Revised_Package.pdf

PDF 2 MB Posted

Attached to
Bridge Crane Federal contract opportunity
Solicitation number
W912LM16T4091
Issued by
Department of the Army Minnesota Army National Guard

About this file

Revised Specs

View the file

Other files for this federal contract opportunity

Other files attached to Bridge Crane, newest first.
File Type Posted
SECTION_14_6400_BRIDGE_CRANES_(2)_(002).docx DOCX document
SECTION_14_6400_BRIDGE_CRANES_(2).docx DOCX document
Site.Visit.MFR_Bridge_Crane.pdf PDF
S3.00_Section_ _Enlarged_Crane_plan.pdf PDF
SECTION_14_6400_BRIDGE_CRANES.docx DOCX document
S4.03_Refer_to_detail_6.pdf PDF
S4.03_Refer_to_detail_6.pdf PDF
SECTION_14_6400_BRIDGE_CRANES.docx DOCX document
S3.00_Section_ _Enlarged_Crane_plan.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE CRANES

14 6400 - 1

PART 1 GENERAL

1.1 SECTION INCLUDES

SECTION 14 6400

BRIDGE CRANES

A. Maintenance Bay CMAA Class C bridge cranes complete system including runway beams, crane, rails and hook bolts, bridge beam, end trucks, hoist, trolley and operating system.

B. Materials and labor for complete installation.

C. Sequencing and coordination of work with other disciplines.

1.2 REFERENCES

A. CMAA No. 74 - Crane Manufacturers Association of America.

B. ASME Crane Standards, B30 Series.

C. ASME HST-4-1999 (R 2010), "Performance Standard for Overhead Electric Wire Rope Hoists".

D. NEMA - National Electric Manufacturers Association.

E. NEC - National Electric Code.

F. OSHA - Occupational Safety and Health Administration.

G. HMI - Hoist Manufacturers Institute.

H. AISC - American Institute of Steel Construction.

I. AWS - American Welding Society.

1.3 SYSTEM DESCRIPTION

A. Two Maintenance Bay bridge cranes with the following features:

1. Double-girder, top running, bridge crane

2. Four-ton capacity; three-ton main hoist plus one-ton auxiliary hoist per bridge.

3. 57-foot-8-inch span.

4. 75 feet/minute traveling +/- speed.

5. C-track power festoon.

6. Wireless Radio Pushbutton Control with receiver.

7. Three-ton manual wire rope main hoist: Government furnished

a. 16'-0" +/- available lift with 20.0 feet/minute +/- speed lift operation

b. Motor driven trolley with 65 feet/minute speed and brake. True vertical lift type hoist.

8. One-ton manual wire rope auxiliary hoist: Government furnished

a. 15'-10" +/- available lift with 40.0 feet/minute speed lift operation.

b. Motor driven trolley with 65 feet/minute speed and brake. True vertical lift type hoist.

9. 4-bar enclosed mainline electrification for 83 foot long runway.

a. Includes: conductor bars, power feeds, mounting brackets, hangars, end caps, and connecting tool.

10. Runway beams: Government furnished and installed

a. Includes: channel cap, splice plates, end stops and attachment hardware.

b. Runway beams with varying lengths up to 30 foot spans. Runway beams supported at locations indicated on the drawings by bolting to new columns and anchored to the existing structure as shown.

B. Installation, mechanical and electrical hookup of above equipment.

1.4 DESIGN REQUIREMENTS

A. Runway beams, complete with connections to the building structural system, and any required splices shall be designed, supplied, and erected by the Contractor as shown in the drawings.

Runway beam design including sizing and all connections shall be per CMAA.

14 6400 - 2

B. All equipment furnished under this section shall comply in all respects with the requirements of OSHA, the standards of the Crane Manufacturers Association of America (CMAA), the Hoist Manufacturer's Institute (HMI), and Air Force Occupational Safety and Health Standards

(AFOSH 91-46).

1.5 SUBMITTALS

A. Not used.

B. Product Data: Provide manufacturers catalog data confirming rated capacity, equipment speeds, horsepower electrical requirements, and component sizes and dimensions.

C. Shop Drawings

1. Each submittal shall be complete in all respects, incorporating all information and data listed herein and all additional information required for evaluation of the proposed equipment's compliance with the Contract Documents. Partial, incomplete or illegible submissions will be returned to the Contractor without review for resubmission.

2. Shop drawings shall include but not be limited to:

a. Equipment specifications and data sheets identifying all materials used and methods of fabrication.

b. Complete assembly, layout and installation of drawings with clearly marked dimensions.

c. Manufacturer's installation and startup instructions.

d. Weights of all component parts, assembled weight of units and approximate total shipping weight.

e. Example equipment nameplate data sheet.

f. Interconnecting ladder-type wiring diagrams for power and control wiring required for final connections. Clearly differentiate between portions of wiring that are factory installed and portions to be field installed.

g. List of recommended spare parts.

D. Certificates: Certify that products of this section meet or exceed specified requirements.

Provide factory test certificates.

E. Factory testing and inspection certificates.

F. Operation and maintenance manuals.

G. Manufacturer's instructions.

H. Installation, testing and commissioning certificates.

I. List of manufacturers and model numbers.

J. Special tools list.

K. List with a minimum of four manufacturers' standard lubricants, which may be used interchangeably for each type of lubricant required.

L. Warranty: Submit manufacturer warranty and ensure that forms have been completed in Contracting Officer's name and registered with manufacturer.

1.6 QUALITY ASSURANCE

A. Manufacturer shall be regularly engaged in the business of designing, building, and repairing bridge cranes of the type specified in this Section. All bridge crane components and appurtenances furnished for this contract shall be designed, coordinated, and supplied by a single supplier. The Contractor shall be responsible for ensuring the proper components are incorporated in the package and that the requirements of other specification sections are satisfied.

