W912P520Q0058 00001.pdf

PDF 162 KB Posted

Attached to
Wilson Lock, Lower Miter Gate Fenders
Solicitation number
W912P520Q0058
Issued by

View the file

Other files

File Type Posted
W912P520Q0058.pdf PDF
07_WIL-02-L2-21-58.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to answ er questions from the industry and extend the quote deadline.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P520Q0058

X 9B. DATED (SEE ITEM 11)

08-Sep-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Sep-2020

CODE

US ARMY CORPS OF ENGINEERS-NASHVILLE

CELRN-RC-N,

110 NINTH AVE. SOUTH

NASHVILLE TN 37203

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P520Q0058

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS

QUESTION: Page 4 estimated qty = 38 of fender MK F2 and on page 5 says qty= 36, Can you please confirm the quantity for the fender ends? Is it 36 or 38?

ANSWER: The Correct quantity is 36 not 38. Quote Schedule has been corrected to reflect the correct quantity.

QUESTION: Question about matching radius of fender sections, MK F12 : Does this mean to actually build MK:

F2 using section D-D channel 12 x 20.7 and using bent 16”x 3/8” plate ?.........dis regarding section B-B entirely ?

ANSWER: Correct. Fabricate using section D-D with channel and plate as marked on drawing

QUESTION: I have read pages 43 thru 49 (item identifier) ………..Can you explain how parts are to be identified or marked ? Will each part be marked with Drawing number and MK #? What is preferred method of marking? Permanent metal stamp or engraving?

ANSWER: Marking or identifiers are not required. MK F5 is 22’-2” long and has two open ends and no closure plates. MK F2 is 18’-9” long with one open end and one having an end closure plate (View C-C)

QUESTION: Are there any additional drawings for this contract? I do not see the middle section drawing on the one provided. It only shows the end section.

ANSWER: There are no additional drawings. Middle section is Fender MK F5 (just left of center at top of 02-L2- 21/58).

QUESTION: It states on the drawing that 2 of each will need to be made. Just to clarify this will be a right hand and left-hand side correct? With two of each needing to be made, the totals are meant to be sets?

ANSWER: Make numbers on the reference drawing should be disregarded. Make 18 of fender MK F5 (middle sections) with modifications noted in the specifications and make 36 Fender MK F2 (end sections) with modifications noted in the specifications.

The following have been modified:

QUOTE SCHEDULE

ITEM NO. DESCRIPTION REFERENCE

DRAWINGS

EST.

QTY.

UNIT UNIT

PRICE

TOTAL

AMOUNT

Base Contract

0001 Wilson Lock Fender End Section

02-L2-21^58 36 Each $ $

W912P520Q0058

0002 Wilson Lock Fender Middle Section

02-L2-21^58 18 Each $ $

TOTAL AMOUNT $

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 22-Sep-2020 11:00 AM to 24-Sep-2020 11:00 AM.

(End of Summary of Changes)