USAG BENELUX
NATO SHAPE SUPPORT GROUP
ENGINEERING DIVISION
HANGAR # 6 - CHIEVRES AIR BASE
HAINAUT - BELGIUM
SPECIFICATIONS FOR
PROJECT R-CH-8FD-15029-15 & R-CH-8FD-15030-15
LOCATION Building #20001 & 20002 - Chièvres Air Base
TITLE Replace PVC gables.
DATE February 2016
PERFORMANCE PERIOD 150 calendar days
INDEX
CHAPTER I : GENERAL
CHAPTER II : TECHNICAL PROVISIONS
SECTION 1: Preliminary work and dismounting SECTION 2: Replace the gables translucent panels
CHAPTER I
GENERAL
G-01: SCOPE OF WORK
A) General work description
The purpose of this project is to replace the translucent panels on the Alpha and Bravo Taxi sides of hangar #20001 and #20002.
The site of work is located: Chievres Air Base Bldg. 20001 and 20002 7950 Chievres
B) Principal features
Principal items to be performed to accomplish the work consist of the following:
1) See various sections on previous page.
The above general outline of principal features does not in any way limit the responsibility of the contractor to perform all work necessary to achieve the desired end results and to supply all materials and labor required by these specifications and drawing.
G-02: DRAWINGS AND STANDARDS
A) Drawings
All work under this contract shall be carried out in strict conformity with the following drawing, which forms a part of these specifications. Drawing will be provided during the site visit.
DRAWINGS # TITLE DATE
R-CH-8FD-15029&30-15-1 Replace PVC gables # 20001 & 20002 Plan view February 16
B) Specific applicable standards
All Belgian norms and regulations (NBN (Bureau de Normalisation), EN (European Norm), etc.) in force concerning the performance of this project shall be applicable.
All regulations in matter of environmental, safety and health shall be applicable
- General Regulations for Work Protection (RGPT) and Code on the welfare of workers on the work place
- General Regulations for Electrical Installations (RGIE)
Not limited to those above.
G-03: GUARANTEE, WORKMANSHIP AND MATERIALS
A) Workmanship and materials
All work done by the contractor shall be in strict conformance with the best practices of the trades involved.
The contractor shall employ workmen who are skilled in their particular trades.
In particular, all works with potential risk of refrigerants release to the atmosphere should be conducted under the direct supervision or by a person with a category I certificate as specified in the EU regulation (EC) 303/2008 and valid for the Walloon Region area.
For safety purposes, during the execution of the work, the contractor’s workers shall have to speak French or English.
All materials shall be brand new.
The contractor shall in no way use asbestos containing materials for the performance of his work.
The paints shall be lead free.
All hazardous products brought on site by the contractor must be documented on an inventory list with safety data sheet.
B) Guarantee
The contractor shall guarantee his workmanship and materials for a minimum period of 1 year after the date of final acceptance or for the period as specified by pertinent Belgian laws for the workmanship or materials in question, whichever is longer.
G-04: SCHEDULING OF WORK
Prior to starting any work, the contractor shall furnish the contracting officer, for approval, a detailed schedule showing the successive phases of the work. All interruptions or disturbance in normal functioning of US Government organizations shall also be indicated (road closure, water or utility cuts).
G-05: AS-BUILT DRAWINGS
The contractor shall submit detailed as-built drawings after completion of the project and before submitting the final bill. As-built drawings shall be precise and accurate. They shall be drawn on BENTLEY MICROSTATION v8 system or any other 100% compatible system. The CD-Rom of the basic project shall be given to the contractor for correction at his request.
G-06: RESERVE
G-07: HOT WORK PERMIT
All security measures as stated in the “Règlement Général sur la Protection du Travail” shall be complied with. Prior to starting the work, the contractor shall ask a Hot Work Permit (for welding, cutting work, etc...) to the COR. This permit shall be delivered by the U.S. Army Fire Officer.
In addition, no open fires or burning of trash shall be allowed within the confines of the USAG Benelux (NSSG) Community.
Contractors, concessionaires or vendors performing work or conducting business on or in facilities under the jurisdiction of the USAG Benelux Military Community Commander AOR shall conform to this regulation. The Contractor Officer’s Representative (COR) shall ensure that a copy of the French or Dutch translation of this regulation is handed to contractors at pre-construction conferences and that all requirements therein are adhered to. Specific requirements and limitations are as follows:
1. Smoking shall be prohibited in the vicinity of hazardous operations and locations.
2. Waste material and rubbish shall not be stored or allowed to accumulate within the building or in the immediate vicinity, but shall be removed from the site at least daily. Rubbish shall not be burned on the site.
3. Contractor materials and equipment shall not be stored in a location or manner which shall create a fire exposure to facilities adjacent to the project site.
4. The contractor shall provide fire extinguishers at all locations where work is carried out.
5. In every building operation where a shed, storage, or other shanty is placed, or room or space is used for storage or workshop, the contractor shall provide at least one approved portable fire extinguisher in a accessible location.
6. Flammable liquids and other hazardous materials such as paints, paint thinner, gasoline, asphalt, and tar shall be stored in small detached structure or out in the open and not inside main buildings. Low flash point liquid used within buildings shall be handled only in approved safety cans.
7. Adequate ventilation shall be provided for paint spraying and operations involving the application of materials using adhesives containing flammable solvents. Such operations shall be conducted remote from any potential source of ignition.
8. Asphalt and tar kettles shall be located in a safe place outside of the building. Such kettles shall not be placed on roofs or porches. Continuous supervision shall be maintained while kettles are in operation. Metal covers shall be provided for all kettles to smother flames in case of fire.
9. Electrical wiring and equipment for lighting, heating, and power purposes shall be installed in compliance with current US and Host Nation Electrical Regulation requirements.
10. Cutting and welding shall not be permitted unless:
a. A valid Hot Work Permit (welding permit) is available.
b. Combustibles have been safely covered or moved away.
c. A fire guard with a serviceable fire extinguisher is posted for the duration of the work and 30 minutes thereafter to assure that sparks or drops of hot material do not start fires.
11. Fire hydrants shall only be used for fire fighting and training of the local fire and Emergency Services. Water can only be taken from hydrants with the permission of the Community Fire and Emergency Services Office. Parking within 2.5 m (8 feet) of a hydrant is not permitted.
12. Vehicles and other equipment with fuel driven motors, with mounted and filled fuel tanks shall be equipped with 2,5 kg or larger carbon dioxide or dry chemical fire extinguishers.
13. Gasoline, oil and grease shall not be disposed into drainage systems or public water systems. Oil contaminated areas shall be covered with an absorbent material and removed in accordance with the Spill Contingency plan.
Any POL spillage shall be reported immediately to the DES Fire and Emergency Services Office, DSN 361- 5401/5347.
14. Construction offices, huts, construction vehicles, trailers and supplies shall be located at least 10 m from all adjacent buildings.
15. Access for fire fighting vehicles shall be provided to the immediate job site at the start of construction and maintained until all construction is completed. Vehicle parking control measures shall be established.
16. Free access from the street to fire hydrants and to outside connections for standpipes or other firefighting equipment, whether permanent or temporary, shall be provided and maintained at all times. No materials or constructions shall be placed within 10 feet of such hydrants or connections, or between fire hydrants and the center line of the street.
17. Scaffolding materials or equipment shall not block fire escape routes or access routes during performance of projects in occupied buildings.
18. In all buildings over 30 feet in height at least one stairway shall be provided in a usable condition at all times.
19. Notification and actions to be taken in case of a fire:
a. Persons who discover a fire shall immediately alarm all personnel in the area, and shall report the fire to the Community Military Police using the nearest telephone. Military telephone dial 117.
b. The fire shall be reported using the building number. If the fire is outside of a building, the nearest building number shall be given. Stay on the phone until the operator on duty has completely understood and does not have any further questions. After the notification you should immediately ensure all windows and doors are closed and that all personnel have left the area. The responding fire department must be informed if any special dangers exists; example: If gas and pressurized containers, or paint and other flammable material are within the range of the fire. Not only acute fires, but also fires which have been extinguished and did not cause any damage must be reported.
c. To ensure smooth notification and fire fighting procedures, it is essential to show all employees the location of the nearest telephone, make sure they are familiar with the building number in which they are employed, and inform them of the locations of the fire extinguishers.
Also, for fire safety reasons, hot work permit shall not be issued to perform cutting or welding operations before or after USAG BENELUX AOR regular duty hours.
G-08: ENVIRONMENTAL STEWARDSHIP
All measures shall be taken to prevent occurrence of spills during works. When a leak is detected (i.e. fuel leak on field works vehicles or company vans), the contractor shall proceed to the immediate clean-up of the spill. Should the spill characteristics exceed the contractors response capacities, the contractor shall immediately contact:
1) The Contracting Officer Representative
2) The Chievres Air Base Fire Department (068/ 27 54 01).
3) The USAG Benelux Environmental Division (068 27 5704)
4) The Spill Response Coordinator (068 27 5906)
The contractor must comply with all European, Belgian and regional environmental laws and regulations as well as regulations specified within the Belgian Final Governing Standards (BFGS). The BFGS is available on request through the Contracting Officer Representative (COR). BFGS requirements that should be followed include, but are not limited to, the following:
BFGS Requirements
Air:
Any work that may potentially result in the release/recovery/recycling of a refrigerant requires the supervision of a trained refrigerant technician. (C.2.3.6.1.)
The use of the following Ozone Depleting Substances is prohibited: CFC’s, other fully halogenated chlorofluorocarbons, Halons, Carbon tetrachloride, 1.1.1.trichloro-ethane, Carbon tetrachloride, Hydrobromoflurorocarbones, bromochloromethane.
(C.2.3.6.5.1) The following use of HCFCs is prohibited: aerosol, solvents, and refrigerants. (C2.3.6.5.2)
Drinking Water:
Only lead-free pipe, solder, flus and fittings can be used to repair water systems and plumbing systems for drinking water.
(C3.3.1.11)
Waste Water:
Best Management Practices (Table C4.T1) Protect fueling areas from rain and store spill response equipment nearby.
Construct sediment dams/silt fences around construction sites.
Perform corrosion control activities inside.
Store product drums/materials inside or under cover.
Capture sandblasting media, any paint waste and clean up materials (thinners, rinsates) for proper disposal.
Hazardous Materials (HMs):
HM containers and storage areas must be properly maintained. (C5.3.2) Dispensing and storage areas for flammable liquids must have secondary containments. (C5.3.2) All HMs must be labeled correctly. (C5.3.9) All persons who use, handle or store HMs must be appropriately trained. (C5.3.10) HMs must be in a locked cabinet/compartment when not in daily use. (C5.3.13.7 and C5.3.13.8.6.1) Non-fixed liquid petroleum gas (LPG) containers must be stored outdoors. (C5.3.13.1) Each HM must have a readily available Material Safety Data Sheet (MSDS) in English OR the predominant language. (C5.2.15)
Hazardous Waste (HW):
HW generated by the contractor shall not be stored on Base, even temporarily, and must be disposed of at the cost of the contractor and by the contractor to an authorized facility outside of USAG Benelux.
HW should be segregated by the different hazardous characteristics (corrosive / flammable etc). (C6.3.2.1) All HW containers must be closed, in good condition and with no traces of corrosion, leaks or spills. (BFGS C6.3.4 -> C5.3.2) HW containers must be labeled correctly. (C6.3.4 ->C5.2.8)
Solid Waste:
Solid Waste must be disposed of at the cost of the contractor and by the contractor to an authorized facility outside USAG Benelux installations. It is recommended that the waste is recycled to the maximum extent possible.
Petroleum, Oil and Lubricants:
At a minimum, all personnel handling (POL) shall be trained annually in the operation and maintenance of equipment to prevent discharges; discharge procedure protocols; general facility operations and the USAG Benelux (Belgian installations) Red Plan (updated regularly). (C9.3.6) If the fueling of vehicles/machines is required on an installation it must take place on an impervious surface that drains to an oil-water separated. (C9.3.8.1.4.2)
Noise:
The contractor shall not cause sound levels in surrounding public place to exceed an established maximum level of 90dB (C10.3.1.)
Breaking and sieving activities shall neither be performed between 1900 and 0700 nor on Saturdays, Sundays or holidays.