B. Products Requiring Electrical Connection: Listed and classified by UL as suitable for the purpose specified and indicated.

1.7 DELIVERY, STORAGE, AND PROTECTION

A. Units shall be packaged, shipped and stored in such a way as to prevent rust or damage.

14 6400 - 3

1.8 PROJECT CONDITIONS

A. Sequence installation to ensure utility connections are achieved in an orderly and expeditious manner.

1.9 WARRANTY

A. Correct defective Work within a five year period after Date of Substantial Completion.

B. Provide one year manufacturer warranty for the complete system, including accessories and components. Each component shall be warranted by the manufacturer having unit responsibility.

1.10 EXTRA MATERIALS

A. Spare Parts and Special Tools: Spare parts and any special tools required for disassembly or maintenance shall be provided. One complete set of manufacturer's standard spare parts for each component size shall be provided. Spare parts shall be completely identified with a numerical system to facilitate parts inventory control and stocking. A separate number shall identify each part.

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. Konecrane, Detroit Crane and Hoist, Columbus McKinnon Corporation, Harrington, or equal, modified to provide the specified features and to satisfy the specified operating conditions.

2.2 MATERIALS

A. Runway beams: ASTM A992 Grade 50 or ASTM A572 Grade 50.

B. Runway channel: ASTM A36

C. Crane rail: ASCE 40

D. Bridge beam: ASTM A992 Grade 50, ASTM A572 Grade 50 or ASTM A36.

E. Wire rope: Extra flexible plow steel cable for crane service.

2.3 COMPONENTS

A. Crane Bridge:

1. The crane shall be assembled and tested at the point of manufacture prior to shipment and disassembled only to the extent required to facilitate shipment and installation.

2. The rated capacity of the crane shall be the load that the crane is designed to carry as specified by the manufacturer and shown in tons on large capacity plates located on each side of the crane bridge.

3. Materials shall be free from all defects and imperfections that may affect the finished product. All parts shall be new and unused.

4. End trucks shall be fabricated from structural steel shapes and plates welded into an integral unit and in-line bored to receive the wheel axles.

5. The bridge shall be designed and fabricated as a complete integral structure with only such parts removable as required to facilitate the erection and maintenance of equipment.

6. The bridge girder shall be constructed of standard structural shapes or boxed sections, reinforced and welded as required. Connections between the girder and end trucks can be either welded or bolted after installation and squaring.

7. Trolleys must run on top of the bridge beams to allow for the alignment of the hoist hooks.

8. The end trucks shall have a minimum wheel base of 1/8 of the crane's span. Each truck will be carried on two (2) wheels running on anti-friction bearings. Wheels shall be of machined, hardened steel, single flanged compound tread wheels capable of running on ASCE 40 # rail. ASCE 40 # rail shall be supplied and installed by crane manufacturer.

ASCE 40 # rail shall be fastened in place by Hook Bolts in lieu of galvanized rail clips.

Install rail hook bolts as per manufacturer’s recommendations. The end trucks shall be provided by crane manufacturer with rubber bumpers at each end to engage end stops on the crane runway.

14 6400 - 4

B. Bridge Drive: The crane bridge shall be driven by two drives. One located on and driving one pair of wheels on each end truck. Each drive shall consist of a drive gear reducer, a TENV, crane duty, 30-minute rated motor with class F insulation and means of braking to meet the requirements of OSHA.

C. Bridge Control Panel:

1. The bridge motion's control shall be located in a bridge-mounted NEMA 12 enclosure. The bridge control is to be provided with a mainline contactor controlled from the bridge control station and a door-mounted disconnect that turns off power to the bridge panel and drives and the hoist and trolley panel and drives before the panel door can be opened.

2. The control shall be designed and built per the National Electric Code (NEC) standards with color-coded and match-marked wires. The panel shall also meet appropriate UL standards.

D. Crane Motion Control:

1. All motions of each crane (hoist, trolley and bridge) shall be operated through a single Wireless Radio pushbutton type control. The Wireless Radio Control shall have pushbuttons for the control of each motion plus power on/off buttons:

a. Hoist – up/down

b. Trolley – left/right

c. Bridge - forward/reverse.

d. Power - on/off.

2. Pushbutton station shall be molded contour grip type and a wall mount for storage and changing. The enclosure is to be NEMA 12. The pushbuttons shall return to the off position when the operator releases the pressure. The magnetic contactors for all motions shall be mechanically or electrically interlocked. Control voltage at the pushbutton stations shall be grounded to the hoists.

E. Crane Bridge Electrification:

1. Power and control voltage will be provided to the moving trolley and hoist through means of a festoon flat cable system. There will be separate cables for the motor power supply (line voltage) and control and these cables will be provided with separate connecting fittings and plugs. The cable connecting fittings and plugs shall be metal, not plastic and will be of the type easily repairable or modified in the field without special tools.

The power and control cables will be carried from trolleys with four (4) steel wheels running in a track suspended off the bridge girder running the full length of the crane span.

2. The bridge will be provided with a main power pick-up (collector pole) and sliding shoe collectors that will contact and run in the shielded bar runway conductor system.

F. Crane Runway System:

1. Runway beams shall be provided and attached to the building framing system as noted on the drawings. The beams shall be capped or uncapped as required to achieve maximum hook lift and to handle the crane's loading (Equivalent Center Loading, ECL) at full capacity load and closest to hook approach possible. The ends of the runway beams are to be jointed together by means of bolted splices.

2. Runway power electrification shall be provided running the full length on one side of the runway. The electrification shall be of the shielded bar type supported at proper intervals to prevent sag or excessive vibration and with power feeds located to minimize voltage drop so as to provide adequate power to operate at least the hoist and one traverse motion at the extreme ends of the runway.

