W912P719B0002_Amendment_0004_April-24-2019.pdf
PDF 1 MB Posted
- Solicitation number
- W912P719B0002
About this file
W912P719B0002 Amendment 0004.pdf
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1) This Amendment 0004 changes line item 0011 for Contractor-furnished beneficial use upland site from "cover material" to "non-cover material," for Reach 10 (STA 173+00 STA 193+00).
2) This Amendment 0004 changes General Note 7 of the Schedule of Drawings, Disposal Site, General Notes, and Typical Section, G-2, by adding a sentence at the end of General Note 7 stating. "However, for Reach 10 (STA 173+00 STA 193+00), the Contactor-furnished beneficial use upland site is for non-cover material."
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P719B0002
X 9B. DATED (SEE ITEM 11)
25-Mar-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
RICHMOND INNER HARBOR CHANNEL MAINTENANCE DREDGING PROJECT, CONTRA COSTA COUNTY, CALIFORNIA
THE BID OPENING DATE HAS BEEN POSTPONDED TO 29 APRIL 2019 AT 11:00 A.M. PACIFIC TIME
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE
DATE
24-Apr-2019
CODE
US ARMY ENGINEER DISTRICT, SAN FRANCISCO
CONTRACTING DIVISION
450 GOLDEN GATE AVE, 4TH FLOOR, SUITE 0134
SAN FRANCISCO CA 94102-3406
W912P7 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
RICHMOND INNER HARBOR CHANNEL MAINTENANCE DREDGING PROJECT, CONTRA COSTA COUNTY, CALIFORNIA
PROJECT DESCRIPTION: The w ork consists of maintenance dredging the Richmond Inner Harbor Channel of approximately 136,600 cubic yards of dredged material to provide a contract depth of -37 feet plus 1 foot of allow able paid over-depth in Reaches 1 thru 10. Dredged material excavated from Reaches 1 thru 10 w ill be disposed at a Contractor-furnished beneficial use upland site, or at the Government-furnished site SF-DODS. All dredging material transportation and material placement shall be in accordance w ith the project plans, specifications, permits, regulatory guidance and applicable contract clauses.
This requirement for Small Business Set Aside competition. It will be issued as an invitation for bid (IFB) w hich will result in the award of a single Firm Fixed Price (FFP) contract.
The North American Industry Classif ication System (NAICS) Code applicable to this acquisition is: 237990
ESTIMATED COST RANGE IS BETWEEN: $5,000,000.00 - $10,000,000.00
X
JAMES E GARROR
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
25-Mar-2019
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
415-503-6988
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______5 calendar days and complete it w ithin ________92 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by local time 29 April 2019 ( date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIVISION
450 GOLDEN GATE AVE, 4TH FL, STE 0134
SAN FRANCISCO CA 94102-3406
W912P7
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
11:00 A.M. (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912P719B0002 137
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Page 5
0011 Dredging Richmond Inner Harbor Reach 10 (STA 173+00-STA 193+00) to -37-ft (MLLW) including 1-foot of paid Overdepth with disposal at Government-furnished SF-DODS, or at a Contractor-furnished beneficial use upland site as non-cover cover material.
0011AA Required Dredging to -37-ft MLLW In Richmond Inner Harbor 600 CY $_________ $_________
0011AB Overdepth Dredging to -38-ft MLLW In Richmond Inner Harbor 3,700 CY $_________ $_________
Total Price (Line Items 0011AA, 0011AB) $_________________________
Total Price (Line Items 0001, 0002AA, 0002AB) $_________________________
Total Price (Line Items 0003AA, 0003AB) $_________________________
Total Price (Line Items 0004AA, 0004AB) $_________________________
Total Price (Line Items 0005AA, 0005AB) $_________________________
Total Price (Line Items 0006AA, 0006AB) $_________________________
Total Price (Line Items 0007AA, 0007AB) $_________________________
Total Price (Line Items 0008AA, 0008AB) $_________________________
Total Price (Line Items 0009AA, 0009AB) $_________________________
Total Price (Line Items 0010AA, 0010AB) $_________________________
Total Price (Line Items 0011AA, 0011AB) $_________________________
Total Evaluated Bid Price $__________________________________________
L3ET9GGF
Cross-Out
G-02
M A
R K
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P S
O
F
E
N G
I N
E E
R S
S A
N
F
R A
N C
I S
C
D
I S
T R
I C
T
G
O L
D E
N
G
A T
E
A
V E
N U
E
T
H
F
L O
O R
S
U I T
E
S A
N
F
R A
N C
I S
C O
C
A
C O
N T
R A
S
T
U
N T
Y
C
A L
I F
O R
N I A
R I C
H M
O N
D
I N
N E
R
H
A R
B O
R
C
H A
N N
E L
M A
I N
T E
N A
N C
E
D
R E
D G
I N
G
P
R O
J E
C T
C:\Users\L3ET9GGF\appdata\local\temp\AcPublish_14244\ Richmond_Inner_O&M_2019 (G01 - G03)-LK.dwg 24 Apr 2019 - 10:56am
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
G
F
O N
G
L
K
W O
N G
L
A
B E
B E
P
S
M I T
H
A N
S I
D
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
N
M A
R C
H
W
P
B
W
P
C
X
X
D E
S C
R I P
T I O
N D
A T
E
D R
A W
I N
G
N
O
R I
100% STATUS
A M
E N
D M
E N
T
S C
H E
D U
L E
D
R A
W I N
G S
D
I S
P O
S A
L
S
I T
E
G E
N E
R A
L
N
O T
E S
A
N D
Y P
I C
L
S
E C
T I O
N
ACCEPTANCE REACHES (INNER HARBOR CHANNEL)
REACH 1: STA 0+21 - STA 27+00
REACH 2: STA 27+00 - STA 43+00
REACH 3: STA 43+00 - STA 55+00
REACH 4: STA 55+00 - STA 81+00
REACH 5: STA 81+00 - STA 100+00
REACH 6: STA 100+00 - STA 120+00
REACH 7: STA 120+00 - STA 140+00
REACH 8: STA 140+00 - STA 161+80
REACH 9: STA 161+80 - STA 173+00
REACH 10: STA 173+00 - STA 193+00
REACH 11: STA 193+00 - STA 217+02 (N.I.C.)
