Questions_and_Answers.docx
DOCX document 12 KB Posted
- Attached to
- Repairing Facility Roof Leak
- Solicitation number
- W912L7-17-R-2003
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CE-A203_Roof_Plan.pdf | ||
| CE-A401_Elevations.pdf | ||
| CE-A204_Roof_Details.pdf | ||
| W912L7-17-R-2003,_Repair_Facility_Roof_Leaks.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
1] Specifications 3.5.7 Repairs to these buildings if any are an unknown. Could we be given an allowance or contingency to use for this work?
ANS: We would like for the contractor to just make reference to the areas needing repair with a recommended solution.
2] Specifications 3.5.15 We need a clarification that warranty only applies to work performed and specified and does not include complete roof warranties.
ANS: The warranty only applies to the work accomplished under this contract.
3] Please clarify that replacing missing and re-attaching loose perimeter wall flashing at The Hangars, Buildings 4513, 4455, and 4425 is not part of this project.
ANS: The perimeter flashing Is Not part of this contract, it will be addressed at a later date under another contract.
4] Specifications 3.2 Testing - What testing if any is required?
ANS: There is NO testing required. That statement is a required entry in all PWS.