G. Electric Wire Rope Hoist:

1. Wire rope hoist shall meet the requirements of ASME B30.16 "Overhead Hoists". Hoist shall be heavy duty meeting H4 Service classification as defined in ANSI/ASME HST-4M "Performance Standard for Overhead Electric Wire Rope Hoists". Hoist shall meet the following requirements:

a. Frame shall be fabricated from rolled steel to form a one-piece weldment.

b. Gear case is to be machined aluminum alloy casting with sealed construction allowing the gears and load brake to operate in a bath of oil.

14 6400 - 5

c. Bearings shall be high quality anti-friction type of either needle or ball design and used throughout the hoist. Bearings not considered lifetime lubricated by the manufacturer, shall be provided with a means for lubrication.

d. Hoist shall have two types of brakes: One DC electrical multiple disc motor brake spring set electrically released, and one self-adjusting Weston type mechanical load brake located in the gear case. Either brake shall have the capability of holding rated load in the event of failure of either brake system.

e. Overload devices shall be provided to prevent lifting excessive overloads. This load-limiting device shall be pre-set at the factory to disengage the hoist motor form the gearing in event of excessive overload condition. Overload device is to be located between the motor and load brake, so that the load brake will hold the load in event of overload device failure.

f. Motors shall be of high starting torque type designed specifically for hoist duty services with permanently lubricated ball bearings, rated for 30-minute duty cycle.

The motor enclosure is to be totally enclosed non-ventilated, TENV. Motor insulation shall be class F minimum. If hoist is to be two-speed, it shall have a high speed to low speed ration of 3:1. Motor is to have automatic reset temperature actuated switch (TAS) in motor windings to provide motor running over current protection.

g. Gearing shall be a combination of spur and/or helical, precision cut and heat treated to ensure quiet, efficient operation. Gears shall be totally enclosed and run in a bath of oil to provide maximum lubrication. Gears are either splined or keyed to shafts.

h. Deep grooved, large diameter rope drum that helps prevent over wrap of cable for longer rope life.

i. The diameter of the rope drum shall not be less than 18 times the diameter of hoisting cable, running sheaves not less than 16 times, and idler sheaves not less than 12 times the diameter. Hoisting cable shall be 6x37 improved plow steel.

j. Geared upper and lower limit switch shall be provided that allows the upper and lower limits to be set to accommodate the application.

k. Controls to be centralized and designed per NEC standards and housed in a panel with a hinged door. The controls are to be provided with a step-down transformer within the panel that provides 120 volts power to the control circuits. Control circuit voltage to push the button station shall not exceed 120 volts. In addition, the panel shall meet appropriate UL standards.

l. All controls, including power transformer, shall be housed in a NEMA 1 enclosure mounted in an easily accessible location on the hoist. Controls shall include trolley travel and hoist raising and lowering. Motors shall be fully enclosed 30-minute duty cycle motors in a NEMA frame rated for 208 volts, 3-phase, 60 Hz power supply.

m. Motor driven trolleys shall have heavy section rolled steel side frames. The wheels shall be steel with heat-treated tread. Motor driven trolleys shall have totally enclosed non-ventilated (TENV) motors with right angle gear reducers. Trolley wheel gears and pinions shall have machined cut gear teeth. Spacer washers shall be provided for trolley adjustments to various beam sizes.

H.

I. Electrical:

1. Electrical Characteristics:

Crane main / control voltage 208 V - 60 Hz / 115 V Nominal power of crane 10.8 hp Maximum (In Rush) / nominal currency of crane 149.2 A / 40.8 A Power factor at starting / nominal current 0.77 / 0.89

2. Furnish and install all wiring and controls from the wall-mounted disconnect switch.

3. The sizing and selection of electric crane motors shall be the responsibility of the crane manufacturer in order to ensure complete coordination of components and to provide unit responsibility.

4. Any reference to motor size or power requirements for the crane motors contained in the Contract Documents is preliminary and shall not be relied on by the Contractor. The Contractor shall be responsible for any changes to the electrical system that may result

14 6400 - 6 from final sizing and selection of the crane motors by the crane manufacturer at no additional cost to the Contracting Officer.

5. All motors shall be furnished and installed under this Section. All motors shall be of the standard efficiency totally enclosed non-ventilated squirrel cage type for 208 volts, 3-phase, 60 Hz. All motors shall be of ample size and construction to carry continuously all loads which may be imposed through their full range of operation. The maximum motor loading shall not exceed the nameplate horsepower rating, exclusive of service factor.

Motor horsepower is to be determined by the crane supplier. All motors shall operate at speeds not greater than described herein.

6. Furnish and install all motors and drives specified in this Section. The Contractor shall also furnish all necessary wiring diagrams and instructions for proper wiring of equipment.

2.4 SHOP FINISHING

A. Except for touchup, all painting shall be done in the shop. The top-running crane bridge beams shall be primed and finish coated.

2.5 SOURCE QUALITY CONTROL AND TESTS

A. Fabrication Tolerances: Per CMMA requirements.

B. Factory tests shall be performed by the manufacturer prior to delivery in order to verify the accuracy and performance of the systems specified. The manufacturer shall certify and provide copies of the tests and warranty the equipment's performance specified in this Section. All certifications of factory tests shall be submitted to and reviewed by the Contracting Officer before the equipment is shipped.

PART 3 EXECUTION

3.1 EXAMINATION

A. Section not used.

3.2 INSTALLATION

A. The Contractor shall install the complete systems in the general arrangement and where shown on the drawings and as specified. The Contractor shall install and test each complete system and each system component in strict conformance with the manufacture's written recommendations. Installation shall be performed by mechanics skilled in work of this kind.