INNER CHANNEL VERTICAL CONTROL
BENCHMARK #2: (1932) USC&GS DISK ELEVATION 16.62 MLLW
LOCATED ON HARBOR WAY SOUTH SET VERTICALLY IN THE
GRANITE FOUNDATION AT THE NORTHERN MOST ENTRANCE OF
THE WEST SIDE OF THE OLD FORD PLANT.
PUBLICATION DATE: 4/21/2003.
DESCRIPTION AVAILABLE AT NOAA WEBSITE. STATION ID: 9414849
B.M. LS2769 CITY OF RICHMOND DISK PAVEMENT 13.87 FT MLLW.
INNER CHANNEL TIDE GAGE LOCATION
MON B-1
INNER AND OUTER CHANNEL HORIZONTAL CONTROL
COAST GUARD D-BEACON
2' ALLOWABLE OVERDEPTH
(PAID AND NON-PAID)
EL. 0.00 FEET MLLW
1' ALLOWABLE (PAID) OVERDEPTH
PROJECT DEPTH
NOTE:
SEE SECTION 35 20 23 DREDGING PARA. 1.6 FOR DETAILS.
1' ALLOWABLE OVERDEPTH (NON-PAID)
GENERAL NOTES:
1. BATHYMETRIC SURVEYS WERE DONE BY THE U.S ARMY CORPS OF ENGINEERS,
SAN FRANCISCO DISTRICT, 1 MAY 2018 OF THE INNER HARBOR.
2. BATHYMETRIC SURVEY SOUNDINGS ARE BASED ON THE DATUM OF MEAN LOWER
LOW WATER (MLLW) AT THE LOCALITY.
3. DRAWINGS ARE NOT TO BE USED AS NAVIGATION CHARTS.
4. INFORMATION SHOWN ON THE DRAWINGS IS BASED ON BATHYMETRIC SURVEYS
MADE ON THE DATES INDICATED AND CAN ONLY BE CONSIDERED INDICATING THE
GENERAL CONDITIONS EXISTING AT THAT TIME.
5. BATHYMETRIC SURVEY SOUNDINGS WERE TAKEN BY FATHOMETER (MULTI-BEAM
SURVEY EQUIPMENT) AND ARE SHOWN TO THE NEAREST TENTH OF A FOOT.
6. COORDINATES ARE BASED ON THE CALIFORNIA STATE PLANE COORDINATE
SYSTEM OF 1983 (CCS83), LAMBERT CONFORMAL PROJECTION ZONE III, AS
DESCRIBED IN SPECIAL PUBLICATION NO. 253, PUBLISHED BY NATIONAL OCEAN
SURVEY.
7. THE AUTHORIZED PROJECT DEPTH OF THE INNER HARBOR IS -38 FOOT MLLW. THE
CONTRACT DEPTH FOR REACH 11 IS -37 FOOT MLLW (BASE). DISPOSAL SITE IS
GOVERNMENT-FURNISHED DEEP OCEAN DISPOSAL SITE (SF-DODS) OR AT A
CONTRACTOR FURNISHED BENEFICIAL USE UPLAND SITE AS COVER MATERIAL
EXCEPT REACH 10 (NON-COVER MATERIAL).
8. BASE MAPS WERE COMPILED BY PHOTOGRAMMETRIC METHODS FROM AERIAL
PHOTOGRAPHY FLOWN 10 AUGUST 1996.
9. THE LOCATION OF ALL NAVIGATION AIDS ARE BASED ON INFORMATION PROVIDED
BY THE U.S. COAST GUARD. BUOY LOCATION REPRESENTS THE POSITION OF THE
SINKER ONLY.
10. SEDIMENT SAMPLING AND TESTING DATA AVAILABLE UPON REQUEST.
ABBREVIATIONS:
MLLW MEAN LOW LOWER WATER
NIC NOT IN CONTRACT
S a n r a n c i s c o
B a y
SF-DODS DISPOSAL SITE
NOT TO SCALE
0 10 20km
Monterey Bay National
Marine Sanctuary
Pigeon Pt.
