W81G6681912023
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE: SOLICITATION W912P6-19-B-0003; Burns Harbor Breakw ater Repair Project - Burns Harbor, IN, Porter County
- This Amendment makes the changes as delineated on the follow ing pages.
- The Bid Opening Date remains unchanged. All bids are due by March 6, 2019, by 2:00PM CST.
- Point of Contact for this Amendment is Anita R. Simpkins at (312) 846-5370 or anita.r.simpkins@usace.army.mil.
1. CONTRACT ID CODE PAGE OF PAGES
1 42
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Feb-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P619B0003
X 9B. DATED (SEE ITEM 11)
04-Feb-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Feb-2019
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P619B0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
A. AMENDED Solicitation Sections:
1. Block #11 has been amended to show 600 calendar days for project completion.
2. Section 00 10 00 – “Solicitation”, is amended as follows:
The description of Line Items 0002, 0003, 0006, 0008, 0010, and 0012 are changed to designate the
“Type” of stone required. Bidders shall remove and replace the previously issued Bid Schedule included herein this Amendment 0001.
3. Section 00 21 13 – “Instruction to Bidders”, is amended as follows:
a. FAR Provision 52.236-27 Site Visit (Construction) has been added by full text.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and
Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Douglas M. Anderson, P.E.
Area Engineer, Calumet Area Office
U.S. Army Corps of Engineers, Chicago District
906 N. Griffith Blvd.
Griffith, IN 46319
Telephone: 219-923-1763
(End of provision)
b. FAR Provision 52.236-27 Site Visit (Construction) (FEB 1995) – Alternate I (FEB 1995) is here by deleted by way of this amendment 0001.
4. Section 00 22 13 – “Supplementary Instructions to Bidders”, is amended as follows:
Paragraph 3. DELIVERY OF BIDS, subparagraph C, is changed to read as follows.
c. Hand‐carried Bids Delivered on the Day of the Bid Opening PRIOR TO NOON Central time: For bids being hand‐carried prior to 12: NOON on the date of the bid opening, the bidder shall
CONTACT Anita R. Simpkins at 312‐846‐5370, or Mike Jones at 312‐846‐5373 to retrieve its Bid from the Lobby Area of the USACE’s office location, which is located at 231 South LaSalle Street, Chicago, Illinois 60604.
5. Section 00 70 00 – “Conditions of the Contract”, is amended as follows:
a. FAR Clause 52.219-14 Limitations on Subcontracting has been added by full text.
52.219-14 LIMITATIONS ON SUBCONTRACTING (JAN 2017)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Applicability. This clause applies only to—
(1) Contracts that have been set aside or reserved for small business concerns or 8(a) participants;
(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or
8(a) participants; and
(3) Orders set aside for small business or 8(a) participants under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).
(c) By submission of an offer and execution of a contract, the Offeror / Contractor agrees that in performance of the contract in the case of a contract for--
(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.
(2) Supplies (other than procurement from a non-manufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.
(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.
(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.
(End of Clause)
b. FAR Clause 52.211-10 Commencement, Prosecution, and Completion of Work has been modified as follows:
c.
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR
1984)
The Contractor shall be required to (a) commence work under this contract within 10 CALENDAR days after the date the Contractor ACKNOWLEDGES the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 600 CALENDAR DAYS after the Contractor’s acknowledgement of the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
d. FAR Clause 52.252-6 Authorized Deviations in Clauses has been modified to read as follows:
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any FAR (48 CFR CHAPTER 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
e. FAR Clause 52.219-27 Notice of Service – Disabled Veteran-Owned Small Business Set-
Aside (DEVIATION 2019-O0003) has been added in full-text by way of this Amendment
0001.
52.219-27 NOTICE OF SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS
SET-ASIDE (DEVIATION 2019-O0003)
(a) Definitions. As used in this clause—
“Service-disabled veteran-owned small business concern”—
(1) Means a small business concern—
(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and
(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.
(2) “Service-disabled veteran” means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).
“Similarly situated entity” means a first-tier subcontractor, including an independent contractor, that has the same small business program status as that which qualified the prime contractor for the award and that is considered small for the NAICS code the prime contractor assigned to the subcontract the subcontractor will perform. An example of a similarly situated entity is a first-tier subcontractor that is a HUBZone small business concern for a HUBZone set-aside or sole source award under the HUBZone Program.
(b) Applicability. This clause applies only to—
(1) Contracts that have been set aside or reserved for service-disabled veteran-owned small business concerns;
(2) Part or parts of a multiple-award contract that have been set aside for service-disabled veteran-owned small business concerns; and
(3) Orders set aside for service-disabled veteran-owned small business concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).
(c) General.
(1) Offers are solicited only from service-disabled veteran-owned small business concerns. Offers received from concerns that are not service-disabled veteran-owned small business concerns shall not be considered.
(2) Any award resulting from this solicitation will be made to a service-disabled veteran-owned small business concern.
(d) Independent contractors. An independent contractor shall be considered a subcontractor.