The equipment shall be checked, aligned, and approved for start-up by the manufacture's factory trained representatives. Each system component shall be reviewed and approved by the applicable manufacturer prior to start-up of the complete system. The manufacture having unit responsibility shall arrange and coordinate such reviews between component manufacturers and the Contractor.

3.3 ERECTION TOLERANCES

A. Erection tolerances shall meet the requirements of the manufacturer and all referenced standards.

3.4 FIELD QUALITY CONTROL

A. The Contractor shall arrange and schedule testing and commissioning with the Contracting Officer.

B.

After completion of installation, the bridge crane, trolley and hoist shall be completely tested to ensure compliance with the performance requirements as specified. As a minimum, testing shall be by operating the equipment through a complete lift and lowering cycle and through a complete travel of the bridge and runway or monorail beams to determine that the equipment performs smoothly and safely without failure. Verify that the crane is electrically interlocked with the cord reels. Such tests shall be carried out with the hoisting equipment loaded at 125 percent of specified capacity. After load testing, the overload limit switch is to be reset at the rated load. Any defects shall be corrected or replaced immediately by the Contractor at no expense to the Contracting Officer. All testing and the costs of all required certification shall be at the Contractor's expense.

3.5 STARTING EQUIPMENT AND SYSTEMS

14 6400 - 7

A. The Contractor shall include in the Contractor's bid all costs associated with providing the services of the Manufacturer's field representative for checking, aligning, testing placing in operation, and Contracting Officer Training.

B. The Contractor shall not use cranes or hoists to perform any of the Work for this Contract without prior written authorization by the Contracting Officer. Any use of cranes or hoists by the Contractor shall be at the Contractor's risk. Any damage done to cranes or hoists by Contractor shall be repaired by Contractor at Contractor's expense.

3.6 CLEANING

A. Clean all installed materials, equipment and related areas after final installation.

END OF SECTION

NOT USED

REINFORCED WITH

WWF 6X6 W1.4XW1.4

MEZZ ELEV.

109'-3"

VULCRAFT 1.0C26 GALV.

STEEL DECK

3" TOTAL DEPTH

CONCRETE SLAB

R/W 6x6-W1.4xW1.4 WWF

PLACED @ MID-DEPTH

OF SLAB

MEZZ ELEV.

109'-3"

1200S200-97

METAL JOISTS @ 24" O.C.

1.0 C 26 GALV.

FORM DECK

S4.03

CONCRETE SLAB

ON MTL. FORM DECK

SEE PLAN

MEZZ ELEV.

109'-3"

METAL JOIST

SEE PLAN

∠6X4XCONT.

CMU WALL

SEE PLAN

S4.03

1200T200-68 x CONT.

METAL JOIST

SEE PLAN

∠6 X 4 X CONT.

1/2"ø SLEEVE ANCHORS @ 8" O.C.

CMU WALL

SEE PLANL

/2

T/RAIL

113'-8"

T/STL.

SEE PLAN

WT7x21.5x1'-0" W/ (4) 5/8"ø HILTI HIT-RE 500 SD

EPOXY ANCHORS TO EXIST.

CONC. COL. / WALL

REMOVE & REPLACE

BRICK VENEER

INSULATION AS REQ'D

2' - 4"

GRID

W12 COL.

W21 BEAM

W/ C12 CAP CHANNEL

40# RAIL

BY SUPPLIER

EXIST. 24x24

CONC. COL.

C9x15x1'-10" W/ (2) 3/4"ø A325-HS BOLTS

/4

/4

EMBEDMENT

6" MIN.

3/8" WEB STIFFENER

EACH SIDE

1"x16"x1'-2" CAP PL

3/16

3/16

TYP.

5/16

5/16

S4.03

S4.03

NOTE: WORK INCLUDED IN THIS DETAIL IS BASE BID NO. 2

2' - 8" 1' - 8"

4' - 4"

"1 /2

/2

" 2

W21

(2) 3/4"ø

A325-HS

BOLTS

3/8" WEB

STIFFENER

(N/S & F/S)

1"x16"x1'-2"

CAP PL

GRID

GRID

NOTE: WORK INCLUDED IN THIS DETAIL IS BASE BID NO. 2

W21 BELOW

STIFFENER PL

BELOW

#40 RAIL

GRID

/2

/2

C10

2 1/2"1 1/2"

WT7x21.5x1'-0"

W/ (4) 5/8" HILTI

HIT-RE 500SD

EPOXY ANCHORS

C9x15x1'-8"

(2) 3/4"ø A325-HS

BOLTS

1/4

3 SIDES

TYP.

/2

/2

GRID

NOTE: WORK INCLUDED IN THIS DETAIL IS BASE BID NO. 2

W21

C12

3/8" ASCE 40# RAIL

MOLYNEUX 40/S73R2

RAIL CLIPS @ 1'-9" O.C.

INSTALL WITH MANUFACTURERS

RECOMMENDATIONS. CLIPS

SHALL BE GALVANIZED.

AT JOINT BARS

USE (4) GANTREX

9119/15/00

T/ CRANE RAIL

113'-8"

5/16 4@8

2'-0" CONT.

@ END

1/4

NOTE: WORK INCLUDED IN THIS DETAIL IS BASE BID NO. 2

3/4" 1' - 0"

/2

3/4"x10 1/2"x2'-6 1/2" PL

#40 RAIL

C12

W21

3"

3" O.C. = 1'-3"

(5) SPA. @ 3"

(6) 3/4"ø

A325 BOLTS

EXIST. WALL

W30x99

1/4

1/4

TYP

1"

GRID

T.O. RAIL

113'-8"

T.O. STEEL

113'-4 1/2"

JOIST BRG.

108'-0"

T/SLAB

109'-3"

∠3X3X12 GA. x CONT.

POUR STOP

CONC. SLAB

ON METAL DECK

SEE PLAN

6" CMU BOND BEAM

R/W (1) #5 x CONT.

6" CMU WALL

(SEE PLAN)

RIGID INSULATION

SEE ARCH

MTL. JOIST

SEE PLAN

3/8"x4"xCONT. PL W/ 1/2"ø x 4" HSA @ 1'-4" O.C.

1/8

1/8

∠4X4X12 GA. CLIP

W/ (4) #12 TEK SCREWS

PER LEG (TYP)

1200T200-68 X CONT.

TRACK

CMU WALL, SEE PLAN

& SCHEDULE FOR

REINFORCEMENT

∠3x3x1/4xCONT. W/ 1/2"ø x 4"

SLEEVE ANCHORS @ 1'-4" O.C.

WRAP W/ BLDG. PAPER TO PREVENT

BONDING. GROUT CORE SOLID

EXIST. CONC. & CMU WALL

#5 X 1'-0" DOWEL @ 1'-0" O.C.

DRILL & EPOXY 6" MIN. INTO

EXIST. GREASE HALF OF BAR

TO PREVENT BONDING INTO NEW

NEW 8" C.I.P.

CONCRETE WALL

SEE DETAIL 6/S4.01

FOR ADD'L INFOGROUT CORE

SOLID

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

I HEREBY CERTIFY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

Signature:

Typed or Printed Name:

Date: Reg. No.:

THIS SQUARE APPEARS 1/2"x1/2" ON

FULL SIZE SHEETS

CLIENT:

DULUTH, MINNESOTA

148th FIGHTER WING

MINNESOTA AIR

NATIONAL GUARD

ADAL BUILDING 223

FOR JEIM

120592 B223 JEIM 14_Central.rvt

COPYRIGHT 2014 BY LHB, INC. ALL RIGHTS RESERVED.

NO DATE ISSUED FOR

NO DATE REVISION

21 W. Superior St., Ste 500 | Duluth, MN 55802 | 218.727.8446

9/9/2014 TYPE B3 - FINAL SUBMITTAL

C U s e rs

\d js

\D o c u m e n ts

\1 J

E

IM

S

C e n tr a l_

M A

S c h le

.r v t

/1

/2

:0

:2

A

M

S4.03

JENNIFER M. BABCOCK

407689/9/14

MAS

JMB

120592

DETAILS

1" = 1'-0"

DETAIL

3" = 1'-0"

TYP - CONC. FLOOR SECTION

1 1/2" = 1'-0"

TYP - JOIST FRAMING

1" = 1'-0"

SECTION

3" = 1'-0"

LEDGER ANGLE SECTION

3/4" = 1'-0"

CRANE BRG. DETAIL

1 1/2" = 1'-0"

CRANE BRG. CONNECTION DETAIL

1 1/2" = 1'-0"

CRANE SUPPORT DETAIL

1" = 1'-0"

DETAIL - TYPICAL GIRDER

1" = 1'-0"

DETAIL - CRANE STOP

1 1/2" = 1'-0"

JOST BRG. DETAIL

3/4" = 1'-0"

NEW WALL CONNECTIONS

1137906933N Polygon

1137906933N Polygon

1137906933N Line

1137906933N Line

1137906933N Line

1137906933N Line

1137906933N Line

1137906933N Callout ASCE 40 # rail shall be supplied and installed by crane manufacturer. ASCE 40 # rail shall be fastened in place by Hook Bolts in lieu of galvanized rail clips. Install hook bolts as per manufacturer's recommendations.

1137906933N Callout ASCE 40 # rail shall be supplied and installed by crane manufacturer. ASCE 40 # rail shall be fastened in place by Hook Bolts in lieu of galvanized rail clips. Install hook bolts as per manufacturer's recommendations.

1137906933N Line

1137906933N Typewritten Text

CRANE MANUFACTURER

GENERAL SHEET NOTES KEYED SHEET NOTES

R E

F

WP

GFI

WP

GFI

WP

GFI

WP

GFI

WP

GFI

J

GFI

EWC

GFI

J

GFI

WP

GFI

WP

GFI

WP

P

P P

P

3/4

3/4

3/4

G

FI

W P

GFI

WP

WP

3/4

84"

84"

W

48"

CLNG

CLNG

AC

GFI

56"

GFI

AC

GFI

48"

AC

GFI

AC

GFI

GFI

GFI

GFI

GFI

84"

84"

84"

EPO

WP

GFI

WP

84"

GFI

AC

GFI

R

-R

R

R

R

R

SP

SP

L

J

M

S

GFI

WP

R

BID OPTIONS

A. REFER TO ELECTRICAL EQUIPMENT AND SHOP EQUIPMENT SCHEDULES

FOR CONDUIT AND WIRE SIZES.

B. REFER TO SECTION 26 0519 FOR WIRE SIZE ADJUSTMENTS FOR

VOLTAGE DROP.

1. PROVIDE 120 VOLT CONNECTION TO EYE WASH/SHOWER.

2. ALL RECEPTACLES IN THIS ROOM OR SPACE SHALL BE MOUNTED

48" AFF UNLESS INDICATED OTHERWISE.

3. POWER PEDESTAL RELOCATED FROM EXISTING FACILITY.

4. THIS ROOM IS A CLASS 1 DIV. 1 HAZARDOUS LOCATION.

5. PROVIDE INTERFACE TO DIRECT DIGITAL CONTROL (DDC) FOR SHUT

DOWN OF HVAC EQUIPMENT.

6. TRENCH AND BACKFILL FOR UNDERGROUND AND UNDERFLOOR

CONDUITS.

7. PROVIDE WIREWAY ABOVE DISCONNECTS WITH POWER

DISTRIBUTION BLOCKS FOR TAP CONDUCTORS.

8. REFER TO SINGLE LINE DIAGRAM FOR CONDUIT AND WIRE SIZE.

9. ROUTE CONDUIT AND WIRE INSIDE BUILDING, SHOWN OUTSIDE FOR

CLARITY.

PROPULSION

WORK LEAD

PROPULSION

ELEMENT

W LOCKER

105A

W SHWR

105B

W TOILET

W ALCOVE

102B

M TOILET

MEN LOCKER

103B

M SHWR

103C

COMM

RECYCLE

MECHANICAL

TRAINING / BREAK

CTK PARTS

ENGINE STORAGE

LP4N-104A

SUPPLY

VEST

WASH BAY &

PARTS CLEANING

BEARING AND

INSPECTION

MAINTENANCE

BAY

CIRC

ENGINE MGMT/

CAMS

M ALCOVE

102A

LP4N-102

LP4N-103

LP4NEG-101

ELEC

S2

S11

(3) DS-KARDEX

108"S6

S6

S5

S4

S3

S7

S7

S10S9S8

DS-GEN

WP

2 4 S13

MDP

SCR

PROJ

K1

K2

K3

K4

HD

HD

DS-BRCR

OHD

OHD

OHD

OHD

TO DDC

PD-EX

PD-EX

PD-EX

108"

S15

PS-D2

PS-D2

PS-D2 PS-D2PS-D2

T-223

C-MDP-N

GEN

TO MDP

UE

U

E

UE

UE

C-MDP-OP

CUH-1

P-5

BRCR

EYE

WASH

SHOWER

F-2 P-4

F-3 F-4

F-5

CMPR-FP

F-1

F-1

F-1F-1

F-1

GEN GND

LP4N-101

LP4N-102

6,8,10

K5

LP4N-102

1,3,5

LP4N-102

7,9,11

LP4N-102

13,15,17

LP4N-102

19,21

LP4N-102

23,25,27

LP4N-102

29,31

LP4N-102

40,42

LP4N-103

MDP

LP4N-103

LP4N-103

LP4NEG-101

1,3

4 4

LP4NEG-101

LP4NEG-101

1,3

57 7

LP4NEG-101

5,7,9

LP4NEG-101

14,16

LP4N-103

LP4N-103

NO. 1

NO. 2

NO. 3

NO. 4

LP4NEG-101

11,13,15

21 19

LP4NEG-101

17,19,21

& LP4N-104B

LP4NEG-101

8,10,12

LP4NEG-101

18,20

LP4N-104A

LP4N-104A

3,5,7

LP4N-104B

5,7,9

LP4N-104B

6,8,10

11 13 11

13 13

LP4N-104B

11,13

LP4N-104B

14,16

LP4N-104B

15,17

18 20 18

LP4N-104B

18,20

24222422

LP4N-104B

22,24

LP4N-104B

45,47

LP4N-104B

46,48

LP4N-104B

49,51,53

LP4N-104B

50,52,54

MDP

LP4N-104B

LP4N-104A

16,18

LP4N-104A

26,28,30

LP4N-104A

38,40,42

LP4N-104B

LP4N-104A

13,15

LP4N-104A

23,25,27

LP4N-104A

35,37,39

LP4N-104B

LP4N-104A

9,11

LP4N-104A

17,19,21

LP4N-104A

29,31,33LP4N-104A

2,4

PS-D2

LP4N-104B

LP4N-104A

12,14

LP4N-104A

32,34,36

LP4N-104A

20,22,24

PD-EX

LP4N-104B

LP4N-104A

6,8,10

LP4N-104B

17,19,21

DS S9

/2 E6.01

SEE

SEE

/1 E6.01

BASE BID ITEM #2

54"

LP4NEG-101

XP

LP4N-103

1,3

LP4N-103

A. REFER TO SPECIFICATION SECTION 01 2300 FOR DESCRIPTIONS

OF BID ITEMS AND OPTIONS.

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

I HEREBY CERTIFY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

Signature:

Typed or Printed Name:

Date: Reg. No.:

THIS SQUARE APPEARS 1/2"x1/2" ON

FULL SIZE SHEETS

CLIENT:

DULUTH, MINNESOTA

148th FIGHTER WING

MINNESOTA AIR

NATIONAL GUARD

ADAL BUILDING 223

FOR JEIM

120592 B223 JEIM 14_Central.rvt

COPYRIGHT 2014 BY LHB, INC. ALL RIGHTS RESERVED.

NO DATE ISSUED FOR

NO DATE REVISION

21 W. Superior St., Ste 500 | Duluth, MN 55802 | 218.727.8446

09/09/2014 TYPE B.3 - FINAL SUBMITTAL

C U s e rs

\d js

\D o c u m e n ts

\1

J

E

IM

E C e n tr a l_ e c m a u b a .r v t

/9

/2

:2 :1

P

M

E2.31

WILLIAM S. NICHOLS

4986409/09/2014

ECM

LRH

120592

ELECTRICAL POWER

PLAN

1/8" = 1'-0"1 ELECTRICAL POWER PLAN PLAN NORTH ORDINAL NORTH

1137906933N Polygon

1137906933N Polygon

1137906933N Callout

MDP FOR CRANE POWER

1137906933N Callout

DISCONNECT LOCATION FOR CRANE POWER

MULTIOUTLET ASSEMBLY SCHEDULE

1. PROVIDE ALL FITTINGS NECESSARY FOR A COMPLETE INSTALLATION.

2. INSTALL VERTICALLY ON COMMUNICATIONS RACK. PROVIDE CORD AND PLUG INTO UPS.

3. DISCONNECT AND REMOVE (1) 480Y/277V RECEPTACLE, PROVIDE BLANK COVER PLATE.

SCHEDULE NOTES:

CONTACTOR SCHEDULE

SCHEDULE NOTES:

1. REFER TO EXTERIOR LIGHTING CONTROL DIAGRAM.

2. PROVIDE ON/OFF/AUTO SELECTOR SWITCH IN COVER.

CABLE TRAY SCHEDULE

SCHEDULE NOTES:

1. MATCH MANUFACTURER OF MAIN DISTRIBUTION FRAME EQUIPMENT RACKS.

ENCLOSED SWITCH SCHEDULE

IDENTIFICATION TYPE SIZE POLES FUSE KVA LOAD SERVED NOTES

DS-GEN NFS 200 3 --- 60.0 DTS-MAIN OPT. STANDBY

GROUND BAR SCHEDULE

TYPE DESCRIPTION NOTES

MGB MAIN BUILDING GROUND: 6.35mm (1/4") THICK x 50.80mm (2") WIDE x 1220mm (4'-0")

COPPER GROUND BAR.

GB-W

6mm (1/4") THICK X 50mm (2") WIDE COPPER GROUND BAR WITH 11mm (7/16) HOLES SPACED 762mm (30") ON CENTER, IN LENGTHS INDICATED ON PLANS.

SCHEDULE NOTES:

1. PROVIDE ALL FITTINGS NECESSARY FOR A COMPLETE INSTALLATION.

1TMGB TELECOMMUNICATIONS GROUND BAR: 6.35mm (1/4") THICK x 457.2mm (4") WIDE x 457.2mm (18") LONG COPPER GROUND BAR DRILLED AND TAPPED PER

SPECIFICATIONS.

METER SCHEDULE

A. ALL METERS SHALL REPORT DATA TO FACILITY ENERGY MANAGEMENT SYSTEM. PROVIDE WIRING CONNECTIONS, INSTALL IN CONDUIT/CABLE TRAY

SYSTEM.

GENERAL NOTES

METER IDEN

METER CT

LOCATION PANEL CIRCUITS METERED DESCRIPTION NOTES

FACILITY

POWER

QUALITY

GUTTERS

IN MDP

SERVICE SERVICE POWER QUALITY FOR ALL FACILITY POWER

LIGHTING GUTTERS

IN MDP

LP4N-101 FEEDER TO LP4N-101. ALL FACILITY LIGHTING.

MECHANICAL

EQUIPMENT

GUTTERS

IN MDP

MDP 3: ACCU-1

MECHANICAL EQUIPMENT: HVAC, WATER

HEATER, PUMPS, ETC.GUTTERS

IN MDP

LP4N-103 FEEDER TO LP4N-103

GENERAL

POWER PLUG

& PROCESS

GUTTERS

IN MDP

LP4N-102 FEEDER TO LP4N-102

PLUG AND PROCESS LOADS

GUTTERS

IN MDP

LP4N-104

A & B

LEEDER TO LP4N-104 A & B

GUTTERS

IN MDP

MDP 4: BRIDGE CRANE

GUTTERS

IN MDP

MDP 5: KARDEX MACHINES

ELECTRONIC

EQUIPMENT

GUTTERS

IN MDP

LP4NEG-101 FEEDER TO LP4NEG-101. COMPUTERS AND ELECTRONIC EQUIPMENT

PHOTOVOLTAIC

PRODUCTION

GUTTERS

IN MDP

INVERTER FEEDER TO INVERTER PHOTOVOLTAIC PRODUCTION

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

I HEREBY CERTIFY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

Signature:

Typed or Printed Name:

Date: Reg. No.:

THIS SQUARE APPEARS 1/2"x1/2" ON

FULL SIZE SHEETS

CLIENT:

DULUTH, MINNESOTA

148th FIGHTER WING

MINNESOTA AIR

NATIONAL GUARD

ADAL BUILDING 223

FOR JEIM

120592 B223 JEIM 14_Central.rvt

COPYRIGHT 2014 BY LHB, INC. ALL RIGHTS RESERVED.

NO DATE ISSUED FOR

NO DATE REVISION

21 W. Superior St., Ste 500 | Duluth, MN 55802 | 218.727.8446

09/09/2014 TYPE B.3 - FINAL SUBMITTAL

C U s e rs

\d js

\D o c u m e n ts

\1

J

E

IM

E C e n tr a l_ e c m a u b a .r v t

/9

/2

:2 :2

P

M

E8.03

WILLIAM S. NICHOLS

4986409/09/2014

ECM

LRH

120592

ELECTRICAL SCHEDULES

TYPE DESCRIPTION MANUFACTURER SERIES NOTES

PS-A1 TWO-PIECE SURFACE METAL RACEWAY, 6'-0" LONG, WITH 1

ISOLATED GROUND CIRCUIT, 15A. ISOLATED GROUND

OUTLETS SPACED 6" ON CENTER.

WIREMOLD 2000 SERIES 1, 2

PS-D2 5"X3-1/2" (NOMINAL) SURFACE METAL DIVIDED RACEWAY IN

LENGTHS SHOWN ON PLANS. LOCATE DEVICES AS SHOWN ON

PLANS. WHERE INFORMATION OUTLET AND ELECTRONIC

GRADE POWER RECEPTACLE ARE ASSOCIATED TOGETHER,

INSTALL TOGETHER WITH A SINGLE COVER PLATE. USE

UPPER CHANNEL FOR POWER, LOWER CHANNEL FOR DATA.

WIREMOLD 6000 SERIES,

V-4047-BBZZ

DEVICE PLATE.

PD-EX EXISTING PEDESTAL SALVAGED FROM EXISTING FACILITY: 8"

SQUARE WITH THE FOLLOWING DEVICES:

(1) 120V 5-15R DUPLEX

(1) 120/208V 1Ø L10-30R

(1) 208Y/120V 3Ø L21-30R

(1) 208V 3Ø 15-50R

EXISTING --- 3

TYPE DESCRIPTION WIDTH HEIGHT MANUFACTURER

W4-12 WIRE BASKET CABLE TRAY, GALVANIZED,

DIMENSIONS INDICATED

12" 4" COPE ACROBA

12 200 A 3 200 A 0 VA PROVISION

11 200 A 3 200 A 0 VA PROVISION

10 400 A 3 400 A 158413 VA LP4N-104: GENERAL POWER (PLUG)

9 200 A 3 200 A 31349 VA LP4N-103: HVAC

8 100 A 3 100 A 24500 VA LP4N-102: GENERAL POWER (PLUG)

7 100 A 3 100 A 8533 VA LP4N-101: LIGHTING

6 100 A 3 100 A 29562 VA LP4NEG-101: ELECTRONIC

5 100 A 3 100 A 28684 VA (3) S1 KARDEX

4 100 A 3 60 A 14698 VA BRCR BRIDGE CRANE

3 100 A 3 45 A 7926 VA ACCU-1

2 100 A 2 20 A 0 VA FUTURE PHOTOVOLTAICS

1 100 A 3 30 A 0 VA SPD 1, 2

CKT FRAME POLES TRIP LOAD DESCRIPTION/NAMEPLATE NOTES

SECTION NO. 1

200 A 3 200 A OPTIONAL STANDBY GENERATOR

600 A 1 600 A CKT BREAKER TIE BAR MAIN SERVICE DISCONNECT

FRAME POLES TRIP SPECIAL DESCRIPTION/NAMEPLATE

MAIN DEVICE

BUS AMPS: 800 A SPECIAL:

MAIN DEVICE: 600 AMCB AIC RATING: 22,000 AMPS SYMMETRICAL

LOCATION: VOLTAGE: 208Y/120V.3Ø4W.

DISTRIBUTION PANEL: MDP

GENERAL LIGHTING (LITES): 125% OF CONNECTED LOADS.

RECEPTACLES (RCPT): FIRST 10 kVA AT 100%, REMAINDER AT 50%.

COMPUTER LOADS (COMP): 100% OF CONNECTED LOADS.

MOTOR LOADS (MTR): LARGEST MOTOR AT 125%, REMAINDER AT 100%.

KITCHEN (KTCH): 1st & 2nd-100%, 3rd-90%, 4th-80%, 5th-70%, REMAINDER 65%.

HEATING OR AIR COND (HEAT OR AC): LARGEST TOTAL OF HEAT OR AC.

SHOP LOADS (SHOP): 50% OF CONNECTED LOADS.

SPECIFIC LOADS (SPEC): LARGEST AT 100%, REMAINDER AT 100%.

DEMAND FACTOR DETERMINATION:

CALCULATED AMPERES 849 A 583 A

TOTAL VOLT AMPERES 305771 VA 210040 VA

SHOP 189998 VA 50.00% 94999 VA

HEAT 5712 VA 100.00% 5712 VA

KTCH 12492 VA 93.06% 11625 VA

SPEC 7979 VA 100.00% 7979 VA

MTR 37473 VA 104.57% 39184 VA

COMP 26064 VA 100.00% 26064 VA

LITES 8600 VA 125.00% 10750 VA

RCPT 17453 VA 78.65% 13726 VA

LOAD CLASSIFICATION

CONNECTED

LOAD

DEMAND

FACTOR

ESTIMATED

DEMAND LOAD

ELECTRICAL LOAD ESTIMATE

TRANSFORMER RATING 150 kVA

SIZE FOR 65% OF ESTIMATED DEMAND LOAD 136526 VA

TOTAL DEMAND VOLT AMPERES 210040 VA

BUILDING 223 ENGINE MAINTENANCE 302459 VA

TRANSFORMER CALCULATION

1. PROVIDE CIRCUIT BREAKER AMPACITY PER SPD MANUFACTURER INSTRUCTIONS.

2. LOCATE CIRCUIT BREAKER AT HIGHEST POSITION IN PANEL FOR SPD ABOVE PANEL.

NOTES:

SHOP 189998 VA 50.00% 94999 VA EST. DEMAND... 583 A

HEAT 5712 VA 100.00% 5712 VA CONN. CURRENT: 849 A

KTCH 12492 VA 93.06% 11625 VA EST. DEMAND LOAD: 210040 VA

SPEC 7979 VA 100.00% 7979 VA CONN. LOAD: 305771 VA

MTR 37473 VA 104.57% 39184 VA

COMP 26064 VA 100.00% 26064 VA

LITES 8600 VA 125.00% 10750 VA

RCPT 17453 VA 78.65% 13726 VA

LOAD CLASSIFICATION CONNECTED DEMAND ESTIMATED PANEL TOTALS

MDP BRANCH CIRCUITS 302459 VA

DISTRIBUTION LOAD CONN. LOAD

LOAD SUMMARY

CONT NO

CONT

RATING POLES COIL VOLT TYPE ENCLOSURE CONTROL TYPE

CONTROL

LOCATION SOURCE CIRCUIT NO.

LOAD

DESCRIPTION NOTES

CT1 30 A 4 120 V ELECTRICALLY

HELD

NEMA 1 SURFACE PHOTOCELL &

TIME SWITCH

EXTERIOR &

ROOM 110

LP4N-101 29,31 PERIMETER

LIGHTING

1, 2

CT2 30 A 4 120 V ELECTRICALLY

HELD

NEMA 1 SURFACE PHOTOCELL &

TIME SWITCH

EXTERIOR &

ROOM 110

LP4N-101 33,35 SITE AREA

LIGHTING

1, 2

1137906933N Polygon

File details come from the government source that posted it. Updated .