Mount Morris Dam installation of grounding system comprised of a ground cable, ground rods, and ground connections.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ABSTRACT.pdf | ||
| ABSTRACT2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912P419B0020
Section 00 00 00 - Procurement and Contracting Requirements
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions NOV 2013
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
INSTALL GROUNDING SYSTEM
FFP
Install a grounding system comprising of a ground cable, ground rods and ground connections. (See attached Statement of Work for additional instructions).
FOB: Destination
NET AMT
0002 1 Job
CLEAN EXISTING CABLES
FFP
Clean the existing ground cable running through all the 6 levels in MMD using a wire brush or other method pre-approved by the Government. (See attached Statement of Work for additional instructions).
0003 1 Job
REMOVE EXISTING WIRES
FFP
Remove and dispose the existing copper wires that exists at Mount Morris Dam.
(See attached Statement of Work for additional instructions).
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
0003 N/A N/A N/A N/A
Section 00 70 00 - Conditions of the Contract
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
APR 2014
52.204-3 Taxpayer Identification OCT 1998 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-7 System for Award Management OCT 2018 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.212-1 Instructions to Offerors--Commercial Items OCT 2018 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-50 Combating Trafficking in Persons JAN 2019 52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements
MAY 2014
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.225-14 Inconsistency Between English Version And Translation Of
Contract
FEB 2000
52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.
AUG 2018
52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-12 Cleaning Up APR 1984 52.236-18 Work Oversight in Cost-Reimbursement Construction
Contracts
APR 1984
52.236-19 Organization and Direction of the Work APR 1984 52.241-1 Electric Service Territory Compliance Representation MAY 1999 52.243-1 Changes--Fixed Price AUG 1987 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
CLAUSES INCORPORATED BY FULL TEXT
Filled in by Offeror
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2018)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238210.
(2) The small business size standard is $15,000,000.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
( ) Paragraph (d) applies.
( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.209-2; Prohibition on Contracting with Inverted Domestic Corporations--Representation.
(vii) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(viii) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.
(ix) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(x) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(xi) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(xii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xiii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xiv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xv) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xvi) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xvii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.
(xviii) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)
(xix) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xx) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.
(A) If the acquisition value is less than $25,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.
(C) If the acquisition value is $50,000 or more but is less than $80,317, the provision with its Alternate II applies.
(D) If the acquisition value is $80,317 or more but is less than $100,000, the provision with its Alternate III applies.
(xxi) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225- 5.
(xxii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.
(xxiii) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.
(xxiv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.
(2) The following representations or certifications are applicable as indicated by the Contracting Officer:
[Contracting Officer check as appropriate.]
(i) 52.204-17, Ownership or Control of Offeror.
(ii) 52.204-20, Predecessor of Offeror.
(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.
(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.
(vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).
(vii) 52.227-6, Royalty Information.
(A) Basic.
(B) Alternate I.
(viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.
(d) The Offeror has completed the annual representations and certifications electronically in SAM accessed through https://www.sam.gov. After reviewing the SAM information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [ offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.
(End of provision)
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 days.
(End of clause)
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
TYRONE B. PALAGANAS
Chief of Contracting U.S. Army Corps of Engineers 1776 Niagara St.
