JPP Service Building Roof RTA J. Percy Priest W912-P5-20-Q-0026 Nashville, TN
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUBMITTALS
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Location
1.3 OCCUPANCY OF PREMISES
1.4 EXISTING WORK
1.5 Delivery Schedule
1.6 SALVAGE or REUSE MATERIAL AND EQUIPMENT
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 01 11 00 Page 2
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
Work items are detailed below. All incidental related work shall be included.
Contractor shall make detailed recordings of work and findings throughout supported with photographs
JPP Service Building Roof Replacement
Removal -
- Contractor shall remove stone ballast from roofing to be appropriately stored on site as determined by COR. Contractor will haul stone to Seven Points Disposal Area (Approx 5.2 miles from project area). COR may require contractor to haul material to a closer location.
- Contractor to remove built up roofing material: EPDM / rigid insulation / Vapor Barrier entirely and accessory materials to bare metal deck. Removed materials to become property of the contractor.
- Remove aluminum gravel guard to install the roofing material.
- Remove and replace two wood 2" x 4" treated lumber as necessary along the perimeter as shown in sheet Q5-78/70.1. Coordinate efforts with COR.
- Contractor shall seal and repair metal decking if necessary according to EPDM manufacturers satisifaction in order to honor product warranty.
- Areas around vents shall be cleaned and repaired if necessary.
- Contractor will not remove vents. Vents to remain in place.
Installation -
- Place newly acquired treated wood that was previously removed.
- Vapor Barrier to be placed over metal decking or as directed by manufacturer.
- Rigid Insulation to be installed as directed by product manufacturer recommendations. Contractor will slope insulation for runoff a minimum of 1/4" per ft. Contractor will install ISO Panels and Coverboards (min 1" thick)
- White EPDM to be mechanically applied per manufacturer
SECTION 01 11 00 Page 3 specifications.
- Place walkboard to create single continuous perimeter surrounding the multiple HVAC items. Approximate length is 325ft.
- All material sealing and lapping shall be per manufacturers guidance. Contractor shall verify system is waterproof around all seals.
- Contractor shall place new vents if contractor damages vents.
- Contractor will ensure watertight seal around all roof penetrations, edges and joints.
1.2.2 Location
The work is located at J. Percy Priest Service Area located near Nashville, Tennessee. The exact location of work to be performed will be shown by the Contracting Officer.
1.3 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.4 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.5 Delivery Schedule
Notify the Contracting Officer in writing at least 5 calendar days in advance of the date on which the materials and equipment are required.
Pick up materials and equipment no later than 30 calendar days after such date. When materials and equipment are not picked up by the 30th day, the Contractor will be charged for storage as determined by the Contracting Office Representative.
1.6 SALVAGE or REUSE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within 6 miles of the construction site. Items shall be stored above ground protected from ponding water.
Provide a salvage plan, listing material and equipment to be salvaged, and
SECTION 01 11 00 Page 4 their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --