Questions_and_Answers_Crescent_City.pdf
PDF 122 KB Posted
- Attached to
- Crescent City Harbor maintenance dredging
- Solicitation number
- W912P719B0006
About this file
Answers to Requests for Information received.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| Crescent_City_FY19_OandM_Plans_15May19.pdf | ||
| W912P719B0006_20_May_with_specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CRESCENT CITY HARBOR CHANNEL MAINTENANCE
DREDGING PROJECT, SAN MATEO COUNTY, CALIFORNIA
AS OF: 6 JUN 2019 Page 1 of 1
QUESTIONS & RESPONSES
SOLICITATION NUMBER W912P719B0006
The intent of this section is to provide questions & comments received from interested parties on the above solicitation, and our responses to those questions and comments. It is possible that the information below does not reflect 100% of the questions and responses. The questions and comments do not necessarily represent questions received from any particular contractor.
Questions and responses are provided for information only and are not made part of the solicitation. Only a formal amendment (SF30) to the solicitation changes the solicitation.
Changes to any previous responses in this document will be struck-through and new, updated responses will be provided as appropriate.
No. RFP Section Question Response
1 Regarding Disposal Site Whaler Island
Please provide a plan showing design elevations and contours for the intended finished grade of the beach placement site at Whalers Island.
There are no design elevations and contours for the intended finished grade of the beach placement site at Whaler Island.
2 Are hydraulic methods of dredge allowed for the removal of the material from the main channel to be placed at Whalers Island? i.e. Small cutterhead dredge with pipeline that directly discharges onto the placement site.
Yes, hydraulic methods of dredging are allowed for the removal of the material from the entrance channel to be placed at Whaler Island.
3 Can the dredge material to be used as beach fill on
Whalers Island be bottom dumped near shore directly from the dump scow? Beach equipment such as long reach excavators would then be used to shape the material per the provided contours.
The dredged material must be disposed within the Whaler Island boundaries shown on Sheet G-03. The Crescent City O&M Dredging Project doesn’t include the shaping of the material at Whaler Island.