Buffalo, NY 14207 716-879-4126
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FARSITE: https://farsite.hil.af.mil/
FAR: https://www.acquisition.gov
(End of clause)
U.S. Army Corps of Engineers® Buffalo District
Statement of Work Mount Morris Dam, Mount Morris, NY Installation of New Grounding System
Customer:
Park Manager, Mount Morris Dam
Prepared By:
Mary Samoei, NY/PA O&M U.S. Army Corps of Engineers Buffalo District 1776 Niagara Street Buffalo, NY 14207
May 2019
1 General Description of Work
1.1 Base Bid Item(s)
1.1.1 Base Bid Item 1 – Install Grounding System
1.1.2 Base Bid Item 2 – Clean the Existing Ground Cable and Replace the Bolted-clamp Ground Connections ... 4
1.1.3 Base Bid Item 3 – Remove the Existing Copper Wire
2 Point of Contact 3 Pre-Bid Site Visit 4 Project/Contractual References 5 Detailed Description of Work
5.1 Detailed Description of Work – Base Bid Item(s)
5.1.1 Base Bid Item 1 –Install Grounding System
5.1.2 Base Bid Item 2 – Clean the existing ground cable and replace the bolted-clamp ground connections
5.1.3 Base Bid Item 3 – Remove the Existing Copper Wire
6 Project Information
6.1 Basis for Award
6.2 Period of Performance
6.2.1 Pre-Construction Submittals
6.3 Pre-Construction Meeting
6.4 Work Schedule
6.5 Material/Equipment Information
6.6 Dimension/Quantity Verification
6.7 Material Storage
6.8 Site Cleanup
7 Quality Assurance (QA)
7.1 Overview
7.1.1 Government Project Manager (PM)
7.1.2 Government Quality Assurance (QA)
7.1.3 Government Inspections
7.1.4 Product Data Sheets
7.2 Contractor Quality Control (CQC)
7.2.1 Quality Control Program (QCP)
8 Communication 9 Repair/Restoration of Government Property 10 Work Stoppage, Contract Cancellation Actions 11 Material Change Orders 12 Liquidated Damages 13 Inspection/Testing
13.1 Pre-Final/Final Inspection
14 Completion 15 Payment 16 Warranty
16.1 Warranty Period
16.2 Repairs
17 Safety 18 Security
18.1 Access and General Protection/Security Policy and Procedures
18.1.1 Candidate Pre-Screening
18.1.2 Background Investigation
18.1.3 Suspicious Activity Reporting Training
18.2 Start of Work
18.3 Arrival/Departure
18.4 Video/Camera Equipment
19 Submittals
19.1 Bid Submittals
19.2 Pre-Construction Submittals
19.3 Project Completion Submittals
Attachment #1 – Bid Schedule Attachment #2 – Directions to Mount Morris Dam Attachment #3 – Ground Busbar - Level 6 South Side of Dam Attachment #4 – Elevation of Dam Attachment #5 – Aerial View of the Dam Attachment #6 – Head house Attachment #7 – Government Safety Requirements Attachment #8– Blank Activity Hazard Analysis Attachment #9 – USACE Buffalo District Monthly Man Hour Exposure Report Attachment #10 – Accident Prevention Plan Checklist Attachment #11 – Government Safety Requirements
1 General Description of Work The contractor must perform the following work under this contract:
1.1 Base Bid Item(s)
1.1.1 Base Bid Item 1 – Install Grounding System
1.1.2 Base Bid Item 2 – Clean the Existing Ground Cable and Replace the Bolted-clamp Ground
Connections
1.1.3 Base Bid Item 3 – Remove the Existing Copper Wire
2 Point of Contact
For scheduling project site visits and/or questions regarding this Statement of Work:
U.S. Army Corps of Engineers, Buffalo District Attn: Contracting Officer 1776 Niagara Street Buffalo, New York 14207
Phone: 716-879-4126 Facsimile: 716-879-4353
3 Pre-Bid Site Visit There will be one (1) scheduled pre-bid site visit for prospective bidders. The date and time of the visit will be posted on FBO. The location of the visit will be the William B. Hoyt II Visitor Center, 6103 Visitor Center Road, Mount Morris, New York 14510. Prospective bidders are urged to attend to gain information that will be necessary in the preparation of bid submittals. Due to maintenance, operation and security requirements, unscheduled visits may not be honored. Following the visit to the project site, a question and answer session will be held. During this session, prospective bidders are asked to direct all questions concerning the project to the Buffalo District Contracting Office
(DCO).
4 Project/Contractual References
• EM 385-1-1, 30 Nov 2014, U.S. Army Safety and Health Requirements Manual
• National Fire Protection Association (NFPA)
• National Electrical Code (NEC)
• 81-1983-IEEE Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a
Ground System
• UL 467 Grounding and Bonding Equipment
• ASTM B8 Standard Specifications for Concentric-Lay-Stranded Copper Conductors
5 Detailed Description of Work
5.1 Detailed Description of Work – Base Bid Item(s)
5.1.1 Base Bid Item 1 –Install Grounding System
All electrical work must be performed and checked by a licensed electrician in accordance with the current National Electrical Code and any applicable local standards or requirements.
