MINNESOTA AIR NATIONAL GUARD

HEADQUARTERS 133RD AIRLIFT WING (AMC)

SAINT PAUL MINNESOTA

10 July, 2018

STATEMENT OF WORK

1. Project Title: Remove, dispose, hook up and install new nitrogen generator in Bldg. 685.

2. Project Number:

3. Project Location:133d Airlift Wing
Minnesota Air National Guard Base

685 general Miller Drive St Paul, MN 55111

4. Description of Work: This project involves the work as described herein to be accomplished at the above location, with all labor, equipment, supplies and materials to be provided by the contractor. All work shall be accomplished under environmental conditions appropriate to the nature of the project. Work will comply with all local, state, and federal regulations; to include NEC, EPA, OSHA, Minnesota State Building Codes, as well as USAF and Air National Guard regulations. The successful bidder may be required to furnish proof of liability insurance and workers compensation insurance coverage before the contract will be signed by the ANG. Work shall include but not necessarily limited to: Providing materials, removal, and disposal and installation of new Nitrogen generator located at the Minnesota Air National Guard Bldg. 685.

a) Purchase new nitrogen generator unit with the following minimum specifications.

Receiver Tank:
80
Dimensions:
L X W X H: 32 x 32 x 80
Approx. Weight:
(Lbs.): 391
Air Input – @ 160 psi @ 75° F
13.8 SCFM
Air Input Range
100–175 PSI
N2 Output – @ 160 psi @ 75 ° F
7.1 SCFM
N2 Purity
95–99.9 %
N2 Dew point
-70°F
Operating Temperature
40° to 150° F
Inlet & Outlet Ports
3/8" NPT
N2 Purity Port
Yes
Auto Shut Off
Yes
Pre-Filters
2
Filter Maintenance Indicator
Yes
N2 Outlet Pressure Gauge
Yes

b) Remove Champion advantage nitrogen generator located in Bldg. 685 mechanical room, to include, but not limited to: disconnecting electrical hookups, air lines and filter assemblies.

c) Dispose of unit complying with all local, state, and federal regulations. Demo material is to be hauled offsite by contractor and disposed of according to State of Minnesota and Federal laws. Disposal site and quantity will be provided to the 133rd Base Environmental Office prior to final walkthrough.

d) Install new nitrogen generator in same location to include installation of new piping, pipe fittings electrical, if applicable and supplies. Insure unit pipe, pipe fittings attachment fittings are correctly located, routed and installed to include removal of old compressed air supply from the compressor discharge line to the inlet of the Nitrogen generator and plumb in a new air supply line form the inlet to the air receiver, about 30 feet away.

e) Electrical connections will be run to the nearest junction box, with final connection to be made by the 133rd Base Electrician after final inspection.

f) Any costs involved with lifting or hoisting (man, materials or equipment) will NOT be the responsibility of the government.

g) Disposal of excess/demo materials will be the responsibility of the contractor.

h) Contractor required to field verify all measurements prior to installation.

5. Warranty: All materials shall be warranted to be in compliance with this statement of work and to the highest standards of the industry.

6. Work Hours: The Contractor shall provide services between the hours of 0700-1600 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings.

7. Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

Refer technical questions and information to:

MSgt Mikkael Hahn Contracting Specialist 610 Militia Drive St. Paul, MN 55111 612-713-2613 mikkael.r.hahn.mil@mail.mil

CITIZEN AIRMEN STRENGTHENING FREEDOM

image1.png