W912LA-18-Q-9010_Inst_Eqmt_B801_Solicitation_Amendment_1_-_Update_SOW.pdf

PDF 201 KB Posted

Attached to
Install Equipment B801
Solicitation number
W912LA-18-Q-9010
Issued by

About this file

Amendment 1 - Update SOW

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DJCF182638

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate updated SOW dated 14 Sept 2018.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Sep-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912LA18Q9010

X 9B. DATED (SEE ITEM 11)

07-Sep-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Sep-2018

CODE

146 BASE CONTRACTING OFFICE

119 MULCAHEY DRIVE

PORT HUENEME CA 93041-4011

W912LA 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912LA18Q9010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

CLIN 0001

The CLIN extended description has changed from:

Provide all labor, tools, parts, transportation, equipment, materials, supplies,services, permits, insurance, and supervision necessary to "Install Equipment B801" as per Statement of Work Dated 7 June 2018.

To:

Provide all labor, tools, parts, transportation, equipment, materials, supplies,services, permits, insurance, and supervision necessary to "Install Equipment B801" as per Statement of Work Dated 14 Sept 2018.

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

STATEMENT OF WORK

STATEMENT OF WORK

Install Equipment B801

PROJECT NO.: DJCF182638

14 Sept 2018

146TH AIRLIFT WING

CHANNEL ISLANDS AIR NATIONAL GUARD, PORT HUENEME, CA

CALIFORNIA AIR NATIONAL GUARD

TECHNICAL PROVISIONS

TABLE OF CONTENTS:

DESCRIPTION OF SERVICES

SITUS OF WORK

PROJECT SPECIFIC REQUIREMENTS

GENERAL REQUIREMENTS

SUBMITTALS

CLOSEOUT DOCUMENTATION

1. DESCRIPTION OF SERVICES

1.1. Objectives: The purpose of this project is to install six (6) pieces of government furnished equipment

1.2. This statement of work describes contractor requirements for the project titled “Install Equipment B801.” The contractor is responsible to furnish and install all labor and materials to complete the items listed in this Statement of Work. The contractor shall provide the government a complete and usable product at the completion of the project.

All information included in this document, along with the instructions and standards referenced in the document, should be considered as part of the Statement of Work.

2. SITUS OF WORK

2.1. All work will occur at Channel Islands Air National Guard Station, 4146 Naval Air Road Port Hueneme, CA 93041 Facility 801

3. PROJECT SPECIFIC REQUIREMENTS

BASE BID

The contractor shall:

STING RAY WHEEL WASHER

3.1.1. Intercept power from existing electrical panel and Install new 100A 3-Polebreaker.

3.1.2. Run conduit and wire to wire up Stingray Wheel Washer.

3.1.3. Field verify electrical panel loads.

WATER JET

3.1.4. Install conduit and wire from existing panel.

3.1.5. Install new Disconnect and 100A breaker with kit.

3.1.6. Lift and Coring through cinderblock walls at a height of 15’ is required.

3.1.7. Install new water line connection and new compressed air connection.

3.1.8. Field verify electrical panel loads.

SHEER MACHINE

3.1.9. Install new 60A Disconnect and 60A 3-Pole breaker.

3.1.10. Install conduit and wire

3.1.11. Field verify electrical panel loads.

CAVOTEC MACHINE

3.1.12. Install new 60A Disconnect with 3-60A Slow Blow Fuses.

3.1.13. Install conduit and wire.

3.1.14. Lift will be required.

3.1.15. Field verify electrical panel loads.

ZAMBONI MACHINE

3.1.16. Install new 30A 3-Phase 480V Disconnect with 3-20A Slow Blow Fuses.

3.1.17. Install new 20A 3-Phase Twist Lock Female Receptacle.

3.1.18. Field verify electrical panel loads.

LASER ETCHER MACHINE

3.1.19. Install new 15A Twist Lock Female Receptacle.

3.1.20. Install new SqD Bolt on 15A 2-Pole breaker.

3.1.21. Install new conduit and wire.

3.1.22. Field verify electrical panel loads.

3.2. The government must approve materials prior to installation.

3.3. Quantities: Quantities are provided to enhance contractors’ understanding of the magnitude of work required under this bid. Government-provided quantities shall not be used by contractors in establishing pricing. Contractors are responsible for making their own measurements in determining their bids for work under this project.

