W912NW20R0008 0002.pdf
PDF 484 KB Posted
- Solicitation number
- W912NW-20-R-0008
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912NW20R0008 0001.pdf | ||
| FINAL SIGNED J&A_Redacted.pdf | ||
| W912NW20R0008.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to make changes to the Performance Work Statement (PWS); remove actual dates in the period of performance; and to remove the option periods. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 93
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Nov-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912NW20R0008
X 9B. DATED (SEE ITEM 11)
20-Nov-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Nov-2019
CODE
ARMY CONTRACTING COMMAND - REDSTONE
CONTRACTING OFFICE
CORPUS CHRISTI ARMY DEPOT
9035 OCEAN DR. BLDG 10, MAIL STOP 18
CORPUS CHRISTI TX 78419-5260
W912NW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912NW20R0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
The contractor shall provide preventative and remedial maintenance to theAutomated Storage and Retrieval System (ASRS) in accordance with thePerformance Work Statement (PWS) contained herein.Wage Determination WD 15-5225 (Rev. -9) dated 07/16/19 is applicable.
To:
The contractor shall provide preventative and remedial maintenance to theAutomated Storage and Retrieval System (ASRS) in accordance with thePerformance Work Statement (PWS) contained herein.Wage Determination WD 15-5225 (Rev. -9) dated 07/16/19 is applicable.Period of Performance will be twelve (12) months from date of contract award.
SUBCLIN 0002AA
The contractor shall provide MOPPM on Saturdays as needed. Contracting Officer approval shall be given.
The contractor shall provide MOPPM on Saturdays as needed. Contracting Officer approval shall be given.Period of Performance will be twelve (12) months from date of contract award.
SUBCLIN 0002AB
The contractor shall provide Maintenance outside MOPPM on Sundays as needed. Contracting Officer approval shall be given.
Officer approval shall be given.Period of Performance will be twelve (12) months from date of contract award.
SUBCLIN 0003AA
The CLIN description has changed from PARTS REPLACEMENT - DECEMBER to
PARTS REPLACEMENT - DECEMBER.
The CLIN extended description has changed from:
The contractor shall provide replacement parts for the ASRS as contained in the Performance Work Statement (PWS) herein.
Work Statement (PWS) herein.Replacement Parts for one (1) month.
SUBCLIN 0003AB
SUBCLIN 0003AC
SUBCLIN 0003AD
SUBCLIN 0003AE
SUBCLIN 0003AF
SUBCLIN 0003AG
SUBCLIN 0003AH
SUBCLIN 0003AJ
SUBCLIN 0003AK
SUBCLIN 0003AL
SUBCLIN 0003AM
CLIN 1001
The CLIN description has changed from ASRS MAINTENANCE to REMOVED.
The CLIN extended description has changed from:
The contractor shall provide preventative and remedial maintenance to theAutomated Storage
CLIN will not be included in the contract award.
The pricing detail quantity has decreased by 12.00 from 12.00 to 0.00.
The unit of issue Months has been deleted.
The option status has changed from Option to No Status.
CLIN 1002
The CLIN description has changed from MOPPM to REMOVED.
The CLIN extended description has changed from:
The contractor shall provide Maintenance outside Principle Period of Maintenance (MOPPM) as shown in the PWS contained herein.
SUBCLIN 1002AA
The CLIN description has changed from MOPPM SATURDAY to REMOVED.
The CLIN extended description has changed from:
The contractor shall provide Maintenance outside MOPPM on Saturdays as needed. Contracting
The pricing detail quantity has decreased by 192.00 from 192.00 to 0.00.
The unit of issue Hours has been deleted.
SUBCLIN 1002AB
The CLIN description has changed from MOPPM SUNDAY to REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 48.00 from 48.00 to 0.00.
CLIN 1003
The CLIN description has changed from PARTS REPLACEMENT to REMOVED.
The CLIN extended description has changed from:
The contractor shall provide replacement parts for the ASRS every month for 12 months as contained in the PWS herein.
SUBCLIN 1003AA
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
The unit of issue Lot has been deleted.
SUBCLIN 1003AB
The CLIN description has changed from PARTS REPLACEMENT - JANUARY to
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 1003AC
The CLIN description has changed from PARTS REPLACEMENT - FEBRUARY to
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 1003AD
The CLIN description has changed from PARTS REPLACEMENT - MARCH to
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 1003AE
The CLIN description has changed from PARTS REPLACEMENT - APRIL to
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 1003AF
The CLIN description has changed from PARTS REPLACEMENT - MAY to
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 1003AG
The CLIN description has changed from PARTS REPLACEMENT - JUNE to
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 1003AH
The CLIN description has changed from PARTS REPLACEMENT - JULY to
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 1003AJ
The CLIN description has changed from PARTS REPLACEMENT - AUGUST to
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 1003AK
The CLIN description has changed from PARTS REPLACEMENT - SEPTEMBER to
REMOVED.