(e) Agreement. By submission of an offer and execution of a contract, a service-disabled veteran-owned small business concern agrees that in the performance of the contract, in the case of a contract for—
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the
Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 50 percent subcontract amount that cannot be exceeded;
(2) Supplies (other than acquisition from a nonmanufacturer of the supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 50 percent subcontract amount that cannot be exceeded;
(3) General construction, it will not pay more than 85 percent of the amount paid by the
Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85 percent subcontract amount that cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 75 percent subcontract amount that cannot be exceeded.
(f) Joint venture. A joint venture may be considered a service-disabled veteran owned small business concern if—
(1) At least one member of the joint venture is a service-disabled veteran-owned small business concern, and makes the following representations: That it is a service-disabled veteran-owned small business concern, and that it is a small business concern under the North American Industry
Classification Systems (NAICS) code assigned to the procurement;
(2) Each other concern is small under the size standard corresponding to the NAICS code assigned to the procurement; and
(3) The joint venture meets the requirements of paragraph 7 of the explanation of Affiliates in
19.101 of the Federal Acquisition Regulation.
(4) The joint venture meets the requirements of 13 CFR 125.15(b).
(g) Nonmanufacturer.
(1) Unless SBA has waived the requirements of paragraphs (g)(1)(i) through (iii) of this clause in accordance with 13 CFR 121.1204, a service-disabled veteran-owned small business concern that provides an end item it did not manufacture, process, or produce, shall—
(i) Provide an end item that a small business has manufactured, processed, or produced in the
United States or its outlying areas;
(ii) Be primarily engaged in the retail or wholesale trade and normally sell the type of item being supplied; and
(iii) Take ownership or possession of the item(s) with its personnel, equipment, or facilities in a manner consistent with industry practice; for example, providing storage, transportation, or delivery.
(2) Paragraph (g)(1) of this clause does not apply to construction or service contracts.
f. FAR Clause 52.219-27 -- Notice of Service-Disabled Veteran-Owned Small Business
Set-Aside (Nov 2011), is here by deleted by way of this amendment 0001.
6. The Attendance Sheet from the Pre-Bid Meeting on Wednesday, February 13, 2019, is attached to this Amendment.
7. The most current Davis Bacon Wage Determination Number IN190001 dated 02/08/2019, is included in this Amendment 0001, and Davis Bacon Wage Determination Number IL190018 dated
01/04/2019 still applies.
8. USACE’S RESPONSES TO CONTRACTOR’S INQUIRES FOLLOW:
Question #1 – “Note No. 5 on plan sheet CS-307 states that, “On the last approx. 100’ of breakwater work, beginning at STA 59+00, contractor shall place Type A-1 stone. Remainder of sections place
Type A-2. Refer to Spec Section 35 31 19 for details.
CLIN 0002AA is for Type 1 stone with a quantity of 10,000 ton, CLIN 0002AB, also for Type 1 stone, is for 2,500 ton over the initial 10,000 ton. Whereas CLIN 0003 is noted for Type 2 stone with a quantity of 2,500 ton.
Since the above referenced Note 5 indicates Type 1 stone is to be used only in the last approximately
100’ of breakwater work we are asking if the stone type should be reversed in CLINs 0002 and 0003 with the greater quantity allotted to Type 2 stone and the smaller quantity allotted to Type 1 stone.”
USACE RESPONSE FOR QUESTION #1 – The description of Line Items 0002, 0003, 0006, 0008, 0010, and 0012 are changed by way of Amendment 0001 to designate the “Type” of stone required.
Question #2 – “The bid form indicates 20,000 tons of TYPE A-1 (the large stone) and only 2,250 tons TYPE A-2 (the small stone), this includes all options. However Plan Sheets CS301-CS307 indicate in the notes that the vast majority of the stone should be TYPE A-2. Please clarify.”
USACE RESPONSE FOR QUESTION #2 – The description of Line Items 0002, 0003, 0006, 0008, 0010, and 0012 are changed by way of Amendment 0001 to designate the “Type” of stone required.
Question #3 – “Specification Section 01 57 20.02 03 - 1.9 states, "No work shall be conducted between April 1 and June 30 or between October 16 and March 1, all dates inclusive. During acceptable work timeframes should any fish mortality be observed, which includes all life stages, all activity must be halted and the Contracting Officer must be contacted."
This time restriction does not allow sufficient time to perform both base bid and option work.
Will the Government consider allowing the month of June for construction on the breakwater?”
USACE REPONSE FOR QUESTION #3 – The Contract performance period has been extended to 600 days to account for the potential need to perform work in 2020, by way of
Amendment 0001.
Question #4 – “Can the completion be extended to December 31, 2019? Stone supplier is saying they need until end of September to make the stone for the base bid and end of October for alternates if awarded and contracted by April 1st. The stone supplier will not guarantee to hit these dates even if awarded the project. The stone supplier recommended to bid this year and perform the work in
2020.”
USACE REPONSE FOR QUESTION #4 – The Contract performance period has been extended to 600 days to account for the potential need to perform work in 2020, by way of Amendment
0001.
Question #5 – “Can the 75% of the stone weights specification be removed from the stone spec or lowered to a more reasonable number that allows the quarry to produce the stone faster and cheaper?”