3.4. Performance Period: The contractor has 120 Days from the NTP to complete all work on the project. The NTP will be issued at the Pre-Construction Conference.

4. GENERAL REQUIREMENTS

4.1. Contractor shall attend a Pre-Construction Conference. The Pre-Construction Conference will generally be scheduled after award. At a minimum, the contractor shall have their project manager and site superintendent attend the meeting. The Contractor shall provide the following documents at the Pre-Construction Conference.

4.1.1. Project Construction Schedule

4.1.2. Contract Schedule of Values

4.1.3. Safety Plan

4.1.4. Quality Control Plan

4.2. The contractor shall provide all tools, materials, equipment, transportation, removal of debris and trash, supervision, and management (except as specified as Government Furnished) necessary to install, test, and repair facility safety items located at Channel Islands Air National Guard Base, Port Hueneme, California.

4.2.1. Any waste of excess material resulting from any contract requirement shall be removed and disposed of by contractor at a proper disposal site off Channel Islands Air National Guard Station. Disposal, discharge, deposit, dumping, spilling, leaking, or placing of any materials, wastes, effluents, trash, garbage, oil, grease, paint, chemicals, etc. If any waste material is dumped in unauthorized areas, the contractor shall remove the material, restore the area to the condition of the adjacent undisturbed site at contractor’s expense.

4.2.2. The contractor shall comply with all Air Force, OSHA, and building codes requirements that are abiding by the Federal government, and State of California.

4.2.3. Any additional work completed by the contractor without approval by the Contracting Officer shall be at the contractor’s expense.

4.2.4. The contractor shall submit material approval form to the contracting officer within 10 days of contract notice to proceed date. No materials shall be ordered without material approval of the contracting officer and the base civil engineer.

4.3. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The government will provide water, sewer and electrical connections. Unsecure outdoor storage area at the base is available and must be requested through the project manager prior to utilizing.

Secured storage is the responsibility of the contractor.

4.4. QUALITY CONTROL. Contractor shall develop and maintain a quality program to ensure work is performed as described in this Statement of Work and in accordance with all local, state and federal rules.

4.5. QUALITY ASSURANCE. The Government will maintain a Quality Assurance Program to ensure work is performed as described in this Statement of Work and in accordance with all local, state, and federal rules. The Project Manager will manage the Government’s QA program.

4.5.1. Periodic inspection of the work in progress will be accomplished by a representative of the government for the purpose of ensuring the contractor is conforming to the requirements of the statement of work as well as verification of conformance with all safety, environmental, and employment regulations, practices and guidelines.

4.5.2. A one hundred percent (100%) inspection of the finished product will be accomplished. This inspection will be a two part inspection consisting of a pre-final and a final inspection walkthrough by the contracting officer, contracting officer representative, safety, environmental, fire department, security, anti-terrorism officer, user, contract manager and a representative of the associated trades to be inspected.

4.5.3. Upon completion of the pre-final inspection, a pre-final inspection report will be prepared by the COR and forwarded to the contractor. All discrepancies noted in the pre-final inspection report must be corrected by the contractor to the satisfaction of the contracting officer within 10 days of receipt of the report.

4.5.4. The contractor will be held accountable for the successful execution of the project in accordance with the contract documents. Failure to meet the requirements of the contract may result in liquidated damages charged to the contractor at a pre-determined rate.

4.6. HOURS OF OPERATION. The hours of work shall be between 6:00 a.m. and 4:00 p.m.

Monday through Friday unless otherwise prescribed by this statement of work. Work shall not be performed on Weekends and Federal Holidays without prior coordination from the Project Manager. NOTE: No work shall commence without prior coordination with the Base Facility Manager and the government project manager. Work within each building shall not commence without prior coordination of the applicable building manger, the contractor, and government project manager.

4.7. The contractor shall schedule and arrange work with each building facility manager at least two (2) working days before beginning work in each building. The contractor shall make every effort to minimize the interference and effect on the government mission.

4.8. PRIOR TO ANY WORK STARTING ON A FACILITY, A MANDATORY WALK

THROUGH SHALL BE SCHEDULED AND ACCOMPLISHED WITH THE

GOVERNMENT PROJECT MANAGER OR CONSTRUCTION INSPECTOR FOR

EXPLANATION AND REQUIREMENTS OF WORK WITHIN EACH BUILDING.

4.9. BASE ACCESS. Base security personnel require that all personnel entering the installation are cleared for access. The contractor will provide first name, last name, driver’s license number and applicable vehicle data for all personnel accessing the base.

The contractor shall submit this information to the Project Manager NLT two working days prior to the date of required access. Personnel must maintain a valid driver’s license, vehicle registration and proof of insurance at all time while on the base.

4.10. MATERIAL SAFETY DATA SHEETS, AND LABELS. The contractor shall maintain a copy of the Environmental Protection Agency or State Registered Labels, plus Material Data Sheets for all paints, primers, solvents, inhibitors, or solutions used in connection with this contract; Material Data Sheets are also required for all hazardous materials defined in federal Standard 313c. Identical back-up copies of these documents shall be given to the Base Safety Officer and the Contracting Officer prior to the start of any work.

4.11. TECHNICAL COMPETENCE AND ABILITY. If requested by the Government, the Contractor shall provide proof of technical competence and experience in the area of expertise required by this Statement of Work. The contractor shall be prepared to submit documents providing proof of successful competence such as training certificate or accreditations from recognized industry leaders. Contractors shall also be prepared to provide proof of successful project experience through references of former clients in related project types.

4.12. DIMENSIONS AND QUANTITY. All dimensions and quantities provided in the Statement of Work are estimates only. They are provided as a courtesy for contractors to estimate the magnitude of work or materials necessary to complete a task. They are not intended to be final measurements. The Contractor is responsible for verifying all dimensions and quantities in the field prior to starting work.

4.13. WARRANTY. The contractor shall guarantee all workmanship and materials covered under this statement of work for a period of no less than 1 year from the date of project acceptance. This contractor’s warranty shall be included with any manufacturer’s warranties that accompany materials or systems installed as part of this statement of work.

4.14. CONTRACTOR MANPOWER REPORTING (CMR). The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Air Force collection site.

The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.

Contractors may direct questions to the help desk at http://www.ecmra.mil/.

Unit Identification Code (UIC) for the Requiring Activity: F8S3CC Issuing Office DoDAAC: W912LA

4.15. CONTRACTOR PAYMENT. Contractor shall submit an application and certificate for payment Every 30 days or at the end of the performance period, whichever comes first.

4.15.1. The payment request shall include the following:

4.15.1.1. Contractor’s application for payment

4.15.1.2. Schedule of values

4.15.1.3. Contract progress report

4.15.1.4. Contract progress schedule

5. SUBMITTALS

5.1. All material approval submittals shall be forwarded to the COR and transmitted with an AF Form 3000. When submitting on a finish, texture or other material characteristic where a photograph is unacceptable, the Contractor shall provide a sample of the material for review and approval along with the product cut-sheet.

5.1.1. Electrical

5.1.1.1. Breakers

5.1.1.2. Wire gauge

6. CLOSEOUT DOCUMENTATION

6.1. 10% Retainage will be released upon receipt of the following items:

6.1.1. Contractor workmanship letter of warranty up to one year.

6.1.2. Certificates of no debts to suppliers and vendors.

6.1.3. Electronic pictures showing the area before and after repair.

6.1.4. Recycling or Landfill proof of disposition document (if available).

(End of Summary of Changes)

File details come from the government source that posted it.