This document is an amendment to a solicitation for dredging services in Cleveland, Ohio. The amendment updates the milestone schedule to allow 50 calendar days from notice to proceed to complete base bid dredging, sets the notice to proceed date as 1 October 2020, and prohibits beginning dredging prior to 31 October 2020. It also includes information on a conference call scheduled for 7 August 2020 to discuss the solicitation, and provides the call-in details.

View the file

Other files

File Type Posted
W912P420B0004-0002.docx DOCX document
Solicitation_Package_Cleveland_Dredge_W912P420B0004.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This Amendment directs PAGE CHANGES to the originally issued solicitation as provided in the attached documentation.

Note: The response date and time is NOT EXTENDED.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Jul-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P420B0004

X 9B. DATED (SEE ITEM 11)

07-Jul-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Jul-2020

CODE

U.S. ARMY ENGINEER DISTRICT, BUFFALO

1776 NIAGARA STREET

BUFFALO NY 14207-3199

W912P4 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P420B0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 0001.

• -Section 01 35 13 SPECIAL PROJECT PROCEDURES – Paragraph 1.2 a The milestone schedule has been updated to reflect the changes in complete Base Bid Dredging for Maximum Calendar Days After Receipt of Notice to proceed to 50 days.

• -Section 01 35 13 SPECIAL PROJECT PROCEDURES – Paragraph 1.2 b The milestone schedule has been updated to show the Notice to Proceed will be issued on or about 01 October 2020 and that Dredging may not begin prior to 31 October 2020.

(end of provision)

(End of Summary of Changes)

AMENDMENT NO. 1

W912P420B0004

CLEVELAND, OHIO

CLEVELAND HARBOR

CUYAHOGA RIVER DREDGING

REPLACEMENT PAGE IN SECTION

01 35 13 SPECIAL PROJECT

PROCEDURES, CHANGES

HIGHLIGHTED

23 JULY 2020

FY20 CLEVELAND HARBOR DREDGE Amendment No. 1

FY20CLEVDREDGE W912P420B0004

SECTION 01 35 13

SPECIAL PROJECT PROCEDURES

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01, Preconstruction Submittals

Schedule of Work

Additional Real Estate Rights

SD-06, Test Reports

Contract Accruals

SD-07, Certificates

Notifications

Notice to Mariners

1.2 PERFORMANCE PERIOD AND RESTRICTIONS

a. Complete the entire work ready for use not later than the dates indicated below. If the total quantity of material to be paid for and actually removed under the contract exceed the limit established, additional time will be allowed at the rate of 3,000 CY per day, in excess of the established limit. See applicable FAR clauses. A period of time between Notice to Proceed and the actual start of dredging will be allocated for submittal review and approval. The time stated for completion includes final clean-up of the premises. Comply with the milestone schedule below.

Maximum Calendar Days After Receipt

Milestone of Notice to Proceed

Begin Dredging 30

Complete Base Bid Dredging 50

b. Notice to proceed will be issued on or about 01 October 2020. Dredging may not begin prior to 31 October 2020.

1.2.1 Schedule of Work

Submit a complete schedule of work covering the period of time from the Notice of Award through the specified duration of the contract, including

SECTION 01 35 13 Page 1024 07/23/20 h5cosklm Highlight h5cosklm Highlight h5cosklm Highlight h5cosklm Highlight