Half Moon
Bay
Gulf of The Farrallones
National Marine Sanctuary
37°30'
37°45'
38°00'
123°45' 123°30' 123°15' 123°00' 122°45' 122°30'
37°15'
37°00'
Farallon
Islands
EPA SECTION 102
OCEAN DISPOSAL SITE
SF-DODS
SHEET SHEET
NUMBER ID DESCRIPTION
01 G-01 COVERSHEET
02 G-02 SCHEDULE OF DRAWINGS, DISPOSAL SITE,
GENERAL NOTES AND TYPICAL DREDGING SECTION
03 G-03 PROJECT SITE REFERENCE PLAN
04 C-01 INNER HARBOR DREDGING PLAN
STA 0+21 - STA 61+60
05 C-02 INNER HARBOR DREDGING PLAN
STA 61+60 - STA 119+00
06 C-03 INNER HARBOR DREDGING PLAN
STA 119+00 - STA 190+00
07 C-04 INNER HARBOR DREDGING PLAN
STA 190+00 - STA 193+00
SCHEDULE OF DRAWINGS
TYPICAL DREDGING SECTION
NOT TO SCALE
MATERIAL TO BE DREDGED (PAID)
NO DREDGING ON SIDE SLOPES
(SEE NOTE )
EXISTING CHANNEL BOTTOM
SIDE-SLOPE PRISM
CHANNEL WIDTH VARIES
SEE PLAN
CENTER COORDINATES OF
OVAL SHAPED SITE:
37°39.0'N
123°29.0'W
4 NAUTICAL MILES(NM) LONG
(NORTH / SOUTH) AXIS
2.5 NAUTICAL MILES SHORT
(EAST / WEST) AXIS
| W912P719B0002_RichmondInner_Amendment_12Apr19.pdf |
| W912P719B0002 - Richmond Inner Harbor FY19 Maintenance Dredging Project |
| Attention to Bidders |
| Division 00 Specifications - Table of Contents |
| SF-1442 - Solicitation, Offer, and Award |
| 00 10 00 - Pricing Schedule |
| Dredging Plant and Equipment Schedule page 1 of 2 |
| Dredging Plant and Equipment Schedule page 2 of 2 |
| 00 21 00 - Instructions, Onditions and Notices to Bidders/Offerors, and Evaluation Criteria for Award |
| 00 45 00 - Representaions and Certifications |
| 00 72 00 - General Conditions |
| 00 73 00 - Special Contract Requirements |
| Attachment 1 - Wage Determination |
| Attachment 2 - Preaward Survey |
| Division 01 and 35 Technical Specifications |
| Divison 01 and 35 Technical Specifications - Table of Contents |
| 01 11 00 SUMMARY OF WORK |
| 1.1 PROJECT DESCRIPTION |
| 1.1.1 Requirements |
| 1.1.2 Constraints |
| 1.2 MEETINGS |
| 1.3 CONTRACTOR PERFORMANCE EVALUATIONS |
| 1.4 PERMITS |
| 1 PART 1 GENERAL |
| 1.1 PROJECT DESCRIPTION |
| 1.1.1 Requirements |
| 1.1.2 Constraints |
| 1.2 MEETINGS |
| 1.2.1 Preconstruction Conference |
| 1.2.2 Weekly Meetings |
| 1.3 CONTRACTOR PERFORMANCE EVALUATIONS |
| 1.4 PERMITS |
| 1.5 PUBLIC SAFETY |
| 1.6 PUBLIC UTILITIES AND PRIVATE IMPROVEMENTS |
| 1.7 LAYOUT OF WORK |
| 1.8 SAFETY OF STRUCTURES |
| 2 PART 2 PRODUCTS |
| 3 PART 3 EXECUTION |
| 01 32 01 00 10._PROJECT SCHEDULE_Final_19Mar19.pdf |
| 1.1 REFERENCES |
| 1.2 PAYMENT |
| 1.3 SUBMITTALS |
| 1.4 PROJECT SCHEDULER QUALIFICATIONS |
| PART 2 PRODUCTS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 Payment |
| Separate payment will not be made for providing and maintaining an effective project schedule, and all associated costs will be included in applicable bid schedule prices. |
| 1.3 SUBMITTALS |
| 1.4 PROJECT SCHEDULER QUALIFICATIONS |
| PART 2 PRODUCTS |
| 2.1 SOFTWARE |
| 2.1.1 Government Default Software |
| 2.1.2 Contractor Software |
| 2.1.2.1 Primavera |
| 2.1.2.2 Other Than Primavera |
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.2 BASIS FOR PAYMENT AND COST LOADING |
| 3.2.1 Activity Cost Loading |
| 3.2.2 Withholdings / Payment Rejection |
| 3.3 PROJECT SCHEDULE DETAILED REQUIREMENTS |
| 3.3.1 Level of Detail Required |
| 3.3.2 Activity Durations |
| 3.3.3 Procurement Activities |
| 3.3.4 Mandatory Tasks |
| 3.3.5 Government Activities |
| 3.3.6 Activity Code Structure |
| 3.3.7.1 Workers Per Day (WRKP) |
| 3.3.7.2 Responsible Party Coding (RESP) |
| 3.3.7.3 Area of Work Coding (AREA) |
| 3.3.7.4 Modification Number (MODF) |
| 3.3.7.5 Bid Item Coding (BIDI) |
| 3.3.7.6 Phase of Work Coding (PHAS) |
| 3.3.7.7 Category of Work Coding (CATW) |
| 3.3.7.8 Feature of Work Coding (FOW) |
| 3.3.8 Contract Milestones and Constraints |
| 3.3.8.1 Project Start Date Milestone and Constraint |
| 3.3.8.2 End Project Finish Milestone and Constraint |
| 3.3.8.3 Interim Completion Dates and Constraints |
| 3.3.8.3.1 Start Phase |
| 3.3.8.3.2 End Phase |
| 3.3.9 Calendars |
| 3.3.10 Open Ended Logic |
| 3.3.11 Default Progress Data Disallowed |
| 3.3.12 Out-of-Sequence Progress |
| 3.3.13 Added and Deleted Activities |