(C10.3.5.2.1)
Historic and Cultural Resources:
Any discovery of archeological resources shall be reported to the project COR within three business days. (C12.3.8.1)
Asbestos:
There are buildings and structures throughout USAG Benelux that contain asbestos. In particular asbestos can be found in cement piping, cement roofing, boiler gaskets, cement panels, cement chimney inspection holes and thermal system insulations.
The identification of asbestos within a building and/or structure shall be made within the work specific Environmental Review.
Any asbestos that is removed due to work under this contract must be disposed of correctly, at the cost of the contractor, by the contractor and to an authorized facility outside of USAG Benelux.
Spill:
When using and/or storing HMs or POLs the contractor must have the ‘Red Plan’ readily available, in English AND the predominant working language. The Red Plan is different for the Walloon and Brussels regions and is updated regularly.
Work-Specific Environmental Reviews With each Delivery Order (DO) the contractor shall receive an Environmental Review that is specific to the requested work (e.g.
re-paint building 20006). The contractor must also respect and apply all environmental measures defined in the Environmental Review as it shall mention site specific precautions that are not mentioned within this review. The review shall be written by the USAG Benelux Environmental Division and communicated to the contractor through the COR.
The USAG Benelux Environmental Management System (EMS)
USAG Benelux Environmental Management System (EMS):
USAG Benelux implemented EMS IAW EO13423, ISO 14001:2004(E), DoD, and IMCOM requirements. An EMS is an overall management system that includes organizational structure, planning activities, responsibilities, practices, procedures, processes and resources for developing, implementing, achieving, reviewing and maintaining the environmental policy of an organization. USAG Benelux and EMS is designed to ensure that all personnel, including contract personnel, whose work activities can cause a real or potential significant environmental impact, are aware of how their work supports the EMS and are competent to perform their roles, responsibilities, and authorities while supporting the Garrison’s mission. Contractors and their personnel are required to be aware of, and comply with, the Garrison EMS policy and legal and other requirements when performing work at an installation.
The Garrison EMS is explained during the contractor pre-performance meeting and/or in the EMS manual, which may be requested from the Environmental Division. The USAG Commander’s Environmental Policy may be viewed on line at:
http://www.usagbenelux.eur.army.mil/documents/Policies/BNL_PL17(PWE)EnvironmenalMgt%20System(EMS).pdf
G-09: SITE MAINTENANCE AND FINAL CLEANING
During performance of works, all measures should be taken to avoid improper temporary storage of waste generated by works. In particular, emphasis shall be put on POL(Petroleum, Oil and Lubricants) containing equipment or soiled waste/hazardous waste (scrap metal, contaminated soil) http://www.usagbenelux.eur.army.mil/documents/Policies/BNL_PL17(PWE)EnvironmenalMgt%20System(EMS).pdf
As soon as the work is finished, the contractor shall remove all his equipment, excess materials, debris, etc. generated by his work and shall evacuate them outside US Government installations.
G-10: COORDINATION IN MATTER OF SAFETY AND HEALTH
1. The law of 04 August 1996 related to the welfare of workers during the execution of their work and the royal decree of 25 January 2001 concerning temporary or mobile work sites are applicable for this project.
In accordance with article 71, §3, of above mentioned royal decree, a project-coordination as foreseen in section III, 1st sub section, of this royal decree has been set up during the elaboration of this project. Therefore, there is a safety and health plan related to this project for these specifications.
The contractor shall comply with the recommendations of this safety and health plan (available upon request to the “Engineering Plans and Services Division”, Hangar # 6, Chievres Air Base (David Diricq, EPS Division, tel.068/27.54.46). These recommendations are part of this project.
In application of the same article 71, §3, an execution-coordinator shall be designated by the COR for the coordination in matter of safety and health during the execution of this project.
Within 15 days after contract award, the contractor shall submit at least 4 proposals of execution-coordinator to the COR’s approval with:
the necessary documents for the verification of the compliance with the conditions to exercise the coordinator function (art. 56 to 64 of R.D. dated 25.01.2001 completed by the royal decree of 19.12.2001)
No proposal may emanate from a coordinator working for the awarding firm or for an office on which the contractor has a supervisory position.
The COR has 10 calendar days to choose the execution-coordinator.
The coordinator’s fee is at the contractor’s charge.
2. The contractor has 15 days from the selection of the coordinator to make up and transmit to the COR and to the execution-coordinator a document with all the complementary elements to his bid that could be claimed by the coordinator.
3. The execution-coordinator does not act as a substitute for the COR He plays the role of an advisor of the awarding party. His mission is the following:
3.1. General obligations from the law of 04 August 1996 and royal decree of 25 January 2001
1. to coordinate the implementation of the general prevention principles described at article 5 of the law of 04 August 1996, during the technical or planning selections, in order to schedule the various simultaneous or consecutive works or phases of work, as well as during the expectation of the duration of these various works or phases of work;
2. to coordinate the implementation of relevant provisions in order to ensure that the contractors properly implement the general prevention principles and execution principles described at articles 4, 5 and 15 of the law of 04 August 1996;
3. to draw up a coordination logbook comprising the elements described at article 33 of the royal decree of 25 January 2001, except for elements dealing with the design of the project, and to update it;
4. to write down the deficiencies of the various parties in the logbook and to notify the COR;
5. to write down contractors’ remarks in the coordination logbook and leave them for information to the parties concerned;
6. to call and be the chairman of the coordination structure when such a structure has to be set up in accordance with article 37 of the royal decree of 25 January 2001;
7. to draw up an ulterior performance file whose content conforms with article 36 of the royal decree of 25 January 2001;
8. to organize the cooperation and coordination of activities between contractors, including those who follow one another, in order to ensure the protection of workers and the prevention of accidents and professional health hazards, as well as their mutual information;
9. to coordinate the supervision of the proper application of work procedures;
10. to take all necessary precautions so that only authorized people have access to the work site.
11. at the provisional acceptance of the work, to hand over the updated logbook and the ulterior performance file to the COR, and to notify this delivery in a record attached to the ulterior performance file.
3.2. Special obligations within the scope of this project
1. Read and understand these specifications related to the work to be executed, especially the article concerning the safety and health measures to be implemented on the work site in application of the law of 4 August 1996 about the welfare of workers during the execution of their work, and of R.D. of 25 January 2001 about temporary or mobile work sites;
2. Give advice to the COR and to make proposals in due time concerning the implementation and adaptations of the document described at item 2 of above mentioned article, during the previous phase described in that item 2 as well as during the execution of the work;
3. Participate in any meeting to which he is invited by the COR, and to set up himself any useful meeting with the COR, the contractor or any intervening party on the work site, for the execution of his mission;
4. Control the application of the hazards prevention measures described at item 3 of the above mentioned additional article;
5. Write down the contractor’s obligations deficiencies as foreseen in above mentioned item 3 in the logbook.
4. The contractor applies the hazards prevention measures foreseen in the document described at item 2, adapted if necessary. He has the sections of this document applied by the possible sub contractors if they apply to them.
5. During the execution of the work, the contractor updates the document described at item A, either on his own initiative, when the progress of the work, the identification of unforeseen or insufficiently known hazards, the incoming or outgoing of some parties, or any modification brought to the project or the work justifies, or at the COR’s request. If some update occurs on his own initiative, he informs the awarding party and the execution-coordinator. He takes into account any possible remark expressed by the COR
In particular, he also provides the following information to the COR with a copy to the execution-coordinator:
− name of the subcontractor(s), with their certificate, the nature and cost of the work they are responsible for, the expected starting date and duration;
− traffic rules and road signs for the work site, for the public traffic area (automobiles, bicycles, handicapped people…) and for the area reserved for the work and workers, and the access rules;
− storage procedures and evacuation of materials and debris;
− work planning.
6. The contractor must cooperate to the coordination as described above. To that purpose, he shall give to the execution-coordinator, spontaneously or at his request, any information that is indispensable for the good execution of his mission. He shall invite him at any meeting where his presence is necessary for the accomplishment of his task. He shall participate in meetings where he is invited by the COR or the coordinator.
The contractor shall have the obligations of previous paragraph applied by possible subcontractors.
7. The compliance with the obligations described in items 2, 5 and 6 above is an integral part of this project.
The application of hazards prevention measures described at item 4 is also an integral part of the project, provided that these measures do not exceed the general obligations that the law of 4 August 1996 and the R.D. of 25 January 2001 impose to contractors, in particular articles 7 and 15 of the law, and section VI, sub section IV of the decree.
8. The full text related to the coordination in matter of safety and health concerning this project can be consulted upon request to the “Engineering Division”, Hangar # 6, Chievres Air Base (Christophe Pottiez, Eng Division, tel.068/27.56.83).
G-11: SPECIALS CONSIDERATIONS (UFC 3-260-01 on 17 NOVEMBER 2008)
UFC 3-260-01
17 NOVEMBER 2008
SECTION 14 CONSTRUCTION PHASING PLAN AND OPERATIONAL SAFETY
ON AIRFIELDS DURING CONSTRUCTION
Link : https://www.wbdg.org/ccb/DOD/UFC/ufc_3_260_01.pdf
G-12: ACCESS TO THE MILITARY INSTALLATION
See particular clauses in the administrative portion of this package.
Access control/Photography The contractor and all associated subcontractor employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policy and procedures (provided by Government representative). The contractor shall also provide all information required for background checks to meet installation-access requirements to be accomplished by the installation provost marshal office, director of emergency services, or security office. The contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the force protection condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.” Contractor must receive written approval from PAO prior to taking any photos or making any sketches, and may not discuss layout of any infrastructure with anyone outside the USAG Benelux or not associated with the contract. Contractor must receive written approval from PAO prior to taking any photos or sketches. All photos, sketches, and designs must be returned to DPW upon completion of the contract.
For Contracts That Require Performance or Delivery in a Foreign Country.
The clause will be used in solicitations and contracts that require performance or delivery in a foreign country. This clause applies to both contingencies and non-contingency support. The key AT requirement is for non-local national contractor personnel to comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor's compliance with combatant commander and subordinate task-force commander policy and directives.
G-13: FINAL ACCEPTANCE OF WORKS
The final acceptance of the work shall be done in the presence of the COR and the contractor.
https://www.wbdg.org/ccb/DOD/UFC/ufc_3_260_01.pdf
CHAPTER II
TECHNICAL PROVISIONS
SECTION 1
PRELIMINARY WORK AND DISMOUNTING
TP-1-01: Appropriate equipment
During the execution of the work, the contractor shall provide scaffoldings, ladders, and all necessary equipment for a good execution of the work. He shall not ask or borrow equipment from the U.S. Government (ladder, scaffolding, lift machines…)
TP-1-02: Dismounting
Dismounted items mentioned below include the removal and evacuation out of the military area of all debris resulting from the work. All debris shall be evacuated to an authorized public dump at the contractor’s expense. All dismounted items become the property of the contractor, unless otherwise specified in these specifications.
Any damage caused by the contractor’s personnel during the demolition work shall be repaired at his cost.
Following items are given as an indication. This list is not limitative. The contractor shall carry out all required investigations to complete it if necessary.
Dismounting of PVC panels, upper and lower profiles, fastening means and accessories included
TP 1-03: Dismounting and reinstallation of lightning system cables
The dismounting operations shall be carried out carefully. The reinstallation shall be performed according to the norms in force. If required, additional cable extensions shall be used.
Once reinstalled, the system must be approved by a certificated firm.
TP 1-04: Dismounting and reinstallation of signs on the gables
The dismounting operations shall be carried out carefully. The signs shall be reinstalled exactly at the same locations and with the same fastening means.
SECTION 2
REPLACEMENT OF GABLE TRANSLUCENT PANELS
Description of the work
The work described in this section consists of the replacement of the PVC skylights. They shall be replaced by polycarbonate panels on the TAXI Alpha side, and by sandwich-type insulating panels on the TAXI Bravo side.
TP-8-01: Polycarbonate panels
Work to be executed:
• Intermediate sheeting rails shall be kept
• Installation of new top and bottom rail
• Evacuation of all wastes out of the military area to an authorized public dump
Execution of new five wall polycarbonate gables
- thickness: 40mm
- color: OPALAIN
- extrusion formed “tenon/mortise” connection system
- perfectly watertight
- excellent fire resistance
- self-bearing system
- resistant to bad weather and to U.V. under extreme exposure
- light transmission (LT): ± 26%
- thermal insulation: ± 1.43 W/m2 oC
- weight : 4.0 kg/m2
- the panels have an X-shaped internal structure providing a solid and rigid plate .
• Installation of all fittings foreseen by the manufacturer:
- top profile with EPDM watertight joint
- bottom profile with EPDM watertight joint and drip piece of adapted width
- connection profile
- connection splice plate
- stopping adhesive ribbon
- depression hook
• All finishing profiles and necessary modification works for a perfect work and water tightness.
Once installed, the panels shall form plane, fully watertight, surfaces. Fixation means shall be in sufficient number to withstand high winds.
The panels are fitted to one another. This way, the partition can be built very quickly to get a smooth surface with the same insulation value. The double closing mechanical connection provides a water and wind tightness to the whole. The UV stabilized panels made of polycarbonate offer excellent protection against UV rays, rain, wind and hail. The panels are fastened to the bearing structure by means of aluminum auxiliary profiles.
Angle and junction connections provide a perfect alignment of the profiles, even with an uneven floor. The right connection between the side profiles and the threshold profiles is drowned. The groove is invisible. The side and top profiles are miter cut and aligned square by means of an angle connection. As the formation of condensation in polycarbonate plate is inevitable, the threshold profiles must be pre-drilled every 45cm to evacuate the condensation water. Once the polycarbonate panels are fixed, the connection between the polycarbonate and the edge profiles must be executed with flexible EPDM tight joints outside. This joint is anchored to the two sides. This way, the glazing is not subject to expansion or shrinking.
The luminous partition is fixed in front of the gable in a vertical way with regard to the horizontal.
The panels are wrapped by aluminum profiles. The profiles are such that the alignment can be ensured by lengthwise connecting pieces and angles. The side profile and threshold profile are always cut in straight line so that the cut edge is invisible. The panels outside are only fitted with the continuous sealing joint inserted between the panels and the profiles.
The panels are fixed with aluminum assembly profiles and accessories without piercing the plates. The profiles are easily and quickly fixed with stainless steel hangers. The panels withstand normal falling hail and the balloon test required in sports halls.
Type: Polyclip Plus 40/5X from AG PLASTIC or equal.
Concerns: skylights on the TAXI Alpha side.
Unit: m2, partition, joints, aluminum finish profiles and stainless steel fastening accessories included.
TP-8-03: Sandwich-type insulating panels
The panels are a system of insulating metal cladding, with hidden fixations, composed of large sandwich elements in polyisocyanurate foam with fireproof components and steel sheeting.
Work to be executed:
• Dismounting of existing PVC panels, without removing the roof edge
• Removal of top and bottom profiles
• The intermediate rails are kept
• Installation of new top and bottom rails
• Evacuation of all wastes out of the military area to an authorized public dump
• Execution of new sandwich-type insulating panels
- thickness: 60mm
- color: at the COR’s choice
- “tenon/mortise” connection system (see fig. 1)
- completely watertight
- excellent fire resistance
- self-bearing system
- resistant to bad weather and to U.V. under extreme exposure
- thermal insulation: U ± 0.40 W/m2oC
- installation of finish profiles; color at the COR’s choice
• Installation of all fittings foreseen by the manufacturer:
- top profile with EPDM watertight joint
- bottom profile with EPDM watertight joint and drip piece of adapted width
- connection profile
- connection splice plate
- stopping adhesive ribbon
- depression hook
• All finishing profiles and necessary modification works for a perfect work and water tightness
Figure 1
1. Foam joint; thickness 5mm
2. Distribution plate 70 x 30 x1.5mm
The panels must be installed according to the manufacturer’s recommendations and shall be composed of:
− a hot-dip galvanized exterior steel sheet (minimum thickness of 0.6mm and 25µ polyester finish) − insulating core made of PIR rigid foam (density of 45kg/m3 and a fire rating Bs2d0) − a hot-dip galvanized interior steel sheet (minimum thickness of 0.5mm and 15µ polyester finish)
Type: JI WALL 1000 FC L from JORISIDE or equal.
Concerns: skylights on the TAXI Bravo side.
Unit: m2, partition, joints, aluminum finish profiles and stainless steel fastening accessories included
| Contractors, concessionaires or vendors performing work or conducting business on or in facilities under the jurisdiction of the USAG Benelux Military Community Commander AOR shall conform to this regulation. The Contractor Officer’s Representative (... |
| 1. Smoking shall be prohibited in the vicinity of hazardous operations and locations. |
| 2. Waste material and rubbish shall not be stored or allowed to accumulate within the building or in the immediate vicinity, but shall be removed from the site at least daily. Rubbish shall not be burned on the site. |
| 3. Contractor materials and equipment shall not be stored in a location or manner which shall create a fire exposure to facilities adjacent to the project site. |
| 4. The contractor shall provide fire extinguishers at all locations where work is carried out. |
| 5. In every building operation where a shed, storage, or other shanty is placed, or room or space is used for storage or workshop, the contractor shall provide at least one approved portable fire extinguisher in a accessible location. |
| 6. Flammable liquids and other hazardous materials such as paints, paint thinner, gasoline, asphalt, and tar shall be stored in small detached structure or out in the open and not inside main buildings. Low flash point liquid used within buildings sh... |
| 7. Adequate ventilation shall be provided for paint spraying and operations involving the application of materials using adhesives containing flammable solvents. Such operations shall be conducted remote from any potential source of ignition. |
| 8. Asphalt and tar kettles shall be located in a safe place outside of the building. Such kettles shall not be placed on roofs or porches. Continuous supervision shall be maintained while kettles are in operation. Metal covers shall be provided for... |
| 9. Electrical wiring and equipment for lighting, heating, and power purposes shall be installed in compliance with current US and Host Nation Electrical Regulation requirements. |
| 10. Cutting and welding shall not be permitted unless: |
| a. A valid Hot Work Permit (welding permit) is available. |
| b. Combustibles have been safely covered or moved away. |
| c. A fire guard with a serviceable fire extinguisher is posted for the duration of the work and 30 minutes thereafter to assure that sparks or drops of hot material do not start fires. |
| 11. Fire hydrants shall only be used for fire fighting and training of the local fire and Emergency Services. Water can only be taken from hydrants with the permission of the Community Fire and Emergency Services Office. Parking within 2.5 m (8 feet... |
| 12. Vehicles and other equipment with fuel driven motors, with mounted and filled fuel tanks shall be equipped with 2,5 kg or larger carbon dioxide or dry chemical fire extinguishers. |
| 13. Gasoline, oil and grease shall not be disposed into drainage systems or public water systems. Oil contaminated areas shall be covered with an absorbent material and removed in accordance with the Spill Contingency plan. Any POL spillage shall be... |
| 14. Construction offices, huts, construction vehicles, trailers and supplies shall be located at least 10 m from all adjacent buildings. |
| 15. Access for fire fighting vehicles shall be provided to the immediate job site at the start of construction and maintained until all construction is completed. Vehicle parking control measures shall be established. |
| 16. Free access from the street to fire hydrants and to outside connections for standpipes or other firefighting equipment, whether permanent or temporary, shall be provided and maintained at all times. No materials or constructions shall be placed w... |
| 17. Scaffolding materials or equipment shall not block fire escape routes or access routes during performance of projects in occupied buildings. |
| 18. In all buildings over 30 feet in height at least one stairway shall be provided in a usable condition at all times. |
| 19. Notification and actions to be taken in case of a fire: |
| a. Persons who discover a fire shall immediately alarm all personnel in the area, and shall report the fire to the Community Military Police using the nearest telephone. Military telephone dial 117. |
| b. The fire shall be reported using the building number. If the fire is outside of a building, the nearest building number shall be given. Stay on the phone until the operator on duty has completely understood and does not have any further questions... |
| c. To ensure smooth notification and fire fighting procedures, it is essential to show all employees the location of the nearest telephone, make sure they are familiar with the building number in which they are employed, and inform them of the locatio... |
| Also, for fire safety reasons, hot work permit shall not be issued to perform cutting or welding operations before or after USAG BENELUX AOR regular duty hours. |