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 1003AL
The CLIN description has changed from PARTS REPLACEMENT - OCTOBER to
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 1003AM
The CLIN description has changed from PARTS REPLACEMENT - NOVEMBER to
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
CLIN 1004
The CLIN description has changed from ENTERPRISE CONTRACTOR MANPOWER REPORTING to REMOVED.
The CLIN extended description has changed from:
In accordance with the PWS, paragraph 5.27 contained herein. This CLIN is Not Separately Priced.
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
The unit of issue Each has been deleted.
The cost constraint NSP has been deleted.
CLIN 2001
The CLIN extended description has changed from:
The contractor shall provide preventative and remedial maintenance to theAutomated Storage
The pricing detail quantity has decreased by 12.00 from 12.00 to 0.00.
CLIN 2002
SUBCLIN 2002AA
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 192.00 from 192.00 to 0.00.
SUBCLIN 2002AB
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 48.00 from 48.00 to 0.00.
CLIN 2003
The CLIN extended description has changed from:
SUBCLIN 2003AA
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 2003AB
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 2003AC
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 2003AD
REMOVED.
The CLIN extended description has changed from:
SUBCLIN 2003AE
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 2003AF
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 2003AG
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 2003AH
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 2003AJ
REMOVED.
The CLIN extended description has changed from:
SUBCLIN 2003AK
The CLIN description has changed from PARTS REPLACEMENTS - SEPTEMBER to REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 2003AL
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 2003AM
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
CLIN 2004
MANPOWER REPORTING to REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
The unit of issue Each has been deleted.
CLIN 3001
The CLIN extended description has changed from:
The contractor shall provide preventative and remedial maintenance to theAutomated Storage
The pricing detail quantity has decreased by 12.00 from 12.00 to 0.00.
CLIN 3002
The CLIN description has changed from moppm to REMOVED.
The CLIN extended description has changed from:
SUBCLIN 3002AA
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 192.00 from 192.00 to 0.00.
SUBCLIN 3002AB
The pricing detail quantity has decreased by 48.00 from 48.00 to 0.00.
CLIN 3003
The CLIN extended description has changed from:
SUBCLIN 3003AA
REMOVED.
The CLIN extended description has changed from:
SUBCLIN 3003AB
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 3003AC
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 3003AD
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 3003AE
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 3003AF
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 3003AG
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 3003AH
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 3003AJ
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 3003AK
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 3003AL
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 3003AM
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
CLIN 3004
MANPOWER REPORTING to REMOVED.
The CLIN extended description has changed from:
In accordance with the PWS paragraph 5.27 contained herein. This CLIN is Not Separately
The unit of issue Each has been deleted.
CLIN 4001
The CLIN extended description has changed from:
The contractor shall provide preventative and remedial maintenance to theAutomated Storage
The pricing detail quantity has decreased by 12.00 from 12.00 to 0.00.
CLIN 4002
The CLIN extended description has changed from:
shown in the Performance Work Statement contained herein.
SUBCLIN 4002AA
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 192.00 from 192.00 to 0.00.
SUBCLIN 4002AB
The CLIN extended description has changed from:
The contractor shall provide MOPPM on Sundays as needed. Contracting Officer approval shall be given.
The pricing detail quantity has decreased by 48.00 from 48.00 to 0.00.
CLIN 4003
The CLIN extended description has changed from:
SUBCLIN 4003AA
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 4003AB
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 4003AC
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 4003AD
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 4003AE
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 4003AF
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 4003AG
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 4003AH
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 4003AJ
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 4003AK
REMOVED.
The CLIN extended description has changed from:
SUBCLIN 4003AL
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
SUBCLIN 4003AM
REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
CLIN 4004
MANPOWER REPORTING to REMOVED.
The CLIN extended description has changed from:
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
The unit of issue Each has been deleted.
DELIVERIES AND PERFORMANCE
The following Delivery Schedule for CLIN 0001 has been deleted:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 01-DEC-2019 TO
30-NOV-2020
N/A N/A
FOB: Destination
The following Delivery Schedule for SUBCLIN 0003AA has been deleted:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 01-DEC-2019 TO
31-DEC-2019
The following Delivery Schedule for SUBCLIN 0003AB has been deleted:
CAGE
POP 01-JAN-2020 TO
31-JAN-2020
The following Delivery Schedule for SUBCLIN 0003AC has been deleted:
CAGE
POP 01-FEB-2020 TO
29-FEB-2020
The following Delivery Schedule for SUBCLIN 0003AD has been deleted:
CAGE
POP 01-MAR-2020 TO
31-MAR-2020
The following Delivery Schedule for SUBCLIN 0003AE has been deleted:
CAGE
POP 01-APR-2020 TO
30-APR-2020
The following Delivery Schedule for SUBCLIN 0003AF has been deleted:
CAGE
POP 01-MAY-2020 TO
31-MAY-2020
The following Delivery Schedule for SUBCLIN 0003AG has been deleted:
CAGE
POP 01-JUN-2020 TO
30-JUN-2020
The following Delivery Schedule for SUBCLIN 0003AH has been deleted:
CAGE
POP 01-JUL-2020 TO
31-JUL-2020
The following Delivery Schedule for SUBCLIN 0003AJ has been deleted:
POP 01-AUG-2020 TO
31-AUG-2020
The following Delivery Schedule for SUBCLIN 0003AK has been deleted:
CAGE
POP 01-SEP-2020 TO
30-SEP-2020
The following Delivery Schedule for SUBCLIN 0003AL has been deleted:
CAGE
POP 01-OCT-2020 TO
31-OCT-2020
The following Delivery Schedule for SUBCLIN 0003AM has been deleted:
CAGE
POP 01-NOV-2020 TO
30-NOV-2020
The following Delivery Schedule for CLIN 0004 has been deleted:
CAGE
POP 01-DEC-2019 TO
30-NOV-2020
The following Delivery Schedule for CLIN 1001 has been deleted:
CAGE
POP 01-DEC-2020 TO
30-NOV-2021
The following Delivery Schedule for SUBCLIN 1002AA has been deleted:
POP 01-DEC-2020 TO
30-NOV-2021
The following Delivery Schedule for SUBCLIN 1002AB has been deleted:
CAGE
POP 01-DEC-2020 TO
30-NOV-2021
The following Delivery Schedule for SUBCLIN 1003AA has been deleted:
CAGE
POP 01-DEC-2020 TO
31-DEC-2020
The following Delivery Schedule for SUBCLIN 1003AB has been deleted:
CAGE
POP 01-JAN-2021 TO
31-JAN-2021
The following Delivery Schedule for SUBCLIN 1003AC has been deleted:
CAGE
POP 01-FEB-2021 TO
28-FEB-2021
The following Delivery Schedule for SUBCLIN 1003AD has been deleted:
CAGE
POP 01-MAR-2021 TO
31-MAR-2021
The following Delivery Schedule for SUBCLIN 1003AE has been deleted:
POP 01-APR-2021 TO
30-APR-2021
The following Delivery Schedule for SUBCLIN 1003AF has been deleted:
CAGE
POP 01-MAY-2021 TO
31-MAY-2021
The following Delivery Schedule for SUBCLIN 1003AG has been deleted:
CAGE
POP 01-JUN-2021 TO
30-JUN-2021
The following Delivery Schedule for SUBCLIN 1003AH has been deleted:
CAGE
POP 01-JUL-2021 TO
31-JUL-2021
The following Delivery Schedule for SUBCLIN 1003AJ has been deleted:
CAGE
POP 01-AUG-2021 TO
31-AUG-2021
The following Delivery Schedule for SUBCLIN 1003AK has been deleted:
CAGE
POP 01-SEP-2021 TO
30-SEP-2021
The following Delivery Schedule for SUBCLIN 1003AL has been deleted:
POP 01-OCT-2021 TO
31-OCT-2021
The following Delivery Schedule for SUBCLIN 1003AM has been deleted:
CAGE
POP 01-NOV-2021 TO
30-NOV-2021
The following Delivery Schedule for CLIN 1004 has been deleted:
CAGE
POP 01-DEC-2020 TO
30-NOV-2021
The following Delivery Schedule for CLIN 2001 has been deleted:
CAGE
POP 01-DEC-2021 TO
30-NOV-2022
The following Delivery Schedule for SUBCLIN 2002AA has been deleted:
CAGE
POP 01-DEC-2021 TO
30-NOV-2022
The following Delivery Schedule for SUBCLIN 2002AB has been deleted:
CAGE
POP 01-DEC-2021 TO
30-NOV-2022
The following Delivery Schedule for SUBCLIN 2003AA has been deleted:
POP 01-DEC-2021 TO
31-DEC-2021
The following Delivery Schedule for SUBCLIN 2003AB has been deleted:
CAGE
POP 01-JAN-2022 TO
31-JAN-2022
The following Delivery Schedule for SUBCLIN 2003AC has been deleted:
CAGE
POP 01-FEB-2022 TO
28-FEB-2022
The following Delivery Schedule for SUBCLIN 2003AD has been deleted:
CAGE
POP 01-MAR-2022 TO
31-MAR-2022
The following Delivery Schedule for SUBCLIN 2003AE has been deleted:
CAGE
POP 01-APR-2022 TO
30-APR-2022
The following Delivery Schedule for SUBCLIN 2003AF has been deleted:
CAGE
POP 01-MAY-2022 TO
31-MAY-2022
The following Delivery Schedule for SUBCLIN 2003AG has been deleted:
POP 01-JUN-2022 TO
30-JUN-2022
The following Delivery Schedule for SUBCLIN 2003AH has been deleted:
CAGE
POP 01-JUL-2022 TO
31-JUL-2022
The following Delivery Schedule for SUBCLIN 2003AJ has been deleted:
CAGE
POP 01-AUG-2022 TO
31-AUG-2022
The following Delivery Schedule for SUBCLIN 2003AK has been deleted:
CAGE
POP 01-SEP-2022 TO
30-SEP-2022
The following Delivery Schedule for SUBCLIN 2003AL has been deleted:
CAGE
POP 01-OCT-2022 TO
31-OCT-2022
The following Delivery Schedule for SUBCLIN 2003AM has been deleted:
CAGE
POP 01-NOV-2022 TO
30-NOV-2022
The following Delivery Schedule for CLIN 2004 has been deleted:
POP 01-DEC-2021 TO
30-NOV-2022
The following Delivery Schedule for CLIN 3001 has been deleted:
CAGE
POP 01-DEC-2022 TO
30-NOV-2023
The following Delivery Schedule for SUBCLIN 3002AA has been deleted:
CAGE
POP 01-DEC-2022 TO
30-NOV-2023
The following Delivery Schedule for SUBCLIN 3002AB has been deleted:
CAGE
POP 01-DEC-2022 TO
30-NOV-2023
The following Delivery Schedule for SUBCLIN 3003AA has been deleted:
CAGE
POP 01-DEC-2022 TO
31-DEC-2022
The following Delivery Schedule for SUBCLIN 3003AB has been deleted:
CAGE
POP 01-JAN-2023 TO
31-JAN-2023
The following Delivery Schedule for SUBCLIN 3003AC has been deleted:
POP 01-FEB-2023 TO
28-FEB-2023
The following Delivery Schedule for SUBCLIN 3003AD has been deleted:
CAGE
POP 01-MAR-2023 TO
31-MAR-2023
The following Delivery Schedule for SUBCLIN 3003AE has been deleted:
CAGE
POP 01-APR-2023 TO
30-APR-2023
The following Delivery Schedule for SUBCLIN 3003AF has been deleted:
CAGE
POP 01-MAY-2023 TO
31-MAY-2023
The following Delivery Schedule for SUBCLIN 3003AG has been deleted:
CAGE
POP 01-JUN-2023 TO
30-JUN-2023
The following Delivery Schedule for SUBCLIN 3003AH has been deleted:
CAGE
POP 01-JUL-2023 TO
31-JUL-2023
The following Delivery Schedule for SUBCLIN 3003AJ has been deleted:
POP 01-AUG-2023 TO
31-AUG-2023
The following Delivery Schedule for SUBCLIN 3003AK has been deleted:
CAGE
POP 01-SEP-2023 TO
30-SEP-2023
The following Delivery Schedule for SUBCLIN 3003AL has been deleted:
CAGE
POP 01-OCT-2023 TO
31-OCT-2023
The following Delivery Schedule for SUBCLIN 3003AM has been deleted:
CAGE
POP 01-NOV-2023 TO
30-NOV-2023
The following Delivery Schedule for CLIN 3004 has been deleted:
CAGE
POP 01-DEC-2022 TO
30-NOV-2023
The following Delivery Schedule for CLIN 4001 has been deleted:
CAGE
POP 01-DEC-2023 TO
30-NOV-2024
The following Delivery Schedule for SUBCLIN 4002AA has been deleted:
POP 01-DEC-2023 TO
30-NOV-2024
The following Delivery Schedule for SUBCLIN 4002AB has been deleted:
CAGE
POP 01-DEC-2023 TO
30-NOV-2024
The following Delivery Schedule for SUBCLIN 4003AA has been deleted:
CAGE
POP 01-DEC-2023 TO
30-DEC-2023
The following Delivery Schedule for SUBCLIN 4003AB has been deleted:
CAGE
POP 01-JAN-2024 TO
31-JAN-2024
The following Delivery Schedule for SUBCLIN 4003AC has been deleted:
CAGE
POP 01-FEB-2024 TO
29-FEB-2024
The following Delivery Schedule for SUBCLIN 4003AD has been deleted:
CAGE
POP 01-MAR-2024 TO
31-MAR-2024
The following Delivery Schedule for SUBCLIN 4003AE has been deleted:
POP 01-APR-2024 TO
30-APR-2024
The following Delivery Schedule for SUBCLIN 4003AF has been deleted:
CAGE
POP 01-MAY-2024 TO
31-MAY-2024
The following Delivery Schedule for SUBCLIN 4003AG has been deleted:
CAGE
POP 01-JUN-2024 TO
30-JUN-2024
The following Delivery Schedule for SUBCLIN 4003AH has been deleted:
CAGE
POP 01-JUL-2024 TO
31-JUL-2024
The following Delivery Schedule for SUBCLIN 4003AJ has been deleted:
CAGE
POP 01-AUG-2024 TO
31-AUG-2024
The following Delivery Schedule for SUBCLIN 4003AK has been deleted:
CAGE
POP 01-SEP-2024 TO
30-SEP-2024
The following Delivery Schedule for SUBCLIN 4003AL has been deleted:
POP 01-OCT-2024 TO
31-OCT-2024
The following Delivery Schedule for SUBCLIN 4003AM has been deleted:
CAGE
POP 01-NOV-2024 TO
30-NOV-2024
The following Delivery Schedule for CLIN 4004 has been deleted:
CAGE
POP 01-DEC-2023 TO
30-NOV-2024
The following have been modified:
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
FOR
AUTOMATED STORAGE AND RETRIEVAL SYSTEM (ASRS) MAINTENANCE SUPPORT
PART 1
GENERAL INFORMATION
