A21_-_W912P817B0041-0003.pdf

PDF 4 MB Posted

Attached to
2017 Southwest Pass Stone Forechore Dike and Stone Jetty Repairs
Solicitation number
W912P817B0041
Issued by

About this file

Amendment 0003

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above numbered solicitation for Mississippi River, Baton Rouge to Gulf of Mexico, ID-IQ, 2017 Southw est Pass Stone Foreshore Dike and Stone Jetty Repairs, 0.0 to -20.2 BHP, Plaquemines Parish, LA (ED 17-034) is hereby amended to re-establish the bid opening date, respond to contractor questions, and provide revisions to SF 1442 and clauses as show n on the attached continuation pages.

The Bid Opening Date is changed to Tuesday, 3 July 2018 at 2:00 pm local time.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Jun-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P817B0041

X 9B. DATED (SEE ITEM 11)

17-Nov-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Jun-2018

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P817B0041

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

52.216-19 ORDER LIMITATIONS (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $10,000.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor -

(1) Any order for a single item in excess of $28,000,000.00;

(2) Any order for a combination of items in excess of $28,000.000.00; or

(3) A series of orders from the same ordering office within twelve (12) months that together call for quantities exceeding the limitation in paragraph (b) (1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within ten (10) days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of clause)

52.216-22 INDEFINITE QUANTITY. (OCT 1995)

a. This is an indefinite quantity contract for miscellaneous construction and repairs, and effective for a one-year period from the date of award. The quantities of supplies and services specified in the schedule are estimates only and are not purchased by this contract.

b. Delivery or performance shall be made only as authorized by Task Orders issued in accordance with the Section 00700 Contract Clause entitled “ORDERING” (FAR 52.216-18). The Contractor shall furnish to the Government, when and if ordered, work for the items specified.

c. Except for any limitations on quantities in the Section 00700 Contract Clause entitled "ORDER LIMITATIONS" (FAR 52.216-19), there is no limit on the number of Task Orders that may be issued. The Government may issue Task Orders requiring delivery to multiple locations.

W912P817B0041

d. Any Task Order issued during the effective contract period and not completed within that effective contract period shall be completed by the Contractor within the time specified in the Task Order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that Task Order to the same extent as if the Task Order were completed during the contract's effective period.

e. The Contractor shall provide written telecommunication notice (e-mail or facsimile) to the Contracting Officer's Representative of the need to place any quantity for an item of a Task Order above the estimated quantity included for that item in the Task Order. The notice shall be provided at least five (5) calendar days prior to the anticipated need for the additional quantity. The Contractor will be responsible for any impact on the completion of the work resulting from an untimely notice. Upon approval by the Contracting Officer for any additional quantity of an item, the time specified in the Task Order shall be modified accordingly.

(End of clause)

SECTION SF 30 - SF 30 CONTINUATION

The following have been added by full text:

AMD 0003

Question 1: I see the contract will be for 1 year but I do not see where time will be calculated for the individual task orders that will be issued. Is it the intent to just have all task orders completed in 1 years time?

Answer 1: See Blocks 10 & 11 of the SF 1442; 52.216-22 & DFARS 252.216-7006. The SF1442, block 10 states, “Each task order will have an individual period of performance which could, potentially, extend beyond the contract ordering period duration listed in DFARS 252.216-7006. DFARS 252.216-7006, Ordering, the ordering period will be established upon any resultant award from this solicitation. The duration of the base contract will be for 365 days, at which any time a task order can be awarded.

Question 2: Would you please consider pushing the bid date back 1 week so we can do a better site inspection?

The weather this week has been terrible down there and we can’t get out to the head of the jetties. Also please clarify where the anticipated jetty stone will be placed on the East side. I ask this because I went out and from the Pilot station approx., mile 18 to approx., mile 19.5 there is only about 3 to 4 feet of water next to the jetty. This will not allow us to get in with a placement rig and definitely not a material barge. Flotation excavation is also not economical due to the sandy material and the constant wave action we cant keep a flotation channel open. Can you supply surveys that show the areas next to the jetties?

Answer 2: Placement areas will be determined after contract award. Attached are the requested surveys. The surveys are also available on the internet at http://www.mvn.usace.army.mil/Missions/Navigation/Channel- Surveys/.