USACE REPONSE FOR QUESTION #5 – The Stone Specification Section 35 31 19 will not be changed. Bidders must bid on what is described in the Specification for stone weights.
Section 00 10 00 - Solicitation
REVISED CONTRACT BID FORM BID SCHEDULE
THE BELOW BID FORM SERVES AS THE BID SCHEDULE AND SHALL BE USED BY THE BIDDER
TO ENTER ITS BID PRICING IMPORTANT NOTE - DISTINCTION OF LINE ITEMS:
The below Bid Schedule contains a combination of Firm Fixed Price (FFP) and cost reimbursable line items.
Although “FFP” is shown in the description of the cost reimbursable line items, it is not to be construed as a Firm
Fixed Price line item. In this case, the FFP represents the Contract Type, which is firm fixed price. Therefore, the contractor will be reimbursed as stated within the extended description of the cost reimbursable line items.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
MOBILIZATION
FFP
Under this CLIN, the contractor is required to perform mobilization activities. The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.
Payment Provisions: The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The
Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
PURCHASE REQUEST NUMBER: W81G6681912023
NET AMT
BREAKWATER STONE FILL: TYPE 2
FFP
(A-2 Stone)
This is a parent Contract Line Item, linking its Sub-Items 0002AA and 0002AB.
The actual work to be performed is described under the aforementioned Sub-Items.
In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0002AA through 0002AB, wherein the sub-line items themselves identify the quantities required to perform said work.
0002AA 10,000 Net Ton
(2,000
LB).
FIRST 10,000 TONS
0002AB 2,500 Net Ton
OVER 10,000 TONS
0003 2,500 Net Ton
BREAKWATER STONE FILL: TYPE 1
(A-1 Stone)
0004 1 Job
DEMOBILIZATION
FFP
Under this CLIN, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.
Payment Provisions:
The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
0005 1 Lot
PERFORMANCE & PAYMENT BONDS
FFP
BONDS FOR BASE WORK - (LINE ITEMS 0001AA through 0004). THIS IS A
COST-REIMBURSABLE LINE ITEM - The Government will reimburse the
Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.
0006 2,500 Net Ton
OPTION OPTION 1 - BREAKWATER STONE FILL: TYPE 2
0007 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
BONDS FOR OPTION LINE ITEM 0006 - THIS IS A COST-REIMBURSABLE
LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment
(paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.
0008 2,500 Net Ton
OPTION OPTION 2 - BREAKWATER STONE FILL: TYPE 2
0009 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
BONDS FOR OPTION LINE ITEM 0008 - THIS IS A COST-REIMBURSABLE
LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment
(paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to
0010 1,250 Net Ton
OPTION OPTION 3 - BREAKWATER STONE FILL: TYPE 2
0011 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
BONDS FOR OPTION LINE ITEM 0010 - THIS IS A COST-REIMBURSABLE
LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment
(paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to
0012 1,250 Net Ton
OPTION OPTION 4 - BREAKWATER STONE FILL: TYPE 2
0013 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
BONDS FOR OPTION LINE ITEM 0012 - THIS IS A COST-REIMBURSABLE
LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment
(paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to
SUMMATION OF PRICING
TOTAL BASE BID ITEMS (0001 through 0005): $________________________________
TOTAL OPTION ITEMS (0006 through 0013): $__________________________________
TOTAL OVERALL BID AMOUNT (Items 0001 through 0013): $_____________________
General Decision Number: IN190001 02/08/2019 IN1
Superseded General Decision Number: IN20180001
State: Indiana
Construction Types: Building, Heavy and Highway
Counties: La Porte, Lake, Porter and St Joseph Counties in
Indiana.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories, HEAVY AND
HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January
1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year
2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the
Davis-Bacon Related Acts, including those set forth at 29 CFR
5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/04/2019
1 01/18/2019
2 01/25/2019
3 02/08/2019
ASBE0017-002 06/01/2017
LAKE AND PORTER COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 50.50 25.80
HAZARDOUS MATERIAL HANDLER
(INCLUDES PREPARATION,
WETTING, STRIPPING REMOVAL
SCRAPPING, VACUUMING, BAGGING
AND DISPOSAL OF ALL
INSULATION MATERIALS, WHETHER
THEY CONTAIN ASBESTOS OR NOT,
FROM MECHANICAL SYSTEMS).........$ 37.80 24.54
ASBE0075-001 06/01/2017
REMAINING COUNTIES
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 31.50 20.79
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal, scrapping, vaccuming, bagging, and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 23.00 14.40
BOIL0001-005 05/01/2017
LAKE COUNTY, City of Hammond; North of 114th Street
BOILERMAKER......................$ 46.18 29.58
BOIL0374-003 03/01/2018
BOILERMAKER......................$ 37.22 27.65
BRIN0004-011 06/01/2018
LAKE, LAPORTE AND PORTER COUNTIES
BRICKLAYER
Bricklayer; Stone Mason;
Pointer, Cleaner, Caulker...$ 37.80 23.42
Marble Finisher; Tile
Finisher....................$ 29.00 15.54
Marble Mason; Terrazzo
Worker; Tile Layer..........$ 37.05 21.64
Terrazzo Finisher...........$ 30.00 15.54
BRIN0004-018 06/01/2018
SOUTH BEND: ST. JOSEPH COUNTY
BRICKLAYER
BRICKLAYER; STONE MASON;
POINTER, CAULKER, CLEANER...$ 29.00 15.96
MARBLE AND TILE FINISHER....$ 29.00 15.54
MARBLE AND TILE LAYER.......$ 30.57 18.36
TERRAZZO FINISHER...........$ 30.00 15.54
TERRAZZO WORKER.............$ 31.57 18.36
CARP0413-002 06/01/2018
St. Joseph County
CARPENTER........................$ 26.98 19.81
CARP0765-001 06/01/2018
LAKE, LAPORTE AND PORTER COUNTIES
CARPENTER........................$ 37.63 27.05
MILLWRIGHT.......................$ 37.73 26.85
CARP1029-001 06/01/2018
ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT, HOWARD,
HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, ST.
