QJKL222003 - Questions - Water Heaters Replacement and Boiler Installation Updated answered.docx
DOCX document 15 KB Posted
- Attached to
- Replacement of Water Heaters and a Boiler
- Solicitation number
- W912LM-22-Q-1003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A 02 QJKL222003 - SOW Water Heater Replacement and Boiler Install.pdf | ||
| A 02 B642 Water heater b.jpg | JPG image | |
| EXHIBIT B Ld WH and B (Attachment).docx | DOCX document | |
| EAL Request Blank.xlsx | XLSX spreadsheet | |
| A 02 Bldg642 Floorplan Lower Level a.pdf | ||
| A 02 QJKL222003 - Drawings B687 a.pdf | ||
| A 02 B642 Water heater a.jpg | JPG image | |
| EXHIBIT C Reference Questionnaire Ld WH and B (Attachment).docx | DOCX document | |
| EXHIBIT A Ld WH and B (Attachment).docx | DOCX document | |
| EXHIBIT D Letter of Commitment Ld WH and B (Attachment).docx | DOCX document | |
| A 02 B682 Water Heater.jpg | JPG image | |
| B 08 W912LM-22-Q-1003 Water Heater and Boiler.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Water Heaters Replacement and Boiler Installation Solicitation #: W912LM22Q1003 Project #: QJKL22203 133rd AW
Questions:
Building 687 Q1. It appears that the existing roof curb that had been previously used for the removed boiler, is now being used by a water heater. Assuming a new roof curb will need to be added for the new boiler’s flue, what type of roof will we be penetrating and is there an existing roof warranty?
A1. TPO, no roof warranty
Q2. How will the combustion make-up air need to be brought in for the new boiler? Will it require another roof curb/wall penetration?
A2. Roof penetration is preferred
Q3. Can a Sequence of Operation for the new boiler be provided?
A3. Yes it can be provided after award.
Q4. In the Statement of Work, paragraph B.e.2 is requiring that a new “color graphic screen will be added for each new system.” Will you verify that this will be required?
A4. This is referring to the computer graphics, see last sentence of the referenced paragraph “The existing Schneider Electric EcoStruxure software tools shall be used to create all new graphics.”
Q5. Per the SOW, paragraph C.6.d, notes requirements for paint submittals. Please clarify what items will need to be painted?
A5. It’s a general note for any touch-up paints that might be required. No specific areas or items.
Q6. The Existing Boiler has some RIB Relays on it. Do we need to account for these and can you tell us what they do?
A6. Yes we’ll need a RIB for the new boiler. They enable and disable the boiler in spring and fall.