Hire a competent third-party to perform a utility survey prior to beginning any work in order to locate and mark underground utilities within approximately 200 foot radius of the immediate area where the grounding system will be installed. The ground rods must be installed at least 10 feet away from any utilities.
Install a grounding system comprising of a ground cable, ground rods and ground connections. The ground cable must be connected to the existing ground busbar in level 6 of Mount Morris Dam (MMD). A picture of the existing busbar may be seen in Attachment #3. Install three ground rods near the head house of the MMD. Approximate location for installing the ground rods may be seen in Attachment #5. Exact location to be determined by the contractor after the utility survey.
Install a grounding loop of approximately 950 feet of ground cable from the existing ground busbar on level 6 of MMD through the utility gallery and up the spiral stair shaft under the head house to the 3 ground rods installed next to the head house and back to the ground busbar on level 6. The relevant locations of the level 6 ground bus, utility gallery, and spiral staircase under the head house may be seen in an elevation drawing of the dam in attachment #4.
• Provide and install three ground rods made of copper-clad steel conforming to UL 467. Ground rods must be
0.75 inches (19 mm) in diameter and 12 feet (3650 mm) in length. The ground rods must be clean, smooth and have a cone-shaped point. The rods must be die-stamped near the top with the name or trademark of the manufacturer and the length of the rod.
• Dig three 12 inch x 12 inch x 12 inch pits into the ground at the three locations to be specified. Drive the ground rods 11.5 feet into the earth at the bottom of the pit such that 6 inches are exposed above the ground for the ground cable connections. The rods must be centrally positioned inside the pit. Ground rods must be orientated vertically except if prohibited by earthen obstructions, in which case they must not exceed 45 degrees from the vertical. The spacing between each rod must be at least 20 feet. Install the ground rods using appropriate ground rod drivers without breaking or deforming the rods. Completely bury rods, compact soil and re-seed lawn to present a manicure appearance.
• The ground cable must be ASTM B 8 #2 AWG stranded bare copper wire and must be connected to the ground rods by exothermic weld.
• Clean the entire surface of ground busbar using a wire brush or other method to be approved by the
Government and drill the holes on the ground busbar prior to making connection to the bare copper wire. The bare copper wire and ground busbar connections must be made by using tin-plated copper or copper alloy bolts and nuts.
• The #2 AWG stranded bare copper wire must be installed in one continuous, straight length without splices or joints. When necessary, bends at locations including but not limited to the corner of the walls, and top and bottom of the spiral stairs must be made in such a way to avoid damage to the cable. The #2 AWG stranded bare copper wire must be secured against the wall using proper size staples or fasteners. The cable must be secured in accordance with NEC specifications or local requirements
• Drill a hole through the concrete wall to accommodate PVC and sleeving, and excavate existing asphalt walking surface in a straight line to where the asphalt meets the grass, or approximately 30-50 feet; to be verified by contractor. Run #2 AWG stranded bare copper wire in a 2.5 inch diameter schedule 80PVC pipe through the head house wall and then route the copper wire into the excavated walking surface. Location of the head house can be seen in Attachment #6. Where the existing asphalt meets the earth run the bare copper wire through a 6 inch deep trench on the earth to the location of the first rod. Direct buried cable must be a minimum 6 inches deep at all points except where covered by asphalt. Any excavation must be replaced in kind and without providing any trip hazard. Install sleeve seal fitting to prevent any external moisture from entering through the concrete and allow for vertical movement at the interface between the soil and the concrete due to frost heave.
Apply corrosion inhibitor to all contact surfaces when making ground bonding connections. Use corrosion inhibitor appropriate for protecting a connection between the metals used. Submit a corrosion inhibitor compound as a proposal which can be accepted or denied.
After installation of the new ground rods and cable, the contractor must test the new ground network according to IEEE 81 standards. The ground resistance values must be recorded and included in a submittal. The grounding system resistance to ground must not exceed 5 ohms.
All the hardware (concrete anchors, conduit clips etc) must be stainless steel
Make all below grade connections by exothermic process and must be visually inspected by PM or approved government personnel prior to backfilling.
Submit detailed drawings of the earth pit showing the ground rod and cable connection.
Submit pre-construction submittals to the Government for approval prior to ordering any materials and equipment
Exothermic welding must be done by qualified personnel with the appropriate Personal Protective Equipment (PPE) in accordance with OSHA standards and requirements.
Installation must be done in accordance with the NEC standards and manufacturer’s instructions
5.1.2 Base Bid Item 2 – Clean the existing ground cable and replace the bolted-clamp ground connections
Clean the existing ground cable running through all the 6 levels in MMD using a wire brush or other method preapproved by the Government. Remove and replace the existing bolted-clamp ground connections in MMD with the same ones used in Base Bid 1and apply a corrosion inhibitor to all connections. The cleaning products and corrosion inhibitor compound to be used must be submitted as part of pre-construction submittals
5.1.3 Base Bid Item 3 – Remove the Existing Copper Wire
Remove and dispose the existing copper wire that exits MMD through an adit tunnel in level three to the earth in the east side of the dam. Remove only the section of the wire that is above the earth. The copper wire must be removed after the new grounding system has been installed. Personal fall protection equipment and systems must be used.
Submit fall protection plan as part of preconstruction submittal
6 Project Information
6.1 Basis for Award
Awards will be made to the offeror submitting a proposal that is determined to be the lowest price.
6.2 Period of Performance
The project completion date is one-hundred eighty (180) calendar days following the initial award of the contract. In the event the contractor is unable to meet the project completion date, requests for extensions must be made in writing. The request must explain, in detail, why the original project completion date will not be met. The request must be sent to the DCO along with an informational copy to the Project Manager (PM). The request must be made as soon as possible, but not later than ten (10) calendar days prior to the original completion date. This request must not negate penalties for liquidated damages unless an extension is granted by the DCO in writing.
6.2.1 Pre-Construction Submittals
All pre-construction submittals, as stated in Section 19.2 of this SOW, must be provided to the Government within fourteen (14) calendar days following the award of the contract. The contractor must allow up to twenty-one (21) calendar days from time of receipt for Government review of submittals. Work may not begin until Government approval of all submittals required in Section 19.2 of this Statement of Work. Submittals must include ENG FORM 4025.
6.3 Pre-Construction Meeting
Following the award of the contract and review and acceptance of the contractor’s pre-construction submittals, the prime contractor must attend a mandatory pre-construction conference. The meeting must be scheduled by the Government, and conducted on-site, at the Mount Morris Dam, at a time and date to be announced following the award of the contract.
6.4 Work Schedule
All scheduled work is to be performed Monday through Friday 0830-1630 hours, excluding Federal holidays. If the contractor desires to work beyond the previously stated hours and days, written permission to do so must be obtained from the Government. Schedule changes must be requested at minimum 24 hours in advance, unless there is an emergency situation.
6.5 Material/Equipment Information
Contractor must provide all labor, tools, ladders, hammer, equipment, supplies and materials needed to complete the work described herein, unless otherwise noted.
6.6 Dimension/Quantity Verification
Contractor must independently measure and verify all dimensions and quantities given herein prior to ordering materials and supplies for the project. This information must be provided to the Government QA person as part of the pre-construction submittals.
6.7 Material Storage
If temporary storage of project material is requested, the contractor must make a written request to the Government’s QA person and receive written approval from the Government. If material is found to be hazardous, flammable, combustible, etc, the contractor will be required to provide the appropriate hazardous material storage locker. Storage locations will be discussed at the pre-bid site visit and during the pre-con meeting. See Section 17 of this SOW for further information.
6.8 Site Cleanup
All excess, waste, and removed material related to this project must become the contractor’s property and must be promptly removed from the site and disposed of or reused/recycled in accordance with applicable local, state, and Federal regulations. Documentation describing disposal of material must be furnished to the Government as part of the project closeout files. The contractor must not dispose of any project generated waste in Government receptacles or on Government grounds.
7 Quality Assurance (QA)
7.1 Overview
7.1.1 Government Project Manager (PM)
The Government has appointed a Project Manager (PM) for this project. The PM must ensure all questions of a technical nature concerning the contractual work are answered.
7.1.2 Government Quality Assurance (QA)
The Government will appoint a Quality Assurance (QA) person to ensure all work is accomplished in accordance with contractual documents. The QA person for this contract will be identified after the contract is awarded. The QA person serves as the liaison between the contractor, PM, and the DCO. The QA person does not have the authority to modify contractual agreements.
7.1.3 Government Inspections
Contractor must allow inspection by the Government PM, QA person, DCO personnel, and District Safety and Health personnel, at any time during the life cycle of the project. The contractor must provide safe access for Government personnel visiting the project.
7.1.4 Product Data Sheets
The contractor must provide to the Government product data sheets from the manufacturer for all materials used on this job, as part of the pre-construction submittals. All materials must be delivered to the project site in new condition, in their original containers and wrapping material, with labels clearly showing all product information.
7.2 Contractor Quality Control (CQC)
Contractor Quality Control (CQC) is the means by which the contractor ensures that the construction, to include that of subcontractors and suppliers, complies with the requirements of this contract.
7.2.1 Quality Control Program (QCP)
The contractor must implement a written Quality Control Program (QCP) for performing contractual work and must designate an on-site QCP supervisor. The contractor must provide copies of the QCP for review by the Government QA and PM. The QCP is one of the pre-construction submittals. The QCP must include, at minimum, include the following to cover all construction operations, both on-site and off-site, including work by subcontractors, fabricators, supplies, and purchasing agents:
• The name, qualifications (in resume format), duties, responsibilities, and authorities of the person assigned the QCP supervisor.
• Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, off-site fabricators, supplies, and purchasing agents.
• Procedures for procurement, storage of materials and equipment, coordination of subcontractor’s activities, and inspections and tests require to be sure that the specified materials are used and installation is acceptable to produce the required end product. The plan must list any required tests to be performed (See Section 13), state who will be responsible for the results, and who will prepare and sign reports.
• Procedures for tracking construction deficiencies from identification through acceptable corrective action.
These procedures must establish verification that identified deficiencies have been corrected.
Acceptance of the contractor’s QCP is required prior to the start of construction. At the pre-construction meeting, the QCP will be discussed along with the relationship between the contractor and the Government. The PM must be available at all times to discuss the planned QC operations. It may be advantageous for the contractor to make incremental submittals of the plan. The Government reserves the right to require the contractor to make changes in his QCP plan and operations including removal of personnel, as necessary, to obtain the quality specified.
8 Communication
During the execution of the contract, the PM must receive weekly status reports from the contractor on issues such as milestones met and/or missed, and issues standing in the way of project completion. The DCO must be the communication hub for the Government QA Person, PM, and the contractor regarding clarification of contractual issues. By adhering to the established lines of communication, it will reduce or avoid generation of duplicate requests for information, which may inadvertently result the Government or the contractor to the acceptance of contractual changes without official approval by the DCO.
9 Repair/Restoration of Government Property Contractor, at no expense to the Government, is required to protect all Government facilities, grounds, equipment, sidewalks, and pavement during construction. All Government structures, grounds, and equipment disturbed by contractor during the performance of work must be returned to a pre-construction condition prior to request of final payment. Damages to Government property that were caused by contractor and/or sub-contractor will be repaired at no expense to the Government by the prime contractor.
10 Work Stoppage, Contract Cancellation Actions The Mount Morris Dam Park Manager, PM, or Government QA person may issue temporary “Stop Work” notification if they find activities or job site conditions are in violation of Federal, Department of Defense, State or local health, safety and/or environmental standards, laws and regulations. The District Safety Officer (DSO), the
DCO, and the PM must be contacted immediately after a Stop Work notification order is issued or rescinded.
Violation of health, safety or environmental regulations committed by the contractor must not be grounds for compensation by the Government to the contractor. Refer to contractual documents provided by the District Contracting Office regarding additional work stoppage and/or contract cancellation actions.
11 Material Change Orders Once equipment and materials are approved and accepted by the Government, the contractor must not substitute equipment or materials without providing a detailed explanation for the substitution. Changes in materials will require full justification and approval from the DCO. Modifications to contractual documents must be reviewed by the contractor, Government QA person and PM, and approved by the Government’s DCO. Requests for modifications must be in writing explaining the reasons for the modification, detailed description of the modification and what the benefits are and an estimated cost broken down by materials, labor and equipment.