JOSEPH, STEUBEN, TIPTON, WABASH, WELLS and WHITLEY COUNTIES
MILLWRIGHT.......................$ 26.63 23.76
ELEC0153-001 06/04/2018
ST JOSEPH COUNTY
Communication Technician.........$ 26.15 17.36
ELECTRICIAN......................$ 34.25 22.96
Includes the installation, operation, inspection, modification, maintenance and repair of systems used for the transmission and reception of signals of any nature, for any purpose, including but not limited to, sound and voice transmission/transference systems, communication systems that transmit or receive information and/or control systems, television and video systems, micro-processor controlled fire alarm systems, and security systems and the performance of any task directly related to such installation or service. The scope of work shall exclude the installation of electrical power wiring and the installation of conduit raceways exceeding fifteen (15) feet in length.
ELEC0531-001 05/28/2018
LAPORTE and PORTER COUNTIES
ELECTRICIAN......................$ 39.60 25.73
ELEC0697-001 05/28/2018
LAKE COUNTY
ELECTRICIAN......................$ 41.00 63.88%+3.18
ELEC0697-004 08/28/2017
Telecommunication Technician.....$ 31.00 24.95
Work covers low voltage installation, maintenance and removal of telecommunication facilities (voice, sound, data and video) including, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V/SAT, bypass, CATV, WAN (WIDE AREA NETWORKS), LAN (local area networks), and ISDN (integrated system digital network).
Does not cover any work which properly comes under the work description of Inside JW (Journeyman Wireman), but shall cover the pulling of wire in raceways, but not the installation of raceways.
* ELEC1393-003 01/01/2019
LAKE & PORTER COUNTIES
(Calumet Area, North of U.S. Hwy 30)
Line Construction:
EQUIPMENT OPERATOR 1:
(Diggers 5th wheel type trucks, crawler type, D-4 and smaller, bucket trucks and live boom type line trucks).....................$ 34.69 16.21
EQUIPMENT OPERATOR 3
(Backhoe over 1/2 yard bucket capacity, cranes rated at 15 ton or more capacity) 95% of J.L. Rate..$ 43.00 18.62
GROUNDMAN...................$ 25.44 13.53
GROUNDMAN-TRUCK DRIVER......$ 30.79 15.08
LINEMAN.....................$ 44.40 19.03
ELEV0002-005 01/01/2019
ELEVATOR CONSTRUCTION
ELEVATOR MECHANIC................$ 56.61 33.705+a+b
FOOTNOTES:
a) Eight Paid Holidays: New Year's Day; Veterans Day, Memorial Day; Independence Day; Labor Day; Thanksgiving
Day; Friday after Thanksgiving and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service, and 6% of regular hourly rate for less than 5 years of service.
ELEV0044-002 01/01/2019
ELEVATOR MECHANIC................$ 49.72 33.705+a+b
a) PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service;
6% for less than 5 years' service.
