A21_-_Amendment_2_W912P819B0046.pdf

PDF 216 KB Posted

Attached to
SELA Algiers Urban Flood Control Federal contract opportunity
Solicitation number
W912P819B0046
Issued by
Department of the Army Corps of Engineers Engineering District New Orleans

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ED-20-014

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This solicitation is hereby amended as follow s:

a) revise Sections 00700, 01 53 00.02 12, 01 55 26.00 12, 01 57 23.02 09, 03 11 14.00 12, 03 21 00.00 12, 03 31 00.00 12, 13 50 00.00 12, 31 11 00.00 12, 31 62 13.20 12, 32 12 16.00 12 and DRAWINGS as noted in the follow ing pages of this amendment.

b) to delete the Submittal Register in its entirety and replace w ith Attachment 1 titled Submittal Register.

c) to provide Attachment 2 titled Amendment 2 Question & Answ ers.

d) to provide Attachment 3 titled Quantity Takeoff.

Bid opening date remains the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P819B0046

X 9B. DATED (SEE ITEM 11)

12-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Sep-2019

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P819B0046

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 2

SECTION 00700

Page 60 of 83, clause 52.236-4 PHYSICAL DATA, subparagraph (d). Delete this subparagraph in its entirety and substitute the following therefore: “(d) Reserved.”

SUBMITTAL REGISTER

Delete the Submittal Register in its entirety and substitute the attached revised Submittal Register therefore:

SECTION 01 53 00.02 12

Page 7, paragraph 1.6.3.5. Add the following at the end of this paragraph: “When no longer required, work platform piles shall be cut off 0.5 feet below the bottom elevation of the flume base slab.”

SECTION 01 55 26.00 12

Page 2, paragraph 1.2. Delete this paragraph in its entirety and substitute the following therefore:

“1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)

MUTCD (2009) Manual of Uniform Traffic Control Devices

LOUISIANA STANDARD SPECIFICATIONS FOR ROADS AND

BRIDGES (2016 Edition), LOUISIANA DEPARTMENT OF

TRANSPORTATION AND DEVELOPMENT (LADOTD)

LSSRB 713 Temporary Signs, Barricades and Pavement Markings

LSSRB 737 Painted Traffic Striping”

SECTION 01 57 23.02 09

1. Page 2, subparagraph 1.1.1(1). Delete this subparagraph in its entirety and substitute the following therefore:

“(1) The concept for maintenance and diversion of stormwater is that dry weather flow will be blocked from entering the immediate worksite during construction operations by the use of self-eroding dams (Soft Dams). The dry weather flow must be bypassed around the worksite, as needed, using gravity piping or pumping. During rain events, the soft dams shall either be removed at the direction of the Contracting Officer or washed out allowing wet weather flow to flow unimpeded, through the worksite to avoid flooding of streets and other areas outside of the construction project.”

2. Page 6, paragraph 1.9, subparagraph 2. Delete this subparagraph in its entirety and substitute the following therefore:

“2. The diversion system shall be designed to provide continuous drainage of dry weather flow of the existing canal system, and of the existing drainage structures which shall be disconnected during construction of the new General De Gaulle Drive Canal. It shall also be designed to provide continuous drainage of the General De Gaulle Drive Canal upstream of the work site. The estimated dry weather flow in other drainage structures is 10 cfs.””

SECTION 03 11 14.00 12

Page 2, paragraph 1.3. Delete this paragraph in its entirety and substitute the following

“1.3 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

ACI INTERNATIONAL (ACI)

ACI 347(2014) Guide to Formwork for

Concrete ASTM INTERNATIONAL (ASTM) ASTM C 31/C 31M (2019) Standard Practice for Making and Curing Concrete

Test Specimens in the Field

ASTM C 39/C 39M (2018) Standard Test Method for Compressive Strength of

Cylindrical Concrete Specimens

ASTM C 1074 (2004) Standard Practice for Estimating Concrete

Strength by the Maturity Method

ASTM C 1077 (2009) Standard Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation

U.S. DEPARTMENT OF COMMERCE (DOC)

PS-51 (1995) Construction and Industrial Plywood”

SECTION 03 21 00.00 12

Pages 2 and 3, paragraph 1.4, sub items SD-02 and SD-03. Delete these items in their entirety and substitute the following therefore:

“SD-02 Shop Drawings

Fabrication and Placement; G

The Contractor shall prepare and submit complete shop drawings to the Government for approval in accordance with specified requirements. Shop drawings shall include the details of bar supports including types, sizes, spacing and sequence.

SD-03 Product Data

Mechanical Butt-Splices; G

The Contractor shall submit the proposed procedure for mechanically butt-splicing steel bars for No. 11 or larger or as allowed for on the drawings, prior to making the test butt-splices for qualification of the procedure. Properties and analyses of steel bars and splicing materials shall be included in the submitted procedure. Physical properties of splicing sleeves shall include length, inside and outside diameters, and inside surface details. All mechanical splices shall test to a minimum of 125% capacity before being spliced.

Materials

A system of identification which shows the disposition of specific lots of approved materials in the work shall be established and submitted before completion of the contract.”