1.0 GENERAL: This is a non-personal services contract to provide maintenance support for the Automated Storage and Retrieval System (ASRS). The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Scope: The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, quality control, and other items and non-personal services necessary to perform preventive and remedial maintenance of the ASRS system as defined in this PWS, except for those items specified as government furnished. The Contractor shall perform to the standards of this contract.
1.2 Background: CCAD’s ASRS was procured in August 1988. The configuration of the ASRS includes the following list of sub-systems and their respective components: the pallet load system with storage/retrieval (S/R) machines and automated guided vehicles (AGV); mini load system with Processing/Accumulation/Kitting (PAK) work stations; the maintenance receiving area (MRA).
1.3 Description of Services: The contractor shall perform preventive and remedial maintenance of the ASRS system. Services include all preventative and remedial maintenance on-site on the ASRS, sub-systems, and respective components located in Building 8 at Corpus Christi Army Depot, Corpus Christi, Texas. The technician(s) shall be located on-site.
1.4 Period of Performance (POP): The POP shall be one (1) Base Year of 12 Months and four (4) 12-month option years. The POP will be defined in the contract document.
1.5.1 Quality Control (QC): IAW Quality Assurance Program Plan (Contractor Quality Control Program Plan) the Contractor shall develop and maintain an effective QC Program (QCP) to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent and ensure non-recurrence of defective services. The Contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. The Contractor shall develop QC procedures that address the areas identified in the Performance Requirements Summary.
1.5.2 Quality Assurance (QA): The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.5.3 Recognized Holidays: The following are recognized US holidays. The Contractor shall not perform services on these days:
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.5.4 Hours of Operation: The Contractor shall provide 24 hour support services Monday thru Friday, except on US Holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. The Contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed.
Shift times are set as such: First shift 0600 to 1430, second shift 1400 to 2230, and third shift is 2200 to 0630 (Monday through Friday). The contractor shall have one (1) onsite lead to fulfill the supervisory role for all of the contractors on site employees, and ensure a minimum staffing of two (2) onsite technicians per shift during any PPM Monday through Friday.
CCAD may schedule a “compressed work schedule” during various times of the year. The Contracting Officer may authorize a “compressed work schedule” for Contractor operations during a planned CCAD “compressed work schedule”. The Contracting Officer will inform the Contractor of any planned CCAD “compressed work schedule” at least 7 calendar days prior to the change via email or memorandum.
1.5.5 Place of Performance: Performance for work under this contract shall be at Corpus Christi Army Depot, 308 Crecy St, Building 8.
1.5.6 Security Requirements: See Security Requirements Attachment. Security requirements are reflected in detail in Attachment 3 of this PWS. The contractor shall provide an Operations Security (OPSEC) Plan within 90 days after contract award to the COR, IAW Operations Security (OPSEC) Plan.
1.5.6.1 Identification Passes and Badges
1.5.6.1.1 CCAD Identification Pass: Contractor employees will be issued an “Employee Identification Pass” at initial in processing. This pass must be in each employee’s possession at all times when performing work under this contract. Upon termination of employment, the Pass is to be turned in to CCAD Security Office, Building 8, by the individual employee.
1.5.6.1.2 Contractor Identification Badges: Contractor shall provide each employee with an identification badge.
The badge shall include, as a minimum, the person’s name and the Contractor’s firm name. Contractor shall require that his personnel wear the badge on their exterior clothing at all times when performing work under this contract.
1.5.6.1.3 Defense Biometric Identification System (DBIDS): The Contractor shall be required to pay for any costs associated with Defense Biometric Identification System (DBIDS) to access Corpus Christi NAS.
1.5.6.2 Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property for Contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.5.6.3 Lock Combinations: The Contractor shall establish and implement methods of ensuring all lock combination are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know on such combinations. These procedures shall be included in the Contractor’s QC Plan (if one is required).
1.5.7 Conservation of Utilities/Energy and Environmental Stewardship: The Contractor shall instruct employees in utilities conservation practices. The Contractor shall operate under conditions that preclude the waste of utilities which include turning off the water faucets or valves after using the required amount.
1.5.7.1 The Contractor shall perform the requirements of the contract in such a manner as to protect the environment, prevent environmental pollution, conserve energy, and preserve historical sites. All work performed for this contract shall be consistent with all federal, DA, state and local environmental laws, regulations and policies.
All environmental protection matters shall be coordinated with the COR for the Department of Public Works Environmental Management Division. The Contractor shall perform all requirements of this contract in the most environmentally sound and cost efficient manner. The Contractor shall ensure that environmentally sound purchasing practices are made to reduce the amount and volume of unrecyclable materials.
1.5.7.2 The Contractor shall comply with Army Facilities Management Regulation (Army Regulation (AR) 420-1 Chapter 22).
1.5.7.3 The Contractor shall make sure employees practice utilities conservation. The Contractor shall operate under conditions that minimize the waste of utilities to include:
1.5.7.3.1 Turn off lights when not in use.
1.5.7.3.2 Turn off water faucets or valves when not in use.
1.5.7.4 The contractor shall perform all work IAW federal, state and local environmental regulations, and IAW applicable Environmental Protection Agency (EPA) regulations and criteria so as to minimize pollution, exploitation and degradation of natural resources). In addition, the following requirements shall be mandatory:
1.5.7.4.1 The contractor shall not burn any material/debris on the NAS Corpus Christi. Stream beds, lakes, drainage ways, sanitary and storm sewers, etc. shall not be polluted by fuels, acids, pesticides or other harmful materials. If any of these materials are inadvertently spilled into these areas, the Contractor shall immediately notify the Fire Department (911) and then the COR.
1.5.7.4.2 The Contractor shall ensure that his operations do not expose any personnel to any hazardous conditions (i.e. noise, chemicals, etc.) as covered by Occupational Safety and Health Association (OSHA), IAW, Environmental Health and Safety Plan (Contractor's Safety Plan).
1.5.8 Periodic Performance Review Meetings: The contractor shall meet with the COR on a monthly basis to review contract performance. Meetings shall include review and analyses of key process indicators, analyses of process deficiencies, and problem resolution. At these meetings, the COR and the contractor will discuss the contractor's performance as viewed by the Government and problems, if any, being experienced. The contractor shall take appropriate action to resolve outstanding issues. A mutual effort shall be made by the contractor and COR to resolve any and all problems identified. The written minutes of these meetings shall be documented by the Contractor IAW, Report, Record of Meetings/Minutes. Should the Contractor's PM non-concur with the performance review, he shall state in writing (within three working days) to the KO the area(s) wherein he non-concurs. The KO will take appropriate action to resolve the area(s) of disagreement. Meeting attendees shall include contractor managerial, supervisory, and/or other personnel knowledgeable of the subject matter.
1.5.9 Contracting Officer Representative (COR): The COR will be identified by a separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.5.10 Key Personnel: The following personnel are considered key personnel by the Government: Program Manager and Designated Site Supervisor. The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the KO. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available 24 hours a day Monday thru Friday, except for US holidays or when the Government facility is closed for administrative reasons.
1.5.11 NON-PERSONAL SERVICES STATEMENT: Contractor employees performing services under this contract shall be controlled, directed, and supervised at all times by management personnel of the contractor.
Contractor employees shall perform their duties independent of, and without the supervision of, any Government official or other Defense Contractor. The tasks, duties, and responsibilities set forth in the PWS may not be interpreted or implemented in any manner that results in any contractor employee creating or modifying Federal policy, obligating the appropriated funds of the U.S. Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee, or otherwise violating the prohibitions set forth in FAR Parts 7.5 and 37.1. The Government will control access to the facility and will perform the inspection and acceptance of the completed work.
1.5.12 Data Rights: The Government has unlimited rights to all documents/material produced under this contract.
All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government in accordance with DFARS clause 252.227-7015. These documents and materials may not be used or sold by the Contractor without written permission of the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does no abrogate any other Government rights.