12 Liquidated Damages Liquidated damages of $150 per work day will be assessed if the work is not completed within the time period described in Section 6.2 of this Statement of Work. Liquidated damages must be assessed beginning the day following the end of the initial period.
13 Inspection/Testing
13.1 Pre-Final/Final Inspection
Upon completion of the work, the Government will perform a pre-final inspection to verify that the project is complete. A Government pre-final punch list may be developed as a result of this inspection. If contractual requirements are not met, this list must be provided to the DCO, who will bring them to the attention of the contractor.
The contractor’s QC supervisor must ensure that all items on this list have been corrected in a timely manner before notifying the Government, so that a final inspection with the Government and contractor can be scheduled. The contractor’s QC supervisor, PM, DCO representative, and QA person must be in attendance at the final acceptance inspection.
14 Completion The contract will not be deemed fulfilled until all submittals, products, services, equipment, material, installation, construction work, and final inspection is provided by the contractor under the terms of the contractual documents and found satisfactory to the DCO.
15 Payment The project will be paid for on per-job basis, the price for which includes all labor, materials, equipment, mobilization/demobilization, disposal, and other costs required to complete the work. Partial payment(s) may be made; this will be discussed at the pre-construction meeting.
16 Warranty
16.1 Warranty Period
Contractor must, at a minimum, warranty all workmanship against deficiencies for a period of 1 year from the date of acceptance of the work. The contractor must also provide the manufacturer’s warranty for newly installed equipment and/or materials produced by said manufacturer. The period of warranty must commence at time of Government's acceptance of the work. If within the warranty period the installed equipment/materials incur breakdowns, excessive wear, or become unreliable, the costs to repair or replace installed equipment and materials must be borne by the prime contractor. The warranty must bear the name of the Buffalo District, U.S. Army Corps of Engineers as the recipient of the warranty and display the period of coverage. All warranties must be submitted prior to request of final payment on this contract.
16.2 Repairs
When repairs are required because of defective workmanship during the warranty period, contractor must make such repairs within 72 hours of notification. When repairs are not performed within the specified time, emergency repairs performed by others will not void the warranty and contractor must reimburse the Government for the cost of said repairs. Contractor must not bill the Government for costs of repair work and delay of payment due to repair work executed to resolve defective workmanship and/or problems with materials used and services provided.
17 Safety
Refer to Attachment #7 for Government safety requirements.
18 Security
18.1 Access and General Protection/Security Policy and Procedures All contractor and all associated sub-contractors employees must comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures, which will be provided by a Government representative. The contractor must also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by the Army Corps of Engineers (USACE) Buffalo District Emergency Management Office. Contractor workforce must comply with all personal identity verification requirements as directed by the Department of Defense (DOD), Headquarters Department of the Army (HQDA) and/or USACE Buffalo District policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
18.1.1 Candidate Pre-Screening
The contractor must pre-screen candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The vendor must ensure that the candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible candidates must be provided to the COR no later than 3 business days after the initial contract award.
18.1.2 Background Investigation
For all prime and subcontractor employees working at Mount Morris Dam, the following Personally Identifiable Information (PII) must be provided for the US Army Corps of Engineers to perform a limited background check:
Complete name, social security number, driver’s license number, date of birth, place of birth, and current address of residence. This information is mandatory before any workers will be allowed to enter the facility. The contractor must allow up to twenty-one (21) calendar days from time of receipt for Government completion of background checks. Work may not begin until Government clearance of employees is given to the prime contractor.
18.1.3 Suspicious Activity Reporting Training
The contractor and all associated sub-contractors must receive a brief/training provided by the PM on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training must be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the PM no later than five calendar days after the completion of the training.
18.2 Start of Work
Contractor must notify the PM of their planned arrival at the project to start work at least seven (7) calendar days in advance. Contractor must submit a weekly work schedule thereafter by no later than the Friday before the coming work week.
18.3 Arrival/Departure
Contractor is required to notify the Government QA person Park Manager of their arrival to and departure from the project site. A similar notification is required if there must be any deviation or cancellation of a scheduled work day during the life of the project.
18.4 Video/Camera Equipment
Contractor must not transport or use video or camera equipment while working at Mount Morris Dam unless permission to do so is requested through the Park Manager and approval is granted by the Buffalo District Security Officer.
19 Submittals
19.1 Bid Submittals
The following submittals are required from the contractor under this Scope of Work to be submitted with the bid proposal:
• Complete Bid Schedule with prices for all base. (See Attached)
• Other documentation as required by the DCO:
o Representations and certifications
• All submittals must be accompanied by ENG FORM 4025 coversheet
19.2 Pre-Construction Submittals
All submittals are required as per the timeline described in Section 6.2 of this SOW:
• Contractor timeline showing start and completion of contractual work
• Contractor employees Personally Identifiable Information (PII)
• Contractor Quality Control Program (QCP)
• Accident Prevention Plan (APP) including Activity Hazard Analysis (AHA’s): Safety and health submittals as described in Attachment #7 of this Scope of Work will be submitted to the government. Safety and health submittals will be reviewed and accepted in writing by the government prior to commencement of work.
• All materials/equipment data sheets provided under the contract, including but not limited to:
o Copper ground cable and rods o Connectors and clamps o Cleaning material o Corrosion inhibitor compound
19.3 Project Completion Submittals
All submittals are required as per the timeline described in Section 6.2 of this SOW:
• All required submittals required under this contract.
• Manufacturer warranty for newly installed equipment and material.
• Contractor warranty for all work performed under this contract.
• Applicable equipment O&M manuals, shop drawings, maintenance and repair instructions.
• All required training on inspection and preventive maintenance of newly installed equipment and materials.
• Documentation for disposal of project waste material.
• Monthly Man-Hour Exposure Report
• Resistance test report
END OF STATEMENT OF WORK
Attachment #1 – Bid Schedule Attachment #2 – Directions to Mount Morris Dam
Attachment #3 – Ground Busbar - Level 6 South Side of Dam Attachment #4 – Elevation of Dam Attachment #5 – Aerial View of the Dam Attachment #6 – Head house Attachment #7 – Government Safety Requirements Attachment #8– Blank Activity Hazard Analysis Attachment #9 – USACE Buffalo District Monthly Man Hour Exposure Report Attachment #10 – Accident Prevention Plan Checklist Attachment #11 – Government Safety Requirements
Attachment #1 – Bid Schedule Mount Morris Dam, Mount Morris, New York
Grounding System 01/15/2019
Item No. Description Bid Quantity Bid Unit Unit Price ($) Price ($)
1 (Base) Install Grounding System 1 Job
2 (Base) Clean the existing ground cable and replace the bolted-clamp ground connections
1 Job
3 (Base) Remove the Existing Copper Wire 1 Job
TOTAL BASE BID AMOUNT (Item(s) 1-3):________________
TOTAL BID AMOUNT (Item(s) 1-3):________________
Attachment #2 – Directions to Mount Morris Dam
6103 Visitor Center Road Mount Morris, NY 14510
The William B. Hoyt II Visitor Center access road (Visitor Center Rd) is located approx. 1.7 miles South of Mount Morris and 11 Miles North of Nunda on SR 408.
From the north:
(Interstate 90) take 390S to exit 7 - Mount Morris/Letchworth, 5 miles south on Route 408. Turn onto Visitor Center Rd; continue for about 1.25 miles.
From the south:
(Route 17, I-86) take 390N to exit 6 - Sonyea, 7 miles north on Route 36, then two miles south on Route 408. Turn onto Visitor Center Rd; continue for about 1.25 miles.
Distance in Miles Rochester, NY………...35 Binghamton, NY…………..138 Buffalo, NY………...…75 Williamsport, PA………….144 Elmira, NY……………81 Cleveland, OH…………….200 Syracuse, NY…………111 Pittsburg, PA……………...300
Attachment #3 – Ground Busbar - Level 6 South Side of Dam
Attachment #4 – Elevation of Dam
Dam elevation showing the location of the ground busbar on level 6 and the distance through the utility gallery to the bottom of the spiral stairwell
Attachment #5 – Aerial View of the Dam
Aerial view of MMD showing the access road to the dam, head house and approximate location of the ground rods
Attachment #6 – Head house
Attachment #7 – Government Safety Requirements The contractor must follow all applicable safety requirements detailed in the Unified Facilities Guide Specifications (UFGS) 01-35-26, Safety & Health Requirements Manual EM 385-1-1 OSHA, National Electric Code and any other applicable New York State or Federal regulations. Required submittals are listed below.
Submittals required prior to performance of each bid item:
• Complete Accident Prevention Plan (APP) (attachment 10) with Activity Hazard Analysis (AHA) (attachment 8);
to include Lockout-Tagout (LOTO) requirements if applicable per Sections 11 and 12 of the EM 385-1-1 for electrical.
• Proof of qualifications for a designated Competent Person/Site Safety and Health Officer (SSHO); to include proof of LOTO competency and a resume including three (3) years of consecutive similar project experience managing or supervising safety.
• Proof of qualified electrical persons
• Proof of qualified exothermic welding personnel
• CPR/First Aid Certificates for two workers that will be on-site during all work activities.
Submit reports as required
• Accident Reports via Eng Form 3394 Accident Investigation Report
• Monthly Man-Hour Exposure Reports
Overarching UFGS and EM 385-1-1 requirements, all contractor accidents involving injuries, illnesses or property damage, occurring during the execution of this contract must be reported to USACE immediately within the contractor becoming aware of its occurrence. Reporting injuries, illness or property damage to the Contracting Officer Representative (COR) may be sufficient. Based upon the severity of the injury, illness or property damage, more detailed reporting may be required. More detailed notification will include contractor name; contract title; type of contract; name of activity, installation or location where accident occurred; date and time of accident; names of personnel injured; extent of property damage, if any; extent of injury, if known, and brief description of accident (to include type of construction equipment used, PPE used, etc.
Work must not begin until the APP and AHA has been submitted to, and accepted by the USACE Buffalo District Contracting Officer or COR. The AHA must be prepared following the format found in USACE publication USACE Safety and Health Requirements Manual EM 385-1-1.
During the performance of work, the contractor must create procedures for control and safety of persons visiting the site and USACE personnel conducting their normal daily activities transgressing between buildings in the vicinity of the work area. Contractor is responsible for his personnel and for familiarizing each of his subcontractors and all visitors with safety requirements. Contractor must advise the Contracting Officer of any special safety restriction he has established so that Government personnel can be notified of these restrictions. The SSHO must be present on-site whenever project-related work is being executed. The buddy system must be utilized. The contractor must permit safety inspections of all work being performed.
Attachment #8– Blank Activity Hazard Analysis
*Note: This is an un-editable image. See attachment of PDF document for editable XML version.
Attachment #9 – USACE Buffalo District Monthly Man Hour Exposure Report
Contract No. __________________________________________________
Month/Year __________________________________________________
P/
R WEEK WEEK
DAYS
PER
PROJECT NAME &
LOCATION
TYPE OF
CONTRACTO
R
MANHOUR
S
# OF LOST
WORKDAYS
# OF DAYS SINCE
LAST
BEGINNIN
G
ENDIN
G WEEK
OPERATIO
N NAME WORKED DUE TO INJURY LOST WORKDAY
TOTALS 0.0 0.0
Attachment #10 – Accident Prevention Plan Checklist
CONTRACTOR ACCIDENT PREVENTION PLAN (APP) CHECKLIST
(EM 385-1-1, Appendix - A, dated 30 Nov 2014) Minimum Basic Outline for APP
The APP is the Contractor Safety and Health Program Document. The following Site Specific Areas will be addressed:
NOTE: 1. Contractor will complete Checklist and Submit with their APP.
NOTE: 2. Contractor APP WILL be submitted in format below.
NOTE: 3. Safety Office will review Contractor APP and return to PM /COR.
NOTE: 4. Contractor APP's ARE NOT APPROVED by the USACE, only found as Acceptable or Non-Acceptable.
Safety Office Review Status: ACCEPTED BY/DATE: NOT ACCEPTED BY/DATE:
Contractor Name: _______________________________________________________
Contract No: _________________________________
Project Title & Location: Included? Location
Page(s) Yes No N/A
ALL CHECKLIST ITEMS WILL BE COMPLETED!
1. SIGNATURE SHEET. Title, signature, and phone number of the following:
a. Plan Preparer (qualified person, Competent Person such as corporate safety staff person, QC).
b. Plan Approval by company/corporate officers authorized to obligate the company…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.