This solicitation notice seeks proposals for interior renovation services at multiple buildings on an Air National Guard base in Minnesota. Offerors are requested to remove wallpaper, prepare and paint walls, replace ceilings and fixtures in bathrooms, replace countertops, tile, lighting, and entryway heaters. Drawings and specifications are provided. The project value is between $250,000 and $500,000 and work must be completed within 90 days of notice to proceed. The NAICS code is 236220 and it is set aside for small businesses below $39.5 million in size. A pre-proposal conference will be held on August 9th followed by a site visit, and all questions must be submitted by August 6th. Proposals are due by August 31st and will be evaluated based on past performance and price using best value procedures without discussions. Interested parties must register in SAM.gov which is where the solicitation and amendments will be posted electronically. Place of performance is the 133rd Air Wing base in St. Paul, Minnesota. The soliciting agency is the Department of the Army Minnesota Army National Guard.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MINNESOTA AIR NATIONAL GUARD

HEADQUARTERS 133RD AIRLIFT WING (AMC)

SAINT PAUL MINNESOTA

CITIZEN AIRMEN STRENGTHENING FREEDOM

04 JUN 2022

STATEMENT OF WORK

1. Project Title: 656/662/641 Interior Finishes Repairs

2. Project Number: QJKL222010

3. Project Location 133RD Airlift Wing Minnesota Air National Guard Base 614 Militia Drive St Paul, MN 55111-4130

4. Description of Work:

This project involves the work as described herein to be accomplished at the above location(s), with all labor, equipment, supplies and materials to be provided by the contractor. All work shall be accomplished under weather and environmental conditions appropriate to the nature of work. All work shall be performed per applicable UFC’s, Minnesota State Building Codes and Standards, EPA and OSHA regulations, 133rd Airlift Wing Contractor Safety Packet, 133rd Airlift Wing Contractor’s Environmental Compliance Guide and any other applicable federal, state, and local government regulations. All materials shall be industry standards. Contractor is responsible for all field measurements. The contractor is responsible for removing all construction waste from the Base in accordance with all applicable laws and regulations. The work shall include, but is not limited to:

Building 656

A. Contractor to coordinate the following:

a. Remove approximate 2,136 SF of wallpaper on first floor and approximate 7,416 SF on the second floor to include the wallpaper on all bathrooms.

b. Treat/prepare walls for painting approximately 20,400 SF

c. Paint approximately 20,400 SF.

a. Coordinate with Base for color and specifications for base standard paint options.

b. Use UFC 3-120-10 Interior Design, 4-2.2 Paint. For reference to Approved Products List.

d. Remove and replace all gypsum ceiling on bathrooms.

e. Remove and replace lavantories, urinals, dividers and fixtures in accordance with attached specifications:

a. Section 10810 - Toilet and Bath Accesories.

b. Section 10155 - Toilet Compartments.

a. Remove and replace sink countertops on bathrooms with new countertops to match interior esthetics.

Use attached drawings “G1.1-G1.2 B682” to match materials used on attached drawings “1138-09-A6- 1” and “1138-09-A9-3”.

f. Remove and replace all tile (walls and floor) on bathrooms to include showers in accordance with attached specification:

a. Section 09310 – Tile

b. Applicable schedule on attached drawings “G1.1-G1.2 B682” to match materials used on attached drawings “1138-09-A6-1” and “1138-09-A9-3”.

g. Remove and replace all light fixtures with LED fixture to include emergency lights and “EXIT” signs.

a. Reference attached drawings “656 E2 Lighting” for schedule and quantities. Contractor is responsible for all field measurements and quantities.

b. Emergency lighting unit must be LED.

(a) Comply with UFC 3-600-01 Chapter 10 – Means of Egress

c. Internal illuminated “EXIT” signs must be LED type.

(a) Comply with UFC 3-600-01 Chapter 10 – Means of Egress

d. Lighting system alterations must meet AHSRAE 90.1 and UFC 3-530-01.

e. Provide metal oxide varistor (MOV) type SPDs at panel boards for all circuits feeding interior lighting systems.

f. Replace with EvoGrid fixtures, Phillips SpaceWise or suitable alternative.

g. Correlated Color Temperature (CCT) of no greater than 4,100k. Do not mix source CCT’s within a single building.

h. Color Rendering Index (CRI) of no less than 80.

i. Total current Harmonic Distortion (THD) less than or equal to 20% at full and 50% output.

j. Power Factor (PF) greater than or equal to 0.9 at full and 50% output.

k. Inrush current meets NEMA 410.

l. Compatible with NEMA SSL 7A dimmers and dimming systems.

m. LED luminaires must be dimmable or capable of multi-level control.

n. Replace all light switches as required.

o. IES LM-79, LM-80, and TM-21 testing reports must be supplied from manufacturer and include all relevant information.

p. Consistent with industry standard, all LED luminaires require a 10-year warranty.

q. For LED applications, provide built in failure detection in the luminaire or include labor costs to measure light levels (baseline and 70% output - before the end of the warranty) in the LCCA.

r. Internally illuminated Exit signs must be LED type and comply with UFC 3-600-01.

s. Compatible with Daylight & Occupancy sensor or have the option for Daylight & Occupancy sensor available.

t. Submittals must contain:

(a) IESNA LM-79, Approved Method for the Electrical and Photometric Measurements of Solid- State Lighting Products. Test report must include a picture of the fixture tested.