1.5.12.1 The Contractor shall ensure that all Contractor-generated technical records, reports, files, and other documentation are made available to the KO or COR. The Contractor shall obtain KO approval before releasing information that has been stored, generated, or archived related to this contract.
1.5.12.2 Designating Proprietary Information: All records, files, reports, and data deemed proprietary by the Contractor shall be clearly marked accordingly. The Government will make the final determination of the appropriateness of proprietary claims by the Contractor.
1.6 Contractor Administration
1.6.1 Project Coordination: The Contractor shall perform project coordination and IAW Project Manager and Designated alternate(s) shall designate one representative and one alternate to serve as the Point Of Contact (POC) on all matters relating to the execution of this contract. The name of this person and an alternate who shall act for the Contractor when the Project Manager is absent shall be designated in writing and initially submitted 5 days after contract award. The Project Manager shall conduct overall management coordination and shall be the central POC with the Government for performance of all work under the contract. The Project Manager and any individual designated to act for him, shall have the authority to contractually commit the Contractor for prompt action on matters pertaining to Contractor administration of this contract. A Contractor employee shall be designated in writing to act for the Project Manager during his absence. Project Manager and his appointed designee shall be able to understand, speak, read, and write the English language.
1.6.2 Contractor Employees: All Contract employees must be U.S. citizens. Contractor shall provide necessary qualified personnel to accomplish all work throughout the duration of the resulting contract. Contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest.
1.6.3 Administrative Requirements: The Contractor shall prepare all correspondence and maintain all functional files required to accomplish the functions and tasks included in this contract. The Contractor shall annotate the date received on all incoming documents and correspondence received.
1.6.4 The Contractor shall not release NAS Corpus Christi or CCAD related information/news (including photographs and films, public announcements, or denial or confirmation of it) to the media or other persons without the prior written approval from the CCAD Public Affairs Officer and the Legal Office.
1.6.5 Records and Files: All records and files generated or maintained by the Contractor under the provisions of this contract are the property of the Government and shall be returned to the Government upon completion or upon request of the Government. Records and files generated or maintained under this contract shall be maintained and retired IAW AR 25-400-2, Corpus Christi Army Depot Regulation (CCADR) 25-92, and other applicable ARs and regulations. All records and files shall be made available for review by any Government agency as authorized by applicable statutes and regulations.
1.7 Contractor Personnel Administrative Requirements:
1.7.1 Personnel Training: The Contractor shall conduct training for all Contractor employees prior to work assignment on this contract. The cost of training shall be the responsibility of the Contractor to include all certifications required for special requirements determined by the COR/KO. This training shall not interfere with performance of the contract requirements. This training shall be relative to the PWS, and Contractor and Government offices with which the employee(s) will interact. The Contractor shall maintain records of training accomplished. The records shall be submitted to the COR IAW Status Report (Personnel Training Records). The training shall include the following training objectives, as applicable:
(a) General Orientation. An orientation provided by the Contractor relating to the standards of work to be achieved and maintained under the contract, and the personal conduct, regulations, and safety measures that shall be observed while on the Depot.
(b) Functional Area. The internal and external (customer) standing operating procedures and general work requirements.
(c) Physical Configuration. Familiarization with the physical configuration of the Depot, to include the location and layout of facilities.
(d) Safety. The Contractor's Safety Plan, the Depot safety program (CCADR 385-30), facilities support specific safety training, and Hazard Communication training pursuant to 29 Code of Federal Regulations (CFR) 1910.1200.
(e) Fire Safety. Fire safety, including the Army fire prevention and protection program (AR 420-90), the Corpus Christi NAS fire prevention and protection program
Naval Air Station Corpus Christi Instruction (NASCORPCINST 11320.8K), and the CCAD fire prevention and protection program (CCADR 385-30).
(f) Emergency Procedures. Emergency notification and response procedures.
(g) Conduct. Conduct and standards, including standards of customer relations and dress.
(h) Regulations. Applicable CCAD regulations.
(i) Security. Security requirements and procedures Programs.
(i) iWATCH Training Program
(ii) AT Level 1 Awareness Training
(iii) OPSEC Training Program
(iv) In order to access the CCAD network, the contractor shall be required to complete and annually maintain DOD Information Assurance Awareness training
(j) Prevention of Sexual Harassment.
(k) Utility Conservation.
(l) Any other training objectives as determined by the COR.
1.7.2 Personnel Training required by the Government: The Government may require that the Contractor attend training in order to accomplish work or to meet unforeseen Government requirements.
1.8 Safety: General Safety and Health Responsibilities and Accountability: The contractor bears sole responsibility for compliance at all times with Federal, state, and municipal safety and health laws, regulations, and standards that apply to the work performed under this contract, including the Occupational Safety and Health Act. The contractor shall take all reasonable steps and precautions to maintain compliance with applicable regulations/ requirements, prevent accidents, and preserve the health and safety of contractor and government personnel performing or in any way coming in contact with the performance of the work required by this contract. The contractor shall also take additional immediate actions/precautions as requested by the contracting officer when the contracting officer determines that such measures are necessary for safety and health purposes. Contractor/subcontractor supervisors shall monitor worksites and operations daily to ensure safe working conditions and continuing compliance.
Hazardous or noncompliant conditions identified by the contracting officer shall be promptly corrected, and corrective action(s) taken shall be reported in writing to the contracting officer within 5 days of the contracting officer’s notification to the contractor. In cases of serious and/or recurring hazards/noncompliance, the contracting officer may stop the work in question pending correction of the hazardous/noncompliant condition, and/or order the removal of the involved contractor/subcontractor employees from the government installation/ facility. In such cases, the contractor will not be granted a cost adjustment nor an extension of time due to the work stoppage or employee removal action. Failure of the contractor to effectively resolve serious and/or recurring hazards or noncompliance may result in termination of the contract.
1.8.1 Safety Program Plan: IAW Programmatic Environmental Safety and Health Evaluation Plan/Contractor’s Safety Program Plan, the Contractor shall develop a safety plan and submit it to the COR NLT 15 days after contract award. The Government will accept / reject within 15 days. If rejected, the contractor shall resubmit within 15 days after receipt of Government comments. The Contractor shall implement the plan upon Government acceptance. The Safety Program Plan shall delineate the processes and procedures the Contractor shall use to prevent accidents and preserve the life and health of Contractor and Government personnel as well as the public. The Contractors Safety Program shall fully comply with the provisions of OSHA regulations and applicable national consensus standards such as National Fire Protection Association’s National Fire Codes. The Contractor shall use the more stringent standard when standards are different. The accepted Safety Plan will be considered part of this contract.
1.8.2. Regulatory Compliance-Safety. The Contractor shall ensure that all work is performed in full compliance with all Federal, State and local occupational safety and health regulations. This includes, but is not limited to, workplace safety, development of protocols and procedures, inspections, medical surveillance, and maintenance of compliance records. The Contractor shall notify the COR immediately upon shutdown of any operation due to non-compliance with any safety regulations.
1.8.3. Conflicting Regulatory Guidance: In the event of a conflict between any law, ordinances, construction codes, or regulations, the Government shall determine applicability. Safety requirements shall apply to all operations performed by the Contractor and all subcontractors, regardless of the place of performance.
1.8.4. Contractor Safety Brief: Prior to beginning work on the contract and prior to execution of option years, the contractor will meet with the KO/COR and/or Safety, Fire Protection, and Health officials from CCAD to ensure understanding about the contractors ‘administration of the overall safety program.
1.8.5. Safety Inspections. The Contractor ‘s safety plan will describe the frequency and method of accomplishing safety and health inspections of contractor and subcontractor work sites, material, and equipment to ensure conformance to the contractor’s Safety and Health Plan and the requirements of this contract. Inspection frequency shall be outlined in the contractor’s safety plan. The plan shall identify the personnel responsible for performing the inspections, and describe their qualifications. Inspections shall be documented in writing and made available to the contracting officer or government upon request. Inspection documentation shall include the name of the inspector, date of inspection, and all identified safety and health problems and deficiencies. Follow-up inspections shall be conduct by the contractor to ensure correction of any identified deficiencies must also be conducted and documented in inspection reports.
1.8.6. Housekeeping. The Contractor shall at all times keep the work area, including storage areas, in a sanitary and orderly fashion, free from accumulations of waste materials. Flammable and combustible materials will be properly stored when not in active use.
1.8.7. Hazard Reporting and Abatement. The Contractor shall develop a program whereby personnel can report a hazardous situation to the Contractor safety representative with impunity/confidentiality. Timely abatement of confirmed hazards is required. Files shall be maintained of reported hazards and the abatement method. These files shall be made available to the Safety and occupational Health Division.
1.8.7.1. At a minimum, the files shall be maintained that provides the following information: date deficiency identified, person who identified the deficiency, description of deficiency, description of planned/actual corrective action, person responsible for correcting deficiency, projected resolution date, actual resolution date, date the person who identified the deficiency was notified of deficiency resolution. Records of deficiencies and actions taken shall be provided to the contracting officer upon request.
1.8.7.2. The contractor shall provide appropriate safety barricades, signs, and signal lights to alert personnel of hazardous conditions. Work involving installation and dismantling of equipment shall be clearly identified by signs that can be read at least 50 feet away; in addition, the area must be guarded by fences or barriers erected to restrict access to the area. Before completing the work, the Contractor shall remove from the work and premises any rubbish, tools, scaffolding, equipment, and
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .