190273 Entry Control Addendum 03.pdf

PDF 2 MB Posted

Attached to
Repair Entry Control Point Federal contract opportunity
Solicitation number
W912LM-22-R-1001
Issued by
Department of the Army Minnesota Army National Guard

About this file

This solicitation requests proposals for repairing several entry control points and parking areas at a National Guard base in Minnesota to meet anti-terrorism standards. Services include repairing and securing gates, installing lighting and barriers, and constructing a search area. The total contract value is between $1,000,000 and $5,000,000 and work must be completed within 180 days. The pre-proposal conference is August 10th and proposals are due August 26th. Evaluation criteria are past performance and price. The solicitation is a total small business set-aside for NAICS code 236220. Interested parties must register in SAM and check the site regularly for amendments. The place of performance is the Duluth National Guard base.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Entry Control Point, newest first.
File Type Posted
Addendum 2.1.docx DOCX document
Entry Control Addendum 02.pdf PDF
Pre-Bid Roster - Repair ECPs.pdf PDF
B 07 Preproposal Conference 148th.pptx PPTX presentation
B 08 Entry Control Addendum 01 LHB.pdf PDF
A 03 B3 SPEC 051321.pdf PDF
B 08 Release Form 66 Rpr ECP.pdf PDF
EXHIBIT D Letter of Commitment Ld ECP (Attachment).docx DOCX document
B 08 W912LM-22-R-1001 ECP.pdf PDF
EXHIBIT A ECP(Attachment).docx DOCX document
A 03 B3 FINAL DWGS 052021.pdf PDF
EXHIBIT B ECP Ld (Attachment).docx DOCX document
EXHIBIT C Reference_Questionnaire_Package NEW Ld (Attachment).docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 03, AUGUST 24, 2022

RE: MnANG – Repair Entry Control

LHB Project No. 190273, MnANG W912LM22R1001

To: MnANG Contracting Office

From: LHB, Inc.

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated May 13, 2021 Addendum No. 01, dated August 5, 2022, and Addendum No. 02, dated August 19, 2022. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.

This Addendum consists of 02 pages and the following attachments:

Drawings Civil: C130, C210, C300, C400 Structural: S101, S501

Changes to Prior Addenda

1. Refer to Addendum No. 02, dated August 19, 2022:

a. Item 9: Replace Drawing C210 in its entirety.

b. Item 10: Replace Drawing C300 in its entirety.

Questions and Answers

Q1. I am a little confused by plan sheet S101 and C210. I pointed out below the things I am seeing. Can we ask if these drain lines are supposed to be in the bid? Same with the notes to Field Verify those footings near the guard shack. If these are required, then the Civils need updated to reflect this.

A1. Refer to updated drawings this Addendum. Existing footings and drains shown for reference only.

Q2. The other thing to know, is that the Civils don’t seem to account for Asphalt R&R that will most certainly occur for the Lift Gate Foundations. It is noted but will be easy for civil bidders to miss as it’s not clearly depicted.

A2. See updated Civil drawings this Addendum for approximate removals.

General None

Changes to Specifications None

Product Approvals

Refer to Specification Section 01 2500 3.02 and 3.03. Pre-approvals will not be given during bidding.

Changes to Drawings

2. Replace Sheet C130-SCORPION DRIVE SITE PLAN in its entirety.

3. Replace sheet C400 – TOWWAY ACCESS SITE PLAN in its entirety.

ADDENDUM NO. 03: REPAIR ENTRY CONTROL PAGE 2

AUGUST 24, 2022

4. Replace Sheet S101- FOUNDATION PLAN in its entirety.

5. Replace Sheet S501 – FOUNDATION DETAILS in its entirety.

END OF ADDENDUM NO. 03

ATFP REPAIR ENTRY

CONTROL POINTS

NO DATE REVISION

DRAWING TITLE:

PROJECT NAME:

DRAWN BY:

CHECKED BY:

FILE:

DRAWING NO:

PROJ. NO:

..\190273\600 Drawings\C\C100 (B211 Parking & Alert Access).dwg

21 W. Superior St., Ste. 500 | Duluth, MN 55802 | 218.727.8446

COPYRIGHT 2022 BY LHB, INC. ALL RIGHTS RESERVED.

C130190273

MINNESOTA AIR

148TH FIGHTER WING

CLIENT:

NO DATE ISSUED FOR

THIS SQUARE APPEARS 1/2" x 1/2" ON

FULL SIZE SHEETS.