SECTION 03 31 00.00 12

1. Page 15, paragraph 2.1.1.4. Delete this paragraph in its entirety and substitute the following therefore:

“2.1.1.4 Blended Hydraulic Cement

Portland blast-furnace slag cement shall conform to ASTM C 595, Type IS. Portland-pozzolan cement shall conform to ASTM C 595, Type IP (20) to Type IP (35). Blended hydraulic cement shall meet the mortar expansion limits found in Table 2 of ASTM C

595. Admixture additions shall not be included in the blended cement.”

2. Page 16, paragraph 2.1.3.3. Delete this paragraph in its entirety and substitute the following therefore:

“2.1.3.3 Other Chemical Admixtures

Other chemical admixtures for use in producing flowing concrete shall comply with ASTM C 1017/C 1017M, Type 1 or 2. Concrete using these admixtures shall meet the requirements listed in paragraph “Slump”.”

3. Page 17, paragraphs 2.2.3 and 2.2.4. Delete these paragraphs in their entirety and

“2.2.3 Air Content

Air content as delivered to the forms and as determined by ASTM C 231 shall range from 3 to 7 percent except that when the nominal maximum-size coarse aggregate is 3/4 inch, it shall range from 3-1/2 to 7-1/2 percent. Reference paragraph entitled “Concrete Mixture”.

2.2.4 Slump

The slump shall be determined in accordance with ASTM C 143 and shall be within a range of 1 to 4 inches. When approved admixtures are used, the slump can be increased to 3 to 6 inches if the initial slump is within 1 to 4 inches. At no time shall the approved concrete mix design W/CM ratio be exceeded. Reference paragraph entitled “Concrete Mixture”.”

4. Page 19, subparagraph 2.2.8.2a. Delete this subparagraph in its entirety and substitute the following therefore:

“a. Delivery of Samples

Representative samples for all concrete materials proposed for this project and a copy of this section of the contract specifications entitled "CAST IN PLACE STRUCTURAL CONCRETE" shall be delivered to the laboratory that performs the concrete proportioning at least 60 days (90 when pozzolan or GGBF slag is used) before concrete placement is expected to begin. Samples of approved aggregates shall be obtained in accordance with the requirements of ASTM D 75. Samples of materials other than aggregate shall be representative of those proposed for the project and shall be accompanied by manufacturer's test reports indicating compliance with applicable specification requirements. When all of these materials have been delivered, the name, address, and phone number of this laboratory and a list of the sources and types of all concrete materials shall be submitted to the Contracting Officer.”

SECTION 13 50 00.00 12

1. Page 2, paragraphs 1.1, 1.2, and 1.3. Delete these paragraphs in their entirety and

“1.1 SCOPE

The work covered by this section consists of furnishing all plant, labor, materials, and performing all operations in connection with installation of geotechnical instrumentation (inclinometer casings with protective exterior casing, an inclinometer probe, cable, readout unit, riser assembly; inclinometer software) as indicated on drawings and specified herein.

The inclinometers will be required to provide measurements indicating adverse lateral movement of the TRS sheet pile. Allowable deflection limits will be coordinated with the Contractor based on his/her TRS design.

1.2 RESERVED

1.3 RESERVED”

2. Pages 3 thru 7. Renumber the 2nd paragraph numbered as “1.4” to “1.5” and renumber subsequent paragraphs sequentially.

SECTION 31 11 00.00 12

Page 3, paragraph 3.2.1. Delete this paragraph in its entirety and substitute the following

“3.2.1 General

Clearing shall be performed within the limits of the project and unless marked as to remain in drawings, shall consist of the complete removal above the ground surface of all trees, stumps, down timber snags, brush, vegetation, loose stone, and similar debris. Clearing shall also include the removal of silt and debris from the existing open channel flumes, extending to the upstream and downstream ends of the project right-of-way limits.

SECTION 31 62 13.20 12

Page 13, paragraph 3.1.3. Delete this paragraph in its entirety and substitute the following

“3.1.3 Driving Helmets and Pile Cushions

A driving helmet including a pile cushion shall be used between the top of the pile and the ram to prevent impact damage to the pile. The driving helmet and pile cushion combination shall be capable of protecting the head of the pile, minimize energy absorption and dissipation, transmit hammer energy uniformly over the top of the pile and prevent excessive tensile stresses from developing in the concrete during driving. The driving helmet shall fit loosely around the top of the pile so that the pile is not restrained by the helmet if the pile tends to rotate during driving. The pile cushion may be of solid wood or of laminated construction, completely cover the top surface of the pile, and be retained by the driving helmet. Minimum thickness of the pile cushion shall be 3 inches and the thickness shall be increased so as to be suitable for the size and length of pile, character of subsurface material to be encountered, hammer characteristics, and the required driving resistance.”