(End of Summary of Changes)

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

W912P817B0041

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 163

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

Mississippi River, Baton Rouge to Gulf of Mexico, Indefinite Delivery - Indefinite Quantity Contract, 2017 Southwest Pass Stone Foreshore Dike and Stone Jetty Repairs, Miles 0.0 to -20.2 BHP, Plaquemines Parish, Louisiana (ED 17-034)

This procurement is UNRESTRICTED.

The contract ceiling is $28,000,000.00 with a minimum guarantee of 2% ($560,000.00).

DESCRIPTION OF WORK: The work shall consist of placing various types of stone paving and stone repairs along the banks of Southwest Pass (Miles 0.0 to -20.2 BHP).

*Performance and Payment Bonds and Notices to Proceed (NTPs) will be received and issued on a task order basis. Each task order will have an individual period of performance which could, potentially, extend beyond the contract ordering period duration listed in DFARS 252.216-7006.

**TO BE ESTABLISHED BY AMENDMENT

See Item 7

Jenifer Bordelon 504-862-2466

11/17/2017

*10

*365

77913

575757575656565655575655565456565656565661565755575656565757575761586056565755545456555655565554565656545555545554565657665656545655545455605354545661575656575659576061565956565757565657575957565755675658565656565656575758565756575758586156575856565556565656565656575656555655555656565756565556565656565555555756555555555454545554545454535353535353535353535353535353545353535353535353535353535353535453545354535354545454545353545354535453545354545453535454545454545453555454545453535355545453545453545454545354545454545454535554555453535453525352525252525353535353535353535353535354535353535353

8"UNSPECIFIED (DNR)

4"U

NSP

EC

IFI

ED

(D

NR

6"UNSPECIFIED (DNR)

"G

AS

(D

NR

3"OIL (DNR)

2"OIL (DNR)

(D

NR

4"FLOW

LINE

(DNR)

3"FLOWLINE

(DNR)

4"FLOWLINE (DNR)

(DNR)

4"PIPELINE (DNR)

(DNR)

SALT W

ATER DISPOSAL

LINESALT W

ATER

DISPOSAL LINE (DNR)

4"PIPELINE (DNR)

4"FLOWLINE (DNR)

4"FLOWLINE (DNR)

(DNR)

(DNR)

(DN

R)

(DNR)

4"FLOWLINE (DNR)

4"FLOWLINE (DNR)

6" PIPELINEPIPELINE

(DNR)

6" PIPELINEPIPELINE

(DNR) 6" PIPELINEPIPELINE

(DNR)

6" P

IPELIN

EPIPELIN

E

(DNR)2" (DNR)

2" (DNR)

2" (DNR)

2" (DNR)

6" PIPELINEPIPELINE

(DNR)

6" PIPELINEPIPELINE(DNR)

6" PIPELINEPIPELINE(DNR)

6" PIPELINEPIPELINE

(DNR)

6"PIPELINE (DNR)

6"PIPELINE (DNR)

6"PIPELINE (DNR)

6"PIPELINE (DNR)

(DNR)

(DNR)

6"PIPELINE (DNR) 6"PIPELINE (DNR)

6"PIPELINE (DNR)

6"PIPELINE (DNR)

4"FLOWLINE (DNR) 4"FLOWLINE (DNR) 4"FLOWLINE (DNR)

4"FLOW

LINE (DNR)

2"FLOWLINE (DNR)

2"FLOWLINE (DNR)

6"PIPELINE (DNR)

(DNR)

"N

AT

UR

AL

G

AS

(D

NR

"G

AS

(D

NR

3.5"FLOWLINE (DNR)

6"FLOWLINE (DNR)

6"FLOWLINE (DNR)

6"FLOWLINE (DNR)

6"FLOWLINE (DNR)

6"FLOWLINE (DNR) 6"FLOWLINE (DNR)

6"FLOWLINE (DNR)

3.5"FLOWLINE (DNR)

3.5"FLOWLINE (DNR)

SALT WATER DISPOSAL

LINESALT WATER

DISPOSAL LINE (DNR)

10'' C rude Oil (PWMS)

10'' C rude Oil (PWMS)

10.75 in. TENNESSEE

GAS PIPELINE CO (EL

PASO), NATURAL GAS

4.5 in. TENNESSEE

GAS PIPELINE CO (EL

PASO), NATURAL GAS

10.75 in. TENNESSEE

GAS PIPELINE CO (EL

PASO), NATURAL GAS

6.63 in. TENNESSEE

GAS PIPELINE CO (EL

PASO), NATURAL GAS

10.75 in. TENNESSEE

GAS PIPELINE CO (EL

PASO), NATURAL GAS

10.75 in. TENNESSEE

GAS PIPELINE CO (EL

PASO), NATURAL GAS

10.75 in. TENNESSEE

GAS PIPELINE CO (EL

PASO), NATURAL GAS

10.75 in. TENNESSEE

GAS PIPELINE CO (EL

PASO), NATURAL GAS

10.75 in. TENNESSEE

GAS PIPELINE CO (EL

PASO), NATURAL GAS

4.5 in. TENNESSEE

GAS PIPELINE CO (EL

PASO), NATURAL GAS

10.75 in. TENNESSEE

GAS PIPELINE CO (EL

PASO), NATURAL GAS

10.75 in. TENNESSEE

GAS PIPELINE CO (EL

PASO), NATURAL GAS

P20020741

P2

P20 161009

P20050348

P20040194

P20 161009 P20 160238P20 160238

P20131594

P20 051071

P19 850227

P20160617

P20071398

P20 131594

P19881069

P20071398

P20 040442 P20 040442

P20

P20

P19

P20 150973

P20 100337 P20 100337

P20 000799

P20 000799

P20000799

P20 000799

P19 970300

P19 970300

P19 970300

P19 970300

P20161130

P20161130

P20 000799

P20 000799

P20 000799

P20 000799

P20 000770

P20 000770

P20 000770

P20 000770

P20 141491 P20 141491

P20 000770P20 000770P20 000770P20 000770

P20 000554 P20 000554

P20 000554

P20 000554 P19 950276

P19 950276

P20 021364

P20131786

P1

P1

P19841124

P20 021617

P20 021617

P20 021617

P20021617

P20 021617

P20 021617

P20 021617

P19841124 P19 841124

P19 881069

MVN-2015-02061-EV

MVN-2016-00447-EV

MV

N-

-03

5-E

OO

MVN-2014-00127-ETT

EAST JETTY - 01670

(0.0' NAVD88, 2009.55

= 4.18' MLG, 2015 =

0.68' MLLW, 07-11)

3,892,000

3,8

,00

3,895,000

3,8

,00

3,898,000

3,8

,00

3,901,000 3,9

,00

3,904,000

3,9

,00

3,907,000 3,9

,00

161,000

1,0

164,000

4,0

167,000

167,000

170,000

170,000

3,0

173,000

6,0

176,000

Sheet Reference

Number of

Revison Number:

MI

SS

IS

SIP

PI

R

IVE

R

- B .R

. T O

GU

LF

US Army Corps of Engineers

Ch ief

, W ate rw ay s M ain ten an ce S ec tio n

Ch ief

, S urv ey S ec tio n

CORPS OF ENGINEERS U.S. ARMY

Su bm itte d:

Re co mm en de d:

Ap pr ov ed

VICINITY MAP

³

0 5.5 11 16.5 Miles

3.12-20160811

Sh ee t 1

District: CEMVN

SW

_1

1_

SW

P_

_C

S

Ju ne

SO

UT

HW

ES

T P

AS

S - S

HE

ET

Sheet 10

U.

S.

AR

MY

C

OP

RP

S O

F E

NG

IN

EE

RS

NE

W O

RL

EA

NS

D

IST

RI

CT

11 13

DI

SC

LA

IM

ER

Ac ce ss

C on str ain ts:

T he U nit ed

S tat es G ov ern me nt fur nis he s the se da ta an d t he re cip ien t a cc ep ts an d u se s t he m wi th the ex pre ss un de rst an din g t ha t th e U S

Go ve rn me nt ma ke s n o w ar ran tie s, ex pre ss ed , o r im pli ed co nc ern ing th e a cc ur ac y, co mp let en es s, rea da bil ity , u sa bil ity or su ita bil ity fo r a ny pa rtic ula r p urp os e o f th e inf orm ati on an d t he da ta fur nis he d.

Th e U nit ed S tat es sh all be un de r n o l iab ilit y w ha tso ev er to an y p er so n b y r ea so n o f a ny us e ma de th ere of.

T he se da ta be lon g t o t he G ov ern me nt.

Th ere for e t he rec ipi en t fu lly ag ree s n ot to rep res en t th es e d ata to an yo ne as ot he r tha n G ov er nm en t p rov ide d d ata . T he re cip ien t m ay no t tr an sfe r the se da ta to oth ers w ith ou t a lso tra ns fer rin g t his D isc lai me r.

Th e i nfo rm ati on de pic ted on th is ma p r ep re se nts th e r es ult s o f a su rve y c on du cte d o n t he da te ind ica ted an d c an on ly be co ns ide red to rep re se nt the ge ne ra l c on dit ion ex ist ing at th at tim e.

Di str ibu tio n L iab ilit y:

Th e d ata re pre se nts th e r es ult s o f d ata co lle cti on

/pr oc es sin g f or a sp ec ific

U S A rm y C orp s o f E ng ine er s ac tiv ity an d i nd ica tes th e g en era l e xis tin g c on dit ion s.

As su ch it i s o nly va lid fo r it s i nte nd ed us e, co nte nt, tim e a nd ac cu ra cy sp ec ific ati on s.

T he us er is res po ns ibl e f or th e r es ult s of an y o f th e a pp lic ati on of th e d ata fo r o the r th an its in ten de d pu rpo se

Da ta

Co ns tra int s:

Hy dro gr ap hic su rve y d ata is su bje ct to ch an ge rap idl y d ue to se ve ral fa cto rs inc lud ing bu t n ot lim ite d t o d re dg ing ac tiv ity an d n atu ral sh oa lin g a nd sc ou rin g p roc es se s.

Th e U . S

Ar my C or ps of E ng ine ers ac ce pts no re sp on sib ilit y f or ch an ge s i n the hy dr og rap hic al co nd itio ns w hic h d ev elo p a fte r th e d ate of pu bli ca tio n.

Th is da ta is int en de d f or U

. S . A rm y C or ps of E ng ine ers in ter na l u se . P rud en t m ar ine rs sh ou ld no t re ly so lel y u po n i t.

Su rve ye d B y:

Plo tte d B y:

Ch ec ke d B y:

JH

MF

G

RS

L

MS

K

NOTES:

0 500 1,000 1,500 2,000 2,500

Feet

LEGEND

¾ Obstruction Point çè Wrecks-Submerged

!( Shoalest Sounding**

X ( Red Navigation Buoy X ( Green Navigation Buoy

Gage Reading:

Sea Conditions:

Vessel Name:

Survey Type:

Sounding Frequency***:

1.5 MLLW @ MILE 17.9 @ 0900

CHOPPY

OB-173

CONDITION, SB

LOWBeacon, General_(

Federal Navigation Channel Federal Navigation Center Line

Unconfirmed Pipeline/Cable As-built Pipeline/Cable

Borrow Area

Project Depth Contour

Cable Area

Placement Area Anchorage Area

Horizontal Coordinate System:

North American Datum of 1983 (NAD83), projected to the State Plane Coordinate System (SPCS), Louisiana South Zone. Distance units in U.S. Survey Feet.

Vertical Datum:

Soundings are shown in feet and indicate depths below Mean Lower Low Water (MLLW, 07-11).

Datum Relationships for gage 01670 as of July 2015:

0.0' NAVD88 = 0.68' MLLW = 4.18' MLG

Distances on the Mississippi River, above and below Head of Passes are shown at 1 mile intervals.

The location of navigation aids are base on and provided by the U.S. Coast Guard.

2016 Aerial Photography data source: Precision Aerial Reconnaissance, LLC (1998 DOQQ in green) Reference is N.O.A.A. Navigation Chart No. 11361.

** Shoalest Sounding per Quarter per Reach.

*** High frequency (200 kHz) survey data represents the first signal return at a sounding location and will include suspended solids, known as "fluff", if present. Low frequency (24 kHz) survey data normally penetrates through this "fluff" layer to depict elevations of consoldiated bottom material. Low frequency accuracies may vary depending on channel conditions and fathometer settings.

S o u t h w e s t

P a s s

111213

S o u t h P a s s

P a s s A L o u t r e

-10' to -20' -20' to -30' -30' to -40' -40' to -45'

-48.5' to -55' -55' and below

-10' and above

-45' to -48.5'

6363636363616061615858585857575756565656565555555655565655555455545555545655555554545657585656595655565354555356545453565455535557565755565956565657565556565455545554545453545454545453515251515151505152525250535252525353515252515252525253535252545253535454525252525252525253525152525252525352525152525152525252525254515152515252525251525152525152555252525151515251525251515251515252525158527051555252525252525252535253525253525252525352535353535460585860585758575658575756565656

8 in. CHEVRON PIPE

LINE COMPANY OIL

TRANSPORTED AFTER FIRST

PROCESSING (CHEVRON

PIPE LINE COM PANY)

8 in. CHEVRON PIPE

LINE COMPANY OIL

TRANSPORTED AFTER FIRST

PROCESSING (CHEVRON

PIPE LINE COM PANY)

3"OIL (DNR)

2"OIL (DNR)

3"OIL/GAS (DNR)

8"CRUDE OIL (DNR)

6"FLOWLINE (DNR)

6"FLOWLINE (DNR)

SALT WATER DISPOSAL

LINESALT WATER

DISPOSAL LINE (DNR)

3.5"FLOWLINE (DNR)

6"FLOWLINE (DNR)

6"FLOWLINE (DNR)

6"FLOWLINE (DNR)

6"FLOWLINE (DNR)

6"FLOWLINE (DNR)

6"FLOWLINE (DNR)

6"FLOWLINE (DNR)

8'' C rude Oil (PWMS)

8'' C rude Oil (PWMS) 10'' C rude Oil (PWMS)

10.75 in. TENNESSEE

GAS PIPELINE CO (EL

PASO), NATURAL GAS

10.75 in. TENNESSEE

GAS PIPELINE CO (EL

PASO), NATURAL GAS

8 in. CHEVRON PIPE

LINE CO, CRUDE,

UNKNOWN GRADE

8 in. CHEVRON PIPE

LINE CO, CRUDE,

UNKNOWN GRADE

6 in.

ABANDONED,

SOUR CRUDE

6 in.

ABANDONED,

SOUR CRUDE

P20 040255

P20 040255

P19 881069

P19 841124

P20 021617

P20 021617

P20 021617

P20 021617

P20 021617

P20 021617

P20 021617

3,886,000

3,8

,00

3,889,000

3,8

,00

3,892,000

3,892,000

3,895,000 3,8

,00

3,898,000

3,8

,00

149,000

9,0

152,000

2,0

155,000

155,000

158,000

158,000161,000

4,0

Sheet Reference

Number of

Revison Number:

MI

SS

IS

SIP

PI

R

IVE

R

- B .R

. T O

GU

LF

US Army Corps of Engineers

Ch ief

, W ate rw ay s M ain ten an ce S ec tio n

Ch ief

, S urv ey S ec tio n

CORPS OF ENGINEERS U.S. ARMY

Su bm itte d:

Re co mm en de d:

Ap pr ov ed

VICINITY MAP

³

0 5.5 11 16.5 Miles

3.12-20160811

Sh ee t 1

District: CEMVN

SW

_1

2_

SW

P_

_C

S

Ju ne

SO

UT

HW

ES

T P

AS

S - S

HE

ET

Sheet 11

U.

S.

AR

MY

C

OP

RP

S O

F E

NG

IN

EE

RS

NE

W O

RL

EA

NS

D

IST

RI

CT

12 13

DI

SC

LA

IM

ER

Ac ce ss

C on str ain ts:

T he U nit ed

S tat es G ov ern me nt fur nis he s the se da ta an d t he re cip ien t a cc ep ts an d u se s t he m wi th the ex pre ss un de rst an din g t ha t th e U S

Go ve rn me nt ma ke s n o w ar ran tie s, ex pre ss ed , o r im pli ed co nc ern ing th e a cc ur ac y, co mp let en es s, rea da bil ity , u sa bil ity or su ita bil ity fo r a ny pa rtic ula r p urp os e o f th e inf orm ati on an d t he da ta fur nis he d.

Th e U nit ed S tat es sh all be un de r n o l iab ilit y w ha tso ev er to an y p er so n b y r ea so n o f a ny us e ma de th ere of.

T he se da ta be lon g t o t he G ov ern me nt.

Th ere for e t he rec ipi en t fu lly ag ree s n ot to rep res en t th es e d ata to an yo ne as ot he r tha n G ov er nm en t p rov ide d d ata . T he re cip ien t m ay no t tr an sfe r the se da ta to oth ers w ith ou t a lso tra ns fer rin g t his D isc lai me r.

Th e i nfo rm ati on de pic ted on th is ma p r ep re se nts th e r es ult s o f a su rve y c on du cte d o n t he da te ind ica ted an d c an on ly be co ns ide red to rep re se nt the ge ne ra l c on dit ion ex ist ing at th at tim e.

Di str ibu tio n L iab ilit y:

Th e d ata re pre se nts th e r es ult s o f d ata co lle cti on

/pr oc es sin g f or a sp ec ific

U S A rm y C orp s o f E ng ine er s ac tiv ity an d i nd ica tes th e g en era l e xis tin g c on dit ion s.

As su ch it i s o nly va lid fo r it s i nte nd ed us e, co nte nt, tim e a nd ac cu ra cy sp ec ific ati on s.

T he us er is res po ns ibl e f or th e r es ult s of an y o f th e a pp lic ati on of th e d ata fo r o the r th an its in ten de d pu rpo se

Da ta

Co ns tra int s:

Hy dro gr ap hic su rve y d ata is su bje ct to ch an ge rap idl y d ue to se ve ral fa cto rs inc lud ing bu t n ot lim ite d t o d re dg ing ac tiv ity an d n atu ral sh oa lin g a nd sc ou rin g p roc es se s.

Th e U . S

Ar my C or ps of E ng ine ers ac ce pts no re sp on sib ilit y f or ch an ge s i n the hy dr og rap hic al co nd itio ns w hic h d ev elo p a fte r th e d ate of pu bli ca tio n.

Th is da ta is int en de d f or U

. S . A rm y C or ps of E ng ine ers in ter na l u se . P rud en t m ar ine rs sh ou ld no t re ly so lel y u po n i t.

Su rve ye d B y:

Plo tte d B y:

Ch ec ke d B y:

JH

MF

G

RS

L

MS

K

NOTES:

0 500 1,000 1,500 2,000 2,500

Feet

LEGEND

¾ Obstruction Point çè Wrecks-Submerged

!( Shoalest Sounding**

X ( Red Navigation Buoy X ( Green Navigation Buoy

Gage Reading:

Sea Conditions:

Vessel Name:

Survey Type:

Sounding Frequency***:

1.5 MLLW @ MILE 17.9 @ 0900

CHOPPY

OB-173

CONDITION, SB

LOWBeacon, General_(

Federal Navigation Channel Federal Navigation Center Line

Unconfirmed Pipeline/Cable As-built Pipeline/Cable

Borrow Area

Project Depth Contour

Cable Area

Placement Area Anchorage Area

Horizontal Coordinate System:

North American Datum of 1983 (NAD83), projected to the State Plane Coordinate System (SPCS), Louisiana South Zone. Distance units in U.S. Survey Feet.

Vertical Datum:

Soundings are shown in feet and indicate depths below Mean Lower Low Water (MLLW, 07-11).

Datum Relationships for gage 01670 as of July 2015:

0.0' NAVD88 = 0.68' MLLW = 4.18' MLG

Distances on the Mississippi River, above and below Head of Passes are shown at 1 mile intervals.

The location of navigation aids are base on and provided by the U.S. Coast Guard.

2016 Aerial Photography data source: Precision Aerial Reconnaissance, LLC (1998 DOQQ in green) Reference is N.O.A.A. Navigation Chart No. 11361.

** Shoalest Sounding per Quarter per Reach.

*** High frequency (200 kHz) survey data represents the first signal return at a sounding location and will include suspended solids, known as "fluff", if present. Low frequency (24 kHz) survey data normally penetrates through this "fluff" layer to depict elevations of consoldiated bottom material. Low frequency accuracies may vary depending on channel conditions and fathometer settings.

S o u t h w e s t

P a s s

111213

S o u t h P a s s

P a s s A L o u t r e

-10' to -20' -20' to -30' -30' to -40' -40' to -45'

-48.5' to -55' -55' and below

-10' and above

-45' to -48.5'

B2ODTRSL

Text Box

TOO ROUGH TO CONTINUE

File details come from the government source that posted it.