W912P521Q0044 A0001 Amendment Wilson Lock Bulkhead Fabrication.pdf

PDF 558 KB Posted

Attached to
Wilson Lock Bulk Head Fabrication
Solicitation number
W912P521Q0044
Issued by

About this file

This document contains an amendment to a solicitation for the fabrication and delivery of bulkhead structures. The U.S. Army Corps of Engineers is seeking a firm-fixed price contract for one bulkhead with options for three additional bulkheads to be delivered to the Wilson Lock in Florence, Alabama. The contractor must fabricate the bulkheads according to the provided technical plans and specifications. The NAICS code for this 100% small business set-aside is 332312 for fabricated structural metal manufacturing. The response due date was extended to August 20, 2021 by 12:00 PM Central Time. The period of performance for the base order is 210 days with each optional bulkhead adding 90 days if exercised within the contract period. The amendment provides answers to contractor questions to clarify requirements and terms.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W38XDD11263371

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT: Wilson Lock Bulk Head Fabrication

PURPOSE: The purpose of this amendment is to:

1) Provide Government answ ers to contractor questions.

2) Extend quote due date from 16-Aug-2021 at 12:00 PM CT to 20-Aug-2021 at 12:00 PM CT.

3) FAR 52.217-7 Option for Increased Quantity- Separately Priced Line Items has been updated.

4) FAR 52.252-3, Alterations in Solicitation is updated.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Aug-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P521Q0044

X 9B. DATED (SEE ITEM 11)

02-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Aug-2021

CODE

US ARMY CORPS OF ENGINEERS-CELRN-RC-N

DIRECTORATE OF CONTRACTING

110 9TH AVENUE SOUTH, RM A680

NASHVILLE TN 37203

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P521Q0044

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 16-Aug-2021 12:00 PM to 20-Aug-2021 12:00 PM.

The following have been added by full text:

Q&A

Government Responses to Contractor Questions

1. Contractor Question: Spec 05 59 20 pg.10 calls for the contractor to take field measurements prior to shop drawings.

a. What time frame will the contractor have to take measurements?

b. Is the contractor to measure the slots or existing gates only?

c. If only the existing gates are to be measured, will they be stored outside for easy access or inside the slots?

d. What equipment will be needed to access field measurement locations?

Government Answer: A site visit to take field measurements will not be required by the Contractor.

Contractor shall fabricate bulkheads to the dimensions described in the drawings.

2. Contractor Question: Drawing 64W381-9 Note 17 references SR along with spec 055920. Please verify that no items are called to be stress relieved.

Government Answer: No items associated with the fabrication of the bulkheads are required to be stress relieved.

3. Contractor Question: Please confirm that 1 horizontal skin plate splice is acceptable.

Government Answer: See the Government’s response to Question #4.

4. Contractor Question: There is not a location for as splice in the skin plate can you verify that there is one allowed and the location that it should be.

Government Answer: The Contractor may include one (1) vertical splice in the skin plate to suit the Contractor’s means and methods. The splice and location should be detailed on the Contractor’s Shop Drawings for Government approval. The splice should be constructed using a Complete Joint Penetration (CJP) weld, which must be shown on the Contractor’s Shop Drawings and submitted for Government approval.

5. Contractor Question: How long after initial award of the job does the government have to use options. Steel pricing fluctuate daily so hard to hold a quote for an undetermined amount of time.

Government Answer: The Government will exercise the options within the Period of Performance (POP) of the base contract.

6. Contractor Question: how long after bid date will the government award this job?

Government Answer: If an awardable quote is received in response to the solicitation by a responsive and responsible contractor, an award will be made no later than September 30, 2021.

7. Contractor Question: Can you please confirm the skin plate can be set in 2 pieces? Due to the size of the plate it needs to be made from 2 pieces and welded. Please confirm where you prefer the splice, Horizontal or Vertical?

Government Answer: See the Government’s response to Question #4.

8. Contractor Question: Can the Corps Receive this material if shipped by barge?

Government Answer: We do not have the capabilities to unload the bulkheads from a barge.

9. Contractor Question: In regards to the 7/8” Thick Skin Plate: it is assumed that a splice in the skin plate will be required to meet the size. Please confirm that this is acceptable, and if there are any other restrictions that apply to the skin plate splice.

Government Answer: See the Government’s response to Question #4.

10. Contractor Question: Are there liquid damages and taxes included?

Government Answer: There are no liquidated damages, but the contractor is required to deliver the bulkheads by the date specified in the contract. The contractor should include all costs in the offer.

11. Contractor Question: Drawing 64W381-9 Note 17 says “stress relieving shall be performed on indicated welded assemblies” are we to assume that there is to be no stress relieving done because there are no assemblies indicated?

Government Answer: See the Government’s response to Question #2.

12. Contractor Question: Is the connection between the spring retainer plate and the bulkhead being considered a high strength connection under 05 59 20 2.1.5?

Government Answer: No.

13. Contractor Question: Will monthly progress payments be allowed?

Government Answer: Monthly progress payments will not be allowed, see Specification SECTION 01 20

00 PRICE AND PAYMENT PROCEDURES.

14. Contractor Question: Can you confirm that the Government will supply crane and crane operator to off-load bulkhead when delivered?

Government Answer: Yes, the Government will supply crane and crane operator to off-load bulkhead(s) when delivered, see specification SECTION 01 00 00 Page 4.

15. Contractor Question: It appears that 210 calendar days is for the first bulkhead base price. However, it is unclear how the 90 days for each option works. If all 4 bulkheads are procured successively, then the contract duration would be 480 days? Please confirm.

Government Answer: Correct, the period of performance for the base contract is 210 calendar days. The exercise of each option adds an additional 90 days to the period of performance.

16. Contractor Question: How long after initial award of the job does the government have to exercise the options?

Government Answer: See the Government’s response to Question #5.

The following have been modified:

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 210 calendar days after date of contract award. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

Note: Delivery for Base requirement : 210 calendar days after date of contract award.

Delivery: Additional 90 calendar days for option 1 after the option is awarded.

Delivery: Additional 90 calendar days for option 2 after the option is awarded.

Delivery: Additional 90 calendar days for option 3 after the option is awarded.

(End of clause)

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 0001

PURPOSE: The purpose of this amendment is to:

1) Provide Government answers to contractor questions.

2) Extend quote due date from 16-Aug-2021 at 12:00 PM CT to 20-Aug-2021 at 12:00 PM CT.

3) FAR 52.217-7 Option for Increased Quantity- Separately Priced Line Items has been updated.

4) FAR 52.252-3, Alterations in Solicitation is updated.

(End of Summary of Changes)