8

NSHV

RV GLT

Druck/Termp. Sch.

Druck/Termp. Sch.Druck/Termp. Sch.

NSP SchalterUeberspannungs-

Schutz

1. abisolieren, reinigen, einfuehren, beschriften aufloeten auf Loetstreifenverteiler Loet/Steck (250pol)

2. Anklemmen der DP in den einzelnen Verteilungen

Schaltfelder bzw. Feldgeraeten

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter Traforaum 1

IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8

IY(St)Y 10x2x0.8

NSHV

RV GLT

Druck/Termp. Sch.

Druck/Termp. Sch.Druck/Termp. Sch.

NSP SchalterUeberspannungs-

Schutz

1. abisolieren, reinigen, einfuehren, beschriften aufloeten auf Loetstreifenverteiler Loet/Steck (250pol)

Schaltfelder bzw. Feldgeraeten

NYM-I-10x1.5

DGPT2

Trafo 1Station 301

Trafo 1 ausgeloest

Trafo 1 Warnung

Trafo 1

25 kvAr

IY(St)Y 4x2x0.8

Station 303

Trafo-Festkompensation

Reserve Station BW

IY(St)Y 4x2x0.8

14x IY(St) 4 x 2 x 0.8

2x IY(St) 10 x 2 x 0.8

2x A2YFL2Y 10 x 2 x 0.8

4x NYM-I-10x1.5 qmm

2. Anklemmen der DP in den einzelnen Verteilungen

IY(St)Y 20x2x0.8

Strassenbeleuchtung

42A-01077-5P

John Alan Howard C/Engr Div

A2YFL2Y 20 x 2 x 0.8 nach Geb. 3426 Trafostation 301

A2YFL2Y 20 x 2 x 0.8 nach Trafostation 303 SLF1

A2YFL2Y 20 x 2 x 0.8 nach Geb. 3071

A2YFL2Y 10 x 2 x 0.8 nach Geb. 3303

A2YFL2Y 10 x 2 x 0.8 nach KV GLT Geb. 3200

LWL nach 3IMP-Schacht

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

01.04.2016

Ludwig Gruenwald 5

EMCS Scheme

Layoout New Transformer Station 302 Bldg. 3027

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 302 Building # 3027 at Camp Normandy, Transformatorschutz

Erdungsschalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8

NSHV

RV GLT

Druck/Termp. Sch.

Druck/Termp. Sch.Druck/Termp. Sch.

NSP SchalterUeberspannungs-

Schutz

1. abisolieren, reinigen, einfuehren, beschriften aufloeten auf Loetstreifenverteiler Loet/Steck (250pol)

2. Anklemmen der DP in den einzelnen Verteilungen

Schaltfelder bzw. Feldgeraeten

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter Traforaum 1

IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8

IY(St)Y 10x2x0.8

NSHV

RV GLT

Druck/Termp. Sch.

Druck/Termp. Sch.Druck/Termp. Sch.

NSP SchalterUeberspannungs-

Schutz

1. abisolieren, reinigen, einfuehren, beschriften aufloeten auf Loetstreifenverteiler Loet/Steck (250pol)

Schaltfelder bzw. Feldgeraeten

NYM-I-10x1.5

DGPT2

Trafo 1Station 301

Trafo 1 ausgeloest

Trafo 1 Warnung

Trafo 1

25 kvAr

IY(St)Y 4x2x0.8

Station 303

Trafo-Festkompensation

Reserve Station BW

IY(St)Y 4x2x0.8

14x IY(St) 4 x 2 x 0.8

2x IY(St) 10 x 2 x 0.8

2x A2YFL2Y 10 x 2 x 0.8

4x NYM-I-10x1.5 qmm

2. Anklemmen der DP in den einzelnen Verteilungen

IY(St)Y 20x2x0.8

Strassenbeleuchtung

42A-01077-5P

John Alan Howard C/Engr Div

A2YFL2Y 20 x 2 x 0.8 nach Geb. 3426 Trafostation 301

A2YFL2Y 20 x 2 x 0.8 nach Trafostation 303 SLF1

A2YFL2Y 20 x 2 x 0.8 nach Geb. 3071

A2YFL2Y 10 x 2 x 0.8 nach Geb. 3303

A2YFL2Y 10 x 2 x 0.8 nach KV GLT Geb. 3200

LWL nach 3IMP-Schacht

File details come from the government source that posted it. Updated .