| 3.3.14 Original Durations |
| 3.3.15 Leads, Lags, and Start to Finish Relationships |
| 3.3.16 Retained Logic |
| 3.3.17 Percent Complete |
| 3.3.18 Remaining Duration |
| 3.3.19 Cost Loading of Closeout Activities |
| 3.3.19.1 As-Built Drawings (not required for maintenance dredging projects) |
| 3.3.19.2 O & M Manuals |
3.3.20 Early Completion Schedule and the Right to Finish Early
| 3.4 PROJECT SCHEDULE SUBMISSIONS |
| 3.4.1 Preliminary Project Schedule Submission |
| 3.4.2 Initial Project Schedule Submission |
| 3.4.3 Periodic Schedule Updates |
| 3.5 SUBMISSION REQUIREMENTS |
| 3.5.1 Data Electronic Files |
| 3.5.2 Narrative Report |
| 3.5.3 Schedule Reports |
| 3.5.3.1 Activity Report |
| 3.5.3.2 Logic Report |
| 3.5.3.3 Total Float Report |
| 3.5.3.4 Earnings Report by CLIN |
| 3.5.3.5 Schedule Log |
| 3.5.4 Network Diagram |
| 3.5.4.1 Continuous Flow |
| 3.5.4.2 Project Milestone Dates |
| 3.5.4.3 Critical Path |
| 3.5.4.4 Banding |
| 3.5.4.5 Cash Flow / Schedule Variance Control (SVC) Diagram |
| 3.6 PERIODIC SCHEDULE UPDATE |
| 3.6.1 Periodic Schedule Update Meetings |
| 3.6.2 Update Submission Following Progress Meeting |
| 3.7 WEEKLY PROGRESS MEETINGS |
| 3.8 REQUESTS FOR TIME EXTENSIONS |
| 3.8.1 Justification of Delay |
| 3.8.2 Time Impact Analysis (Prospective Analysis) |
| 3.8.3 Forensic Schedule Analysis (Retrospective Analysis) |
| 3.8.4 Fragmentary Network (Fragnet) |
| 3.8.5 Time Extension |
| 3.8.6 Impact to Early Completion Schedule |
| 3.9 FAILURE TO ACHIEVE PROGRESS |
| 3.9.1 Artificially Improving Progress |
| 3.9.2 Failure to Perform |
| 3.9.3 Recovery Schedule |
| 3.10 OWNERSHIP OF FLOAT |
| 3.11 TRANSFER OF SCHEDULE DATA INTO RMS CM |
| 3.12 PRIMAVERA P6 MANDATORY REQUIREMENTS |
| 01 32 23 HYDROGRAPHIC SURVEY |
| 1.1 INTRODUCTION |
| 1.2 PAYMENT |
| 1.3 TECHNICAL CRITERIA AND REFERENCE STANDARDS |
| PART 1 GENERAL |
| 1.1 INTRODUCTION |
| 1.2 PAYMENT |
| 1.3 Reference STANDARDS |
| 1.4 SUBMITTALS |
| 1.5 EQUIPMENT DATA |
| 1.6 SOFTWARE |
| 1.7.1 Depth Elevation Measurements: |
| 1.7.2 Electronic Copies of Surveys: |
1.7.3 Volume Computations:
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 SURVEYING PROCEDURES |
| 3.1.1 Horizontal Positioning Procedures and Accuracies |
| 3.1.2 Reference Horizontal Control Data: |
| 3.1.3 Depth Measurement Procedures And Calibration |
| 3.1.4 Vertical Reference Datum: |
Attachment 1 - Survey Quality Control (QC) Log
| 01 33 00 SUBMITTAL PROCEDURES |
| 1.2 DEFINITIONS |
| 1.3 SUBMITTALS |
| 1.5 FORWARDING SUBMITTALS REQUIRING GOVERNMENT APPROVAL |
| 1.5.1 Submittals Required from the Contractor |
| 1.7.2 Number of Copies of SD-03 Product Data and SD-08 Manufacturer's Instructions |
| 1.7.4 Number of Copies of SD-15 Design Data and SD-07 Certificates |
| 1.7.6 Number of Copies of SD-01 Preconstruction Submittals and SD-11 Closeout Submittals |
| 1.9.4 Action Codes |
| 1.9.4.1 Government Review Action Codes |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 DEFINITIONS |
| 1.2.1 Submittal Descriptions (SD) |
| 1.2.2 Approving Authority |
| 1.2.3 Work |
| 1.3 SUBMITTALS |
| 1.4 SUBMITTAL CLASSIFICATION |
| 1.4.1 Government Approved (G) |
| 1.4.2 For Information Only |
| 1.5 FORWARDING SUBMITTALS REQUIRING GOVERNMENT APPROVAL |
| 1.5.1 Submittals Required from the Contractor |
| 1.6 PREPARATION |
| 1.6.1 Transmittal Form |
| 1.6.2 Format for SD-02 Shop Drawings |
| 1.6.3 Format of SD-01 Preconstruction Submittals and SD-11 Closeout Submittals |
| 1.7 QUANTITY OF SUBMITTALS |
| 1.7.1 Number of Copies of SD-02 Shop Drawings |
| 1.7.2 Number of Copies of SD-03 Product Data and SD-08 Manufacturer's Instructions |
| 1.7.3 Number of Samples SD-04 Samples |
| 1.7.4 Number of Copies SD-05 Design Data and SD-07 Certificates |
| 1.7.5 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's Field Reports |
| 1.7.6 Number of Copies of SD-01 Preconstruction Submittals and SD-11 Closeout Submittals |
| 1.8 INFORMATION ONLY SUBMITTALS |
| 1.9 SUBMITTAL REGISTER AND DATABASE |
| 1.9.1 Use of Submittal Register |
| 1.9.2 Contractor Use of Submittal Register |
| 1.9.3 Approving Authority Use of Submittal Register |
