AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to revise the Plans and Specifications, including quantities and milestones, and provide new bid schedules based on the revisions. See attached documents for new forms and requirements.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Jul-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P419B0012

X 9B. DATED (SEE ITEM 11)

09-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Jul-2019

CODE

U.S. ARMY ENGINEER DISTRICT, BUFFALO

1776 NIAGARA STREET

BUFFALO NY 14207-3199

W912P4 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P419B0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 0001:

Bid Form – The bid form has been updated by changing 2 line item quantities on each schedule.

Section 01 35 13 SPECIAL PROJECT PROCEDURES – Paragraph 1.2 – The milestone schedule has been updated to reflect the changes in quantities.

(End of provision)

(End of Summary of Changes)

AMENDMENT 1

CLEVELAND, OHIO

CLEVELAND HARBOR

MAINTENANCE DREDGING

UPDATED BID FORM AND

SPECIFICATIONS

17 JULY 2019

AMENDMENT NO. 1

The following changes have been made to the plans and specifications:

1. Bid Form – The bid form has been updated by changing 2 line item quantities on each schedule.

The updated bid form is attached with the changes highlighted.

2. Section 01 35 13 SPECIAL PROJECT PROCEDURES – Paragraph 1.2 – The milestone schedule has been updated to reflect the changes in the bid form. It is shown below with the changes highlighted.

Maximum Calendar Days After Receipt Milestone of Notice to Proceed

Begin Fall 2019 Dredging 45 (Fall dredging may not begin before 01 October 2019, unless approved by the Contracting Officer)

Complete Base Bid Fall 2019 Dredging

---If Bid Schedule A is awarded 70

---If Bid Schedule B is awarded 80

Complete Option A Dredging (if full the full quantity is exercised)

---If Bid Schedule A is awarded 80

---If Bid Schedule B is awarded 95

SECTION 00 10 00

BIDDING SCHEDULE

SCHEDULE "A"

The work pursuant to terms and conditions of this contract will consist of dredging and placement of dredged material into a Contractor-furnished Placement Site for the base bid, and a Contractor-furnished Placement Site and the Government-furnished CDF (10B), based upon which option(s) are executed, and as shown on the contract drawings, in accordance with these specifications.

Item No. Description

Estimated Quantity

Unit Unit Price

Estimated Amount

FALL 2019 DREDGING PERIOD

Total Estimated Amount (Items 1 through 2) $ ‐

OPTION "A"

3 Maintenance Dredging: Upper Cuyahoga River (STA 72+00 to 0+00) w/placement in Contractor-furnished Placement Site

30,000

CY $ $ -

Total Estimated Amount (Items 1 through 3) $ ‐

OPTION "B"

SPRING 2020 DREDGING PERIOD

6 Maintenance Dredging: Lower Cuyahoga River (Sta. 297+70 to 72+00) and Old River w/ placement in Government-furnished CDF 10B) 45,000

CY $ $ -

Total Estimated Amount (Items 4 through 6) $ ‐

1 Mobilization and Demobilization 1 JA

2 Maintenance Dredging: Upper Cuyahoga River (STA 72+00 to

70,000

CY

4 Mobilization and Demobilization 1 JA

5 Maintenance Dredging: Upper

Cuyahoga River (STA 72+00 to

155,000

CY

h5cosklm Highlight

Highlight

Total Estimated Amount All Items (Items 1 through 6) $ ‐

NOTE 1: Bidders are required to propose to all schedules. The contracting officer will determine an offer unresponsive for failure to bid on all schedules. The Government reserves the right to make award to the lowest bidder (base + any options) on "Schedule A" or Schedule "B", based on needs of Government.

NOTE 2: The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). Only one Schedule will be awarded per this solicitation. With regard to the options on all schedules - each schedule will be evaluated individually and no combination of schedules will be permitted.

NOTE 3: Regarding the option items, the Government may elect to execute any combination of the options or not to execute any options. If an option item is executed, the government reserves the right to limit the quantity of material up to the estimated quantity of each line item within that option.

NOTE 4: If any portion of any Option is exercised, they will be exercised as follows:

Option A: Exercised by 14 September 2019

Option B: Exercised by 01 March 2020

SECTION 00 10 00

BIDDING SCHEDULE

SCHEDULE "B"

The work pursuant to terms and conditions of this contract will consist of dredging and mechanical placement of all dredged material from the Cuyahoga River into the Government-furnished Confined Disposal Facility (CDF) #10B, as shown on the contract drawings, in accordance with these specifications.

Item No. Description

Estimated Quantity

Unit Unit Price

Estimated Amount

FALL 2019 DREDGING PERIOD

1 Mobilization and Demobilization 1 JA $

2 Maintenance Dredging: Upper Cuyahoga River (STA 72+00 to 0+00) w/mechanical placement in in

Government-furnished CDF 10B 70,000 CY $ $ -

3 Temporary CDF Improvement 1 JA $

Total Estimated Amount (Items 1 through 3) $ ‐

OPTION "A"

4 Maintenance Dredging: Upper Cuyahoga River (STA 72+00 to 0+00) w/mechanical placement in in Government-furnished CDF 10B 30,000 CY $ $ -

Total Estimated Amount (Items 1 through 4) $ ‐

OPTION "B"

SPRING 2020 DREDGING PERIOD

5 Mobilization and Demobilization 1 JA $

6 Maintenance Dredging: Upper Cuyahoga River (STA 72+00 to 0+00) w/ mechanical placement in Government- furnished CDF #10B 155,000 CY $ $ -h5cosklm Highlight

Highlight

7 Maintenance Dredging: Lower Cuyahoga River (Sta. 297+70 to 72+00) and Old River w/mechanical placement in Government-furnished

CDF 10B) 45,000 CY $ $ -

Total Estimated Amount (Items 5 through 7) $ ‐

Total Estimated Amount All Items (Items 1 through 7) $ ‐

NOTE 1: Bidders are required to propose to all schedules. The contracting officer will determine an offer unresponsive for failure to bid on all schedules. The Government reserves the right to make award to the lowest bidder (base + any options) on "Schedule A" or Schedule "B", based on needs of Government.

NOTE 2: The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). Only one Schedule will be awarded per this solicitation. With regard to the options on all schedules - each schedule will be evaluated individually and no combination of schedules will be permitted.

NOTE 3: Regarding the option items, the Government may elect to execute any combination of the options or not to execute any options. If an option item is executed, the government reserves the right to limit the quantity of material up to the estimated quantity of each line item within that option.

NOTE 4: If any portion of any Option is exercised, they will be exercised as follows:

Option A: Exercised by 14 September 2019

Option B: Exercised by 01 March 2020

SOW Change 0001_Cleveland Dredging.pdf
BoringLogs.pdf
em d82-9
ch-60-05
wb cdu77-6
wb duv77-4