Purchase Description - Penetrant Inspection System
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B8-2-1_-_REVISED__3_Purchase_Description_.docx | DOCX document | |
| Question__2.docx | DOCX document | |
| MIL-PRF-32531.pdf | ||
| REVISED__2_Purchase_Description_-_Penetrant_Inspection_System.docx | DOCX document | |
| Round_1_Q&A_.docx | DOCX document | |
| Combined_Synopsis_-_Solicitation.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0001) Penetrant Inspection System - Quantity 1 EA Meet or exceed the following Essential Physical Characteristics:
Overall Characteristics
· Overall length of at least 45 feet, not to exceed 50 feet
· Unit will be assembled in a straight line layout
· 11 Stations consisting of Penetrant Station, Drain Station, Pre-Wash Station, Emulsifier Station, Post-Wash Station, Drain Station, Dryer Station, Rest Station, Dry Developer Station, Rest Station, and an Inspection Station. Station Characteristics listed below.
· Ability to accept parts weighing at least 100 pounds, and a minimum of parts 30 inches in length at all stations
· All stations will be connected with a roller grille between stations
· All stations must be compatible with the entire unit
· Quote shall include installation and set-up, with training of up to 5 individuals on use of the complete installed system.
Station 1 - Penetrant Station Characteristics
· Designed for the use of the penetrant dip method
· Tank constructed of Stainless steel
· Manual controls to dip parts into penetrant tank
· Fitted with drain to allow for complete draining Station 2 – Drain Station
· Stainless steel drain pan
· Full Roller grille
· Fitted with drain to allow for complete draining Station 3 – Pre-Wash Station
· Powered by 115 VAC, 60Hz, Single Phase
· Tank constructed of Stainless steel
· Fitted with water temperature gauge, pressure regulator and gauge, wash gun and hose
· Fitted with drain to allow for complete draining Station 4 – Emulsifier Station
· Tank constructed with stainless steel
· Controls to lower parts into emulsifier station
· Air agitation system
· Fitted with drain to allow for complete draining
Station 5 – Post Wash Station
· Powered by 115 VAC, 60Hz, Single Phase
· Tank constructed of stainless steel
· Controls to lower part into wash station
· Fitted with water temperature gauge, pressure regulator and gauge, wash gun and hose
· LED UV-A Inspection Lamp
· Fitted with drain Station 6 – Drain Station
· Constructed of stainless steel
· Roller Grille Station 7 – Drier Station
· Powered by 480/240 VAC, 60 HZ, 3 PH
· Electrically heated with digital temperature controller
· Ability to maintain temperature of at least 150 degrees
· Safety shutoff at 180 degrees
· Controls or functions to limit humidity in chamber Station 8 – Rest Station
· Full roller grille Station 9 – Dry-Developer Station
· Powered by 115 VAC, 60Hz, Single Phase
· Vertically lifting doors with safety stops to prevent injury in event door opening device fails
· Adjustable automatic process cycle system
· Injector and Vacuum system Station 10 – Rest Station
· Full roller grille
· Dust pan Station 11 – Inspection Station
· Powered by 115 VAC, 60Hz, Single Phase
· Fully enclosed with flame retardant curtains
· Handheld UV Lamp with a minimum of 5,000 μW/cm2 irradiance at 15 in
· Mounting bracket for UV Lamp
· White lights mounted in inspection station
· Ventilation fan with light proof enclosure