| 1.9.4 Action Codes |
| 1.9.4.1 Government Review Action Codes |
| 1.9.4.2 Contractor Action Codes |
1.9.5 Copies Delivered to the Government
| 1.10 VARIATIONS |
| 1.10.1 Considering Variations |
| 1.10.2 Proposing Variations |
| 1.10.3 Warranting that Variations are Compatible |
| 1.10.4 Review Schedule Extension |
| 1.11 SCHEDULING |
| 1.12 GOVERNMENT APPROVING AUTHORITY |
| 1.12.1 Review Notations |
| 1.13 DISAPPROVED SUBMITTALS |
| 1.14 APPROVED SUBMITTALS |
| 1.15 APPROVED SAMPLES |
| 1.16 PROGRESS SCHEDULE |
| 1.16.1 Bar Chart |
| 1.16.2 Project Network Analysis |
1.17 STAMPS
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 35 26 GOVERNMENT SAFETY REQUIREMENTS (DREDGING) |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.12 NOTIFICATIONS AND REPORTS |
| 1.12.1 Accident Notification |
| 1.12.2 Accident Reports |
| 1.12.3 Monthly Exposure Reports |
| 1.12.3.1 Regulatory Citations and Violations |
| 1.12.4 Crane Reports |
| 1.12.5 Certificate of Compliance |
| 1.12.6 Third Party Certification of Barge-Mounted Mobile Cranes |
| 1.12.7 Worker Compensation Claims |
| 1.13 HOT WORK |
| 1.14 SEVERE STORM PLAN |
| 1.15 CONFINED SPACE ENTRY REQUIREMENTS |
| 1.16 HAZARD COMMUNICATION PROGRAM |
| 1.17 PROJECT SAFE CLEARANCE PROCEDURE |
| 1.17.1 Hazardous Entry Control Plan |
| 1.17.2 Safe Clearance Procedure System |
| 1.18 THIRD PARTY CERTIFICATION OF BARGE-MOUNTED MOBILE CRANES |
| 1.19 SPECIAL SAFETY REQUIREMENTS |
| 1 PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.3 SUBMITTALS |
| 1.4 DRUG AND ALCOHOL PREVENTION PROGRAM |
| 1.5 REGULATORY REQUIREMENTS |
| 1.6 SITE QUALIFICATIONS, DUTIES AND MEETINGS |
| 1.6.1 Personnel Qualifications |
| 1.6.1.1 Site Safety and Health Officer (SSHO) |
| 1.6.1.1.1 Contractor Quality Control (QC) |
| 1.6.1.2 USACE Dredging Contract Requirements |
| 1.6.1.2.1 SSHO Staffing for USACE Dredging Contracts |
| 1.6.1.2.2 SSHO Requirements for Dredging |
| 1.6.1.2.3 Designated Representative (DR) Requirements for Dredging |
| 1.6.1.2.4 Safety Personnel Training Requirements for Dredging |
| 1.6.1.3 Competent Person for Confined Space Entry |
| 1.6.1.4 Crane Operators |
| 1.6.2 Personnel Duties |
| 1.6.2.1 Site Safety and Health Officer (SSHO) |
| 1.6.3 Meetings |
| 1.6.3.1 Preconstruction Conference |
| 1.6.3.2 Safety Meetings |
| 1.6.3.3 Work Phase Meetings |
| 1.6.3.4 New Employee Indoctrination |
| 1.6.3.5 Periodic Training |
| 1.6.3.6 Training on Activity Hazard Analysis (AHA) |
| 1.7 ACCIDENT PREVENTION PLAN (APP)/INJURY AND ILLNESS PREVENTION PROGRAM (IIPP) |
| 1.7.1 EM 385-1-1 Contents |
| 1.8 ACTIVITY HAZARD ANALYSIS (AHA) |
| 1.8.1 General |
| 1.8.2 Periodic AHA Review and Updating |
| 1.9 DISPLAY OF SAFETY INFORMATION |
| 1.10 SITE SAFETY REFERENCE MATERIALS |
| 1.11 EMERGENCY MEDICAL TREATMENT |
| 1.12 NOTIFICATIONS AND REPORTS |
| 1.12.1 Accident Notification |
| 1.12.2 Accident Reports |
| 1.12.3 Monthly Exposure Reports |
| 1.12.3.1 Regulatory Citations and Violations |
| 1.12.4 Crane Reports |
| 1.12.5 Certificate of Compliance |
| 1.12.6 Third Party Certification of Barge-Mounted Mobile Cranes |
| 1.12.7 Worker Compensation Claims |
| 1.13 HOT WORK |
| 1.14 SEVERE STORM PLAN |
| 1.15 CONFINED SPACE ENTRY REQUIREMENTS. |
| 1.16 HAZARD COMMUNICATION PROGRAM |
| 1.17 PROJECT SAFE CLEARANCE PROCEDURE |
| 1.17.1 Hazardous Energy Control Plan |
| 1.17.2 Safe Clearance Procedure System |
| 1.18 THIRD PARTY CERTIFICATION OF BARGE-MOUNTED MOBILE CRANES |
| 1.19 SPECIAL SAFETY REQUIREMENTS |
| 2 PART 2 PRODUCTS |
| 3 PART 3 EXECUTION |
| 3.1 CONSTRUCTION AND OTHER WORK |
| 3.1.1 Hazardous Material Use |
| 3.1.2 Hazardous Material Exclusions |
| 3.1.3 Unforeseen Hazardous Material |
| 3.2 PRE-OUTAGE COORDINATION MEETING |
| 3.3 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) |
| 3.4 FALL HAZARD PROTECTION AND PREVENTION PROGRAM |
| 3.4.1 Training |
| 3.4.2 Fall Protection Equipment and Systems |
| 3.4.2.1 Personal Fall Arrest Equipment |
| 3.4.3 Fall Protection for Roofing Work |
| 3.4.4 Horizontal Lifelines |
| 3.4.5 Guardrails and Safety Nets |
| 3.4.6 Rescue and Evacuation Procedures |
| 3.5 SCAFFOLDING |
| 3.6 EQUIPMENT |
| 3.6.1 Material Handling Equipment |
| 3.6.2 Seaworthiness Certification and Equipment Inspection |
| 3.6.2.1 Seaworthiness Certification |
| 3.6.2.2 Contractor Inspection of Floating Plants |
| 3.6.2.3 Government Inspection of Floating Plants |
| 3.6.3 Weight Handling Equipment |
| 3.6.4 Equipment and Mechanized Equipment |
| 3.6.5 USE OF EXPLOSIVES |
| 3.7 EXCAVATIONS |
| 3.7.1 Utility Locations |
| 3.7.2 Utility Location Verification |
| 3.7.3 Utilities Within and Under Concrete, Bituminous Asphalt, and Other |
| 3.8 ELECTRICAL |
| 3.9 WORK IN CONFINED SPACES |
| 3.10 NAVIGATION |
| 3.10.1 Navigation Aids |
| 3.10.2 Dredging Aids |
| 3.10.3 U.S. Coast Guard Notification |
| 3.10.4 Local Notice to Mariners |
| 3.10.5 Signal Lights |
| 3.10.6 Obstruction Marking and Lighting |
| 3.11 RADIOLOGICAL SAFETY |
| 3.12 MARINE TRANSPORTATION SAFETY |
| 3.12.1 San Francisco Bay Traffic |
| 3.12.2 Vessel Traffic Services (VTS) Reporting Requirements |
| 3.12.3 Anchor Waiver Requirements |
| 3.13 TUG AND SCOW OPERATOR CERTIFICATION |
| 3.14 CREOSOTE |
| 3.15 MEANS OF ESCAPE FOR PERSONNEL QUARTERED, OR WORKING ON THE FLOATING PLANT |
| 3.16 EMERGENCY ALARMS AND SIGNALS |
| 3.16.1 Alarms |
| 3.16.2 Fire Alarm Signals |
| 3.16.3 Abandon Ship Signals |
| 3.16.4 Man-Overboard Signal |
3.17 HOUSEKEEPING
| Attachment 1 - Worker's Compensation Claims |
| Attachment 2 - Safety Exposure Report |
| 01 45 00.00 10 QUALITY CONTROL |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 PAYMENT |
| 1.3 SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.2 CONTRACTOR QUALITY CONTROL (CQC) PLAN |
| 3.2.1 Content of the CQC Plan |
| 3.2.2 Acceptance of Plan |
| 3.2.3 Notification of Changes |
| 3.3 COORDINATION MEETING |
| 3.4 QUALITY CONTROL ORGANIZATION |
| 3.4.1 Personnel Requirements |
| 3.4.2 CQC System Manager |
| 3.4.3 CQC Personnel |
| 3.4.4 Additional Requirement |
| 3.4.5 Organizational Changes |
| 3.5 SUBMITTALS AND DELIVERABLES |
| 3.6 CONTROL |
| 3.6.1 Preparatory Phase |
| 3.6.2 Initial Phase |
| 3.6.3 Follow-up Phase |
| 3.6.4 Additional Preparatory and Initial Phases |
| 3.7 TESTS |
| 3.7.1 Testing Procedure |
| 3.7.2 Testing Laboratories |
| 3.7.3 Onsite Laboratory |
| 3.8 COMPLETION INSPECTION |
| 3.9 DOCUMENTATION |
| 3.9.1 Quality Control Activities |
| 3.9.2 Verification Statement |
| 3.10 SAMPLE FORMS |
| 3.11 NOTIFICATION OF NONCOMPLIANCE |
| 01 45 00 15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) |
| 11/16 |
| 11/16 |
| 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS |
| 1.1 SUMMARY |
| 1.2 REFERENCES |
| 1 PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 CONSTRUCTION SITE PLAN |
| 2 PART 2 PRODUCTS |
| 2.1 TEMPORARY SIGNAGE |
| 2.1.1 Bulletin Board |
| 2.1.1.1 General |
| 2.1.1.2 Construction |
| 2.1.1.3 Maintenance and Disposal |
2.1.2 Project and Signs
3 PART 3 EXECUTION
| 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS |
| 11/15 |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 Class I and II Ozone Depleting Substance (ODS) |
| 1.2.2 Contractor Generated Hazardous Waste |
| 1.2.3 Electronics Waste |
| 1.2.4 Environmental Pollution and Damage |
| 1.2.5 Environmental Protection |
| 1.2.6 Hazardous Debris |
| 1.2.7 Hazardous Materials |
| 1.2.8 Hazardous Waste |
| 1.2.9 Installation Pest Management Coordinator |
| 1.2.10 Land Application |
| 1.2.11 Municipal Separate Storm Sewer System (MS4) Permit |
| 1.2.12 National Pollutant Discharge Elimination System (NPDES) |
| 1.2.13 Oily Waste |
| 1.2.14 Pesticide |
| 1.2.15 Pesticide Treatment Plan |
| 1.2.16 Pests |
| 1.2.17 Project Pesticide Coordinator |
| 1.2.18 Regulated Waste |
| 1.2.19 Sediment |
| 1.2.20 Solid Waste |
| 1.2.20.1 Debris |
| 1.2.20.2 Green Waste |
| 1.2.20.3 Material not regulated as solid waste |
| 1.2.20.4 Non-Hazardous Waste |
| 1.2.20.5 Recyclables |
| 1.2.20.6 Surplus Soil |
| 1.2.20.7 Scrap Metal |
| 1.2.20.8 Wood |
| 1.2.21 Surface Discharge |
| 1.2.22 Wastewater |
| 1.2.22.1 Stormwater |
| 1.2.23 Waters of the United States |
| 1.2.24 Wetlands |
| 1.2.25 Universal Waste |
| 1.3 SUBMITTALS |
| 1.4 ENVIRONMENTAL PROTECTION REQUIREMENTS |
| 1.4.1 Training in Environmental Compliance Assessment Training and Tracking System (ECATTS) |
| 1.4.2 Conformance with the Environmental Management System |
| 1.5 SPECIAL ENVIRONMENTAL REQUIREMENTS |
| 1.6 QUALITY ASSURANCE |
| 1.6.1 Preconstruction Survey and Protection of Features |
| 1.6.2 Regulatory Notifications |
| 1.6.3 Environmental Brief |
| 1.6.4 Environmental Manager |
| 1.6.5 Employee Training Records |
| 1.6.5.1 Pest Control Training |
1.6.6 Non-Compliance Notifications
| 1.7 ENVIRONMENTAL PROTECTION PLAN |
| 1.7.1 General Overview and Purpose |
| 1.7.1.1 Descriptions |
| 1.7.1.2 Duties |
| 1.7.1.3 Procedures |
| 1.7.1.4 Communications |
| 1.7.1.5 Contact Information |
| 1.7.2 General Site Information |
| 1.7.2.1 Drawings |
| 1.7.2.2 Work Area |
| 1.7.2.3 Documentation |
| 1.7.3 Management of Natural Resources |
| 1.7.4 Protection of Historical and Archaeological Resources |
| 1.7.5 Stormwater Management and Control |
| 1.7.6 Protection of the Environment from Waste Derived from Contractor Operations |
| 1.7.7 Prevention of Releases to the Environment |
| 1.7.8 Regulatory Notification and Permits |
| 1.7.9 Clean Air Act Compliance |
| 1.7.9.1 Haul Route |
| 1.7.9.2 Pollution Generating Equipment |
| 1.7.9.3 Stationary Internal Combustion Engines |
| 1.7.9.4 Refrigerants |
| 1.7.9.5 Air Pollution-engineering Processes |
| 1.7.9.6 Monitoring |
| 1.7.9.7 Compliant Materials |
| 1.8 LICENSES AND PERMITS |
| 1.9 ENVIRONMENTAL RECORDS BINDER |
| 1.10 PESTICIDE DELIVERY, STORAGE, AND HANDLING |
| 1.11 SOLID WASTE MANAGEMENT PERMIT |
| 1.11.1 Solid Waste Management Report |
| 1.12 FACILITY HAZARDOUS WASTE GENERATOR STATUS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 PROTECTION OF NATURAL RESOURCES |
| 3.1.1 Flow Ways |
| 3.1.2 Vegetation |
| 3.1.3 Streams |
| 3.1.4 Water Quality Monitoring |
| 3.1.5 Light Monitoring |
| 3.1.6 Herring Spawning Observers |
| 3.2 STORMWATER |
| 3.2.1 Construction General Permit |
| 3.2.1.1 Stormwater Pollution Prevention Plan |
| 3.2.1.2 Stormwater Notice of Intent for Construction Activities |
| 3.2.1.3 Inspection Reports |
| 3.2.1.4 Stormwater Pollution Prevention Plan Compliance Notebook |
| 3.2.1.5 Stormwater Notice of Termination for Construction Activities |
| 3.2.2 Erosion and Sediment Control Measures |
| 3.2.2.1 Erosion Control |
| 3.2.2.2 Sediment Control Practices |
| 3.2.3 Work Area Limits |
| 3.2.4 Contractor Facilities and Work Areas |
| 3.2.5 Municipal Separate Storm Sewer System (MS4) Management |
| 3.3 SURFACE AND GROUNDWATER |
| 3.3.1 Cofferdams, Diversions, and Dewatering |
| 3.3.2 Waters of the United States |
| 3.4 PROTECTION OF CULTURAL RESOURCES |
| 3.4.1 Archaeological Resources |
| 3.4.2 Historical Resources |
| 3.5 AIR RESOURCES |
| 3.5.1 Preconstruction Air Permits |
| 3.5.2 Oil or Dual-fuel Boilers and Furnaces |
| 3.5.3 Burning |
| 3.5.4 Class I and II ODS Prohibition |
| 3.5.5 Accidental Venting of Refrigerant |
| 3.5.6 EPA Certification Requirements |
| 3.5.7 Dust Control |
| 3.5.7.1 Particulates |
| 3.5.7.2 Abrasive Blasting |
3.5.8 Odors
| 3.6 WASTE MINIMIZATION |
| 3.6.1 Salvage, Reuse and Recycle |
| 3.6.2 Nonhazardous Solid Waste Diversion Report |
| 3.7 WASTE MANAGEMENT AND DISPOSAL |
| 3.7.1 Waste Determination Documentation |
| 3.7.1.1 Sampling and Analysis of Waste |
| 3.7.1.1.1 Waste Sampling |
| 3.7.1.1.2 Laboratory Analysis |
| 3.7.1.1.3 Analysis Type |
| 3.7.2 Solid Waste Management |
| 3.7.2.1 Solid Waste Management Report |
| 3.7.2.2 Control and Management of Solid Wastes |
| 3.7.3 Control and Management of Hazardous Waste |
| 3.7.3.1 Hazardous Waste/Debris Management |
| 3.7.3.2 Waste Storage/Satellite Accumulation/90 Day Storage Areas |
| 3.7.3.3 Hazardous Waste Disposal |
| 3.7.4 Releases/Spills of Oil and Hazardous Substances |
| 3.7.4.1 Response and Notifications |
| 3.7.4.2 Clean Up |
| 3.7.5 Mercury Materials |
| 3.7.6 Wastewater |
| 3.7.6.1 Disposal of wastewater must be as specified below. |
| 3.7.6.1.1 Treatment |
| 3.7.6.1.2 Surface Discharge |
| 3.7.6.1.3 Land Application |
| 3.8 HAZARDOUS MATERIAL MANAGEMENT |
| 3.9 PREVIOUSLY USED EQUIPMENT |
| 3.10 CONTROL AND MANAGEMENT OF ASBESTOS-CONTAINING MATERIAL (ACM) |
| 3.11 CONTROL AND MANAGEMENT OF LEAD-BASED PAINT (LBP) |
| 3.12 CONTROL AND MANAGEMENT OF POLYCHLORINATED BIPHENYLS (PCBS) |
| 3.13 CONTROL AND MANAGEMENT OF LIGHTING BALLAST AND LAMPS CONTAINING PCBS |
| 3.14 MILITARY MUNITIONS |
| 3.15 PETROLEUM, OIL, LUBRICANT (POL) STORAGE AND FUELING |
| 3.15.1 Used Oil Management |
| 3.15.2 Oil Storage Including Fuel Tanks |
| 3.16 INADVERTENT DISCOVERY OF PETROLEUM-CONTAMINATED SOIL OR HAZARDOUS WASTES |
| 3.17 PEST MANAGEMENT |
| 3.18 CHLORDANE |
| 3.19 SOUND INTRUSION |
| 3.20 POST CONSTRUCTION CLEANUP |
| Attachment 1 - Daily Biological Observation Log |
| 35 20 23_DREDGING_Final_14March19.pdf |
| 1.1 DEFINITIONS |
| 1.2 SUBMITTALS |
| 1.3 MATERIAL TO BE REMOVED |
| 1.3.2.3 DDLS Report/Data |
| 1 PART 1 GENERAL |
| 1.1 DEFINITION |
| 1.2 SUBMITTALS |
| 1.3 MATERIAL TO BE REMOVED |
| 1.3.1 Hard Material |
| 1.3.2 Scow Monitoring |
| 1.3.2.1 Dredge Data Logging System (DDLS) |
| 1.3.2.2 Dredge Material Disposal Site Log (DMDSL) |
| 1.3.2.3 DDLS Report/Data |
| 1.3.2.4 Scow Certification for Disposal at SF-DODS |
| 1.4 QUANTITY OF MATERIAL |
| 1.5.1 Required Dredge Prism |
| 1.5.2 Allowable (Paid) Overdepth Prism |
| 1.5.3 Allowable (Unpaid) Overdepth Prism |
| 1.5.4 Side Slope Prism |
| 1.5.5 Progress Payment Quantity |
| 1.5.6 Final Payment Quantities |
| 1.5.7 Method of Measurement |
1.6 PERMITS
| 1.7 CHARGES |
| The contractor will pay charges imposed by the permitted beneficial use upland site for disposal of material in the beneficial use placement area. |
| 2 PART 2 PRODUCTS |
| 3 PART 3 EXECUTION |
| 3.1 INSPECTION |
| 3.1.1 Government QAR Accommodations |
| 3.2 CONDUCT OF DREDGING WORK |
| 3.2.1 Order of Work |
| 3.2.2 Interference with Navigation |
| 3.2.3 Lights |
| 3.2.4 Ranges, Gages, and Lines |
| 3.2.5 Plant |
| 3.2.6 Disposal of Excavated Material |
| 3.2.6.1 Method of Disposal |
| 3.2.6.2 Disposal in Indicated Fill Areas |
| 3.2.6.3 Submerged Pipeline |
| Barring, dragging and all other methods of bed leveling are prohibited. |
| 3.2.7 Navigation Warnings |
| 3.2.8 Method of Communication |
| 3.2.9 Safety of Structures |
| 3.2.10 Plant Removal |
| 3.3 MEASUREMENT |
| 3.3.1 Method of Measurement |
| 3.3.2 Surveys During Progress of Work |
| 3.4 FINAL EXAMINATION AND REAch ACCEPTANCE |
| 3.4.1 Area Acceptance |
| Attachment 1 - DDLS |
| Attachment 2 - Dredged Material Disposal Site Log |
| Attachment 3 - Scow Certification Checklist |
| 35 20 23.13 SCOW MONITORING PROFILE |
| 1.1 DESCRIPTION |
| 1.2 SUBMITTALS |
| 1.3 PAYMENT |
| 1.4 NATIONAL DREDING QUALITY MANAGEMENT PROGRAM CERTIFICATION |
| 1.5 DREDGE PLANT INSTRUMENTATION PLAN (DPIP) |
| - Dredge Plant Instrumentation Plan Revisions or Addendum; G, SAM-OP-J |
| • SD-06, Test Reports |
| - Data Appropriately Archived email, Paragraph 3.2.5 (“Contractor Data Backup); G, XXX-XX-X (San Francisco District) |
| - Letter of National Dredging Quality Management Program Certification; G, XXX-XX-X (San Francisco District) |
| 3.4 COMPLIANCE QUALITY ASSURANCE CHECKS |
| 3.6 LIST OF ITEMS TO BE PROVIDED BY THE CONTRACTOR |
| 35 20 24 AQUATIC DISPOSAL |
| 1.1 REFERENCES |
| 1 PART 1 GENERAL |
| 2 PART 2 PRODUCTS |
| 3 PART 3 EXECUTION |
| 3.1 GENERAL |
| 3.2 SUBMITTALS REQUIREMENTS |
| 3.3 TRANSPORTATION |
| 3.3.1 Overflows |
| 3.3.2 Open Ocean Transit |
| 3.4 DISPOSAL SITE QUANTITY LIMITS |
| 3.4.1 Carquinez Site (SF-9) |
| 3.4.2 San Pablo Bay Disposal Site (SF-10) |
| 3.4.3 Alcatraz Island Disposal Site (SF-11) |
| 3.4.4 Suisun Disposal Site (SF-16) |
| 3.4.5 San Francisco Deep Ocean Disposal Site (SF-DODS) |
| 3.5 DISPOSAL SITE LOCATIONS |
| 3.5.1 Carquinez Site (SF-9) |
| 3.5.2 San Pablo Bay Disposal Site (SF-10) |
| 3.5.3 Alcatraz Island Disposal Site (SF-11) |
| 3.5.4 Suisun Disposal Site (SF-16): |
| 3.5.5 San Francisco Deep Ocean Disposal Site (SF-DODS) |
| 3.5.6 San Francisco Channel Bar Disposal Site (SF-8): |
| Attachment 1 - Marine Safety and Security Information Bulletin |
| Attachment 2 - SF-DODS Map |
Appendix 1 - Acronym List
| Richmond_SheetG002.pdf |
| Sheets and Views |
| Richmond_Inner_O&M_2019 (G01 - G03)-LK-G-02 General |