ENGI0150-001 06/01/2018
BUILDING CONSTRUCTION POWER EQUIPMENT OPERATORS:
LAKE, LAPORTE, and PORTER COUNTIES
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 40.75 34.48
GROUP 2.....................$ 39.95 34.48
GROUP 3.....................$ 35.65 34.48
GROUP 4.....................$ 33.45 34.48
GROUP 5.....................$ 28.00 34.48
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Asphalt Plant; Autograde; Batch Plant); Benoto
(requires 2 engineers; Boiler & throttle valve; Boring machine (mining machine); Caisson Rigs; Central redi-mix plant; Combination Backhoe Endloader with backhoe bucket over 1/2 cu. yd. or with attachments; Combination tugger hoist & air compressor; Compressor & throttle; Concrete
Breaker (truck mounted); Concrete conveyor; Concrete conveyor (truck mounted); Concrete paver over 27E cu.ft.;
Concrete paver 27E cu. ft. & under; Concrete placing boom;
Concrete pump/grout pump with boom (truck mounted);
Concrete pump with boom (truck mounted); concrete tower;
Cranes and Backhoes (All Attachments); Cranes, Hammerhead
Tower; Creter Crane; Derricks (all); Derricks (traveling);
Forklift lull type; Forklift, 10 ton & over; Gradall, Hoist
1, 2, and 3 drums; Hoist (2 tugger l floor), Hydraulic Boom truck, Laser Screed, Locomotive (all), Motor patrol, Mucking Machine; Pile Driving and Skid rig, Pit machine, Prestress Machines, Pump cretes (and similar types), Rock
Drill (self-propelled), Rock Drill Truck mounted; Slip form paver, Straddle buggies, Tractor with boom and side boom, Trenching Mechine; Winch Tractors, Welding machines (6-9), GROUP 2: Air Comporessor (3) (feeding a common receiver);
Asphalt Spreader; boilers; bulldozers; Combination Backhoe end loader with Backhoe bucket 1/2 cu. yd. and under or with attachments; Corboy drilling machine; Grader, Elevating; Grouting machines; Guard rail post driver;
Highlift Shovel or frontend loader; Hoist (automatic), Hoist (all elevators); Hoist (tugger and single drum); Post hole digger; rollers (all); Scoop (tractor drawn); Stone crushers; Tournapull; Winch trucks
GROUP 3: Air compressor - small 210 and under (1 to 5 not to exceed a total of 300 feet); Air compressor - large over
210; Air compressor (2) feeding a common receiver;
Combination - small equipment operator; Concrete mixer (two bag & over); Conveyor, portable; Forklift-under 10 ton;
Generator; Pumps (1 to 3 not to exceed a total of 300 feet); Pumps, well points; Steam generators; Tractors, farm
& similar type; Welding machines (2 thru 5); Winches, 4 electric drillo winches
GROUP 4: Bull gang (crane erection crew); Heaters, mechanical (1 to 5); Oilers; Switchmen
GROUP 5: Fork lifts (Housing and commercial only)
ENGI0150-012 06/01/2018
BUILDING CONSTRUCTION
ST. JOSEPH COUNTY
GROUP 1.....................$ 29.45 28.35
GROUP 2.....................$ 28.10 28.35
GROUP 3.....................$ 27.30 28.35
GROUP 4.....................$ 26.50 28.35
GROUP 5.....................$ 23.90 28.35
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Mechanic, Asphalt Plant, Asphalt Spreader, Auto
Grader; Batch Plant, Benoto (requires 2 Engineers), Boiler and Throttle Valve, Boring Machine (road), Bulldozers (with engines of 140 net horse power or more) Caisson Rigs, Central Redi-mix Plant, Concrete Conveyor Systems, Concrete
Power (over 27E cu. ft.), Concrete Paver (27E cu. ft. and under), Concrete Pumps/Grout cncrete placer (Truck
Mounted), Concrete Tower, Cranes and backhoes (all), Cranes, Hammerhead Tower, Creter Crane, Derricks (all), Forklift (capble of hoisting and mechanically moving forks horizontally), Grader, Elevating, Highlift Shovels or Front
End Loaders (over 3 yd bucket), Hoists (2 or more drums), Locomotives (all), Laser screed, Motor Patrol, Pile Drivers and Skid Rig, Pre-Stress Machines, Pump Cretes & Similar
Types, Rock Drill (Self-Propelled), Rock Drill (self propelled Truck Mounted), Scoops (tractor drawn), Slip-Form
Paver, Tournapull, Tractor with Boom & Side Boom, Trenching
Machine (12 or more inches in width), Combination Backhoe
Front End Loader Machine with backhoe 1/2 yd bucket or attachments.
GROUP 2: Air Compressor (600 cu. ft. and over), Bob Cat
(over 3/4 cu. yd.), Boilers, Broom (all powered propelled), Bull Dozers with engines of less than 140 net horsepower, combination backhoe front end loader 1/2 yf bskhhoe or under, Compressor and Throttle Valve, Concrete Breaker
(truck mounted), Concrete Mixer (of moore than 21 cu. ft.
capacity), Forklift (with fixed or tilt mast), Greaser
Engineer, Highlift shovel or front endloader 3 yd bucket and under, Hoists (1 drum), Hydrulic Boom Truck, Post Hole
Digger (vehicle mounted), Pump Cretes (squeze crete type pumps, Gypsum, bulker , Rollers(all), Steam Generators, Stone Crushers, Stradddle Buggies, Tractors, Winch Trucks
(with "a" frame.
GROUP 3: Buck Hoist, Combination (small equipment operator), .Conveyor (portable), Grouting Machine, Hoist Elevators
(material and personnel), Hydraulic Power Units, Grouting and Pile Driving, Stud Welder, Trenching Machines less than
12 inches in width, Welding Machines (8 through 15).
GROUP 4: Bobcat (up to and including 3/4 cu. yd.).
Compressor (over 210 cu. ft. and less than 600 cu. ft.), Generator (over 50 kw.), Heaters, Mechanical, Hoists (all elevator, permanent installation), Hoist (automatic), Hoist
(tugger single drum), Oilers, Pumps, Well Points and electric submersible, Small Rubber Tired End Loaders (1/4
cu. yd. and under), Tractors (farm type) Welding Machines
(2 through 8).
GROUP 5: Bobcats and forklifts (commercial or residential).