(b) IESNA LM-80, Approved Method for Measuring Lumen Maintenance of LED Light Sources Test Report.

(c) IESNA TM-21, Projecting Long Term Lumen Maintenance of LED Light Sources calculation based on the IESNA LM-80 data.

(d) Certification from the manufacturer indicating compliance with NEMA 410.

(e) Photometric Plan: Computer generated photometric analysis of the designed-to values for the

“end of useful life” of the lighting system based on IESNA LM-79 data.

h. Remove and replace four (4) hot water entryway heaters with equivalent units to match existing specifications.

a. Existing units:

(a) Airtherm MFG Co.

(b) Model # C40-1R-47RIW

(c) Electrical rating: 120V, 60 Hz, 1 PH

(d) Dimensions: 30” x 43” x 6”

b. Reference attached document: “631 Entryway Heater Locations”

c. Submittal approval required.

i. Ensure no damage to the carpet, furniture and other surfaces while performing work.

j. Coordinate work schedule and access to Base.

Building 662 Bathroom remodel

a. Renovate existing bathrooms (approximate 534 SF), see drawing “662 Room Numbers” for location and layout.

b. Treat/prepare walls for painting approximately.

c. Paint as required.

a. Coordinate with Base for color and specifications for base standard paint options.

b. Use UFC 3-120-10 Interior Design, 4-2.2 Paint. For reference to Approved Products List.

d. Remove and replace all gypsum ceiling on bathrooms.

e. Remove and replace lavantories, urinals, dividers and fixtures in accordance with attached specifications:

a. Section 10810 - Toilet and Bath Accesories.

b. Section 10155 - Toilet Compartments.

f. Remove and replace sink countertops on bathrooms with new countertops to match interior esthetics.

Use attached drawings “G1.1-G1.2 B682” to match materials used on attached drawings “1138-09-A6- 1” and “1138-09-A9-3”.

g. Remove and replace all tiles (walls and floor) on bathrooms to include showers in accordance with attached specification:

a. Section 09310 – Tile

b. Applicable schedule on attached drawings “G1.1-G1.2 B682” to match materials used on attached drawings “1138-09-A6-1” and “1138-09-A9-3”.

Building 641 Conference

a. Remove wall paper/carpet and treat/prepare walls for painting approximate 1,450 SF of wallpaper/carpet on briefing room.

c. Coordinate with Base for color and specifications for base standard paint options.

d. Use UFC 3-120-10 Interior Design, 4-2.2 Paint. For reference to Approved Products List.

b. If necessary remove and reinstall base heater as needed.

c. Protect and ensure no damage is is done to existing chairs and carpet.

A. REFERENCES

a. 2020 Minnesota Building Code

b. Unified Facilities Criteria (UFC) https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc

(a) UFC 3-120-10, Interior Design

(b) UFC 1-200-01, DoD Building Code

(c) UFC 3-520-01, Interior Electrical Systems

(d) UFC 3-530-01, Interior and Exterior Lighting System and Controls

(e) UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings

c. National Fire Protection Association (NFPA)

(a) NFPA70 – National Electrical Code

d. ASTM International (ASTM)

e. Air National Guard Sustainable Design Policy

f. Energy Policy Act of 2005 (EPAct 2005)

g. Underwriters Laboratories (UL)

5. Warranty:

All materials shall be warranted to be in compliance with this statement of work and to the highest standards of the industry. Any property damaged by the contractor will be repaired or replaced by the contractor at no additional cost to the ANG.

6. Special Requirements:

a. Bidders to provide itemized prices.

b. All work to be coordinated with ANG Civil Engineering to comply with work schedule.

c. Contractor responsible for field verifications and locations.

d. All paints require a submittal to include 8-1/2 x 11 draw downs and MSDS information.

e. All shop drawings to be reviewed and approved by ANG-CE.

f. Removed materials to be disposed of off the Air National Guard Base. Contractor to provide documentation of disposal and total tonnage to Base Civil Engineer office.

g. Work is to be completed within the stated Performance Period provided by the Contracting Office.

h. Contractor is responsible for any & all means to accomplish project.

i. Worksite shall be left in a neat, orderly manner at the close of each work day. Materials and workmanship shall, at all times, be subject to inspection by the owner’s designated representative.

j. Contractors are to complete required Flightline Safety, Air Force Anti-Terrorism Force Protection (ATFP) and Operational Security (OPSEC).

k. Contractor responsible for checking latest UFCs and code updates for DOD facilities; as a reference the latest versions can be found on www.wbdg.org

7. Refer all questions and information to:

Drue Glaze Contracting Officer 15000 Hwy 115, Camp Ripley Little Falls, MN 56345-4173 320-616-2752 Fax: 320-632-7799 Drue.I.Glaze.mil@mail.mil