NATIONAL GUARD

FMKM 150215

1 5/13/2021 TYPE B3 FINAL SUBMITTAL

SCORPION DRIVE

SITE PLAN

1 8/24/2022 ADDENDUM 03

NO DATE REVISION

DRAWING TITLE:

PROJECT NAME:

DRAWN BY:

CHECKED BY:

FILE:

DRAWING NO:

PROJ. NO:

..\190273\600 Drawings\C\C200 (Main Gate).dwg

21 W. Superior St., Ste. 500 | Duluth, MN 55802 | 218.727.8446

COPYRIGHT 2022 BY LHB, INC. ALL RIGHTS RESERVED.

C210190273

MINNESOTA AIR

148TH FIGHTER WING

CLIENT:

NO DATE ISSUED FOR

THIS SQUARE APPEARS 1/2" x 1/2" ON

FULL SIZE SHEETS.

NATIONAL GUARD

FMKM 150215

1 5/13/2021 TYPE B3 FINAL SUBMITTAL

MAIN GATE

SITE PLAN

1 8/17/2022 ADDENDUM 02

2 8/24/2022 ADDENDUM 03

NO DATE REVISION

DRAWING TITLE:

PROJECT NAME:

DRAWN BY:

CHECKED BY:

FILE:

DRAWING NO:

PROJ. NO:

..\190273\600 Drawings\C\C300 (Gate 4).dwg

21 W. Superior St., Ste. 500 | Duluth, MN 55802 | 218.727.8446

COPYRIGHT 2022 BY LHB, INC. ALL RIGHTS RESERVED.

C300190273

MINNESOTA AIR

148TH FIGHTER WING

CLIENT:

NO DATE ISSUED FOR

THIS SQUARE APPEARS 1/2" x 1/2" ON

FULL SIZE SHEETS.

NATIONAL GUARD

FMKM 150215

1 5/13/2021 TYPE B3 FINAL SUBMITTAL

GATE 4

SITE PLAN

1 8/17/2022 ADDENDUM 02

2 8/24/2022 ADDENDUM 03

NO DATE REVISION

DRAWING TITLE:

PROJECT NAME:

DRAWN BY:

CHECKED BY:

FILE:

DRAWING NO:

PROJ. NO:

..\190273\600 Drawings\C\C400 (Towway Access).dwg

21 W. Superior St., Ste. 500 | Duluth, MN 55802 | 218.727.8446

COPYRIGHT 2021 BY LHB, INC. ALL RIGHTS RESERVED.

C400190273

MINNESOTA AIR

148TH FIGHTER WING

CLIENT:

NO DATE ISSUED FOR

THIS SQUARE APPEARS 1/2" x 1/2" ON

FULL SIZE SHEETS.

NATIONAL GUARD

FMKM 150215

1 5/13/2021 TYPE B3 FINAL SUBMITTAL

TOWWAY ACCESS

SITE PLAN

1 8/24/2022 ADDENDUM 03

FOUNDATION NOTES

S301

S301

S301

16' - 8" 5' - 8" 39' - 10" 8" 2' - 4" 14' - 8" 2' - 0" 8" 8' - 10"

"1

/4

/4

S501

S501

S301

16' - 8" 5' - 8" 40' - 6" 19' - 0"

AA

BB

CC

C.1C.1

B.9

SF1-4 (94'-0")

SF1-4

(94'-0")

S F

-4

S F

-4

S F

-4

S F

-4

SF2-0 (94'-0")

9' - 6"

A.7

B.3B.3

B.8

5.13.9

D

SF7-4 (93'-0") VFY.

C.2

S301

EX. 8'-6" x 8'-6" x 1'-4" FTG.

(93'-0")

EX. 8'-6" x 8'-6" x 1'-4" FTG.

(93'-0")

EX. 8'-6" x 8'-6" x 1'-4" FTG.

(93'-0")

EX. 8'-6" x 8'-6" x 1'-4" FTG.

(93'-0")

EX. 8'-6" x 8'-6" x 1'-4" FTG.

(93'-0")

EX. 8'-6" x 8'-6" x 1'-4" FTG.

(93'-0")

SLAB ON GRADE

SEE NOTE 2

SLAB ON GRADE

SEE NOTE 2

T/SLAB

99'-6"

T/SLAB

99'-6"

S S

S S

SF1-4

(93'-0")

S F

-4

V F

Y

S F

-4

V F

Y

3' - 0" 1' - 4" 3' - 0"

3' - 0" 1' - 4" 3' - 0"

DRAINING TILE

DAYLIGHT TO

DRAIN - SEE CIVIL

PIER P-1

T/PIER = 99'-2"

PIER P-1

T/PIER = 98'-10"

C.9

4.1 4.8

S302

BRICK LEDGE

ELEV. = 98'-10"

(VFY. W/ ARCH)

T/WALL

ELEV. = 99'-6"

BRICK LEDGE

ELEV. = 99'-2"

(VFY. W/ ARCH)

T/WALL

ELEV. = 99'-10"

LOUVERED METAL FENCE, POSTS,

ANCHORS, AND FOUNDATIONS SHALL

BE DESIGNED BY SUPPLIER. FENCE

SUPPLIER SHALL SUBMIT SHOP

DRAWINGS AND SIGNED STRUCTURAL

CALCULATIONS OF FENCE AND

FOUNDATION COMPONENTS.

COORDINATE QUANTITY, LOCATIONS,

AND ELEVATIONS WITH CIVIL.

/2

/8

/4

/8

/4

LOUVERED METAL FENCE, POSTS,

ANCHORS, AND FOUNDATIONS SHALL

BE DESIGNED BY SUPPLIER. FENCE

SUPPLIER SHALL SUBMIT SHOP

DRAWINGS AND SIGNED STRUCTURAL

CALCULATIONS OF FENCE AND

FOUNDATION COMPONENTS.

COORDINATE QUANTITY, LOCATIONS,

AND ELEVATIONS WITH CIVIL.

EXISTING DRAIN TILE

SHOWN FOR

REFERENCE ONLY

1. REFERENCE FLOOR ELEVATION IS 100'-0" (REFERENCE FLOOR ELEVATION 100'-0" = CIVIL ELEVATION 1402.25' VERIFY AND COORDINATE WITH CIVIL). TOP OF SLAB ON GRADE IS AT THE REFERENCE FLOOR ELEVATION UNLESS NOTED OTHERWISE.

2. 4" SLAB ON GRADE R/W 6x6-W2.9xW2.9 WWF PLACED AT MID-DEPTH OF SLAB, OVER 15 MIL. VAPOR BARRIER, AND 4" MIN.

STRUCTURAL FILL.

4. (XX'-XX") INDICATES TOP OF FOOTING ELEVATION. ALL FOOTINGS SHALL BEAR ON UNDISTURBED SUBGRADE OR

STRUCTURAL FILL.

5. SF X-X INDICATES STRIP FOOTING. SEE SCHEDULE ON S101 AND DETAILS.

6. FOOTINGS ARE CENTERED ON WALL OR PIER UNLESS NOTED OTHERWISE.

7. COORDINATE WITH CIVIL AND MECHANICAL DRAWINGS FOR UNDER-SLAB UTILITIES AND FOUNDATION PENETRATION

LOCATIONS. SEE 6/S501 AND 7/S501 FOR TYPICAL FOUNDATION WALL PENETRATION DETAIL.

8. S-S DENOTES STEPPED FOOTING. SEE DETAIL 3/S501.

9. FOOTING SIZES AND TOP OF FOOTING ELEVATIONS ARE SHOWN FOR REFERENCE ONLY. ANY NEW WORK ADJACENT TO THE EXISTING STRUCTURAL COMPONENTS SHALL BE FIELD VERIFIED AND PROTECTED DURING EXCAVATION

AND CONSTRUCTION OF ALL NEW BUILDINGS AND STRUCTURES.

FOOTING SCHEDULE

MARK SIZE REINFORCING

SF 1-4 (2) #5 CONT.

REMARKS

SEE DETAIL 1/S5011'-4"X1'-0" X CONT.

SF 2-0 2'-0"X1'-0" X CONT. SEE DETAIL 1/S501(2) #5 CONT.

STRIP FOOTINGS

*SEE PLANS FOR FOOTING LOCATIONS.

SF-X

SF 7-4 7'-4"X1'-4" X CONT. SEE DETAIL 5/S302(6) #5 X CONT. T & B

#6 HORIZ. @ 1'-0" T & B

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

I HEREBY CERTIFY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

Signature:

Typed or Printed Name:

Date: Reg. No.:

THIS SQUARE APPEARS 1/2"x1/2"

ON FULL SIZE SHEETS

CLIENT:

DULUTH, MINNESOTA

148th FIGHTER WING

MINNESOTA AIR

NATIONAL GUARD

ATFP REPAIR ENTRY

CONTROL POINTS

XXX

FMKM 152015

COPYRIGHT 2021 BY LHB, INC. ALL RIGHTS RESERVED.