ENGI0150-014 05/01/2017
POWER EQUIPMENT OPERATOR HEAVY/HIGHWAY
LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES
GROUP 1.....................$ 40.50 32.00
GROUP 2.....................$ 40.05 32.00
GROUP 3.....................$ 39.60 32.00
GROUP 4.....................$ 38.40 32.00
GROUP 5.....................$ 37.35 32.00
POWER EQUITMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt plants (construction), Asphalt plant
(permanent), Auto Patrol (Maintainer), Automatic Dry
Batch Plant, Automated Concrete Placer, Automated
Sub-Grader, Automated Slip Form Paver, Automated Finish
Machine, Combination Backhoe Front, End Loader Machine
(1/2 cu. yd.), Backhoe bucket or over or with attachments), Combination backhoe 1 cu yd, Backhoe bucket or over or with attachments, Ballast Regulator (RR), Belt Loader
(stationary), Boring Machine (road), Bulldozer, Concrete
Mixer(27 cu. ft. or over), Concrete Pump (truck mounted), Concrete Breaker (truck mounted and self-propelled), Core
Drilling Machine, Cranes and Backhoes (all attachments), Cranes, Hammerhead, Creter Crane, Crushers (concrete, rock, recycling, etc.), Derricks , Derricks (traveling), Dredge
Operator, Formless Curb and Gutter Machine (36 inches and over), Formless Curb and Gutter Machine under 36 inches, Gradall and Machines (of a like nature), Guardrail Post
Driver (truck mounted), Lead Greaser, Helicopter, Highlift
Shovel (3 yd. and over), Hoist (1 drum), Hoist (2, and 3 drums), Hydraulic Power Units (grouting, piledriving and extracting) Hydro or water blaster (self-propelled), Locomotive Operators, Mechanic, Welder, Mucking Machine, Panelboard Concrete Plant (central mix type), Paver
(Hetherington), Pile Driver (Skid or Crawler), Road Paving
Mixer, Rock Drill Crawler or Skid Rig, Rock Drill (truck
Mounted), Ross Carrier, Roto Mill Grinder (36" and over), Roto mill grinder (less than 36"), Throttle Valve and
Compressor or Clever Brooks Type Combination, Throttle
Valve and Fireman Combination or Horizontal or Upright
Boiler, Tournapull or similar type equipment, Tractor
(boom), Tractor Drawn Belt Loader with attached Pusher
(requires two engineers), Trench Machine, Tug Boat
Operator, Wheel Excavator, Winch Tractor with "a" frame, Scoops, Turnapull or similar types machine used in Tandem
(add $1.00 to class l hourly rate for each machine attached there to).
GROUP 2: Combination Backhoe Front End Loader Machine with less than 1/2 cu. yd., Backhoe Bucket or with attachments, Bituminous Mixer, Bituminous Paver, Bridge Deck Finisher, Concrete Mixer (less than 27 cu. ft.), Compressor and throttle valve, Compressor (common receiver 3), Greaser, Highlift Shovels (under 3 cu. yds.), Jersey Spreader or
Base Paver, Pavement Bump Grinder (self-propelled), Roller
(Asphalt, waterbound, Macadam, Bituminous Macadam, Brick
Surface, Sheepfoot Roller (self- propelled with blade), Surface Heater and Planer, Tamper (mutiple vibrating, asphalt waterbound macadam, bituminouus macadam, brick surface), Tractor (push), Tractor with scoop, Widener, Apsco or similar type.
GROUP 3: Back Filler, Bituminous Distributor, Broom and Belt
Machine, Bull Float, Compressor (common receiver 2), Concrete cutter wheel type (rockwell), Concrete Finishing
Machine, Concrete Spreader (power driven), Digger, Post
Hole (power driven), Finishing Machine and Bull Float, Forklift, Form Grader, Form Tamper (motor driven), Hydraulic (boom truck) when used for hauling materials, Laser screed, Mutiple Tamping Machine, Paving Breaker, Roller (earth and subbase material), Roller sheepfoot
(self-propelled), Sub-grader, Tamper, Mutipile Vibrating
(earth and subbase material), Tractaire with Drill, Tractor
(with all drawn attachements except backhoe and including
Highlift, Endloader of 1 cu. yd. capacity and less.
GROUP 4: Air Compressors, Conveyor (all), Fireman on Boiler, Generator, Grout Machine, Power curing Spraying Machine
(self-propelled), Broom (self-propelled), Seaman Tiller, Skid steer loaders, Spike Machine (RR), Stripping Machine
(paint, self-propelled), Throttle Valve, Welding Machine, Well Points System.
GROUP 5: Deck Hand, Hetherington Driver, Mechanical Heater
(1 to 5), Outboard or Inboard Motor Boat, Oiler, Power Saw
(Concrete Power Driven), Water Pump, Grasscutter.
