EXHIBIT_E_-_Cost_Breakdown_Form.doc
DOC document 89 KB Posted
- Attached to
- Formal Training Unit (FTU) Facility Federal contract opportunity
- Solicitation number
- W912LA-18-R-8004
- Issued by
- Department of the Army National Guard
About this file
Exhibit E Cost Breakdown Form
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0005_to_W912LA-18-R-8004.pdf | ||
| Amendment_0004_to_W912LA-18-R-8004_Combined.pdf | ||
| Amendment_0003_Exhibit_1_Sheet_01E602_Revision_B.PDF | ||
| Amendment_0003_to_W912LA-18-R-8004_Combined.pdf | ||
| Attachment__1_-_Revised_Plan_Sheets.pdf | ||
| Amendment_0002__Exhibit_1_-_Patio_fire_alarm_relocation_7.pdf | ||
| Attachment__2_-_Wage_Determenation_CA180036_07-20-2018.pdf | ||
| Amendment_0002_to_W912LA-18-R-8004_Combined.pdf | ||
| Amendment_0001_to_W912LA-18-R-8004.pdf | ||
| EXHIBIT_B_SUBCONTRACTOR_INFORMATION_AND_CONSENT_FORM.DOC | DOC document | |
| EXHIBIT_C_Reference_Questionnaire_Package.docx | DOCX document | |
| EXHIBIT_A_PERFORMANCE_RELEVANCY_QUESTIONNAIRE.DOC | DOC document | |
| Solicitation_W912LA-18-R-8004_Combined.pdf | ||
| Exhibit_D_Letter_of_Commitment.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construct Formal Training Unit (FTU), RFP NO. W912LA-18-R-8004
EXHIBIT E – COST BREAKDOWN
1. Distribute indirect costs to each applicable item shown on this sheet (i.e., don't load only one item). Show "field" or "job" overhead (non-home office or non-G&A) under "all other."
2. For each work category which is key subcontracted: identify key subcontractors (names and amounts) and amount of any self-performed work. If there is more than one key subcontractor per work category, list each name and subcontract amount, using additional lines, as necessary.
3. For other than key subcontracted work items: list total amount of subcontracts and amount of work to be self-performed, if any.
4. Category totals and sum of all work category totals must match bid item totals.
5. The government reserves the right to obtain additional cost clarification (details), if necessary, to adequately evaluate proposed prices.
6. Prime contractor - please obtain subcontract and material quotes in such a manner as to be able to accurately break out costs into this format.
7. This information can be provided in a Word- or Excel-type document. Offerors shall ensure all information required below is provided and is responsible for the validity of all information regardless of format.
TOTAL OF ALL LINE ITEMS TO INCLUDE OPTIONS
| Work Category |
| Key Subcontractor Name |
(if Applicable)
| Subcontract Cost To Prime |
| Prime |
Self Cost Subtotal Sub & Prime
Job Cost Prime
OH (G&A)
Profit/Bond Total Cost
1. Site Prep
2. Concrete
3. Structural Steel (Incl. steel decking)
4. CMU walls
5. Roofing/Skylights
6. Glass/Glazing/ Storefronts
7. Interior Finishes & Specialty Items (Incl. drywall, ceilings, doors, painting, carpets, flooring, toilet partitions, bathroom accessories, etc.)
7a. Drywall/Interior partitions
7b. Doors
7c. Painting/sealants
7d. Ceiling and treatments
7e. Flooring and treatments
7f. Toilet accessories
8. Plumbing
9. HVAC
10. Instrumentation and Controls for HVAC
11. Fire Protection and Fire Alarms
12. Elec. and other Electrical Systems
13. Communication
14. Commissioning
Elevator
15. All Other Construction (MISC)
Subtotal Base Bid
Options
1. Demolition (B2316)
2. Site Improvements (irrigation, landscaping)
3. Mechanical Wall
4. Sitework paving/parking lot per 00C101, 00C102, 00C108, 00C109, 01E100
5. Sitework parking lot expansion per 00C108, 00C109, 01L104, 01L102, 01L106, 01E100
6. 2nd Floor Patio, Doors, Storefront, Guardrail
Exhibit E
File details come from the government source that posted it.