SECTION 32 12 16.00 12

Page 2, paragraph 1.1. Delete this paragraph in its entirety and substitute the following

“1.1 SCOPE

The work covered by this section consists of furnishing all plant, labor, materials, testing, and equipment required for constructing asphaltic pavement repairs as specified herein. The work required by this section will be at the discretion of the Contracting Officer. Asphaltic pavement repairs will be made for asphaltic pavement damaged during construction along streets that are within the contract limits, in areas as directed by the Contracting Officer’s representative.”

DRAWINGS

1. SHEET IDENTIFICATION No. G13. DEMOLITION PLAN

a. @ approximate Sta. No. 53+50. Cross-hatch the 15” RCP (DESTROYED) shown on the left descending bank. Add the following note: “15” DIA. RCP x 20’ LONG”.

b. Add the following new Note as: "8. EXISTING TIMBER BULKHEADS SHALL

BE CUT AT THE REQUIRED EXCAVATION LINE, EXCEPT IN AREAS WHERE

THEY WILL BE LOCATED AT FINAL GRADE. BULKHEADS SHALL BE CUT

1 FOOT BELOW GRADE IF THEY WILL BE LOCATED AT FINAL GRADE."

2. SHEET IDENTIFICATION No. G14, DEMOLITION PLAN

a. @ approximate Sta. No. 58+80. Change “18” DIA. CMP x 32’ LONG” to “18” DIA.

CMP x4 0’ LONG”.

b. @ approximate Sta. No. 60+50. Change “15” DIA. RCP x 12’ LONG” to “15” DIA. RCP x 20’ LONG”.

3. SHEET IDENTIFICATION No. G15, DEMOLITION PLAN

a. @ approximate Sta. No. 62+70. Change “15” DIA. RCP x 26’ LONG” to “15” DIA. RCP x 35’ LONG”.

b. @ approximate Sta. No. 66+35. Change “EXIST. 16” DIA. SFM ABOVE GROUND CROSSING TO BE RELOCATED” to “EXISTING 16” DIA. SFM BELOW

GROUND CROSSING TO REMAIN.”

c. @ approximate Sta. No. 67+50. Change “18” DIA. RCP x 27’ LONG” to “18” DIA. RCP x 40’ LONG”.

d. Change the note “TIMBER BULKHEAD TO BE REMOVED” to

“TIMBER BULKHEAD TO BE CUT BELOW GRADE".

4. SHEET IDENTIFICATION No. G16, DEMOLITION PLAN. Change the note “EXIST TIMBER BULKHEAD TO BE REMOVED” to “EXIST TIMBER BULKHEAD TO BE

CUT BELOW GRADE".

5. SHEET IDENTIFICATION No. G17, DEMOLITION PLAN.

a. @ approximate MATCHLINE STA. 78+50. Cross-hatch the 18” RCP shown on the right descending bank. Add the following note: “18” DIA. RCP x 25’ LONG”.

b. @ approximate Sta. No. 85+25. Change “36” DIA. RCP x 20’ LONG” to “46” DIA. RCP x 20’ LONG”.

c. Change the note “EXIST. TIMBER BULKHEAD TO BE REMOVED” to

“EXIST. TIMBER BULKHEAD TO BE CUT BELOW GRADE".

6. SHEET IDENTIFICATION No. G18, DEMOLITION PLAN. Change both occurrences of the note “EXIST. TIMBER BULKHEAD TO BE REMOVED” to “EXIST. TIMBER

BULKHEAD TO BE CUT BELOW GRADE".

7. SHEET IDENTIFICATION No. G19, DEMOLITION PLAN. Change both occurrences of the note “EXIST. TIMBER BULKHEAD TO BE REMOVED” to “EXIST. TIMBER

BULKHEAD TO BE CUT BELOW GRADE".

8. SHEET IDENTIFICATION No. TC-3. Add the following new Note as: “12: “NO LEFT

TURN SIGNS SHALL BE PROVIDED ON ALL CROSS OVER CLOSURES ALONG

GEN DEGAULLE DR.”

9. SHEET IDENTIFICATION Nos. TC-4 and TC-5. Add the following new Note as: “10.

NO LEFT TURN SIGNS SHALL BE PROVIDED ON ALL CROSS OVER CLOSURES

ALONG GEN DEGAULLE DR.”

10. SHEET IDENTIFICATION No. TC-6. Add the following new Note as: “9. NO LEFT

TURN SIGNS SHALL BE PROVIDED ON ALL CROSS OVER CLOSURES ALONG

GEN DEGAULLE DR.”

11. SHEET IDENTIFICATION No. C6. PLAN – NEW CONCRETE FLUME @ approximate Sta. No. 66+35. Change “EXIST. 16” DIA. SFM ABOVE GROUND CROSSING TO REMAIN” to “EXISTING 16” DIA. SFM BELOW GROUND CROSSING

TO REMAIN.”

12. SHEET IDENTIFICATION No. CE1, NOTE 4. Delete this note in its entirety and substitute the following therefore: “4. THE SAFETY FENCE SHALL BE LOCATED 6

FEET FROM THE BACK OF THE EXISTING CURB. THE LOCATION OF THE FENCE

AND ACCESS GATE SHALL BE SUBMITTED TO THE CONTRACTING OFFICER

FOR APPROVAL.”