NO DATE ISSUED FOR

21 W. Superior St., Ste 500 | Duluth, MN 55802 | 218.727.8446

1 05/13/2021 TYPE B3 FINAL SUBMITTAL

B

IM

/1

M n A

N G

-A T

F P

R e p a ir E n tr y C o n tr o l P o in ts /1

M n A

N G

R e p a ir E n tr y C o n tr o l S

.r v t

/2

/2

:0

:0

A

M

S101

JENNIFER M. BABCOCK

4076805/13/2021

MAS

JMB

190273

FOUNDATION PLAN

1/4" = 1'-0"1 FOUNDATION PLAN

NORTH

NO DATE REVISION

1 08/24/2022 ADDENDUM 03

1 1

SEE PLAN FOR FOOTING

2 X H

M

A X

H

M

IN

C L R

S E

E P

L A

N t

PVC SLEEVE

1/2" MIN. FLEXIBLE

SEALANT ALL AROUND

SEE MECH/ELEC/CIVIL

FOR SIZE & LOCATION

SLAB ON GRADE (SEE PLAN)

8" CONC.

FND WALL .

2X6 X CONT. TREATED WD PL

W/ 1/2" DIA ANCHOR BOLTS @

32" O.C. (SEE DETAIL 1/S001

FOR TYP. ANCHOR ROD)

SCHEDULE

SEE

SEE SCHEDULE

DOWELS TO MATCH

SIZE & SPACING OF

VERT. REINF. W/STD.

HOOK

#4 HORIZ. @

1'-0" O.C.

#4 VERTS @

1'-4" O.C.

EXT. SHEATHING

(SEE NOTES)

2X6 WD STUDS

@ 1'-4" O.C. (TYP.)

1/2" EXPANSION JOINT MATERIAL

W/ BACKER ROD, CAULK, & SEALANT

STRUCTURAL

FILL

T/SLAB

SEE PLAN

T/FTG

SEE PLAN

S C

H E

D

S E

E

3" CLR.

SAWCUT OR TOOLED JOINT

4" 4"

5 1/2"1 1/4" 1 1/4"

GRID

SEE GEOTECHNICAL

REPORT FOR FOOTING

SUBGRADE PREPARATION

T/SLAB

SEE PLAN

T/FTG

SEE PLAN

SLAB ON GRADE

(SEE PLAN)

8" CONC.

FND WALL .

2x6 x CONT. TREATED WD PL

W/ 1/2" DIA ANCHOR BOLTS @

32" O.C. (SEE DETAIL 1/S001

FOR TYP. ANCHOR ROD)

SCHEDULE

SEE

GRID

5 1/2"

SEE SCHEDULE

DOWELS TO MATCH

SIZE & SPACING OF

VERT. REINF. W/STD.

HOOK

#4 HORIZ. @

1'-0" O.C.

#4 VERTS @

1'-4" O.C.

EXTERIOR

SHEATHING

(SEE NOTES)

2x6 WD STUDS

@ 1'-4" O.C. (TYP.)

U.N.O.

1/2" EXPANSION

JOINT MATERIAL

W/ BACKER ROD,

CAULK, & SEALANT

S C

H E

D

S E

E

1/2" NOMINAL

STRUCTRUAL

FILL (SEE PLAN)

RIGID INSUL.

(SEE ARCH)E

X

IS

T F

IL

L

R E

M O

V E

R

E P

L A

C E

S E

E G

E O

T E

C H

R E

P O

R T

SEE GEOTECHNICAL

REPORT FOR FOOTING

SUBGRADE PREPARATION

3" CLR

VAPOR

BARRIER

GRID

GRID

1' - 2" 1' - 2"

2' - 4"

(12) #6 VERTS

#4 TIES @

1'-0" O.C.

FOOTING

SLEEVE TO BE 4"

LARGER THAN PIPE

PIPE

FDN. WALL

PIPE

PIPE PERPENDICULAR

TO FOOTING

F T

G

M A

X

.3

.0

D + 1'-6"

STEP FOOTING TO ALLOW

PIPES TO PASS THROUGH

WALL IN THIS AREA

D

NOTES:

1. FOR PIPES 3'-0" OR LESS BELOW FTG PROVIDE

SLEEVE AND CONCRETE AS SHOWN.

