PR_15T4012_SOW_Vertical_Lift_(2).docx
DOCX document 31 KB Posted
- Attached to
- Verticle Lift Module
- Solicitation number
- W912LM-15-T-4012
About this file
Amending solicitation to include the Scope of Work for Vertical Lift Modules
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PR_15T4012_Vertical_Lift_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
148th Fighter Wing USAF, MN
1. PROJECT DATA:
TITLE: Purchase and Install 3each Vertical Lifts
BUILDING/FACILITY: 148th Fighter Wing USAF, MN
CONSTRUCTION DURATION: 30-45 days
2. GENERAL SCOPE:
The Contractor shall provide all supervision, labor, materials and equipment to purchase and install 3 each Vertical Lifts to support this requirement. The contractor shall install the Vertical Lift Module storage system in Building 222 Duluth, MN. The contractor shall also provide final electrical hookup connections from the system motors to the electrical disconnects.
3. DETAILED REQUIREMENTS (Vertical Lifts):
· Vertical Lift must be of Ergonomic Design
· All units must be able to be installed in an area only accessible by 72” wide by 84” high opening. There is no overhead/hangar door access to the room they will be installed in.
· Vertical Lift must have ergonomic tray positioning and must be fully flexible and can be set by the operator.
· Vertical Lift must have steel inside shutter door supplied that opens and closes automatically when trays are delivered.
· Vertical Lift must have interior access light included.
· Vertical lift will provide maximum adjustability of trays minimal increments to maximize storage space.
· Vertical Lift must have the ability to accept multiple tray weight capacities to maximize storage potential.
· Vertical Lift must have Emergency Bypass system that incorporates both operator protection light and height detection safety features.
· Vertical Lift must have energy saving standby mode which switches all electrical consumers into “sleep” mode when not being used.
· Vertical Lift must have an overload safety system.
· Vertical Lift trays are held in the access opening so that it does not move during product loading or unloading
· Vertical Lift is preferred be toothed Belt Driven with 6 points of contact.
4. OVERALL EQUIPMENT SPECIFICATION:
Vertical Lift Specifications:
· Quantity of Units: 3
· Quantity of Trays: 36 each lift
· Capacity of Trays: Minimum 500 LBS
· Overall Unit Height: Maximum 17’, Minimum 15’ 8”
· Overall Unit Width: 110” (+/- 8”)
· Overall Unit Depth: 120” (+/- 6”)
· Overall Tray Size: 96.” (+/- 4”) x 34” (+/- 2”)
· Minimum Unit Capacity: 130,000 LBS
· Minimum Lifting Speed: 120 ft/min
· Power: 208 Volt/3/PE
5. ANTITERRORISM/OPERATIONS SECURITY/INFORMATION PROTECTION
· Access and General Protection/Security Policy and Procedres: The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
· For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
· AT Level I Training: All contractor employees, to include subcontractor employees, requiring access Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training prior to the entry of DoD Facility. Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the Antiterrorism Representative, TSgt Michael Panula – Michael.r.panula.mil@mail.mil. AT level I Awareness Training is available at the following website: http://jko.jten.mil
END SCOPE OF WORK