* IRON0292-001 06/01/2018
ST. JOSEPH and LAPORTE (Remainder of County) COUNTIES
IRONWORKER.......................$ 29.75 22.01
* IRON0395-001 06/01/2018
LAKE, PORTER AND LAPORTE (FROM LAKE MICHIGAN ON NORTH TO 50
MILES S. OF LAKE MICHIGAN ON THE S. AND FROM IN/IL STATE LINE
ON W. TO 3 MILES E. OF IN. COUNTIES
IRONWORKER
SHEETER.....................$ 40.25 31.22
STRUCTURAL & ORNAMENTAL.....$ 40.00 31.22
LABO0041-001 06/01/2018
LAKE COUNTY (Western Half)
Laborers:
CAISSON AND TUNNEL WORK
(Compressed & Free Air).....$ 37.33 21.20
GROUP 1.....................$ 35.83 21.20
GROUP 2.....................$ 36.58 21.20
GROUP 3.....................$ 36.83 21.20
LABORER CLASSIFICATIONS:
GROUP 1: Building and Construction Laborers; Scaffold
Builders (other than for Mason or Plasterers); Railroad
Workers, Masonry Wall Workers, (interior & exterior);
Portable Water, Pumps with discharge up to 3 indches;
Handling of Creosote Lumber or Like Treated Material
(excluding railroad material); Asphalt Rakers and Lutemen;
Earth compactors; Jackmen and Sheetmen Working Ditches
Deeper than Six (6) Feet in Depth; Laborers Working Ditches
Six (6) Feet in Depth or Deeper; Assembly of Unicrete Pump;
Tile Layers (sewer or field) and Sewer Pipe Layers
(metallic or non-metallic); Motor Driven Wheelbarrows and
Concrete Buggies; Hyster Operators; Pump Crete Assemblers;
Core Drill Operators; Cement, Lime or Silica Clay Handler
(bulk or bag); Handling of Toxic Materail Damaging to
Clothing; Pneumatic Spikers; Deck Engine and Winch
Operators; Water main and Cable Ducking (metallic and non-metallic); Screed Man or Screw Operator on Asphalt
Paver; Chain Saw and Demolition Saw Operators; Concrete
Saw; Concrete Conveyor Assemblers; Applying of Curing
Compound; Sinking of Wellpoints; Dewatering Header Systems
GROUP 2: Plaster Tenders, Masons Tenders; Mortar Mixers;
Welders (acetylene or electric); Cutting Torch or Burner;
Cement Nozzle Laborers; Cement Gun Operators; Scaffold
Builders for Plasterers; Scaffold Builders for Masons;
Water Blast Machine Operators; Air Tool Operators and all
Pneumatic Tool Operators, Air and Electric Vibrators and
Chpping Hammer Operators; Asbestos Removal; Hazardous Waste
Removal; All Boiler Setters Laborers, including expediters, bottom men, bell men, and Mason Tenders
GROUP 3: Dynamite Men; Drillers, Air Track or Wagon Drilling for explosives.
CAISSON AND TUNNEL WORK (Compressed & Free Air)
GROUP 1: Cage Tenders, Dump Men, Flagman, Signalman, Top
Laborers, Rod Men, Concrete Repairmen, Motor Men, Muckers, Grout Machine, Track Layers, Air Hoist, Key Board, Agitator
Car, Car Pushers, Concrete Laborers, Grout Laborers, Sttl
Setters, Tuggers, Switchmen, Mucking Machine, Laser Beam, Liner Plate & Ring Setter, Shield Drivers, Power Knife, Burners, Pipe Jacking Machine, Skinners, Maintenance
Technician, Miner, Bricklayer Tenders, Concrete Blowers, Drillers, Erectors, Form Men, Jackhammermen, Mining
Machine, Dynamite Men, Drillers-air track or wagon drilling for explosives.
Premium for all employees working in compressed air shall be as follows:
0 - 15 lbs. $1.00 per hour
16 - 20 lbs. 1.50 per hour
21 - 26 lbs. 2.00 per hour
27 - 33 lbs. 3.00 per hour
34 & over 4.00 per hour
LABO0041-004 04/01/2018
UTILITY CONSTRUCTION
LABORERS
Group 1.....................$ 31.32 17.23
Group 2.....................$ 31.62 17.23
Group 3.....................$ 32.32 17.23
LABORERS CLASSIFICATIONS (HEAVY AND HIGHWAY)
GROUP 1: Construction Laborer, Carpenter Tender, Fence
Erector, Grade Checker, Guard Rail Erector, Continuous
Steel Rod or Mat Installer, Wire Mesh Layer, Joint Man
(Mortar, Mastic, and all other types), Lighting Installer
(Permanent or Temporary), Lineman for Automatic Grade Maker on Paving Machines, Mortar Man, Multi-Plant Erector, Rip-rap Installer (all Products and Materials), Road
Marking and Delineation Laborer, Setting and Placing of all
Precast Concrete Products, Sing Installation including supporting structure, Spraying of all Epoxy, Curing
Compound, or Like Material, Flagperson, Air Tool, Power
Tool Operator, Asphalt Raker Man, Batch Truck Dumper, Bridge Hand Rail ERector, Handler (bulk or bag cement), Chain Saw Man, Concrete Puddler, Concrete Rubber, Concrete
Saw Operator, Core Drill Operator, Eye Level, Hand Blade
Operator Hydro Seeder Man, Motor Driven Georgia Buggy
Operator, Power Driven Compactor or Taper Operator, Power
Saw Operator, Pump Crete Assembly Man, Sreed Man or Screw