2. FOR PIPES MORE THAN 3'-0" BELOW FTG BUT LESS

THAN 8'-0" USE STEPPED FTG DETAIL TO GET WITHIN

3'-0" MAX.

3. FOR PIPES DEEPER THAN 8'-0" BELOW FOOTING CONC.

FILL NOT REQ'D, PROVIDE TRENCH COMPACTED PER

SPEC REQUIREMENTS.

4. WRAP PIPE AT WALL/FOOTING PENETRATION

W/COMPRESSIBLE MATERIAL THAT IS RATED FOR BELOW

GRADE USE SUCH AS BACKER ROD WITH ELASTOMERIC

JOINT SEALANT OR ASPHALT IMPREGNATED EXPANSION

JOINT MATERIAL. FOR MULTIPLE PIPES/CONDUIT, DETAIL

APPLIES TO PERIMETER OF GROUP. FOR CONCRETE DUCT

BANK, ENSURE THE HOLE IS 2 INCHES LARGER ON ALL SIDES

AND WRAP PERIMETER OF DUCT BANK. FOR 33 INCH OPENING

AND 2 FEET OF CONCRETE ABOVE OPENING PROVIDE

(3) #5 BARS LONGITUDINAL ALONG THE WALL LENGTH AND

EVENLY SPACED APART. BARS SHALL BE 3 INCHES ABOVE

OPENING AND EXTENDING 24 INCHES BEYOND EITHER

SIDE OF THE OPENING FOR DEVELOPMENT LENGTH.

5. AT CONTRACTORS OPTION, FILL PIPING TRENCH BELOW

FOOTING W/ LEAN CONCRETE (MIN. 1000 PSI COMPRESSIVE

STRENGTH. PROVIDE SLEEVE AND COMPRESSIBLE

MATERIAL AS NOTED ABOVE.

SECTION A-A

A

A

SLEEVE

DETAIL

NOT

USED

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

I HEREBY CERTIFY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

Signature:

Typed or Printed Name:

Date: Reg. No.:

THIS SQUARE APPEARS 1/2"x1/2"

ON FULL SIZE SHEETS

CLIENT:

DULUTH, MINNESOTA

148th FIGHTER WING

MINNESOTA AIR

NATIONAL GUARD

ATFP REPAIR ENTRY

CONTROL POINTS

XXX

FMKM 152015

COPYRIGHT 2021 BY LHB, INC. ALL RIGHTS RESERVED.

NO DATE ISSUED FOR

21 W. Superior St., Ste 500 | Duluth, MN 55802 | 218.727.8446

1 05/13/2021 TYPE B3 FINAL SUBMITTAL

B

IM

/1

M n A

N G

-A T

F P

R e p a ir E n tr y C o n tr o l P o in ts /1

M n A

N G

R e p a ir E n tr y C o n tr o l S

.r v t

/2

/2

:0

:0

A

M

S501

JENNIFER M. BABCOCK

4076805/13/2021

MAS

JMB

190273

FOUNDATION DETAILS

1/2" = 1'-0"3 TYPICAL STEPPED WALL FOOTING

1 1/2" = 1'-0"4 FND PENETRATION

3/4" = 1'-0"2 INTERIOR FTG. @ 2x6 WALL

3/4" = 1'-0"1 EXTERIOR FOOTING @ 2X6 WALL

1" = 1'-0"5 P-1 PIER DETAIL

3/4" = 1'-0"6 FOOTING PERPENDICULAR TO PIPE

3/4" = 1'-0"7 FENCE PIER DETAIL

NO DATE REVISION

1 08/24/2022 ADDENDUM 03

ADD 03 Narratvie
Addendum No. 03, August 24, 2022
Drawings
Changes to Prior Addenda
Questions and Answers
General None
Changes to Specifications None
Product Approvals
Changes to Drawings

END OF ADDENDUM NO. 03

Civil Addendum 03 Drawings
C100 (B211 Parking & Alert Access)-C130
C130
C200 (Main Gate)-C210
C210
C300 (Gate 4)-C300
C300
C400 (Towway Access)-C400
C400
190273 MnANG Repair Entry Control Struct_ADD 03
Sheets
S101 - FOUNDATION PLAN
S501 - FOUNDATION DETAILS