Man on Asphalt Paver, Regar Installer, Sandblaster Man, Sealer Applicator for Asphalt (toxic), Setting and Placing pre-stressed on Pre-cast Concrete Structural Members, Side
Rail Setters (for Sidewalk, Side Ditches, Radii, and
Pavement), Spreader Box Tender (manua or power driven), Straw Blower Man, Subsureface Drain and Culvert Pipe Layer, Concrete Conveyor, Horizonal Boring and Jackman and
Sheetman, Pipe Greade Man, Winch and Windless Operator
Conduit Installer, Sod Layer
GROUP 2: Cutting Torch Burner, Laser Beam Aligner, Manhole
Erector, Sewer Pipe Layer, Water Line Installer, Temporary or Permanent Welders (electric or Oxy Acetylene)
GROUP 3: Air Track and Wagon Drillman, Dynamite and Powder
Man, Concrete Barrier Rail Form Setter, Concrete Saw Joint
Control Cutting
LABO0081-001 04/01/2018
HEAVY and HIGHWAY CONSTRUCTION:
LAKE, LA PORTE, and PORTER COUNTIES
GROUP 1.....................$ 30.49 17.23
GROUP 2.....................$ 30.79 17.23
GROUP 3.....................$ 31.49 17.23
LABORERS CLASSIFICATIONS (HEAVY AND HIGHWAY)
GROUP 1: Construction Laborer; Carpenter Tender; Fence
Erector; Grade Checker; Guard Rail Erector; Continuous
Steel Rod or Mat Installer; Wire Mesh Layer; Joint Man
(Mortar, Mastic, and all other types); Lighting Installer
(Permanent or Temporary); Lineman for Automatic Grade Maker on Paving Machines; Mortar Man; Multi-Plant Erector;
Rip-rap Installer (all Products and Materials); Road
Marking and Delineation Laborer; Setting and Placeing of all Precast Concrete Products; Sing Installation including
Supporting Structure; Spraying of all Epoxy, Curing
Compound, or Like Material; Flagperson; Air Tool, Power
Tool Operator; Asphalt Raker Man; Batch Truck Dumper;
Bridge Hand Rail Erector; Handler (bulk or bag cement);
Chain Saw Man; Concrete Puddler; Concrete Rubber; Concrete
Saw Operator; Core Drill Operator, Eye Level; Hand Blade
Operator Hydro Seeder Man; Motor Driven Georgia Buggy
Operator; Power Driven Compactor or Tamper Operator; Power
Saw Operator; Pump Crete Assembly Man; Screed Man or Screw
Man on Asphalt Paver; Rebar Installer; Sandblaster Man;
Sealer Applicator for Asphalt (toxic); Setting and Placeing
Prestressed on Precast Concrete Structural Members; Side
Rail Setters (for Sidewalk, Side Ditches, Radii, and
Pavement); Spreader Box Tender (manual or power driven);
Straw Blower Man; Subsurface Drain and Culvert Pipe Layer;
Concrete Conveyor; Horizonial Boring and Jackman and
Sheetman; Pipe Grade Man; Winch and Windlass Operator
Conduit Installer, Sod Layer.
GROUP 2: Cutting Torch Burner: Laser Beam Aligner; Manhole
Erector; Sewer Pipe Layer; Water Line Installer, Temporary or Permanent; Welders (electric or Oxy-Acetylene).
GROUP 3: Air Track and Wagon Drillman; Dynamite and Powder
Man; Concrete Barrier Rail Form Setter; General Laborer;
concrete saw, joint control cutting
LABO0081-002 04/01/2018
LA PORTE & PORTER COUNTIES
GROUP 1.....................$ 30.97 17.23
GROUP 2.....................$ 31.27 17.23
GROUP 3.....................$ 31.97 17.23
LABORERS CLASSIFICATIONS (UTILITY CONSTRUCTION)
GROUP 1: Construction laborer; Fence erector; Flagger; Grade checker; Guard rail erector; Wire mesh layer; Joint man
(mortar, mastic and all other types); Lighting installer
(permanent or temporary); Lineman for automatic grade maker on paving machines; Mortar man; Multi-plate erector;
Rip-rap installer (all products and materials); Road marking and delineation laborer; Setting and placing of all precast concrete products; Sign installation including supporting structure; Spraying of all epoxy, curing compound, or like material; sod layer; Air tool, power tool, and power equipment operator; Asphalt lute man;
Asphalt raker man; Batch truck dumper; Bridge handrail erector; Handler (bulk or bag cement); Chain saw man;
concrete puddler; concrete rubber; Concrete saw operator;
Core drill operator, eye level; Hand blade operator; Hydro seeder man; Motor-driven Georgia buggy operator;
Power-driven compactor or tamper operator; Power saw operator; Pumpcrete assembly man; Screed man or screw man on asphalt paver; Rebar installer; Sandblaster man; Sealer applicator for asphalt (toxic); Setting and placing prestressed or precast concrete structural memebers; Side rail setter (for sidewalks, side ditches, radii, and pavements); Spreader box tender (manual or power-driven);
Straw blower man; Subsurface drain and culvert pipe layer;
Transverse and longitudinal hand bull float man; Concrete conveyor assembly…